1 Resettlement Planning Document Resettlement Plan Document Stage: Updated Project Number: February 2010 PHI: Visayas Base Load Power Development Project Prepared by KEPCO SPC Power Corporation The Short Resettlement Plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB s Board of Directors, Management, or staff, and may be preliminary in nature.

2

3 I. INTRODUCTION 1. KEPCO SPC Power Corporation (KSPC), a joint venture between KEPCO Philippines Holdings, Inc. (a wholly-owned subsidiary of Korea Electric Power Corporation or KEPCO) and SPC Power Corporation, is developing the Visayas Base Load Power Project (Project). The Project facilities to be constructed by KSPC include a 200 MW coal-fired power plant using circulating fluidized bed (CFB) technology and support and associated facilities including the 0.90km (kilometer) proposed transmission line to the new Naga substation. The Project will be funded by the Asian Development Bank (ADB), which requires the preparation of this resettlement plan in conformity with its policy on Involuntary Resettlement (1995). 2. For the power plant component, an ADB due diligence mission was undertaken and confirmed that the resettlement activities have been carried out and completed by the local government unit (LGU) of Naga City, Cebu, National Power Corporation (NPC), Power Sector Assets and Liabilities Management Corporation (PSALM), and KSPC in accordance with applicable national laws and ADB Policy on Involuntary Resettlement (1995). However, noted are outstanding issues to be resolved by NPC/PSALM and the LGU in coordination with KSPC: (i) a case filed in court by NPC against the 5 families who claim to have legal titles and have partially encroached in the leased land and need to be relocated; and (ii) land ownership and/or land titling process for the relocated 17 families. 3. The proposed transmission line (138 KV DC-ST) from KSPC power plant to the new Naga substation aims to provide a new termination point that can accommodate future load growth and maintain an electricity highway that is characterized as reliable, secure, stable, and resilient power system. It will also establish the asset boundary between National Transmission Company (TransCo) asset and the power plant by separating control of Naga Power Plant Complex from TransCo s substation. The new substation will serve as the receiving station of the proposed KSPC power plant as the old Naga switchyard is already congested and all the installed protection equipment/materials are already underrated and operating beyond their economic life. 4. A social analysis carried out in the Project area concluded that the proposed transmission line would require land acquisition and resettlement. For expediency, land acquisition and resettlement program for the transmission line will be incorporated into the overall Land Acquisition and Resettlement Plan (LARP, September 2008) prepared by TransCo which will be implemented by National Grid Corporation of the Philippines (NGCP) as part of the new Naga substation project. In addition to the Project transmission line, this overall resettlement plan of TransCo covers the following components which are outside of the Project: (i) expansion of the existing new Naga substation; (ii) construction of the Banilad-Quiot-New Naga 138kV cut-in-line; (iii) Suba L1 and L2 138 kv line extension; (iv) Sigpit and Suba L3 138 kv line extension; and (v) new Naga 69 kv line extension. II. SCOPE OF LAND ACQUISTITION AND INVOLUNTARY RESETTLEMENT IMPACTS A. Land Requirements and Coverage 1. Power Plant 5. Land for the power plant was acquired by KSPC through an open and competitive bidding held on 14 November 2005 conducted by NPC and PSALM. The land will be leased by KSPC for 25 years and solely used for the construction, testing, operation, management, and

4 2 maintenance of the power plant. The rental due for the lease of the land for the entire 25-year term is P190,050, and shall be paid in advance on the closing date. 6. Naga land is collectively composed of (i) the PP Land, which has an approximate area of 96,994 m 2 (square meter); and (ii) 16 parcels of land adjacent to, fronting, or near the PP Land with an aggregate area of approximately 12,412 m 2 and more particularly described as the Other Land both located in barangay (district) of Colon, city of Naga, Cebu Province. Out of the total of 109,406 m 2, only 96,771 m 2 will be occupied by the Project. A large portion (84,359 m 2 ) of this land is registered in the name of NPC under Original Certificate of Title No. OP while the rest are unregistered lands (12,412 sq.m.) which are currently in the process of registration under the name of NPC. These unregistered lands were vacant and not being used by any third party for residential or economic purposes prior to NPC occupying the land. 2. Transmission Line 7. The Project transmission line (138-kV DC/ST, MCM, ACSR/AS "Condor") will be 0.90 km long and extend from KSPC power plant to the new Naga substation. Approximately half of the line will pass inside the existing Naga Power Plant Complex. A 30-meter wide rightof-way (ROW) corridor, which will pass through flat to rolling lands, will affect around 10 houses and 3 secondary structures. Most of these are located beside a barangay road that the line will traverse. The total estimated area of affected private and public lands is 15,791 m 2. Table 1 below presents the summary of project-affected persons, structures, and properties. Table 1: Impact Figures for the Transmission Line Description Impact Figures Estimated Area of Affected Private Lands 1 6,324 m 2 Estimated Area of Affected Lands inside Salcon Power Complex 9,467 m 2 Estimated No. of Affected Houses 10 Estimated No. of Affected Structures 3 Estimated Number of Project Affected Persons Land Owner 11 Tenant 1 Structure Owner 13 Relocatee-Household 10 Source: KSPC, November For expediency, land acquisition and resettlement program for this transmission line will be incorporated into the overall Land Acquisition and Resettlement Plan (September 2008) prepared by TransCo, which will be implemented by NGCP 2 as part of the new Naga substation project. B. Status of Land Acquisition 1. Power Plant 9. A Memorandum of Agreement (MOA) had been executed and entered into by and between NPC, KSPC, and Naga City to spearhead the necessary negotiations with the affected 1 Residential use but officially classified as industrial lands. 2 NGCP has been awarded a 25-year concession contract to manage the country s power grid and in January 2009 took over these operations from TransCo.

