March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Similar documents
April 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

July 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

September 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Section GT&C, Awarding of Available and Planned Pipeline Capacity, Bid Procedures ( Section ). 2

July 10, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

May 23, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

main. July 6, 2017

Mailing Address: P.O. Box 1642 Houston, TX

March 31, Columbia Gulf Transmission, LLC. 700 Louisiana Street, Suite 700 Houston, TX

March 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

February 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Order No. 587-Y Compliance Filing, Colorado Interstate Gas Company, L.L.C.; Docket No. RP19-

MIDCONTINENT EXPRESS PIPELINE LLC

April 10, Via etariff. Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

April 16, Docket No. ER

Tennessee Gas Pipeline Company, L.L.C. Orion Project Negotiated Rate and Non-Conforming Agreement Filing Docket Nos. RP and CP

June 2, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

March 22, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

December 18, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Kimberly D. Bose, Secretary

Transco submits the amendments for inclusion in Original Volume No. 1A of Transco s FERC Gas Tariff.

PJM Interconnection, L.L.C. and Progress Energy Carolinas, Inc. Docket No. ER

December 19, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

December 1, Columbia Gas Transmission, LLC. 700 Louisiana Street, Suite 700 Houston, TX

November 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

February 12, Notice of Certificate of Concurrence Regarding Agua Caliente Solar LGIA

October 1, PJM Interconnection, L.L.C., Docket No. ER Default Allocation Assessment Clarifying Revisions

April 3, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

A. Zonal Agreements and Termination of the GFA

An etariff XML filing package, filed as a zip (compressed) file, containing:

March 28, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Philis J. Posey, Acting Secretary

December 13, 2004 VIA ELECTRONIC FILING

November 21, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

December 18, Filing of PSP Agreement with Placer County Water Agency

February 26, , NEGOTIATED RATE AGREEMENTS TABLE OF CONTENTS, Version , SourceGas Arkansas, Inc (RS FT), Version 1.0.

May 21, 2010 VIA ELECTRONIC MAIL. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

December 28, Via Electronic Filing

February 1, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

June 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Magalie R.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION STIPULATION AND AGREEMENT

California lndependent System Operator Corporation Docket No. ER Compliance Filing

February 20, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Magalie R. Salas, Secretary

Arizona Public Service Company, Docket No. ER , Agency Agreement

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

August 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

The Atlantic Building 950 F Street, N. W. Washington, DC Fax: Direct Dial:

The North American Electric Reliability Corporation ( NERC ) hereby submits the

November 10,2004. The Honorable Magalie R. Salas Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

November 30, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

OPERATIONAL BALANCING AGREEMENT FORM OF SERVICE AGREEMENT CONTRACT NO.

NorthWestern Energy requests an effective date of March 12, 2016, for the proposed revisions.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

November 9, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

February 12, Southwest Power Pool, Inc., Docket No. ER15- Submission of Interconnection Agreement

FORM OF SERVICE AGREEMENT (APPLICABLE TO ISS RATE SCHEDULE)

PSEG Energy Resources & Trade LLC

MIDCONTINENT EXPRESS PIPELINE LLC

November 12, 2004 VIA ELECTRONIC FILING

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426

January 4, Filing of Service Agreement No Docket No. ER

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Northern Natural Gas Company ) Docket No. RP

SCHIFF HARDIN LLP. January 24, 2011 VIA ELECTRONIC FILING

July 19, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

July 13, FTS Service Agreement No Between Columbia Gas Transmission, LLC and EQT Energy, LLC Dated July 13, 2016

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

July 5, PJM Interconnection, L.L.C., Docket No. ER17- Amendment to Service Agreement No. 4597; Queue No. AB2-048

FORM OF PARK AND LOAN SERVICE AGREEMENT AGREEMENT FOR PARK AND LOAN SERVICE VECTOR PIPELINE L.P.

March 27, Tariff Amendment to Modify Administrative Oversight of the Department of Market Monitoring

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO

THE UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

October 10, FERC Electric Tariff No. 7, Transmission Control Agreement

Governors of the States of Arizona, California, Colorado, Montana, Nevada, New Mexico, Oregon, Utah, Washington and Wyoming, Docket No.

136 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING TARIFF REVISIONS. (Issued July 1, 2011)

July 28, Please do not hesitate to call if you have any questions in regard to the enclosed. Very truly yours, /s/ James William Litsey

August 30, Commission's L.L.C Line CIG. Line Nos. 5A and. Inspector Report. under the 2018.

Colorado PUC E-Filings System

BISON PIPELINE LLC OPERATIONAL BALANCING AGREEMENT (For Use at Point(s) of Interconnection)

August 31, Generator Scheduling Agreement CAISO Service Agreement No Docket No. ER

Jnofflclal FERC-Generated PDF of Received by FERC OSEC 07/08/2005 in Docket#: ER

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

THE BOROUGH OF EAST RUTHERFORD REQUEST FOR QUALIFICATIONS

April 6, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

January 8, Southwest Power Pool, Inc., Docket No. ER15- Submission of Interconnection Agreement

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: September 1, 2011 Service Agreement No.

