November 9, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

Similar documents
November 21, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

July 19, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

August 30, Commission's L.L.C Line CIG. Line Nos. 5A and. Inspector Report. under the 2018.

Order No. 587-Y Compliance Filing, Colorado Interstate Gas Company, L.L.C.; Docket No. RP19-

BILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

THE UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

June 2, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

August 30, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

main. July 6, 2017

Governors of the States of Arizona, California, Colorado, Montana, Nevada, New Mexico, Oregon, Utah, Washington and Wyoming, Docket No.

February 20, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Magalie R. Salas, Secretary

May 23, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

November 12, 2004 VIA ELECTRONIC FILING

March 22, The documents submitted with this filing consist of this letter of transmittal, and all attachments thereto.

September 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

July 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

April 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Section GT&C, Awarding of Available and Planned Pipeline Capacity, Bid Procedures ( Section ). 2

December 13, 2004 VIA ELECTRONIC FILING

MIDCONTINENT EXPRESS PIPELINE LLC

Mailing Address: P.O. Box 1642 Houston, TX

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) )

Transco submits the amendments for inclusion in Original Volume No. 1A of Transco s FERC Gas Tariff.

BOARD OF ELECTIONS IN THE CITY OF NEW YORK

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Case , Document 1-1, 04/21/2017, , Page1 of 2

PJM Interconnection, L.L.C. and Progress Energy Carolinas, Inc. Docket No. ER

March 28, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Philis J. Posey, Acting Secretary

BACKGROUND INFORMATION

December 18, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Kimberly D. Bose, Secretary

8.130, 8.201, 8.235, 8.310, and 8.315, relating to General Applicability and Standards; Definitions;

November 7, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southern California Edison Company ) Docket No.

November 29, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC Dear Ms.

ALABAMA PUBLIC SERVICE COMMISSION ADMINISTRATIVE CODE CHAPTER 770-X-7 GAS PIPELINE SAFETY RULES TABLE OF CONTENTS

Ben Miller dba Miller Enterprises vs. COMMERCE AND INSURANCE

NOV 2 8 2M]9. Sincerely,,

March 27, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. United Water Conservation District Project No.

UNITED STATES DISTRICT COURT MIDDLE DISTRICT OF FLORIDA JACKSONVILLE DIVISION

Tennessee Gas Pipeline Company, L.L.C. Orion Project Negotiated Rate and Non-Conforming Agreement Filing Docket Nos. RP and CP

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO

March 1, 2018 Advice Letter 5250-G

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Northern Natural Gas Company ) Docket No. RP

IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT

There being no corrections, deletions, or additions, the Minutes for the September 19, 2018 meeting of the Board were accepted as presented.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Southwest Power Pool, Inc. ) Docket No. ER

Public Service Commission

IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLORADO

REPUBLICAN RIVER WATER CONSERVATION DISTRICT S RULE 26(a)(1) DISCLOSURES

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 7C Subdivision Plat Vacation 8/25/99

RULES AND REGULATIONS Title 52 PUBLIC UTILITIES

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Berry Petroleum Company ) Docket No. ER _

BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION : : : : : : : : : : : : : : : : : : : : : : : COMMENTS OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

130 FERC 61,051 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING RELIABILITY STANDARD. (Issued January 21, 2010)

As used in this ordinance, unless the context otherwise requires, the following terms shall mean:

DM METRA INDUSTIRES INC. Show Cause Proceeding. Order Approving Settlement Agreement O R D E R N O. 24,190. July 9, 2003

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

API-AGA JOINT COMMITTEE ON OIL AND GAS PIPELINE FIELD WELDING PRACTICES 2018 ANNUAL MEETING MINUTES

ARLINGTON COUNTY CODE. Chapter 55 UNDERGROUND UTILITY PROTECTION

UNITED STATES OF AMERICA BEFORE THE FEDERAL REGULATORY COMMISSION. Seaway Crude Pipeline Company LLC ) Docket No. IS

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF PUBLIC UTILITIES

Title 30: Public Service

December 28, Via Electronic Filing

TUNKHANNOCK BOROUGH WYOMING COUNTY, PENNSYLVANIA

April 10, Via etariff. Hon. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

February 12, Notice of Certificate of Concurrence Regarding Agua Caliente Solar LGIA

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

July 10, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

NERC Notice of Penalty regarding EFS Parlin Holdings LLC FERC Docket No. NP10-_-000

RESOLUTION #OSE-18 EXECUTIVE SESSION

BILL ORDINANCE 10003

EXCAVATION PERMIT Application Packet

Invitation to Bid Commerce Blvd/A1A Intersection Improvements & Signalization NC APPENDIX E ST. JOHNS RIVER WATER MANAGEMENT DISTRICT

June 28, 2012 Advice Letter 4366-G. Subject: Notification of the Creation of New Affiliates and Revision of an Affiliate s Information

76 FR , 2011 WL (F.R.) Page 1 NOTICES DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission

IC Chapter Gas Pipeline Safety

July 28, Please do not hesitate to call if you have any questions in regard to the enclosed. Very truly yours, /s/ James William Litsey

ARENAC COUNTY ORDINANCE SOIL EROSION AND SEDIMENTATION CONTROL

DEFENDANT CITY OF FORT COLLINS ANSWER WITH CROSS-CLAIM

Re: Errata Filing for Joint Submittal of Motion for Leave to Respond and Response to Indicated LSEs Comments, Docket No. ER09-40S-000.