5 3 nontitled/informal settlers families and secured the relocation site, which is just outside the leased land. The local barangay is coordinating with the Assessor s Office in Naga City on the provision of exclusive rights to the resettled families in the allotted alienable land through tax declarations. The barangay will also make a resolution on the donation of this land to each family. Titling process will involve the LGU to resurvey and claim the land and at the same time determine actual area of the relocation site occupied by the 17 families. KSPC will also provide funds to the host LGU and barangay as provided under section 289 of the Local Government Code 3 and ER No of Department of Energy (DOE). 2. Transmission Line 10. Use of the ROW easement of the transmission line including the land required for steel towers to be erected inside the Naga Power Plant Complex is covered by an agreement to be finalized between SPC, PSALM, and KSPC. For the ROW passing through private lands, landowners will be paid at current fair market value. The initial standard rate used to calculate compensation was P per m 2. After negotiations with affected people and to reflect the latest Schedule of Unit Base Market Value for Residential, Commercial and Industrial Lands for the Municipality of Naga in Cebu, the rate was increased to P813 per m 2. While the land use is residential, NGCP adopted the valuation for industrial lands. C. Involuntary Resettlement Impacts 1. Power Plant 11. Loss of Public Lands and Housing Structure. The proposed power plant required the acquisition of 84,359 m 2 public land and displacement of families living near the old reclamation area. A Memorandum of Agreement had been executed and entered into between NPC, KSPC, and Naga City. The LGU of Naga spearheaded the necessary negotiations with the affected nontitled/informal settlers families and secured the relocation site which is just outside the leased land. Out of 22 families, 17 families have voluntarily evacuated and relocated. The remaining 5 families claim to have legal titles and have partially encroached in the leased land. They do not affect the ongoing construction activities inside the leased land since they are fenced out. NPC has filed a case against these families in the court. In case NPC/PSALM wins the case against the five families and there is a need for involuntary resettlement, KSPC will ensure that they receive replacement cost for legal assets (e.g. house or any developments on land, crops, trees etc.), moving assistance and assistance to restore income and livelihoods if these are affected by relocation. 12. No compensation and financial assistance package have been provided by NPC or the LGU, though the LGU secured the relocation just outside the Project land. KSPC provided moving allowance amounting to P15, to each family and assistance to demolish their old houses through their contractor and rebuild new houses at no cost (cost of labor and materials was paid for by KSPC). Salvageable materials were allowed to be kept by the owners to be used to reconstruct their new houses. The relocation activities started in October 2008 and were 3 Republic Act 7160 Local Government Code (LGC) of 1991, Section 289 Share in the Proceeds from the Development and Utilization of the National Wealth states that Local Government Units shall have an equitable share in the proceeds derived from the utilization and development of the national wealth within their respective areas including sharing the same with the inhabitants by way of direct benefits. 4 ER No promulgated by the DOE on 24 may 1994 prescribed the provision of direct benefits to pertinent Local Government Units (LGus) hosting energy generating facilities and/or energy resource development projects within their jurisdiction to Section 5 of Republic Act (RA) 7638-DOE Act of 1992.

6 4 2. Transmission Line 13. Loss of Private and Public Lands. The 0.90 km transmission line from KSPC power plant to the new Naga substation will traverse portions of private land (6,324 m 2 ), which is composed of 14 land plots owned by 11 landowners with 1 tenant and public land (9,467 m 2 ) inside the Naga Power Plant complex. 14. Loss of Structures and other Assets. A total of 13 structure owners (bungalow, hut structure, pig pen, stockhouse, and shanty) will require compensation. House/structure owners will be paid the replacement cost of their houses/structures. Relocatee-households will be granted disturbance compensation. Together with the tenants, land owners will also be compensated for affected crops, plants and trees. The land acquisition and resettlement cost for the Project T/L is estimated at P7 million. III. RESETTLEMENT PRINCIPLES AND POLICY FRAMEWORK 15. As earlier mentioned, the resettlement activities for the power plant have been completed in November 2008 and this was confirmed during the ADB due diligence mission in April The succeeding paragraphs will deal with the applicable resettlement principles and policy framework for the proposed transmission line only. 16. The resettlement principles adopted for the transmission line recognize the national and local laws such as the Republic Act 8974, RA 7279, Article VII, Urban Renewal and Resettlement (Sections 26 and 28), and ADB's social safeguard requirements, in particular the Policy on Involuntary Resettlement (1995) and Operations Manual (OM) F2 on Involuntary Resettlement (2006). 17. The primary objective of this Resettlement Plan (RP) is to identify impacts and to plan measures to mitigate various losses due to the implementation of the transmission line. The RP is based on the general findings of the census survey, field visits, and meetings with various affected persons in the transmission line area. Taking into account the various losses, an entitlement matrix provides for compensation and resettlement assistance to all affected persons including the non-titleholders in the transmission line area. In general terms, the affected people will be entitled to the following: (i) payment of non-agricultural lands (i.e. residential, industrial, commercial land); (ii) payment of crops, plants, and trees; (iii) payment of houses and other structures; and (iv) grant of disturbance compensation to relocatee households. 18. The policy also asserts integrated income restoration measures for affected households losing their source of income and income opportunity. As mentioned earlier, the census survey identified 10 households living along the route of the transmission line, who currently derive their livelihood from working as laborers and construction workers, operating small convenience store, raising livestock, among others. The construction of the transmission line will require relocation of these 10 households. The affected households will self relocate to locations of their choice. They are likely to resettle within the same vicinity but outside the 30 meter ROW limit. Most of the affected people rely on wages for their livelihood hence their income will be temporarily affected during reconstruction of their dwelling units. In addition to compensation for structures

