1 CONSTRUCTION THE RISE OF THE CORPORATE DEATH PENALTY: UNDERSTANDING SUSPENSIONS AND DEBARMENTS Over the past decade, the number of convicted criminals sentenced each year to the death penalty has rapidly declined. 1 Yet, while fewer criminals are being sentenced to capital punishment, the number of federal government contractors sentenced to what is commonly known as the corporate death penalty has skyrocketed. According to a September 2012 report issued by the Interagency Suspension and Debarment Committee (ISDC), federal agencies 2 took 5,838 suspension or debarment actions in fiscal year 2011, 3 up from 2,668 in fiscal year Since there is no indication that contractors are behaving any worse than they were a few years ago, it raises the question: What is causing this dramatic rise in the number of suspensions and debarments? The dramatic uptick in suspensions and debarments should not only be a concern to bad contractors, but also to good contractors. Under the new rules and regime, it appears that the days of free passes and second chances may be going away. ORIGINS AND CAUSES FOR SUSPENSION AND DEBARMENT Suspensions and debarments are exclusions of individuals and entities from federal contracting. The U.S. Comptroller General first recognized the right of government agencies to debar or suspend contractors from bidding on federal contracts in In that watershed opinion, the comptroller general recognized as a general rule, there is no authority for the debarment of bidders, but there might be circumstances when the interests of the United States justified debarment of a contractor from bidding on federal contracts Death Penalty Information Center, The Death Penalty in 2011: The Year End Report (Dec. 2011), available at www. deathpenaltyinfo.org/documents/2011 Year End.pdf. 2. For purposes of simplicity, federal agencies and departments are referred to collectively as agencies in this article. 3. ISDC, FY11 Report on Federal Agency Suspension and Debarment Activities (Sept. 18, 2012) [hereinafter ISDC FY11 ], available at 4. ISDC, FY09 and FY10 Report on Federal Agency Suspension and Debarment Activities (June 15, 2011) [hereinafter ISDC FY09/10 ], available at 5. Comptroller Gen. McCarl to the Sec y of the Treasury, 7 Comp. Gen. 547 (1928). 6. Ibid.

2 There are three types of suspension and debarment actions that can be taken by a federal agency to exclude an entity from federal contracting: Suspension a temporary disqualification of a contractor from government contracting Proposed debarment occurs when an agency debarring official issues a notice of proposed debarment, and lasts until the debarring official makes the decision on whether or not to debar for a specified period Debarment an exclusion of a contractor from government contracting for a specified period after debarment procedures have been followed Depending on the contractor and circumstances, a contractor can go through one or all of these stages. 7 Suspension and debarment actions can be authorized by statute or regulation. While statutory-based suspension and debarment is usually mandatory and intended as a punishment, administrative suspension and debarment is discretionary and may not be imposed for the purpose of punishment. Authority for administrative suspensions and debarments is found in FAR Part 9.4 (procurement-based), 2 C.F.R. Part 180 (nonprocurement-based), and individual agency regulations. However, even if there is sufficient proof of such misconduct, none of these administrative causes result in automatic suspension or debarment. Instead, an agency s suspension and debarment official (SDO) has the discretion to decide whether it is in the government s best interests to suspend or debar the contractor. Importantly, the serious nature of debarment and suspension requires that these sanctions be imposed only in the public interest for the Government s protection and not for purposes of punishment. 10 More specifically, It serves a remedial purpose of protecting the federal government from the business risk of dealing with an individual who lacks business integrity or business honesty. 11 PROCEDURES FOR SUSPENSION AND DEBARMENT The debarment and suspension procedures vary from agency to agency. If the SDO believes there is sufficient evidence of contractor misconduct to justify action, then it will either issue a notice of suspension or a notice of proposed debarment to the contractor. 12 The contractor (also referred to as the respondent in such proceedings) then has 30 days from receipt of the notice to submit a written response with facts and argument contesting the basis for suspension or debarment. 13 Today, most suspensions and debarments result from a contractor s commission of criminal or civil fraud, poor contract performance, or other serious misconduct that indicates that the contractor is not presently responsible. 