Central African Backbone (CAB) Project Africa Coast to Europe (ACE) Submarine Cable. Abbreviated Resettlement Action Plan

Size: px
Start display at page:

Download "Central African Backbone (CAB) Project Africa Coast to Europe (ACE) Submarine Cable. Abbreviated Resettlement Action Plan"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Government of Sao Tomé and Principe Central African Backbone (CAB) Project Africa Coast to Europe (ACE) Submarine Cable Abbreviated Resettlement Action Plan Final 4 July 2011 Prepared by: Paul Scherzer E&D Consulting Services PO Box 222 Felixton, 3875 South Africa paul@edcs.co.za

2 EXECUTIVE SUMMARY The Government of Sao Tomé and Principe and the Companhia Santomense de Telecomunicaçoes (CST), with assistance from the World Bank, are going to finance the first submarine cable landing for the Republic of Sao Tomé and Principle (STP), the Africa Coast to Europe (ACE) submarine cable. The cable route, beach landing sites and the cable station location have been identified. The objective of this assignment is to undertake a qualitative and quantitative analysis of the environmental and social impacts and/or risks of the project and incorporate these into an Environmental and Social Management Plan (ESMP) and abbreviated Resettlement Action Plan (RAP) for the Construction and Operation phases of the project. Submarine telecommunication cables form the backbone of the global communications network. The proposed cable will extend from Europe (Segment 3) and then onto South Africa (Segment 4) and will connect a number of countries along the west coast of Africa. The main cable segments from Europe and South Africa will be joined in STP s cable station. This cable will provide STP with improved communication infrastructure and will be able to accommodate future ultra-broadband networks. The cable will pass through STP s exclusive economic zone (EEZ) (including the Joint Development Zone shared with Nigeria) and territorial waters before landing at the identified landing area. Parts of the cable connecting Cameroon, Equatorial Guinea and Gabon also fall within STP s EEZ, but do not pass through STP s territorial waters. There will be separate Beach Man-Holes for each segment of the cable, which both land at Praia Meleo and the land-based cables will run under different roads back to the cable station at Sao Gabriel. The size of the proposed cable station has been reduced considerably, from that proposed initially, and the aim is to now primarily renovate an existing building with associated parking and fuel infrastructure constructed alongside the building. The proposed cable station will require an additional 1,922m² of land that is currently being used for agriculture. Most of the farmers who will be impacted upon rely upon this garden as a source of income and some have been farming in this area for 15 years. However, the land is owned by CST and does not belong to the farmers. The proposed cable station will result in a seven individuals losing access to land, only one of which does not rely upon this area as a source of income. One of the farmers is likely to loose approximately 70% of the land which he cultivates, another will loose approximately 50%, whilst the others will loose various smaller fractions. The fact that many of these farmers have a relatively low level of formal education will make it difficult for them to easily replace the lost income. These households could be further impoverished with the loss of access to this land and best practise requires that these households be compensated for their loss and assisted where possible to restore their income earning capacity. As alternative land within the city in close proximity to the households is not available, it has been proposed that compensation be provided to cover short-term losses of income as well as a provision be made to assist and support these households in replacing lost income through improved skills or other income-generating assets of their choice. The GoSTP and CST have formed a company, STP Cabo, to implement and operate the cable station and associated infrastructure on the island. CST will be responsible for the payment of all compensation amounts. CST will also hold the funds allocated for skills compensation and release I

3 these upon instruction from the third party. It is recommended that a third party, such as STP Cabo, be made responsible for agreeing and confirming with the individual farmer on the livelihood support opportunity identified. STP Cabo will then instruct CST to release the funds to the relevant service provider. Section 7 outlines the outlines a grievance procedure for those individuals or groups that feel they may not have been treated fairly in terms of the compensation calculations. Section 8 includes the budget and implementation schedule whilst Section 9 outlines the monitoring requirements. II

4 TABLE OF CONTENTS EXECUTIVE SUMMARY...I TABLE OF CONTENTS...III FIGURES...IV PLATES...IV TABLES...IV 1. INTRODUCTION PROJECT DESCRIPTION ACE Cable Project s Influence Area in STP Marine environment Terrestrial environment LEGAL FRAMEWORK Relevant STP Legislation Constitution Law on the Management of State Land Property (Law no. 3/91) World Bank requirements Concordance between World Bank and STP requirements DESCRIPTION OF THE SOCIAL IMPACTS APPROACH AND CALCULATIONS Focus Group Meeting Field measurement Questionnaire Calculation of direct loss Estimation of compensation and livelihood support/restoration IMPLEMENTATION GRIEVANCE PROCEDURE BUDGET AND IMPLEMENTATION MONITORING...15 APPENDIX 1: PAP DATA SHEETS...16 APPENDIX 2: MINUTES OF THE MEETING WITH PAPS...23 III

5 FIGURES Figure 1: Route of the ACE Cable Project...2 Figure 2: Proposed Cable Station Layout...5 Figure 3: Outline of the proposed grievance mechanism...14 PLATES Plate 1: Praia Meleo BMH Plate 2: BMH 1 completed...4 Plate 3: Landing area for BMH Plate 4: Location of BMH 2 at Praia Meleo...4 Plate 5: Landing area for BMH Plate 6: Cable being placed under the road...4 Plate 7: Old building to be renovated and road under which cables will run...5 Plate 8: Back of building and vegetables behind it...5 Plate 9: Vegetable cultivation...8 Plate 10: Vegetable cultivation...8 Plate 11: Water channels...9 Plate 12: Irrigation pump...9 TABLES Table 1: Concordance between World Bank and STP requirements...7 Table 2: Compensation cost breakdown...15 IV

6 1. INTRODUCTION The Government of Sao Tomé and Principe (GoSTP) and the Companhia Santomense de Telecomunicaçoes (CST) are going to finance the Africa Coast to Europe submarine cable (ACE). The World Bank is providing financing to support the linking of the ACE cable to the Republic of Sao Tomé and Principe (STP). This cable will be the first international submarine cable to land in STP. The cable route, beach landing sites and the cable station location have been identified. During the initial phases of the project an Environmental and Social Management Framework (ESMF) and Resettlement Policy Framework (RPF) were prepared which provided an overview of the natural and social environment and potential impacts to inform and guide the ongoing project design and planning process. The objective of this assignment is to undertake a qualitative and quantitative analysis of the environmental and social impacts and/or risks of the project and incorporate these into an Environmental and Social Management Plan (ESMP) and abbreviated Resettlement Action Plan (RAP) for the Construction and Operation phases of the project. Due to the small nature of the resettlement and compensation required, this document has been prepared as an abbreviated Resettlement Action Plan (RAP) outlining the procedures undertaken, the Project Affected Persons (PAPs) and households affected and the compensation proposed. 2. PROJECT DESCRIPTION 2.1 ACE Cable Submarine cables have become key facilitators of modern life. Telecommunication cables form the backbone of the global communications network. Fibre optic cables transmit voice and data traffic with higher reliability and security at a cheaper rate than satellite ( In its planned configuration the ACE cable will be 17,000km long and will run from France to South Africa (Figure 1). However, the project is being constructed and financed in phases. Segments 1, 2 and 3 of the ACE cable are expected to be operational in the first half of These segments will connect France, Portugal, Morocco, Tenerife, Nouakchott, Senegal, The Gambia, Guinea, Sierra Leone, Liberia, Ivory Coast, Ghana, Benin, Nigeria, Cameroon, Equatorial Guinea, Gabon and Sao Tomè. Segment 4 will connect Sao Tomè, the Democratic Republic of the Congo, Angola, Namibia and end in South Africa. The countries involved and timeframes for Segment 4 are still being finalised. The main cable (Segments 3 and 4) will land in Sao Tomé and be connected in STP s cable station. To reduce the risk of a single incident, such as a ship dragging its anchor, breaking the two cables, CST proposes to land Segments 3 and 4 at different Beach Man-holes (BMH) 1 and use different terrestrial cable routes back to the cable station. 1 The BMH is the first manhole on land where the marine portion of the cable is connected to the land-based cable. The BMH is never on the beach itself but is rather usually set back from the beach at a practical location. 1