7 5 at replacement cost, they will be provided disturbance compensation sufficient to tide them over while reconstructing their houses and/or structures. Skilled workers and laborers from among the affected households will be prioritized for project-related employment. This requirement is clearly specified in the terms of reference for contractors. Non-skilled affected people and other directly affected persons who wish to learn new livelihood skills will be prioritized under the Literacy and Skills Training program under the Social Development Plan. 19. A detailed entitlement matrix which lists various types of subproject losses, identification/eligibility and entitlements and provides for basic parameters for preparation of compensation and resettlement benefits is provided in Table 2. The end of the validation period of affected people based on the parcellary and house-to-house surveys will serve as the cut-off date in identifying affected people who are entitled to compensation and benefits. A written notice about the NGCP project, including the Project transmission line, and the cut-off date shall be given to the respective barangay officials. People moving into the subproject area after this date will not be entitled to compensation or assistance outlined below. Type of Loss/Impact Loss of nonagricultural lands (i.e. residential, industrial, commercial land) Loss of standing crops, plants and trees Loss of structure/house Loss of income/ Disturbance of relocates during transfer of residence Application Non-agricultural lands located within the proposed transmission line ROW corridors, S/S area and access road Crops, plants and trees located within the proposed transmission line ROW corridors, S/S area, and access road Houses/structures located within the proposed transmission line ROW corridors, substation area, and access road Households who have to transfer residence due to the project Table 2: Entitlement Matrix Compensation/Mitigating Measures Payment of land based on current fair market value Cash compensation based on fair market value Cash compensation based on replacement cost (no depreciation) Owners may retain salvageable materials if they dismantle their affected houses/structures down to ground level. Disturbance Compensation equivalent to the daily minimum wage in the projectaffected area multiplied by 60 days If qualified, will be prioritized for project related employment Entitled No. of Person Households Landowner 11 Owners of affected crops, plants and trees House/ structure owner Relocatee - households Skills training Note: This entitlement matrix applies to the overall TransCo project including the KEPCO Transmission Line. Source: KSPC, November

8 6 IV. PROFILE OF AFFECTED PERSONS 20. A socio-economic survey was conducted covering 12 out of 36 households affected by NGCP's new Naga substation project and the Project transmission line. The survey shows that all interviewed households are headed by males with ages ranging from 27 to 67 years old. Almost all of them (11 or 92%) are in the working age group (15-64 years old). Most of them (8 or 67%) work as construction workers or laborers while the rest are self-employed including a pedicab driver, a sari-sari (neighborhood store) owner, and a livestock trader. All of them earn more than the Cebu province's monthly per capita poverty threshold of P1,085.00: 3 households report a monthly earning from P3,000 to P6,000; 6 report a monthly earning from P6,000 to P12,000 and two earning a relatively high monthly income of P12, All the interviewed households own their houses with floor areas ranging from 6.75 to 96 m 2. Majority of the houses are relatively small with floor areas of 20 m 2 and below. The rest are average sized houses ranging from 21 m 2 to 40 m 2. Majority of the houses have strong wall and roofing materials like galvanized iron sheets, concrete walls, lumber and plywood while the rest a use light materials such as bamboo, salvage materials and nipa shingles. 22. A list of AFs have been prepared by NGCP and attested by concerned barangay officials. Table 3: List of Affected Relocatee-Household and Structure Owner along the Transmission Line AP # Type of AP Type of Structure Floor Area (sq.m.) Material Roofing Siding Flooring 1 R, SO Bungalow GI Sheets CHB Concrete 2 R, SO Bungalow GI Sheets CHB Concrete 3 R, SO Bungalow GI Sheets CHB Concrete 4 R, SO Bungalow; Other Structures GI Sheets CHB Concrete 5 R, SO Bungalow; Other Structures GI Sheets LM, iron grill Concrete; LM 6 R, SO Bungalow GI sheets CHB Concrete 7 R, SO Bungalow GI sheets Plywood Concrete 8 R, SO Bungalow GI sheets CHB Concrete 9 R, SO Shanty GI sheets CHB Concrete 10 R, SO Bungalow GI sheets CHB Concrete 11 SO Hut Structure* 8.59 GI Sheets LM Bamboo & Concrete 12 SO Pig Pen GI sheets CHB Concrete 13 SO Shanty 2.70 GI Sheets LM Bamboo CHB= concrete hollow blocks; GI = galvanized iron; AP = Affected Person; R = relocate; SO = Structure Owner; LM= combination of lumber, plywoord, bamboo mat, bamboo split; Other Structures= may include convenience store, shed, stockhouse or pigpen. Note: Actual size and type of materials will be validated prior to payment of compensation. Source: KSPC, July 2009.

9 7 Table 4: List of Affected Landowners and Tenants along the Transmission Line AP No. Tower/Pole Span Type of AP Lot Number Landowner Landowner Landowner 1-A (886-part) Landowner 1-H (886-part) Landowner 1-C (886-part) Landowner 1-D (886-part) Landowner 959-A Landowner 959-D Landowner Landowner Landowner Tenant 1-A, 1-C, 1-D Source: KSPC, November Indigenous Peoples. There are no indigenous peoples in Naga City. Majority of the household population in Naga City consider themselves as Cebuanos. No indigenous peoples will be affected by the Project. V. STAKEHOLDER PARTICIPATION AND INFORMATION DISCLOSURE 24. The transmission line and related development activities were discussed with the local communities during the consultation meetings at the sites. The discussions were held with all primary and secondary stakeholders involved with the implementation of the NGCP project and the Project transmission line. The directly affected populations' concerns and suggestions on the types of mitigation measures were gathered and considered in preparing NGCP's LARP. Negotiations with affected people on compensation rates were undertaken from September 2008 to May Engagement with the affected people and the local community will continue throughout the implementation stage of the Project transmission line. 25. Written communications were sent to LGUs to inform them about the Project transmission line and to request for an endorsement. To date, the Project transmission line has been presented to the affected LGUs (Barangay Colon and Naga City) and development councils (Provincial Development Council of Cebu and Regional Development Council for Region 7). All of them have issued a resolution signed and confirmed by its members. Copies of the LARP were distributed to the municipal office for reference by the LGUs and their constituents. This RP will also be made available both at KSPC and ADB offices and will be posted on ADB website. 26. Role of NGOs and CBOs. As in any national development project, the affected persons may seek the assistance of non-government and/or community-based organizations for a nonpartisan or impartial assessment of the project. These groups are encouraged by NGCP to participate in public hearings and community dialogues and voice out their concerns about the project.