IS0 CALIFORNIA. February 2,2004

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

California Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.16 Pseudo-Tie Participating Generator Agreement

SCHIFF HARDIN LLP A Limited Liability Partnership Including Professional Corporations

November 7, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

Decision D ATCO Electric Ltd Annual Performance-Based Regulation Rate Adjustment Filing. Costs Award

APPROVAL CA (FIFTH REVISION) ISSUED BY THE COMPETENT AUTHORITY OF THE UNITED STATES EXPIRATION DATE: JULY 31, 2022

May 22, Docket No. ER Amendment to Transmission Interconnection Agreement

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

September 2, FTS Service Agreement No Between Columbia Gas Transmission, LLC and Cabot Oil & Gas Corporation Dated January 2, 2015

California Independent System Operator Corporation. Fifth Replacement Tariff

March 24, Filing of CAISO Rate Schedule No. 89

File No. SR-NASD Revisions to NASD By-Laws Extending Existing Pilot Program for the Regulatory Fee and the Trading Activity Fee

Transcription:

March 25, 2015 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Great Lakes Gas Transmission Company 700 Louisiana Street, Suite 700 Houston, Texas 77002-2700 John A. Roscher Director, Rates & Tariffs tel 832.320.5675 fax 832.320.6675 email John_Roscher@TransCanada.com web www.glgt.com Re: Great Lakes Gas Transmission Limited Partnership Natural Gas Act Pipeline Maps Compliance Filing RP15- -. Dear Ms. Bose: Pursuant to Section 154 of the Federal Energy Regulatory Commission s ( FERC or Commission ) regulations, 1 Great Lakes Gas Transmission Limited Partnership ( Great Lakes ) hereby submits for filing the tariff sections included as Appendix A to be part of its, ( Tariff ). 2 The purpose of this filing is to comply with new FERC regulations regarding interstate natural gas pipeline maps. Great Lakes respectfully requests that the Commission approve the revised tariff sections to become effective June 1, 2015. Correspondence The names, titles and mailing addresses of the persons to whom correspondence and communications concerning this filing should be directed are as follows: 1 18 C.F.R. Part 154 (2015). 2 Specifically, Part 3 Maps; Part 3.1 through Part 3.4 Maps, Reserved for Future Use (collectively, Section 3 ). 1

John A. Roscher * David R. Hammel Director, Rates and Tariffs Senior Legal Counsel * Joan F. Collins Great Lakes Gas Transmission Manager, Tariffs and Compliance Limited Partnership Great Lakes Gas Transmission 700 Louisiana Street, Suite 700 Limited Partnership Houston, Texas 77002-2700 700 Louisiana Street, Suite 700 Tel. (832) 320-5861 Houston, Texas 77002-2700 Fax (832) 320-6861 Tel. (832) 320-5651 E-mail: dave_hammel@transcanada.com Fax (832) 320-6651 E-mail: joan_collins@transcanada.com * Persons designated for official service pursuant to Rule 2010. Statement of the Nature, Reasons, and Basis for Filing On November 20, 2014, in RM14-21-000, the Commission issued Order No. 801, 3 which revised Part 154 of its regulations governing interstate natural gas pipeline system maps, in an effort to reduce the regulatory burden on pipelines and to enhance transparency. Previously, the regulations required that pipelines maintain a system map within their respective tariffs, 4 and specified the content of those maps as well as the deadline for filing updated maps. 5 Order No. 801 eliminated the requirement that pipelines include system maps in their tariffs as well as the requirement that pipelines must file updated maps by April 30 of any year following a major system change. Furthermore, as the Commission retained the requirement that pipelines post and maintain a system map on their Internet websites, Order No. 801 implemented a quarterly requirement for updating such website maps. Specifically, Section 154.103(a) was revised to require that a pipeline s tariff include a tariff section to accommodate a uniform resource locator ( URL ) for the Internet address of its system map. A corresponding change was made to Section 154.106(a) requiring a tariff to state a URL on the pipeline s website. 6 Within Section 154.106(c), the annual April 30 filing requirement for tariff maps was replaced with the requirement that the maps posted on a pipeline s website must be updated for major changes no later than the end of the calendar quarter that immediately follows the calendar 3 Natural Gas Act Pipeline Maps, 149 FERC 61,133 (2014) ( Order No. 801 ). 4 18 C.F.R. Part 154.103(a) - Composition of Tariff ( Section 154.103 ) (2014). 5 18 C.F.R. Part 154.106 - Map ( Section 154.106 ) (2014). 6 Section 154.106(a) states in its entirety, The tariff must state a uniform resource locator on the pipeline s Internet website, at which the general public may display and download the pipeline s system maps. 2