7 Figure 1: Route of the ACE Cable Project In order to reduce the risk of cable damage from fishing activities, anchoring or offshore petroleum activities, the cable will be buried wherever possible in water depths of less than 1,000m. Cable burial is achieved with the use of a specially designed sea plough or remotely operated vehicle that trenches and buries the cable. Cable burial is not possible at all areas on the continental shelf of Sao Tomé as this depends on the composition and thickness of the sediment layer. 2.2 Project s Influence Area in STP Marine environment During preparation of the ESMF it was decided that the extent of this project in STP would be to the seaward limit of STP's Exclusive Economic Zone and that for the purposes of subsequent environmental assessment work regarding benthic habitat and ecology, the Cable Route Survey will provide this analysis between the outer limit of the EEZ and the 50 m isobath. 2

8 Between the 50 m isobath and the shoreline, the Cable Route Survey will provide environmental baseline information regarding benthic habitat and ecology, augmented as deemed necessary by other sources of information. From Europe the main cable will run through STP s Joint Development Zone, exclusive economic zone (EEZ) and territorial waters. The Joint Development Zone is an area where STP and Nigeria s EEZ s overlap and economic proceeds from this portion of the ocean are shared between the two countries. Parts of the cable connecting Cameroon, Equatorial Guinea and Gabon also fall within STP s EEZ, but do not pass through STP s territorial waters. It has not been possible to obtain updated modern maps that illustrate this area of influence Terrestrial environment Upon landing, the terrestrial infrastructure will include two Beach Man-Holes, terrestrial land cables and the construction of a cable station. At the time of writing, construction had just commenced on the construction of the first BMH (BHM 1) at a new location at Praia Meleo (0 18'38.42"N, 6 44'52.72"E) (Plates 1 and 2). The second cable will in the future also land at Praia Meleo but slightly further south (0 18'25.37"N 6 44'52.87"E) (Plates 3 and 4) (BMH 2). Both BMHs are located adjacent to the road not to distant from the beach. Each BMH will be approximately 9m² and will be 3m deep. Access to the BMH will be through a man-hole placed level with the ground. The terrestrial cable ducts will be placed under the existing tarred road surfaces from the BMH back to the cable station. Man-holes, approximately 1m deep will be positioned at various points along the road to allow the cable to be pulled through the ducts. Plate 6 illustrates similar cable work being undertaken during the site visit. 3

9 Plate 1: Praia Meleo BMH 1 Plate 2: BMH 1 completed Plate 3: Landing area for BMH 2 Plate 4: Location of BMH 2 at Praia Meleo Plate 5: Landing area for BMH 2 Plate 6: Cable being placed under the road 4

10 The proposed cable station site is located at Sao Gabriel ( N E). During the preparation of the ESMF the construction of a new cable station building at Sao Gabriel approximately 1,400m² on a 0.5 ha plot was proposed. However, now due to timeframes, CST is proposing to rehabilitate and upgrade an old building at Sao Gabriel for the European cable segment with extensions to the building made for the cable from South Africa. This proposal will still require some of the land currently being used for urban farming, for parking and associated fuel infrastructure, but the area of influence has been significantly reduced (Figure 2 and Plates 7 and 8). Figure 2: Proposed Cable Station Layout Key Initial size Currently proposed size Plate 7: Old building to be renovated and road under which cables will run Plate 8: Back of building and vegetables behind it 5

11 3. LEGAL FRAMEWORK 3.1 Relevant STP Legislation Constitution The Constitution is the overarching legislation of STP and Article 48 grants all citizens a right to housing and a humane living environment. It also grants everyone the right and duty to defend these rights. Under the Constitution all laws on the environment permit citizens to access natural resources and use them for sustainable economic and social development, contributing to the acquisition of financial means to combat poverty, to preserve biodiversity and protect biological resources Law on the Management of State Land Property (Law no. 3/91) This law defines the framework for matters related to state owned land. It defines the basis for identifying public and private property of the state. It also defines the basis for private use of State land such as the distribution for investment purposes. However, it could not be identified whether this law or others have any legal requirements with regard to expropriation or compensation arrangements in the event of expropriation. 3.2 World Bank requirements The World Bank Operational Policy (OP) 4.12 is seen as the standard set of resettlement guidelines internationally. The fundamental objective of resettlement planning, as encapsulated in OP 4.12 is to avoid or minimize resettlement whenever feasible. When resettlement is unavoidable the policy requires that resettlement is undertaken as part of a sustainable development program that assists displaced persons in their efforts to improve their livelihoods and standards of living or at least to restore them. If incomes are adversely affected, adequate investment is required to give the persons displaced by the project the opportunity to at least restore their income. The resettlement and compensation activities are to be carried out in a manner that provides sufficient opportunity for the people affected to participate in the planning and implementation of the operation. The policy covers direct economic and social impacts that are caused by the involuntary taking of land (including crops or improvements on the land) resulting in a relocation or loss of shelter, a loss of assets or access to assets, or a loss of income sources or means of livelihood. Importantly, the implementation of resettlement activities must be linked to the implementation of the investment component of the project to ensure that displacement or restriction of access does not occur before the necessary measures for resettlement are in place. Thus, compensation or provision of other assistance needs to be provided prior to the displacement of those affected. In addition, preference should be given to land based resettlement strategies for displaced persons whose livelihoods are land-based. 6

12 3.3 Concordance between World Bank and STP requirements The following table provides a summary of concordance between the STP legislation reviewed and the requirements of the World Bank OP The higher of the two standards must be followed. Table 1: Concordance between World Bank and STP requirements Category of PAPs/Type of Lost Assets PAPs who are land and asset owners with formal legal rights to land or claims on the land/assets that are recognised under the National Laws. PAPs who will be displaced from land for which they have no recognisable legal right or claim to occupy STP law World Bank OP 4.12 Measures to address gaps Grants citizens the right to own property and assets. No legal requirement for expropriation and compensation arrangements were identified, but private property is expected to be protected by law. No entitlement to compensation or assistance was identified in terms of National Laws. Recommends land for land compensation and replacement of assets at full replacement cost. Recommends that assistance is provided for the relocation process i.e. transport or transport costs. Offer support after displacement for a transitional period based on the reasonable estimate of time likely to be needed to restore livelihoods and standards of living. Provided with development assistance in addition to compensation measures required. Recommends that resettlement assistance be provided in lieu of compensation for the land they occupy. This resettlement assistance may consist of land, other assets, cash, employment etc. as appropriate in order to achieve the objectives of the policy i.e. that displaced persons be assisted in their efforts to improve or at least restore their livelihoods and standard of living. Follow the World Bank OP 4.12 principles and procedures for determining the value of assets, land and livelihoods affected and required replacement values and assistance. Follow the World Bank OP 4.12 principles and procedures. 7