10 8 VI. IMPLEMENTATION ARRANGEMENT AND GRIEVANCE PROCEDURES 27. Power Plant. There are no outstanding grievances related to compensation for structures owned by informal settlers. Actual Interview with relocated family mentioned that they are satisfied with their present situation because the relocation site is very accessible to their work place and basic utilities (power and water) have also been provided, while the other respondent said that the financial package of P15, per family is not enough to re-build their house and the allocated lot of 25 m 2 is too small for them. An LGU official mentioned that subdivision of the available resettlement area is 25 m 2 per relocatee only in order to accommodate all of the 17 families. The said respondent is used to having at least 50 m 2 in her previous location. The Office of the Barangay Captain serves as the channel to accept and address complaints, requests, and grievances from the local residents. KSPC s social development plan applies to these relocates. 28. Transmission Line. KSPC, per its agreement with NGCP, will be responsible for the implementation of the RP based on the requirement of the lenders and it shall provide the necessary resources such as the budget and manpower. KSPC will process and disburse payments for resettlement and property compensation related to the transmission line. All compensation and other assistances will be paid to all affected persons prior to commencement of civil works. 29. Issues which may arise concerning payment of lands, crops and improvements and relocation will be settled by NGCP and KSPC. They will be assisted by a legal adviser to be hired by NGCP to handle all the legal matters/concerns. All other issues on relocation and ROW which cannot be resolved by NGCP and the Project Office shall be referred to the Land and Land Rights Department, Office of the General Counsel. As a last recourse, the NGCP could elevate the related concern/issue to the concerned trial court for a resolution/decision. The Conflict Resolution Process Flow as shown in Figure 1. Figure 1. Conflict Resolution Process Flow START Project Office receives issues/concern from APs and refers to appropriate NGCP/ KEPCO Personnel/ Office for Resolution AP and concerned NGCP/ KEPCO Personnel discuss/ resolve issue/concern (AP may opt to involve local government leaders in the negotiations) Issue/ Concern Resolved? YES END NO Project Office forwards issues/concerns to NGCP/KEPCO Management for Review/ Evaluation/Resolution END NGCP/KEPCO or AP goes to court to settle issue NO Issue/ Concern Resolved? Project Office informs AP of Management Decision END YES Source: KEPCO SPC Power Corporation

11 9 VII. BUDGET AND IMPLEMENTATION SCHEDULE 30. The total estimated cost for resettlement operation and management for the Project is P7 million. The estimate includes all costs related to compensation for land, resettlement cost, and other benefits as per the entitlement benefits. The costs of the private land and trees have been derived in close coordination with the City Assessor's office, local people and affected persons based on the prevalent market value of the land in the area. Table 5: Budget for Land Acquisition and Resettlement KEPCO T/L Type of Payment (peso) Acquisition of Private Lands (P813/m 2 x 6,324 m 2 ) 5,141,912 House and other structures 1,226,696 Crops, plants and trees 256,225 Disturbance Compensation 106,273 Contingency (5%) 170,815 Grand Total 6,901,921 SAY 7,000,000 Source: KSPC, November In addition to the resettlement budget, KSPC has allocated P20,000 annually for literacy and skills training for directly affected people as well as residents of Barangay Colon. 32. Activities for public acceptance, from identification or affected LGUs up to the securing of project endorsements, have been completed. All the affected LGUs and development councils have endorsed the Project transmission line as of 31 March Land acquisition and resettlement activities, such as identification and socio-economic survey of affected people, secondary data gathering, preliminary cost estimation of affected properties, and actual preparation and securing approval were conducted from January to September The measurement and detailed cost estimation of houses/structures, counting of crops, plants and trees, and inventory of other affected properties were started earlier even prior to the TransCo approval of the LARP. Implementation of the land acquisition and resettlement activities is targeted for completion by the end of September VIII. MONITORING ARRANGEMENTS 33. TransCo will have the overall responsibility to supervise and monitor the implementation of the RP through its Social Engineering and Right-of-Way Management Department in coordination with KSPC representatives. KSPC will report to the lenders on a quarterly basis within the RP implementation period. The monitoring report will deal with all aspects of relocation, resettlement, and rehabilitation of the households. A complete status report on RP implementation will be prepared by KSPC and submitted to the lenders at the end of RP implementation. The report will reflect on the resettlement experience and lessons learned for improved management of resettlement for future projects.

Quarterly Social Monitoring Report (1 st Submission)

Quarterly Social Monitoring Report (1 st Submission) 2 x 100 MW CEBU POWER PLANT Quarterly Social Monitoring Report (1 st Submission) 2010.04 KEPCO SPC Power Corporation Construction Office Table of Contents I. Social Monitoring Report (as of 31 March 2010)

More information

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the RESETTLEMENT FRAMEWORK Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the Secondary Education Modernization Project II in Sri Lanka Ministry of Education

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005 Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project

More information

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT A. Introduction and Subprojects Components 1. Tranche 2 of the

More information

Bangladesh: Urban Public and Environmental Health Sector Development Program

Bangladesh: Urban Public and Environmental Health Sector Development Program Resettlement Planning Document Draft Resettlement Framework Document Stage: Draft for Consultation Project Number: 39305 May 2009 Bangladesh: Urban Public and Environmental Health Sector Development Program

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of

More information

RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1

RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1 RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1 Prepared for: CLRP-AF Project Monitoring Unit, Ministry of Environment and Spatial Planning Prepared by: replan Inc.