Atlantic Coast Pipeline Certificate Application Filing Notification: Docket Number: CP

NC General Statutes - Chapter 95 Article 7A 1

ORDINANCE NO

Lakeland Regional Sewer District lakelandrsd.com

135 FERC 61,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation

Case 1:16-cv NAM-DJS Document 1 Filed 05/16/16 Page 1 of 33 IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF NEW YORK

PUTNAM COUNTY PUBLIC WORKS DEPARTMENT RIGHT-OF-WAY USE PERMIT APPLICATION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) )

No. IN THE UNITED STATES COURT OF APPEALS FOR THE FOURTH CIRCUIT

CHAPTER XIV WATER AND SEWERS ARTICLE 1. WATER SERVICE

CITY OF WAUCHULA/HARDEE COUNTY INTERLOCAL AGREEMENT FOR RIGHT OF WAY UTILIZATION

ADOPTED REGULATION OF THE STATE ENVIRONMENTAL COMMISSION. LCB File No. R186-18

Town of Nunn Regular Board Meeting January 18, :00 p.m.

161 FERC 61,084 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

CHAPTER IV ADJUDICATION OF PROOFS

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Transcription:

November 9, 2018 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: Colorado Interstate Gas Company, L.L.C. Docket No. CP18-94-000 Commissioners: Colorado Interstate Gas Company, L.L.C. ("CIG") is hereby filing with the Federal Energy Regulatory Commission ( Commission ) in Docket No. CP18-94-000 its Weekly Environmental Inspector Report related to the CIG 2018 Line Nos. 5A and 5B Expansion Project. Description of Proceeding On February 27, 2018, CIG filed a prior notice request, pursuant to Sections 157.205, 157.208(b), and 157.210 of the Federal Energy Regulatory Commission's ("Commission") Regulations under the Natural Gas Act to modify certain existing compression facilities located at the Cheyenne Hub in Weld County, Colorado. The project is referred to as the "" or "Project." On March 9, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60-day comment period to allow for any person or Commission s staff to file motions or notice to intervene and protests. No protests were filed with the time allowed therefore, the Project was deemed authorized on May 9, 2018. Submittal of Environmental Inspector Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, CIG is providing Environmental Inspector Report No. 19 for the period of October 28, 2018 through November 3, 2018.

Federal Energy Regulatory Commission -2- November 9, 2018 Filing Information CIG is e-filing this letter and attachment with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000. A copy of this filing is also being provided to all parties of record. Respectfully submitted, COLORADO INTERSTATE GAS COMPANY L.L.C. By /s/ Francisco Tarin Director, Regulatory Attachment

Colorado Interstate Gas Company, L.L.C. Docket No. CP18 94 00 Reporting Period: 10/28/2018 thru 11/3/2018 Environmental Inspector: Tom Blandi Construction Status: The contractor installed valves and began bolting up the bidirectional manifold. The 24 and 30 inch pipelines were hydrotested and dried. Crews dried the above ground fabrication pipe. Grading: N/A Erosion Control: All erosion controls were inspected and are performing as expected. Work Planned for the Following Reporting Period (011/4/18 11/10/18): Crews will excavate for the final discharge tie in. The contractor will install instrumentation on the bidirectional manifold. The bi directional manifold fabrication will be coated and painted. Correspondence from Federal, State, and Local Agencies Concerning Compliance Issues: No federal, state or local permitting agency has notified CIG of instances of noncompliance. Landowner Complaints: There were no landowner/resident complaints received during the reporting period. Environmental Training: Environmental training was provided to 9 employees during site safety orientation. To date a total of 257 employees have received environmental training.

Colorado Interstate Gas Company, L.L.C. Docket No. CP18 94 000 Bi directional valve installed Prep for drying the 24 inch pipeline

Colorado Interstate Gas Company, L.L.C. Docket No. CP18 94 000 Preparation for 24 inch hydrotest Prep for 30 inch pipeline hydrotest

Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 9 th day of November, 2018. /s/ Francisco Tarin Two North Nevada Avenue Colorado Springs, Colorado 80903 (719) 667-7517