13 4. DESCRIPTION OF THE SOCIAL IMPACTS The proposed cable station site is located within the city of Sao Tomé in the suburb Sao Gabriel. CST owns the land which has an existing building. The cable station will use and renovate the existing building and will extend the existing footprint in order to add a small access driveway, a fuel storage area, space for generators and minor extensions to the building. The area to be developed will require approximately 1,922m² of land that is currently being used for agriculture. There are seven farmers that will be impacted upon and will loose a portion of the land they cultivate. Apart from one of the plot holders who is a medical specialist, the highest level of education amongst the others is Grade 7. Most claim to have been farming in this garden area for the last 15 years and rely upon it as a source of income. The main crops being grown are cabbage, onions, green peppers and sweet potatoes (Plates 9 and 10). Some lettuce, carrots and cassava are also grown. Most of the farmers are producing primarily to sell at the market rather than for home consumption. Irrigation water is channelled off from the storm water drain alongside the road into the garden from where it runs into a network of small pools created throughout the garden area (Plate 11). There is an area on the eastern side of the building that is planted to sweet potatoes and bananas. This was planted by an employee of CST primarily to prevent the area being used as a dumping ground. None of the farmers have formal permission to use the land, but it appears to have been a mutually beneficial arrangement where the farmers have an area to cultivate whilst CST has its vacant land protected from home construction and/or dumping. One small farmer owner has a pump and a hosepipe which he uses to irrigate. Other farmers just use watering cans (Plate 12). No fixed infrastructure improvements or dwellings were identified on the part of land to be lost, although there are a few temporary shade and tool sheds outside of the footprint of the proposed cable station. Plate 9: Vegetable cultivation Plate 10: Vegetable cultivation 8

14 GOVERNMENT OF SAO TOMÉ AND PRINCIPE Plate 11: Water channels Plate 12: Irrigation pump Although none of the farmers, apart from the medical specialist, will loose all of the land they cultivate, they will loose access to a resource that has provided them with income, in some cases for up to 15 years. One of the farmers is likely to loose approximately 70% of the land which he cultivates, another will loose approximately 50%, whilst the others will loose various smaller fractions. The fact that many of these farmers have a relatively low level of formal education will make it difficult for them to easily replace the lost income. One of the fundamental risks of resettlement or displacement, regardless of the legality of the landownership, is that landlessness can often lead to impacts such as food insecurity, homelessness or education losses with affected households becoming further impoverished. Although the number of affected farmers is few and the overall impact small, the potential impact upon individual households could be of medium to high significance over the long-term. Best Practice implies that Project Affected Persons (PAPs) should be compensated for the loss of assets or crops and that efforts are made to ensure that the income earning capacity of PAPs is restored or at least sustained. Available land in STP is relatively scarce and it has apparently been difficult to find alternative land for rural inhabitants which in the past have needed to be resettled. Thus, the option of finding vacant available land in close proximity to the places where these farmers reside in the City is not feasible. It is likely that alternative plots of land may be rented or loaned from others either in the same area or elsewhere to replace this lost income and such arrangements already seem to occur on an informal basis. Thus, in order to prevent any immediate or long-term impoverishment it is proposed that compensation is provided to cover short-term losses of income and provision be made to assist and support PAPs in replacing lost income through improved skills or other income-generating assets. 9

15 5. APPROACH AND CALCULATIONS The following steps were undertaken in order to assess and quantify the social impact, loss and compensation recommended. 5.1 Focus Group Meeting A group meeting was held on 1 June 2011 with the affected farmers and other non-affected farmers. During this meeting the procedures for measuring the fields, the completion of questionnaires and compensation process was explained. It was highlighted that the proposed cable station site had been reduced significantly from what had been proposed initially and that this had already reduced the potential impact and loss to the farmers. The process of measurement and calculation to be undertaken was explained as well as the follow up work. The grievance procedure was outlined. At this meeting it was highlighted that the cut off date for compensation would be the 1 June 2011 and that any planting after this date on the affected land would be at the farmers own risk. 5.2 Field measurement The engineers from CST, working from a plan of the proposed cable station, marked out on the ground the extent of the new property. The ESMP team including Mr Teodorico Campos from Federação Nacional dos Pequenos Agricultores de São Tomé e Príncipe (FENAPA), then marked out and identified the fields to be lost. In order to ensure measurements were in favour of the farmers all the boundary lines were extended by a further 5 m on each side of the project site to take into account possible edge impacts during construction. The farmers responsible for each plot then identified the boundaries of their plots that would be affected. This was undertaken in the presence of the ESMP team, the small holder farmer specialist, and conjunction with the neighbouring plot holders. Thus, there was no double counting of land and no disputes over the boundary lines for each plot. Each plot holder then assisted the ESMP team to measure their plot to calculate the square meters to be lost. Photographs of each plot were taken for record purposes. 5.3 Questionnaire Individual interviews were then held with each household to obtain data on their household, education level, income sources and other aspects of their livelihood. The extent of the other areas they cultivated in relation to that which is going to be lost was visually quantified and general observations were recorded. The relevant data on each affected household and the land to be lost is contained in Appendix 1. 10

16 5.4 Calculation of direct loss The calculation of direct loss and livelihood support was undertaken by using an average of the main crops being grown. Crops being grown were onions, cabbage, sweet potatoes, cassava and green peppers. The calculated loss for a once-off crop loss was estimated using general yields likely for these crops, assuming that two crops per year would be grown and using the average price for these vegetables as seen on the market over the past year. The calculations for estimated direct losses, annual income and livelihood restoration were made based on these yield and price data. 5.5 Estimation of compensation and livelihood support/restoration Economic displacement and disruption of livelihoods is often an invisible impact of resettlement. In essence, resettlement may lead to the disruption of income-earning capacity or livelihood strategies such as subsistence farming. Often the restoration of income streams and livelihoods lost during the resettlement is difficult to value and thus often overlooked. The overarching aim of any initiative is to ensure that the affected people s livelihoods and living standards are restored as closely as possible or they are better-off than they were prior to resettlement. In order to achieve this the following compensation procedures have been proposed: Direct crop loss compensation. Compensation should be paid for the average loss of income from standing crops. This has been calculated as an average of the crops being cultivated and as if the area to be lost was fully planted. Some of the farmers still have crops on their lands and these can be harvested. Some of the farmers ceased planting earlier in 2011 after being informed of the proposed project. Thus, all farmers should be compensated for direct costs incurred or income opportunities lost. Income-support. In order to ensure that families are not impoverished between the time when access to the land is no longer possible but income streams from other livelihoods strategies have not yet commenced, it is proposed that the annual income potential from these plots be paid to the PAPs in two instalments, six months and one year after displacement respectively. Livelihood restoration. All of the farmers still have a small amount of remaining land within this garden and most households also have some form of other income sources as well. As the option of locating to alternative vacant land in close proximity is not feasible, it is proposed that two years of potential income from these plots be placed in a managed fund for each PAP s household. The funds in this account should go towards skills training or equipment purchase that will allow the PAP or member s of their household to restore the lost income through a similar or alternative occupation. These funds must not be provided in cash to the PAP s but should only be released, directly to the service provider, after evaluation of the livelihood proposal made by the PAP. Specific examples recommended include: 11

17 Intensive agricultural or horticultural training by one of the local or international NGOs dealing with such training that focuses on more intensive cultivation or speciality crops for urban environments. Tools required to further opportunities in existing alternative income options. Education or skills training linked specifically to new employment opportunity within the City. As each household has different requirements and potential skills, it is recommended that the identification of these opportunities should be made at the discretion of the household with support provided by FENAPA or a representative from STP Cabo or the Agência Fiduciária de Administração de Projecto, where required. This will provide an element of choice and alternative option for each household to explore and encourage them to actively participate and consider new income sources. All farmers apart, from the medical specialist who has stable employment, qualify for the income-support and livelihood restoration assistance. The medical specialist only qualifies for direct compensation of crops lost. 6. IMPLEMENTATION The GoSTP and CST have formed a company, STP Cabo, to implement and operate the cable station and associated infrastructure on the island. The various institutions involved in the compensation procedures of this project are as follows. CST will be responsible for the payment of all compensation amounts. CST will also hold the funds allocated for skills compensation and release these upon instruction from the third party. It is recommended that a third party, such as STP Cabo, be made responsible for agreeing and confirming with the individual farmer on the livelihood support opportunity identified. STP Cabo will then instruct CST to release the funds to the relevant service provider. 12