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Thua Thien Hue Province Prepared by the Ministry

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 34055 TECHNICAL ASSISTANCE TO THE SOCIALIST REPUBLIC OF VIET NAM FOR ENHANCING THE RESETTLEMENT LEGAL FRAMEWORK AND INSTITUTIONAL CAPACITY September 2001 CURRENCY EQUIVALENTS

More information

Semi-annual Social Safeguards Monitoring Report (January to June 2012)

Semi-annual Social Safeguards Monitoring Report (January to June 2012) Semi-annual Social Safeguards Monitoring Report (January to June 2012) Armenia: Sustainable Urban Development Investment Program Tranche 1 Project Number: 42417 Loan Number: L2752 Prepared: July 2013 Prepared

More information

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION Table of Content Volume 4 Chapter 1: Project Description 1 PROJECT DESCRIPTION...1 1.1 THE NT2 PROJECT...1 1.2 THE NEED FOR RESETTLEMENT AND DEVELOPMENT...1 1.3 THE

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Soc Trang Province Prepared by the Ministry of

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Binh Thuan Province Prepared by the Ministry of

More information

MON: Urban Development Sector Project Bulgan Subproject

MON: Urban Development Sector Project Bulgan Subproject Resettlement Completion Report Annual Report 24 December 2012 MON: Urban Development Sector Project Bulgan Subproject Prepared by Purevsuren Dorjnamjil, Resettlement Specialist, Project Management Unit

More information

EBRD Performance Requirement 5

EBRD Performance Requirement 5 EBRD Performance Requirement 5 Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or loss of

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Bac Lieu Province Prepared by the Ministry of Education

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project RESETTLEMENT DUE DILIGENCE REPORT Project Number: 46391-001 January 2018 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh City Power Corporation, Electricity

More information

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FINAL REPORT Resettlement and Rehabilitation (R&R) Entitlement Framework RP297 Under

More information

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B. Module 8 - Involuntary Resettlement- Policy Principles & Requirements (World bank OP 4.12 and 4.12 Annex A) Key principles and objectives of an involuntary Resettlement Policy Resettlement planning instruments

More information

IND: Mumbai Metro Rail Systems Project

IND: Mumbai Metro Rail Systems Project Social Due Diligence Report October 2018 IND: Mumbai Metro Rail Systems Project Prepared by Mumbai Metropolitan Region Development Authority, Government of India for the Asian Development Bank. ABBREVIATION

More information

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement This document should be read in conjunction with the proposed World Bank Policy to understand the proposed responsibilities of the World Bank (in the Policy) and the Borrowing Country (in the Standards).

More information

IND: Railway Sector Investment Program

IND: Railway Sector Investment Program Resettlement Framework Document Stage: Final March 2011 IND: Railway Sector Investment Program Prepared by Ministry of Railways for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 16 March 2011)

More information

BAN: Railway Sector Investment Program

BAN: Railway Sector Investment Program Resettlement Planning Document Resettlement Framework Document Stage: Final Project Number: 32234 June 2006 BAN: Railway Sector Investment Program Prepared by Bangladesh Railway, Dhaka, Bangladesh The

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

XI-F35. Figure (1/3) The Study on Sabo and Flood Control for. Western River Basins of Mount Pinatubo in the Republic of the Philippines

XI-F35. Figure (1/3) The Study on Sabo and Flood Control for. Western River Basins of Mount Pinatubo in the Republic of the Philippines THE GOVERNMENT OF THE PHILIPPINES THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS The Study on Sabo and Flood Control for Western River Basins of Mount Pinatubo in the Republic of the Philippines JAPAN INTERNATIONAL

More information

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Resettlement Policy Framework for the Smallholder Agriculture Development Project

More information

Land Acquisition and Resettlement Due Diligence Report

Land Acquisition and Resettlement Due Diligence Report Land Acquisition and Resettlement Due Diligence Report Document stage: Draft for consultation Project Number: 48434 Loan and/or Grant Number(s): {LXXXX; GXXXX; TAXXXX} March 2016 India: Visakhapatnam-Chennai

More information

Performance Standard 5 Land Acquisition and Involuntary Resettlement

Performance Standard 5 Land Acquisition and Involuntary Resettlement Introduction Performance Standard 5 1. Involuntary resettlement refers both to physical displacement (relocation or loss of shelter) and to economic displacement (loss of assets or access to assets that

More information

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang)

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Resettlement Plan August 2011 VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Prepared by the Lang Son Provincial People s Committee for the Asian

More information

Indonesia: Enhanced Water Security Investment Project

Indonesia: Enhanced Water Security Investment Project Initial Poverty and Social Analysis March 2018 Indonesia: Enhanced Water Security Investment Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy

More information

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING Road Development Agency 1 5 6 2 3 4 RESETTLEMENT POLICY FRAMEWORK FINAL REPORT Consultancy Services for the Design and Preparation of Bidding Documents for a Countrywide Roll-out of the Output and Performance

More information

Revised Resettlement Plan Tibar-Gleno Road

Revised Resettlement Plan Tibar-Gleno Road REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING PROJECT February 2012 Democratic Republic of Timor-Leste REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS

More information

Guidance Note 5 Land Acquisition and Involuntary Resettlement

Guidance Note 5 Land Acquisition and Involuntary Resettlement This Guidance Note 5 corresponds to Performance Standard 5. Please also refer to the Performance Standards 1-4 and 6-8 as well as the corresponding Guidance Notes for additional information. Bibliographical

More information

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014)

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Submitted to : Egyptian Natural Gas Holding Company Prepared by: EcoConServ Environmental

More information

Cambodia: Agriculture Sector Development Program

Cambodia: Agriculture Sector Development Program Resettlement Planning Document Resettlement Plan (Boeung Ket) Document Stage: Final Project Number: 34380 May 2009 Cambodia: Agriculture Sector Development Program Prepared by National Divestment Committee

More information

Resettlement Plan. October Prepared by the Government of Jammu and Kashmir, Economic Reconstruction Agency for the Asian Development Bank.