quarter in which the major change occurred. Finally, Order No. 801 stated that pipelines are not required to submit an initial compliance filing until April 1, 2015. 7 In the compliance filing, the pipeline must reference an online map updated at least through December 31, 2014. 8 In the instant filing, Great Lakes is submitting revised Section 3, attached hereto, to reflect the changes required by the Commission in Order No. 801. The maps in Section 3 have been replaced with a URL by which Great Lakes system maps, updated through December 31, 2014, may be displayed or downloaded. Effective Date and Request for Waiver Great Lakes requests that the Commission accept the revised Section 3 included as Appendix A to be effective June 1, 2015. Other Filings That May Affect This Proceeding There are no other filings before the Commission that may significantly affect the changes proposed herein. Material Enclosed In accordance with Section 154.7 of the Commission s regulations, Great Lakes is submitting the following XML filing package, which includes: 1. This transmittal letter; 2. Clean tariff sections (Appendix A); and 3. Marked tariff sections (Appendix B). 7 Pipelines are permitted to update their tariffs and websites as soon as the rule goes into effect, 90 days after the Final Rule s publication; see Federal Register, Volume 79, No. 242 at 75050 (December 17, 2014). 8 Order No. 801 at P17-18. 3

Certificate of Service As required by Sections 154.7(b) and 154.208 of the Commission s regulations, copies of this filing are being served upon all of Great Lakes existing customers and interested state regulatory agencies. A copy of this letter, together with the enclosed tariff sections and other attachments, are available during regular business hours for public inspection at Great Lakes principal place of business. Pursuant to Section 385.2005 and Section 385.2011, the undersigned has read this filing and knows its contents, and the contents are true as stated, to the best of his knowledge and belief. Additionally, the undersigned possesses full power and authority to sign such filing. Any questions regarding this filing may be directed to Joan Collins at (832) 320-5651. Respectfully submitted, GREAT LAKES GAS TRANSMISSION LIMITED PARTNERSHIP BY: GREAT LAKES GAS TRANSMISSION COMPANY, ITS OPERATOR John A. Roscher Director, Rates and Tariffs Enclosures 4

Appendix A Great Lakes Gas Transmission Limited Partnership, Clean Tariff Tariff Section Version 3 Maps v.2.0.0 3.1 Maps, Reserved for Future Use v.4.0.0 3.2 Maps, Reserved for Future Use v.3.0.0 3.3 Maps, Reserved for Future Use v.3.0.0 3.4 Maps, Reserved for Future Use v.3.0.0

Great Lakes Gas Transmission Limited Partnership PART 3 MAPS v.2.0.0 Superseding v.1.0.0 The currently effective system maps are available on Great Lakes' Web Site at http://glgt.com/infopostings/tariff/map/systemmap.htm.

Great Lakes Gas Transmission Limited Partnership PART 3.1 3.1 - Maps Reserved for Future Use v.4.0.0 Superseding v.3.0.0 RESERVED FOR FUTURE USE

Great Lakes Gas Transmission Limited Partnership PART 3.2 3.2 - Maps Reserved for Future Use v.3.0.0 Superseding v.2.0.0 RESERVED FOR FUTURE USE

Great Lakes Gas Transmission Limited Partnership PART 3.3 3.3 - Maps Reserved for Future Use v.3.0.0 Superseding v.2.0.0 RESERVED FOR FUTURE USE

Great Lakes Gas Transmission Limited Partnership PART 3.4 3.4 - Maps Reserved for Future Use v.3.0.0 Superseding v.2.0.0 RESERVED FOR FUTURE USE

Appendix B Great Lakes Gas Transmission Limited Partnership, Marked Tariff Tariff Section Version 3 Maps v.2.0.0 3.1 Maps, Reserved for Future Use v.4.0.0 3.2 Maps, Reserved for Future Use v.3.0.0 3.3 Maps, Reserved for Future Use v.3.0.0 3.4 Maps, Reserved for Future Use v.3.0.0

Great Lakes Gas Transmission Limited Partnership PART 3 MAPS v.2.0.0 Superseding v.1.0.0 The currently effective system maps are available on Great Lakes' Web Site at http://glgt.com/infopostings/tariff/map/systemmap.htm. MAPS

Great Lakes Gas Transmission Limited Partnership PART 3.1 3.1 - Maps Reserved for Future Use v.4.0.0 Superseding v.3.0.0 RESERVED FOR FUTURE USESystem Map

Great Lakes Gas Transmission Limited Partnership PART 3.2 3.2 - Maps Reserved for Future Use v.3.0.0 Superseding v.2.0.0 RESERVED FOR FUTURE USEWestern Zone Map

Great Lakes Gas Transmission Limited Partnership PART 3.3 3.3 - Maps Reserved for Future Use v.3.0.0 Superseding v.2.0.0 RESERVED FOR FUTURE USECentral Zone Map

Great Lakes Gas Transmission Limited Partnership PART 3.4 3.4 - Maps Reserved for Future Use v.3.0.0 Superseding v.2.0.0 RESERVED FOR FUTURE USEEastern Zone Map