18 7. GRIEVANCE PROCEDURE It is important that an adequate grievance procedure be defined to ensure that individuals or groups who feel that they have been treated inadequately or unfairly, can resolve their issues. Providing credible and accessible means for affected persons to pursue grievances allows the project to address genuine issues in a timely manner and decreases the chances of ongoing complaints and objections from disgruntled stakeholders. Due to the relatively small nature of this project, the following grievance mechanism has been proposed (Figure 3). Step 1: The grievance is provided in writing to the farmer s elected representative. If the grievance cannot be resolved at this stage amongst the farmers themselves then the grievance is taken to Step 2. Step 2: The grievance is considered by a Grievance committee consisting of: A representative from Administrador da AGER. A representative from STP Cabo. The farmer s elected representative. The Grievance committee must provide a response to the individual farmer within a period of 15 days. If after this process a solution still cannot be found and the complaint still feels that their grievances have not been addressed, as a last resort, they have the right to approach a court of law. 13

19 Figure 3: Outline of the proposed grievance mechanism Affected party declares a grievance. Farmer s elected representative hears and rules on grievance. Resolved No further action required Not Resolved Grievance considered by Grievance Committee Resolved No further action required Not Resolved Affected party may seek legal action if grievance is still not resolved. 14

20 8. BUDGET AND IMPLEMENTATION The total cost of compensation, support and livelihood restoration is as follows: Table 2: Compensation cost breakdown Item/Task Cost (Dobras) Direct crop loss compensation 87,143,480 Income-support 64,246,053 Livelihood restoration 116,525,360 TOTAL 267,914,893 The implementation schedule will be as follows: Direct crop loss compensation - July Income-support 50% in January 2012 and 50% in July Livelihood restoration as farmers identify opportunities that suit their personal requirements and interests. A monitoring/final audit budget of 17,000,000 Dobras ($1,000) is recommended to make provision for a local independent party to undertake the final monitoring audit. 9. MONITORING The Directorate of Environment has been involved in the project and is part of the Government Commission established to oversee the implementation of the project. This Directorate should be responsible for monitoring the implementation of the project and that proposed compensation mitigation measures are implemented. An independent consultancy, research institution or NGO, preferably based on the island, should be appointed to undertake an annual audit of the training undertaken and the impact upon the livelihoods of the households for two years after displacement. This audit should make recommendations where applicable if the intended results of livelihood restoration are not being achieved. 15

21 APPENDIX 1: PAP DATA SHEETS The following seven PAPs will be affected. 1. Jose Lopes Valdemiro Area to be lost: 400 m² Sex Male Age 46 Education Grade 6 Contact number Dwelling lives within 5 minutes walk of the garden Family members living at household Education Relation Age Level Details Wife 46 Grade 4 does not work, sometimes sells at the market Daughter 19 Grade 11 Daughter 13 Grade 6 Son 6 Grade 1 Niece 25 Grade 10 does not work Niece s baby 3 He has two children overseas, one in Portugal at High School, one at Cape Verde studying agriculture at university. He pays for them both. Lives in a wooden house that he built, grows nothing at home by has fruit trees and some herbs. Assets include his house, a car, TV, Radio, fridge Only income is from this garden which he has been cultivating for years. He has always lived in the city and his parents did agriculture before him. He felt his loss would be great as it was the best area for onions and will try to adapt. He estimated his income from the garden was approximately per annum. He owns a pump and irrigates with a hosepipe his garden and employs people to help him. He will loose approximately 15% of what he has in total. 16

22 2. Erlander de Gloria Area to be lost: 298 m² Sex Male Age 31 Education Grade 3 Contact number Dwelling lives 10 minutes cycle away from the garden Family members living at household Education Relation Age Level Details Wife 21 Grade 4 Wife sells at the market Son 5 Kindergarden Son 2 Kindergarden Sister in law 18 Grade 8 Owns a wooden house that he lives in. Assets include his house and a bike. Has electricity at house, but no TV, and uses a borrowed fridge, cooks on a petrol stove His income is from this garden, he has three separate sections he cultivates, the other areas are bigger than what he will loose. His wife sells at the market. He was not cultivating the part he would loose as he was delayed by the project. He is brother to PAP no. 3. The plot to be lost has some sweet potatoes, not well maintained at the moment, most probably because he felt he was going to loose it. 17

23 3. Edgar de Gloria Area to be lost: 187 m² Sex Male Age 33 Education Grade 5 Lost Contact number phone Dwelling lives 10 minutes cycle away from the garden Family members living at household Education Relation Age Level Details Wife 25 Grade 4 Wife sells at the market Daughter 7 Grade 3 Daughter 5 Brother in law 18 Grade 4 He has a motor taxi He owns his wooden house which he is building Assets include his house and a TV His main income is from this garden, but he stopped after CST came to him. He has another small piece of garden in another area which is not affected. His wife does make some money and he contributes from the garden. His brother in law apparently makes about 500 per year, and he makes about $ per year from the garden. He has been gardening for about 15 years and since CST spoke to him, he has been working for others on their plots. A friend gave him another portion to use. He will loose about 70% of his plot in this part of the garden. His plot was not planted and very dry at the time of the interview. 18

24 4. Argentina Aragao Espirito Santo Area to be lost: 210 m² Sex Female Age 39 Education Grade 6 Contact number Dwelling lives 500 m away from the garden Family members living at household Education Relation Age Level Details Husband 60 Grade 4 Works as a carpenter Daughter 10 Grade 4 Daughter 5 Kindergarden Daughter 2 Kindergarden Son 16 Grade 6 Son 12 Grade 6 Son 7 Grade 2 Own their wooden house Do not have electricity but have applied for it and are waiting to be connected. A cousin as a plot in another part of the garden. Source of income are the garden, selling in the market and husband carpentry Has farmed in this garden since a child and this is her only area. She will loose about 30% of the area she cultivates. 19

25 5. Delson Cumprido Fereira dos Reis Area to be lost: 529 m² Sex Male Age 30 Education Grade 7 Contact number Dwelling lives 15 minutes away by motor bike Family members living at household Education Relation Age Level Wife 27 Grade 5 Daughter 7 Grade 3 Son 4 Kindergarden Daughter 1 Details He rents the wooden house where he lives. Assets include his motorbike and TV. Walks to the garden when he does not have petrol. His only income is from the garden and his wife does not work. He has worked in the garden for about 15 years and never done any other work. Estimated he made about $ per year. He will loose about 50% of the area he is cultivating. 20

26 6. Deodato Xavier dias costa Neto Area to be lost: 179 m² Sex Male Age 30 Education Medical Specialist Contact number Dwelling lives 500m away Family members living at household Education Relation Age Level Son 12 Grade 7 Son 11 Grade 6 Son 9 Grade 4 Son 6 Grade 1 Step-daughter 14 Grade 9 Housemaid 57 Grade 9 Details He owns his brick and wooden house. His wife is deceased. He is a specialist in Tropical Public Health and has worked for the Ministry of Health for the last 21 years. He claims to have farmed this plot since 2006 and pays someone to cultivate for him. He was growing cassva, sugar cane, sweet potato and Elephant's ear also known as taro or macabo (Colocasia esculenta). He grew vegetables for home consumption as it was cheaper than buying in the market. At home at bananas and a little sugar cane. He will loose the whole area of what he cultivates. 21

27 7. Edmilton Adelino Fereira dos Reis Area to be lost: 119 m² Sex Male Age 27 Education Grade 5 Contact number Dwelling lives 30 minutes away from garden Family members living at household Education Relation Age Level Wife 24 Grade 7 Child 1 Details He lives alone in brothers house. Wife lives in another house that she rents. He helps provide wife and child with food as well as his grandmother. Estimated his annual income was about $1 700 Earns some money from the garden, some from construction doing tiling. He rented tiling tools when required. He stopped cultivating a few months previously after CST came to tell him of the project. He cultivates two areas and will loose the smallest of them and also gets income from construction work but this is not regular. 22