Resettlement Plan. October Prepared by the Government of Jammu and Kashmir, Economic Reconstruction Agency for the Asian Development Bank. Resettlement Plan October 2013 IND: Jammu and Kashmir Urban Sector Development Investment Program (JKUSDIP) - Construction of Mechanized Automated Multi Level Parking Facility at Super Bazaar, Jammu (Tranche

More information

India: Jammu & Kashmir Urban Sector Development Project

India: Jammu & Kashmir Urban Sector Development Project Resettlement Planning Document Full Resettlement Plan- Improvements to B.C Road from Shakuntala Crossing to Children s Hospital Including pedestrian subway Document Stage: Final Project Number: 41116 October

More information

2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field

2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field Draft Safeguards Monitoring Report Project No. 38164-013 Draft Semi Annual Report December 2015 2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas

More information

Ministry of Energy and Mining. Development Bank of Jamaica. Energy Security and Efficiency Enhancement Project

Ministry of Energy and Mining. Development Bank of Jamaica. Energy Security and Efficiency Enhancement Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Energy and Mining Development Bank of Jamaica FINAL (JANUARY 21, 2011) Energy

More information

ABBREVIATED RESETTLEMENT ACTION PLAN RP285 V.

ABBREVIATED RESETTLEMENT ACTION PLAN RP285 V. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ABBREVIATED RESETTLEMENT ACTION PLAN RP285 V. 3 For the North Septage Treatment Plant

More information

Lake Turkana Wind Power Project - Kenya Resettlement Policy Framework

Lake Turkana Wind Power Project - Kenya Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Lake Turkana Wind Power Project - Kenya Resettlement Policy Framework November 2011 Prepared

More information

SRI: Local Government Enhancement Project

SRI: Local Government Enhancement Project Draft Resettlement Framework July 2011 SRI: Local Government Enhancement Project Prepared by the Ministry of Local Government and Provincial Councils for the Asian Development Bank. CURRENCY EQUIVALENTS

More information

Nepal: Rural Reconstruction and Rehabilitation Sector Development Project

Nepal: Rural Reconstruction and Rehabilitation Sector Development Project Resettlement Planning Document Resettlement Plan Grant Number: 0093 December 2010 Nepal: Rural Reconstruction and Rehabilitation Sector Development Project Kushma-Durlung-Salija Road Sub-Project, Kusma-Parbat

More information

Cambodia: Agriculture Sector Development Program

Cambodia: Agriculture Sector Development Program Resettlement Planning Document Resettlement Plan (Chamkar Andong) Document Stage: Final Project Number: 34380 May 2009 Cambodia: Agriculture Sector Development Program Prepared by National Divestment Committee

More information

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia)

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Republic of Sakha (Yakutia) of the Russian Federation Innovative Development of Preschool

More information

Resettlement Plan Dili-Tibar-Liquica Road

Resettlement Plan Dili-Tibar-Liquica Road REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING SECTOR PROJECT November 2011 REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK

More information

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014 Work plan of Independent Agency and Implementation of IFC Performance Standards Green Goal Ltd., 17 February 2014 Content IFC performance standards Legal grounds of Cambodia Resettlement planning process

More information

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems Technical Assistance Consultant s Report Project Number: 44140 Date: April 2013 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Strengthening Involuntary Resettlement Safeguard

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO Prepared for: Kosovo Energy Corporation Prepared by: Project Hade Office, Ministry of Environment and Spatial Planning replan Inc. 2011

More information

Resettlement Due Diligence Report

Resettlement Due Diligence Report Resettlement Due Diligence Report August 2015 VIE: Power Transmission Investment Program, Tranche 2-500kV Pleiku-My Phuoc-Cau Bong Transmission Line Binh Phuoc Province Prepared by Central Vietnam Power

More information

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT DRAFT COMPARATIVE ANALYSIS OF NEPAL s LEGAL FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT Note: The following is based

More information

Resettlement Plan. October Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank.

Resettlement Plan. October Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank. Resettlement Plan October 2013 IND: Jammu & Kashmir Urban Sector Development Investment Programme (JKUSDIP) Construction of Storm Water Drains in the Adjoining Areas of NH Bypass (Rawalpora Chowk Chanapora

More information

Resettlement Plan: Solar-LED Streetlights. BAN: Power System Efficiency Improvement Project

Resettlement Plan: Solar-LED Streetlights. BAN: Power System Efficiency Improvement Project Resettlement Plan: Solar-LED Streetlights Document Stage: Draft Project Number: 37113 April 2011 BAN: Power System Efficiency Improvement Project Prepared by: Bangladesh Power Development Board (BPDB),

More information

Draft Resettlement Policy Framework

Draft Resettlement Policy Framework Republic of Tajikistan Ministry of Transport Central Asia Road Links Project Republic of Tajikistan Draft Resettlement Policy Framework Date: July 5, 2014 Draft Resettlement Policy Framework for Central