28 APPENDIX 2: MINUTES OF THE MEETING WITH PAPS Central African Backbone (CAB) Project Africa Coast to Europe (ACE) Submarine Cable Abbreviated Resettlement Action Plan Meeting: Compensation discussions with PAPs Date: 30 June 2011 Time: 9h00 Venue: Sao Gabriel Attendance: Minutes No Name Organisation 1 Wilson TenJua CST 2 José Diogo STP Cabo 3 P Scherzer E&D Consulting Services 4 Bastien Loloum Translator No Name Farmer 1 Delson Fereira dos Reis Morador de S. Gabriel 2 Jose Lopes Valdemiro Morador de S. Gabriel 3 Edimilton dos Reis Morador de S. Gabriel 4 Erlander da Gloria Morador de S. Gabriel 5 Deodato Xavier dias costa Neto Morador de S. Gabriel 6 Edgar da Gloria Morador de S. Gabriel 7 Argentina Aragao Espirito Santo Morador de S. Gabriel 1. Welcome Mr Scherzer welcomed the PAPs and thanked the others for waiting whilst those still needing to arrive had been called. Introductions were made although most participants had previously met. 2. Progress update Mr Scherzer reminded them of the assessment and compensation process and that they had each assisted the consulting team in identifying and measuring out their land during the previous mission. Mr Scherzer explained how the compensation calculations had been made using local prices and predicted crop yields for the commonly grown crops. He explained how the compensation package had been structured in order to provide both income support and promote livelihood restoration. This had been done by providing a once off cash payment for lost crops, a split income restoration payment over one year and a livelihood/skills support component, equalling two years worth of income from the plots they would loose, which they could only use for approved income-generating activities or skills training. 23

29 Mr Scherzer then handed out the individual compensation calculation forms to each farmer and explained to each how the forms worked and where to see the individual compensation calculations. 3. Discussion The PAPs stated that they were reluctant to move off the land until they had seen some of the compensation being paid. Mr Scherzer said that CST was interested in commencing with the compensation as soon as possible and that legal agreements would be signed that would confirm these compensation amounts. Mr W TenJua added that the legal agreements were already being prepared and that the farmers needed to come to CST and provide their full names as per their identity documents and bank account details so that the contracts could be finalised and payments made. Thereafter, CST would mark out the land and commence with construction activities. Mr Deodato Xavier dias costa Neto stated that he was upset that he had only been allocated the direct crop loss compensation and not also the income support compensation. He accepted that he was not eligible for the livelihood restoration component. Mr Scherzer stated that as a medical specialist who had been employed for the last 21 years and continued to be employed, he was not in the same situation as the other PAPs. Thus, it could not be argued that he required additional income support for day to day expenses whilst he identified alternative income sources. Mr dias costa Neto disagreed strongly with this and proceeded to become quite upset. Mr W TenJua stated that in the interests of peaceful negotiations, CST would agree to pay Mr dias costa Neto the additional income support compensation. Mr Scherzer said that there was no problem with this if CST were willing to make this concession. 4. Closure Mr Scherzer explained the grievance procedure and provided the PAPs elected representative, Mr Delson Fereira dos Reis with a copy of the conflict resolution process. The meeting ended with PAPs confirming with Mr W TenJua when they would come to the CST offices to finalise the contracts. 24

30 25

Central African Backbone (CAB) Project Africa Coast to Europe (ACE) Submarine Cable

Central African Backbone (CAB) Project Africa Coast to Europe (ACE) Submarine Cable Government of Sao Tomé and Principe Central African Backbone (CAB) Project Africa Coast to Europe (ACE) Submarine Cable Resettlement Policy Framework Draft 19 November 2010 Prepared by: Paul Scherzer E&D

More information

EBRD Performance Requirement 5

EBRD Performance Requirement 5 EBRD Performance Requirement 5 Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or loss of

More information

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007 Involuntary Resettlement - Overview Transport Forum Washington, D.C. March 30, 2007 OP 4.12 - Triggers Trigger: acquisition of land which displaces people physically and / or economically. Policy applies

More information

Performance Standard 5 Land Acquisition and Involuntary Resettlement

Performance Standard 5 Land Acquisition and Involuntary Resettlement Introduction Performance Standard 5 1. Involuntary resettlement refers both to physical displacement (relocation or loss of shelter) and to economic displacement (loss of assets or access to assets that

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005 Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement This document should be read in conjunction with the proposed World Bank Policy to understand the proposed responsibilities of the World Bank (in the Policy) and the Borrowing Country (in the Standards).

More information

Gender Equality and Development

Gender Equality and Development Overview Gender Equality and Development Welcome to Topic 3 of the e-module on Gender and Energy. We have already discussed how increased access to electricity improves men s and women s lives. Topic Three

More information

Guidance Note 5 Land Acquisition and Involuntary Resettlement

Guidance Note 5 Land Acquisition and Involuntary Resettlement This Guidance Note 5 corresponds to Performance Standard 5. Please also refer to the Performance Standards 1-4 and 6-8 as well as the corresponding Guidance Notes for additional information. Bibliographical

More information

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Resettlement Policy Framework for the Smallholder Agriculture Development Project

More information

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014 Work plan of Independent Agency and Implementation of IFC Performance Standards Green Goal Ltd., 17 February 2014 Content IFC performance standards Legal grounds of Cambodia Resettlement planning process

More information

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B. Module 8 - Involuntary Resettlement- Policy Principles & Requirements (World bank OP 4.12 and 4.12 Annex A) Key principles and objectives of an involuntary Resettlement Policy Resettlement planning instruments

More information

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION Table of Content Volume 4 Chapter 1: Project Description 1 PROJECT DESCRIPTION...1 1.1 THE NT2 PROJECT...1 1.2 THE NEED FOR RESETTLEMENT AND DEVELOPMENT...1 1.3 THE

More information

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FINAL REPORT Resettlement and Rehabilitation (R&R) Entitlement Framework RP297 Under

More information

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014)

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Submitted to : Egyptian Natural Gas Holding Company Prepared by: EcoConServ Environmental

More information

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TRANSPORT NOTES TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP THE WORLD BANK,

More information

THE AFRICAN PEER REVIEW MECHANISM (APRM): its role in fostering the implementation of Sustainable development goals

THE AFRICAN PEER REVIEW MECHANISM (APRM): its role in fostering the implementation of Sustainable development goals THE AFRICAN PEER REVIEW MECHANISM (APRM): its role in fostering the implementation of Sustainable development goals by Ambassador Ashraf Rashed, Member of the APR Panel of Eminent Persons at UN High Level

More information

Tenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold

Tenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold Tenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold Tenke Fungurume Mining (TFM), an affiliate of Freeport-McMoRan Copper & Gold, is the largest private foreign investment in the DRC,

More information

Isa Alade, (Banwo & Ighodalo/ Main One Cable Company Limited)

Isa Alade, (Banwo & Ighodalo/ Main One Cable Company Limited) DIGITAL DIVIDE AND THE LAW: A CRITICAL ANALYSIS OF THE LEGAL AND REGULATORY FRAMEWORK FOR THE DEPLOYMENT, OPERATION AND MAINTENANCE OF INTERNATIONAL SUBMARINE CABLES IN WEST AFRICA - THE MAIN ONE CABLE

More information

Resettlement and Impact Assessment points of intersection

Resettlement and Impact Assessment points of intersection Resettlement and Impact Assessment points of intersection IAIA Webinar December 15 th, 2016 Liz Wall Shared Resources Contents The basic principles of resettlement Intersections with impact assessment:

More information

Resettlement Policy Framework

Resettlement Policy Framework Urban Transport Improvement Project of Tianjin by Using the World Bank Loan Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Cambridge International Examinations Cambridge International General Certificate of Secondary Education Cambridge International Examinations Cambridge International General Certificate of Secondary Education *0142274826* GEOGRAPHY 0460/13 Paper 1 May/June 2017 Candidates answer on the Question Paper. Additional

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 34055 TECHNICAL ASSISTANCE TO THE SOCIALIST REPUBLIC OF VIET NAM FOR ENHANCING THE RESETTLEMENT LEGAL FRAMEWORK AND INSTITUTIONAL CAPACITY September 2001 CURRENCY EQUIVALENTS

More information

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT DRAFT COMPARATIVE ANALYSIS OF NEPAL s LEGAL FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT Note: The following is based

More information

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the RESETTLEMENT FRAMEWORK Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the Secondary Education Modernization Project II in Sri Lanka Ministry of Education

More information

Thirty-third Meeting of the Least Developed Countries Expert Group. and

Thirty-third Meeting of the Least Developed Countries Expert Group. and United Nations Thirty-third Meeting of the Least Developed Countries Expert Group and Expert meeting to assess progress made in the process to formulate and implement National Adaptation Plans 5 9 February

More information

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS ENVIRONMENTAL SAFEGUARDS Objectives To ensure the environmental soundness and sustainability of projects and to support the integration

More information

SYMBION POWER LAKE KIVU LTD.

SYMBION POWER LAKE KIVU LTD. SYMBION POWER LAKE KIVU LTD. DRAFT Abbreviated Relocation Action Plan and Livelihoods Restoration Plan Final October 2018 [11.4.3.3] [10669-20181009-ESIA Abbreviated RAP_final_signed.pdf] [Page 1 of 52]

More information

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING Road Development Agency 1 5 6 2 3 4 RESETTLEMENT POLICY FRAMEWORK FINAL REPORT Consultancy Services for the Design and Preparation of Bidding Documents for a Countrywide Roll-out of the Output and Performance

More information

THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA

THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA In July 2014 the World Bank Inspection Panel, the Bank s complaints mechanism for people who believe that

More information

isimangaliso Resettlement Policy Framework and Process Framework April 2009

isimangaliso Resettlement Policy Framework and Process Framework April 2009 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized isimangaliso Resettlement Policy Framework and Process Framework April 2009 Resettlement

More information

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia)

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Republic of Sakha (Yakutia) of the Russian Federation Innovative Development of Preschool

More information

Resettlement and Income Restoration in Thilawa SEZ

Resettlement and Income Restoration in Thilawa SEZ Resettlement and Income Restoration in Thilawa SEZ Lessons from the first & second phases and emerging good practices Thilawa SEZ Management Committee (TSMC) Yangon Region Government (YRG) 20 February

More information

SUMMARY of the Key Points

SUMMARY of the Key Points SUMMARY of the Key Points Report on the Complaint Consideration for Proposed Policy Recommendations by the National Human Rights Commission of Thailand RE:Community Rights: The Case of Dawei Deep Seaport

More information

Resettlement Policy Framework (RPF) for the West Africa Regional Communications Infrastructure Program (WARCIP), Sierra Leone

Resettlement Policy Framework (RPF) for the West Africa Regional Communications Infrastructure Program (WARCIP), Sierra Leone Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF SIERRA LEONE MINISTRY OF INFORMATION AND COMMUNICATION Resettlement Policy

More information

EG-Giza North Power Project (P116194)

EG-Giza North Power Project (P116194) Public Disclosure Authorized The Egyptian Natural Gas Company SFG1796 Public Disclosure Authorized Public Disclosure Authorized EG-Giza North Power Project (P116194) Utilization of Project Savings for

More information

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives Page 1 of 9 Involuntary Resettlement 1. Bank 1 experience indicates that involuntary resettlement under development projects, if unmitigated, often gives rise to severe economic, social, and environmental

More information

Papua New Guinea LNG Project

Papua New Guinea LNG Project Esso Highlands Limited Papua New Guinea LNG Project Land Access, Resettlement and Livelihood Restoration Management Plan - Production PGGP-EH-OPZZZ-000004-006 LNG Project Page 2 of 35 CONTENTS 1.0 INTRODUCTION...

More information

FEDERAL REPUBLIC OF ETHIOPIAN MINISTRY OF MINES

FEDERAL REPUBLIC OF ETHIOPIAN MINISTRY OF MINES Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FEDERAL REPUBLIC OF ETHIOPIAN MINISTRY OF MINES Volume II: Resettlement Policy Framework

More information

Ethiopia : the Gilgel Gibe Resettlement Project

Ethiopia : the Gilgel Gibe Resettlement Project No. 141 August 1999 Findings occasionally reports on development initiatives not assisted by the World Bank. This article is one such effort. The views expressed here do not necessarily reflect the views

More information

Bangladesh: Urban Public and Environmental Health Sector Development Program

Bangladesh: Urban Public and Environmental Health Sector Development Program Resettlement Planning Document Draft Resettlement Framework Document Stage: Draft for Consultation Project Number: 39305 May 2009 Bangladesh: Urban Public and Environmental Health Sector Development Program

More information

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT A. Introduction and Subprojects Components 1. Tranche 2 of the

More information

Summer School November Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK)

Summer School November Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK) Housing Policy and Circular No. 3 on Squatter Settlement Resolution Summer School 12-13 November 2014 Beng Hong Socheat Khemro Ph.D. (UCL, London, England, UK) bhskhemro@yahoo.com Content Housing Policy

More information

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project BURCU ERGIN SOCIAL SAFEGUARDS SPECIALIST WORLD BANK RSM LAUNCH WORKSHOP IZMIR, 5 JULY 2018 Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project Why is it critical

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO Prepared for: Kosovo Energy Corporation Prepared by: Project Hade Office, Ministry of Environment and Spatial Planning replan Inc. 2011

More information

Indonesia: Enhanced Water Security Investment Project

Indonesia: Enhanced Water Security Investment Project Initial Poverty and Social Analysis March 2018 Indonesia: Enhanced Water Security Investment Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy

More information

MINISTRY OF COMMERCE, TRADE AND INDUSTRY

MINISTRY OF COMMERCE, TRADE AND INDUSTRY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Zambia SFG2542 MINISTRY OF COMMERCE, TRADE AND INDUSTRY Project ID: No. P156492

More information

Activist Guide to Sinohydro s International Corporation Limited s Environmental and Social Policy Commitments

Activist Guide to Sinohydro s International Corporation Limited s Environmental and Social Policy Commitments Activist Guide to Sinohydro s International Corporation Limited s Environmental and Social Policy Commitments Sinohydro, a Chinese government-owned enterprise, is the world s largest dam builder. By its

More information

REACH Situation Overview: Intentions and Needs in Eastern Aleppo City, Syria

REACH Situation Overview: Intentions and Needs in Eastern Aleppo City, Syria REACH Situation Overview: Intentions and Needs in Eastern Aleppo City, Syria 18 August 2016 INTRODUCTION Since the closure of Castello road in early July and the ensuing intensification of conflict in

More information

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF)

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) World Bank-financed Project World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Human Rights and Business Fact Sheet

Human Rights and Business Fact Sheet Sector-Wide Impact Assessment Human Rights and Business Fact Sheet Housing, Land Acquisition and Resettlement This factsheet was compiled for the use of the Myanmar Centre for Responsible Business (MCRB)

More information

MLD - Kulhudhuffushi Harbor Expansion Project

MLD - Kulhudhuffushi Harbor Expansion Project Kulhudhuffushi Harbor Expansion Project (RRP MLD 36111-013) Due Diligence Report on Involuntary Resettlement and Indigenous Peoples March 2016 MLD - Kulhudhuffushi Harbor Expansion Project Prepared by

More information

Resettlement Action Plan Update for the Rehabilitation and Upgrading of Bukoba Airport

Resettlement Action Plan Update for the Rehabilitation and Upgrading of Bukoba Airport Public Disclosure Authorized UNITED REPUBLIC OF TANZANIA SFG2612 Public Disclosure Authorized MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA AIRPORTS AUTHORITY Public Disclosure Authorized Resettlement