More information

Resettlement Policy Framework

Resettlement Policy Framework Urban Transport Improvement Project of Tianjin by Using the World Bank Loan Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives Page 1 of 9 Involuntary Resettlement 1. Bank 1 experience indicates that involuntary resettlement under development projects, if unmitigated, often gives rise to severe economic, social, and environmental

More information

Decree on Compensation and Resettlement Management in Development Projects

Decree on Compensation and Resettlement Management in Development Projects Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity The Government No. 84 Vientiane Capital, Date: 05 / 04 / 2016 Decree on Compensation and Resettlement Management in Development

More information

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II Social Safeguards Monitoring Report Full Report November 2018 CAM: Rural Roads Improvement Project II Prepared by the Ministry of Rural Development for the Kingdom of Cambodia and the Asian Development

More information

VIE: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Project

VIE: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Project Resettlement Plan July 2012 VIE: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Project Prepared by Ho Chi Minh City People s Committee Management Authority Of Urban Railway for the Asian Development

More information

India: Preparing the Energy Efficiency Enhancement Project in the Assam Power Sector

India: Preparing the Energy Efficiency Enhancement Project in the Assam Power Sector Resettlement Planning Document Short Resettlement Plan for Tranche-2 Components Document Stage: Draft for Consultation Project Number: TA 7096-IND April 2010 India: Preparing the Energy Efficiency Enhancement

More information

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION Public Disclosure Authorized VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION ------------------------------------------------------------------ SFG1163 V11 Public Disclosure Authorized Public

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Tajikistan Ministry of Transport Central Asia Road Links Project Republic

More information

SRI: Local Government Enhancement Project

SRI: Local Government Enhancement Project Appendix 13 Resettlement Framework Dec 2011 SRI: Local Government Enhancement Project CURRENCY EQUIVALENTS (as of 27 June 2011) Currency Unit = Sri Lankan Rupee/s (SLR/Rs) Rs1.00 = $0.0091 $1.0 = Rs 109.8700

More information

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION ---------------------------------------------------------------

More information

VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT

VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT Resettlement Framework February 2012 VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT Prepared by the Ministry of Agriculture and Rural Development (MARD), Socialist

More information

Internal Monitoring Report. PAK: Loan 2299: Lower Bari Doab Canal Improvement Project

Internal Monitoring Report. PAK: Loan 2299: Lower Bari Doab Canal Improvement Project Internal Monitoring Report 37231-023 March 2016 PAK: Loan 2299: Lower Bari Doab Canal Improvement Project This social monitoring report is a document of the borrower. The views expressed herein do not

More information

The World Bank FOR OFFICIAL USE ONLY

The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT

More information

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF)

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) World Bank-financed Project World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

MLD: Greater Malé Environmental Improvement and Waste Management Project

MLD: Greater Malé Environmental Improvement and Waste Management Project Resettlement Framework Document Stage: Draft for Consultation Project Number: 51077-002 March 2018 MLD: Greater Malé Environmental Improvement and Waste Management Project Prepared by Ministry of Environment

More information

THE LAND ACQUISITION, RESETTLEMENT, REHABILITATION AND INDIGENOUS PEOPLES (LARRIP) POLICY FRAMEWORK (Chapter 3 of the SEMS Policy Framework)

THE LAND ACQUISITION, RESETTLEMENT, REHABILITATION AND INDIGENOUS PEOPLES (LARRIP) POLICY FRAMEWORK (Chapter 3 of the SEMS Policy Framework) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NRIMP2: LARRIP FRAMEWORK E1467 V34 THE LAND ACQUISITION, RESETTLEMENT, REHABILITATION

More information

ABBREVIATED RESETTLEMENT ACTION PLAN

ABBREVIATED RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project: Irrigated Agriculture Improvement (IAIP) Subproject 1, Hoa Binh province SOCIALIST

More information

MLD - Kulhudhuffushi Harbor Expansion Project

MLD - Kulhudhuffushi Harbor Expansion Project Kulhudhuffushi Harbor Expansion Project (RRP MLD 36111-013) Due Diligence Report on Involuntary Resettlement and Indigenous Peoples March 2016 MLD - Kulhudhuffushi Harbor Expansion Project Prepared by

More information

PAK: MFF II Power Transmission Enhancement Program (PTEIP II)

PAK: MFF II Power Transmission Enhancement Program (PTEIP II) Social Document stage: Draft 16 May, 2017 PAK: 48078-002 MFF II Power Transmission Enhancement Program (PTEIP II) Social Due Diligence Review of Upgradation/ Extension of NTDC s Telecommunication & SCADA

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Cao Bang Province Prepared by the Ministry of Education

More information

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Final Project Number: 40282 September 2006 VIE: Calamity Damage Rehabilitation Project The summary

More information

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN. VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE

DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN. VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE DUE DILIGENCE REPORT AND CORRECTIVE ACTION PLAN Project Number: Loan 2225-VIE September 2013 VIE: Northern Power Transmission Expansion Sector Project SON LA HIEP HOA 500 KV TRANSMISSION LINE Prepared

More information

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TRANSPORT NOTES TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP THE WORLD BANK,

More information

THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA

THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA In July 2014 the World Bank Inspection Panel, the Bank s complaints mechanism for people who believe that

More information

ORDINANCE NO GAS FRANCHISE

ORDINANCE NO GAS FRANCHISE ORDINANCE NO. 1161 GAS FRANCHISE AN ORDINANCE GRANTING TO NEW MEXICO GAS COMPANY, INC., A DELAWARE CORPORATION, ITS LEGAL REPRESENTATIVES, SUCCESSORS, LESSEES AND ASSIGNS, GRANTEE HEREIN, CERTAIN POWERS,