More information

THE WORLD BANK OPERATIONAL MANUAL. Indigenous Peoples

THE WORLD BANK OPERATIONAL MANUAL. Indigenous Peoples THE WORLD BANK OPERATIONAL MANUAL Indigenous Peoples (Draft OP 4.10, March 09, 2000) INTRODUCTION. 1. The Bank's policy 1 towards indigenous peoples contributes to its wider objectives of poverty reduction

More information

LIVELIHOODS RAPID ASSESSMENT among Internally Displaced Persons (IDPs) in Tomas Cabili, West Pantar and Ubaldo Laya temporary shelters

LIVELIHOODS RAPID ASSESSMENT among Internally Displaced Persons (IDPs) in Tomas Cabili, West Pantar and Ubaldo Laya temporary shelters LIVELIHOODS RAPID ASSESSMENT among Internally Displaced Persons (IDPs) in Tomas Cabili, West Pantar and Ubaldo Laya temporary shelters The objective of the livelihood rapid assessment is to present the

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized The World Bank SFG3873 REV Public Disclosure Authorized Hezhou Urban Water Infrastructure and Environment Improvement Project Public Disclosure Authorized Resettlement Policy

More information

Recalling resolution 57/254., proclaiming the United Nations Decade of Education for Sustainable Development,

Recalling resolution 57/254., proclaiming the United Nations Decade of Education for Sustainable Development, Forum: General Assembly s Third Committee Question of: Developing Guidelines for Sustainable Urban Development Submitted by: Islamic Republic of Pakistan Co-submitted by: Albania, Argentina, Armenia, Belize,

More information

Lake Turkana Wind Power Project - Kenya Resettlement Policy Framework

Lake Turkana Wind Power Project - Kenya Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Lake Turkana Wind Power Project - Kenya Resettlement Policy Framework November 2011 Prepared

More information

Securing Free, Prior & Informed Consent to Resettlement. First Quantum s Cobre Panama Project

Securing Free, Prior & Informed Consent to Resettlement. First Quantum s Cobre Panama Project Securing Free, Prior & Informed Consent to Resettlement First Quantum s Cobre Panama Project International Seminar on Resettlement Medellin, Colombia; November 7, 2013 Overview 1. Introduction 2. Project

More information

FILE COPY. RP222 February Water Supply and Sanitation Project. Resettlement Policy Framework. Final. The World Bank

FILE COPY. RP222 February Water Supply and Sanitation Project. Resettlement Policy Framework. Final. The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Federal Democratic Republic of Ethiopia Ministry of Water Resources Prepared for: Prepared

More information

REGIONAL CONVENTION ON FISHERIES COOPERATION AMONG AFRICAN STATES BORDERING THE ATLANTIC OCEAN

REGIONAL CONVENTION ON FISHERIES COOPERATION AMONG AFRICAN STATES BORDERING THE ATLANTIC OCEAN REGIONAL CONVENTION ON FISHERIES COOPERATION AMONG AFRICAN STATES BORDERING THE ATLANTIC OCEAN FINAL ACT OF THE MINISTERIAL CONFERENCE ON FISHERIES COOPERATION AMONG AFRICAN STATES BORDERING THE ATLANTIC

More information

Consolidated Group Approach to Artisanal and Small- Scale Mining (ASM)

Consolidated Group Approach to Artisanal and Small- Scale Mining (ASM) Note for: EXCOM Subject: Consolidated Group Approach to Artisanal and Small- Scale Mining (ASM) 1. PURPOSE This paper proposes a consolidated group approach to ASM, and seeks to: Provide clarity of definitions

More information

EXECUTIVE SUMMARY. Harrowing Journeys: Children and youth on the move across the Mediterranean Sea, at risk of trafficking and exploitation

EXECUTIVE SUMMARY. Harrowing Journeys: Children and youth on the move across the Mediterranean Sea, at risk of trafficking and exploitation EXECUTIVE SUMMARY Harrowing Journeys: Children and youth on the move across the Mediterranean Sea, at risk of trafficking and exploitation 1 United Nations Children s Fund (UNICEF) International Organization

More information

NOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT

NOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT Public Notice US Army Corps of Engineers Louisville District Public Notice No. Date: Expiration Date: RGP No. 003 9 Jul 08 9 Jul 13 Please address all comments and inquiries to: U.S. Army Corps of Engineers,

More information

RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1

RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1 RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1 Prepared for: CLRP-AF Project Monitoring Unit, Ministry of Environment and Spatial Planning Prepared by: replan Inc.

More information

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RPF of Additional Financing for Fujian Highway Sector Investment Project Contents RP1032

More information

BAHIA INTEGRATED URBAN DEVELOPMENT PROJECT Involuntary Resettlement Plan Alagados VI Executive Summary

BAHIA INTEGRATED URBAN DEVELOPMENT PROJECT Involuntary Resettlement Plan Alagados VI Executive Summary Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1- Introduction BAHIA INTEGRATED URBAN DEVELOPMENT PROJECT Involuntary Resettlement Plan

More information

Guidance Note for CLA members

Guidance Note for CLA members Guidance Note for CLA members A RURAL FIXED LINE NETWORK ACCESS AGREEMENT Date: 27 June 2018 CLA Guidance Note Reference: GN16-18 (This guidance note replaces GN01-13 which should be deleted from your

More information

Rule of Law Africa Integrity Indicators Findings

Rule of Law Africa Integrity Indicators Findings Rule of Law Africa Integrity Indicators Findings August 201 The Rule of Law subcategory assesses the judiciary s autonomy from any outside control of their activities, the existence of unbiased appointment

More information

On track in 2013 to Reduce Malaria Incidence by >75% by 2015 (vs 2000)

On track in 2013 to Reduce Malaria Incidence by >75% by 2015 (vs 2000) ALMA SUMMARY REPORT: 2 ND QUARTER 205 Introduction The month of July 205 sees Ethiopia and the United Nations Economic Commission for Africa hosting the 3 rd International Financing for Development Conference,

More information

RESETTLEMENT POLICY FRAMEWORK (RPF) ZAMBIA RENEWABLE ENERGY FINANCING FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK (RPF) ZAMBIA RENEWABLE ENERGY FINANCING FRAMEWORK RESETTLEMENT POLICY FRAMEWORK (RPF) ZAMBIA RENEWABLE ENERGY FINANCING FRAMEWORK i TABLE OF CONTENTS LIST OF ACRONYMS AND ABBREVIATIONS... iv DEFINITIONS... v 1.0 INTRODUCTION... 1 1.1 Background... 1 1.2

More information

10/27/2017 Guided practice: Causes and effects of human migration (article) Khan Academy

10/27/2017 Guided practice: Causes and effects of human migration (article) Khan Academy Guided practice: Causes and effects of human migration Migration is the movement of people from one place to another with the intent to settle. Learn more about why it was important! Google Classroom Facebook

More information

SUSTAINABLE LAND AND WATER MANAGEMENT PROJECT

SUSTAINABLE LAND AND WATER MANAGEMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF GHANA MINISTRY OF ENVIRONMENT AND SCIENCE SUSTAINABLE LAND AND WATER MANAGEMENT

More information

FIELD MANUAL FOR THE MIGRANT FOLLOW-UP DATA COLLECTION (EDITED FOR PUBLIC RELEASE)

FIELD MANUAL FOR THE MIGRANT FOLLOW-UP DATA COLLECTION (EDITED FOR PUBLIC RELEASE) FIELD MANUAL FOR THE MIGRANT FOLLOW-UP DATA COLLECTION (EDITED FOR PUBLIC RELEASE) 1. INTRODUCTION This is the second phase of data collection for the 1994-95 CEP-CPC project. The entire project is a follow-up

More information

Unit 3 (under construction) Law of the Sea

Unit 3 (under construction) Law of the Sea Unit 3 (under construction) Law of the Sea Law of the Sea, branch of international law concerned with public order at sea. Much of this law is codified in the United Nations Convention on the Law of the

More information

Slums As Expressions of Social Exclusion: Explaining The Prevalence of Slums in African Countries

Slums As Expressions of Social Exclusion: Explaining The Prevalence of Slums in African Countries Slums As Expressions of Social Exclusion: Explaining The Prevalence of Slums in African Countries Ben C. Arimah United Nations Human Settlements Programme (UN-HABITAT) Nairobi, Kenya 1. Introduction Outline

More information

Timorese migrant workers in the Australian Seasonal Worker Program

Timorese migrant workers in the Australian Seasonal Worker Program Timorese migrant workers in the Australian Seasonal Worker Program By Ann Wigglesworth, Research consultant Co-researcher: Abel Boavida dos Santos, National University of Timor-Leste Presentation outline

More information

HLP GUIDANCE NOTE ON RELOCATION FOR SHELTER PARTNERS March Beyond shelter, the social and economic challenges of relocation

HLP GUIDANCE NOTE ON RELOCATION FOR SHELTER PARTNERS March Beyond shelter, the social and economic challenges of relocation HLP GUIDANCE NOTE ON RELOCATION FOR SHELTER PARTNERS March 2014 This Advisory Note provides guidance to Shelter Cluster Partners on national and international standards related to relocation as well as

More information

POWER TRANSMISSION LINE FOR ZUMA COAL-FIRED POWER PLANT: RESETTLEMENT ACTION PLAN (RAP) EXECUTIVE SUMMARY

POWER TRANSMISSION LINE FOR ZUMA COAL-FIRED POWER PLANT: RESETTLEMENT ACTION PLAN (RAP) EXECUTIVE SUMMARY POWER TRANSMISSION LINE FOR ZUMA COAL-FIRED POWER PLANT: RESETTLEMENT ACTION PLAN (RAP) EXECUTIVE SUMMARY Project Name: Zuma Coal-Fired Power Plant Power Transmission Resettlement Action Plan. Country:

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized PEOPLE S COMMITTEE OF PHU YEN PROVINCE PHU YEN PROJECT MANAGEMENT UNIT OF CONSTRUCTION INVESTMENT WORKS FOR AGRICULTURE AND RURAL DEVELOPMENT ----------------o0oo---------------

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of

More information

Guidance Note 5 Land Acquisition and Involuntary Resettlement

Guidance Note 5 Land Acquisition and Involuntary Resettlement This Guidance Note 5 corresponds to Performance Standard 5. Please also refer to the Performance Standards 1-4 and 6-8 as well as their corresponding Guidance Notes for additional information. Bibliographical

More information

Mining Toolkit. In-Migration

Mining Toolkit. In-Migration Tool Child Rights and Mining Toolkit Children are the most vulnerable stakeholders regarding mining impacts, including the effects of project-related in-migration. As dependents of migrant mine workers,

More information

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems Technical Assistance Consultant s Report Project Number: 44140 Date: April 2013 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Strengthening Involuntary Resettlement Safeguard

More information

Halve, between 1990 and 2015, the proportion of people whose income is less than $1 a day

Halve, between 1990 and 2015, the proportion of people whose income is less than $1 a day 6 GOAL 1 THE POVERTY GOAL Goal 1 Target 1 Indicators Target 2 Indicators Eradicate extreme poverty and hunger Halve, between 1990 and 2015, the proportion of people whose income is less than $1 a day Proportion

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE INDEPENDENT STATE OF SAMOA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Samoa Post Tsunami Reconstruction

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education

More information

TOF WHITE PAPER - SECTION re EXTENDED CONTINENTAL SHELF

TOF WHITE PAPER - SECTION re EXTENDED CONTINENTAL SHELF TOF WHITE PAPER - SECTION re EXTENDED CONTINENTAL SHELF Introduction The 1982 United Nations Convention on the Law of the Sea (UNCLOS or the Convention), which went into effect in 1994, established a comprehensive

More information

Framework Resettlement Action Plan

Framework Resettlement Action Plan Nimba Western Range Iron Ore Project, Liberia Environmental and Social Studies, 2008-2015 Project Phase 2: Concentrator Environmental and Social Impact Assessment Volume 6, Part 1: Framework Resettlement

More information

CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE. Adopted: June 1, 2000 by Ordinance #

CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE. Adopted: June 1, 2000 by Ordinance # CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE Adopted: June 1, 2000 by Ordinance # 1999-215 This new language is located in Article V - Site Development Standards, and replaces the Bear Creek (B-C) Overlay

More information

Quick and Dirty Livelihoods Survey, Kakuma Refugee Camp FIRST DRAFT

Quick and Dirty Livelihoods Survey, Kakuma Refugee Camp FIRST DRAFT UNIVERSITY OF CAMBRIDGE 1/1 shelterproject.org report title Quick and Dirty Livelihoods Survey, Kakuma Refugee Camp FIRST DRAFT date published July 2003 who undertook the work Jon Fowler jon@shelterproject.org

More information

Protecting Liberia s Forest

Protecting Liberia s Forest Protecting Liberia s Forest Conservation for People and Planet 10 December 2015 This paper deploys geospatial analysis to approximate the costs associated with plans to allocate 30% of Liberia s forest

More information

Resettlement Work Plan (RWP) for. Development of Phase 1 Area. Thilawa Special Economic Zone (SEZ)

Resettlement Work Plan (RWP) for. Development of Phase 1 Area. Thilawa Special Economic Zone (SEZ) Yangon Region Government Resettlement Work Plan (RWP) for Development of Phase 1 Area Thilawa Special Economic Zone (SEZ) November 2013 Table of Content Abbreviations CHAPTER 1 INTRODUCTION......1 1.1

More information

Subproject: Hai Lang Province: Quang Tri

Subproject: Hai Lang Province: Quang Tri Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP299 vol. 4 Ministry of Agriculture and Rural Development The World Bank Natural Disaster

More information

y Fomento Municipal (FUNDACOMUN);

y Fomento Municipal (FUNDACOMUN); Report No. PID6684 Project Name Venezuela-Caracas Slum Upgrading (+) Project Region Sector Project ID Borrower Guarantor Implementing Agencies Latin America and the Caribbean Urban VEPA40174 Government

More information

Africa Agriculture Transformation Scorecard: Performance and Lessons for the Southern Africa Development Community-SADCSS

Africa Agriculture Transformation Scorecard: Performance and Lessons for the Southern Africa Development Community-SADCSS Africa Agriculture Transformation Scorecard: Performance and Lessons for the Southern Africa Development Community-SADCSS Matchaya, Greenwell, Nhemachena, Charles, Muchero Martin, Elago, Panduleni, Nhlengethwa,

More information

Livelihood Restoration in Practice: Key Challenges and Opportunities

Livelihood Restoration in Practice: Key Challenges and Opportunities Livelihood Restoration in Practice: Key Challenges and Opportunities BRITISH MUSEUM, LONDON, NOVEMBER 9, 2016 Shaza Zeinelabdin, Senior Social Dev t Specialist Larissa Luy, Principal E&S Specialist IFC

More information

WFP Somalia SPECIAL OPERATION SO

WFP Somalia SPECIAL OPERATION SO WFP Somalia SPECIAL OPERATION SO 201051 Country: Somalia Type of project: Special Operation Title: Emergency Rehabilitation Work and Capacity strengthening at the Port of Kismayo Total Cost: US$1,579,112

More information

ASSOCIATION OF AFRICAN UNIVERSITIES BYELAWS

ASSOCIATION OF AFRICAN UNIVERSITIES BYELAWS ASSOCIATION OF AFRICAN UNIVERSITIES Meeting of the Executive Committee of the Governing Board 18-19 April, 2017 MJ Grant Hotel, East Legon, Accra-Ghana BYELAWS Byelaw 1 REQUIREMENTS FOR MEMBERSHIP 1. To

More information