More information

Gender Equality and Development

Gender Equality and Development Overview Gender Equality and Development Welcome to Topic 3 of the e-module on Gender and Energy. We have already discussed how increased access to electricity improves men s and women s lives. Topic Three

More information

India: Madhya Pradesh Urban Services Improvement Project (MPUSIP)

India: Madhya Pradesh Urban Services Improvement Project (MPUSIP) Resettlement Planning Document Resettlement Framework Document Stage: Draft for Consultation Project Number: 42486 June 2016 India: Madhya Pradesh Urban Services Improvement Project (MPUSIP) The resettlement

More information

India: Infrastructure Development Investment Program for Tourism

India: Infrastructure Development Investment Program for Tourism Infrastructure Development Investment Program for Tourism (RRP IND 40648) Resettlement Framework (Updated) Project Number: P40648 Approved: July 2010 Revised: October 2010 India: Infrastructure Development

More information

MFF 0021-PAK: Power Distribution Enhancement Investment Program Proposed Tranche 3

MFF 0021-PAK: Power Distribution Enhancement Investment Program Proposed Tranche 3 Resettlement Plan October 2012 MFF 0021-PAK: Power Distribution Enhancement Investment Program Proposed Tranche 3 Prepared by Multan Electric Power Company for the Asian Development Bank. ASIAN DEVELOPMENT

More information

CORPORATION OF THE TOWNSHIP OF ESQUIMALT PARKING BYLAW 1992 BYLAW NO. 2011

CORPORATION OF THE TOWNSHIP OF ESQUIMALT PARKING BYLAW 1992 BYLAW NO. 2011 CORPORATION OF THE TOWNSHIP OF ESQUIMALT PARKING BYLAW 1992 BYLAW NO. 2011 MAY, 2003 Consolidated for convenience. In case of discrepancy the original Bylaw or Amending Bylaws must be consulted. PARKING

More information

SOL: Transport Sector Flood Recovery Project

SOL: Transport Sector Flood Recovery Project Resettlement Plan March 2016 SOL: Prepared by the of the for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those

More information

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RPF of Additional Financing for Fujian Highway Sector Investment Project Contents RP1032

More information

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems Technical Assistance Consultant s Report Project Number: 44140 Date: April 2014 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Supporting and Strengthening National-Level Capacity

More information

IND: Visakhapatnam to Chennai Industrial Corridor Development Program (VCICDP)

IND: Visakhapatnam to Chennai Industrial Corridor Development Program (VCICDP) Resettlement Framework Document stage: Draft for Consultation Project Number: 48434 March 2016 IND: Visakhapatnam to Chennai Industrial Corridor Development Program (VCICDP) Prepared by the Department

More information

SYMBION POWER LAKE KIVU LTD.

SYMBION POWER LAKE KIVU LTD. SYMBION POWER LAKE KIVU LTD. DRAFT Abbreviated Relocation Action Plan and Livelihoods Restoration Plan Final October 2018 [11.4.3.3] [10669-20181009-ESIA Abbreviated RAP_final_signed.pdf] [Page 1 of 52]

More information

Resettlement and Ethnic Minority Development Framework (REMDF)

Resettlement and Ethnic Minority Development Framework (REMDF) Resettlement and Ethnic Minority Development Framework (REMDF) Stage of the document: FINAL Project number: 49026-002 April 2017 VIE: Basic Infrastructure for Inclusive Growth in the Northeastern Provinces

More information

Comparative Analysis of Philippines Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

Comparative Analysis of Philippines Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement Comparative Analysis of Philippines Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Corresponding Provisions in National and Legal Involuntary Resettlement Safeguards Objectives:

More information

AFG: MFF Water Resources Development Investment Program- Tranche 1, Nangarhar Valley Development Authority Grant No: 0167 AFG

AFG: MFF Water Resources Development Investment Program- Tranche 1, Nangarhar Valley Development Authority Grant No: 0167 AFG Social Monitoring Report Semiannual Report February 2015 AFG: MFF Water Resources Development Investment Program- Tranche 1, Nangarhar Valley Development Authority 42091 Grant No: 0167 AFG Project Implementation

More information

RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE

RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the CENTRAL

More information

RESETTLEMENT PLAN (RP) TAY HA NOI 500KV SUBSTATION

RESETTLEMENT PLAN (RP) TAY HA NOI 500KV SUBSTATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL POWER TRANSMISSION CORPORATION Northern Power Projects Management Board -------------------------------

More information

Recommendation 1: Establish a compensation deficit payment scheme.

Recommendation 1: Establish a compensation deficit payment scheme. Eleventh Quarterly Progress Report ADB Management s Action Plan to Implement the Board Decision on the Recommendations of the CRP Final Report: Rehabilitation of the Railway in Cambodia Project This report

More information

BAN: Secondary Education Sector Investment Program

BAN: Secondary Education Sector Investment Program Secondary Education Sector Investment Program (RRP BAN 44213) Resettlement Framework September 2013 BAN: Secondary Education Sector Investment Program Prepared by Directorate of Secondary and Higher Education

More information

Resettlement Framework

Resettlement Framework i Resettlement Framework Resettlement Framework Document Stage: Draft for Consultation September 2007 Cambodia: Tonle Sap Lowland Stabilization Sector Project The Resettlement Framework is a document of

More information

Province of Alberta EXPROPRIATION ACT. Revised Statutes of Alberta 2000 Chapter E-13. Current as of December 17, Office Consolidation

Province of Alberta EXPROPRIATION ACT. Revised Statutes of Alberta 2000 Chapter E-13. Current as of December 17, Office Consolidation Province of Alberta EXPROPRIATION ACT Revised Statutes of Alberta 2000 Current as of December 17, 2014 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700, Park

More information