8 The FAR enumerates a number of causes for which a contractor may be suspended or debarred, including: Fraud relating to obtaining, performing, or attempting to obtain a public contract or subcontract Violation of antitrust statutes relating to submission of offers Embezzlement Theft Forgery Bribery Falsification or destruction of records Federal tax delinquency 9 7. See U.S. Gov t Accountability Office (GAO), GAO , Suspension and Debarment: DOD has Active Referral Processes, but Action Needed to Promote Transparency 4-5 (2012). 8. See Steven A. Shaw, Deputy General Counsel (Contractor Responsibility), U.S. Air Force, Suspension and Debarment in a Nutshell (2011), available at media/document/afd pdf. 9. FAR , ; see also GAO , supra note 7, at 5. For a more detailed discussion on the causes for suspension and debarment, see Kate M. Manuel, Cong. Research Serv., Report No. R40826, Debarment and Suspension of Government Contractors: An Overview of the Law Including Recently Enacted and Proposed Amendments (Jan. 6, 2012), available at FAR 9.402(b). 11. See Burke v. U.S. E.P.A., 127 F. Supp. 2d 235, (D.D.C. 2001) (quoting 40 C.F.R (a)(4)). 12. In some cases, the SDO will first send a show-cause letter to the contractor. A show-cause letter offers the contractor a brief period to respond and convince the SDO that administrative action is not warranted. Unlike a notice of suspension or proposed debarment, a show-cause letter does not suspend the contractor during the pendency of the investigation. See David Robbins, et al., Path of an Investigation: How a Major Contractor s Ethics Office and Air Force Procurement Fraud and Suspension/Debarment Apparatus Deal with Allegations of Potential Fraud and Unethical Conduct, 40 Pub. Cont. L.J. 595, 611 (2011). 13. FAR (c)(5); FAR (c)(4). 2

3 IMPLICATIONS OF SUSPENSION AND DEBARMENT The implications of suspension or debarment should not be taken lightly. It has long been said that suspension or debarment is the equivalent of the death penalty for a contractor. 14 Absent a compelling reason justification an awarding agency, 15 a suspended or debarred contractor is prohibited from bidding on any federal government contracts, nor may it perform any federal subcontracts valued in excess of $30, These same restrictions may also be applied to entities and individuals affiliated with the suspended/debarred contractor. 17 With regard to the contractor s existing federal contracts, no new orders, work or options can be exercised, and the government even has discretion to terminate these existing contracts. 18 In addition to the immediate consequences, long-term and collateral consequences also result from suspension or debarment. A contractor may lose its security clearance or specialty license, making it impossible to return to work even after the debarment/suspension period ends. Additionally, a contractor with a federal suspension or debarment on its record will be put at a significant disadvantage when competing for many local and state contracts, and may in some jurisdictions face reciprocal suspension/debarment. 19 The reality is most contractors are unable to recover from a debarment or long-term suspension. Even a brief suspension can cripple a contractor s business. 20 WHY ARE SUSPENSIONS AND DEBARMENTS ON THE RISE? A September 2012 report issued by the ISDC showed a more than two-fold increase in the number of suspension and debarment actions taken over the past two fiscal years. 21 While there is no doubt that suspensions and debarments are on the rise, the actual increase may not be as dramatic as the statistics in the ISDC reports would suggest. The shortcoming of the ISDC report is that it counts the number of suspensions and debarments in terms of actions instead of cases. A suspension or debarment action occurs each time any entity or individual is suspended, proposed for debarment, or debarred. The first problem is that while some contractors who end up being debarred for misconduct are first suspended and/or proposed for debarment for that same misconduct, some are not. In addition, when an agency commences a suspension or debarment case against a contractor, it will often prosecute multiple individuals and entities affiliated with that contractor as part of the same case. However, there is little uniformity in the number of affiliates prosecuted from one case to the next. Thus, while one suspension or debarment case might account for just a single action, another case might account for 27 actions (e.g., if nine affiliated entities/ individuals are prosecuted for the same misconduct as part of a single case, and all nine are suspended, proposed for debarment, and then debarred, this one case would amount to 27 actions ). 22 Because there is little uniformity in the number of actions taken per case, comparing the number of suspension and debarment actions taken from one year to the next is not a particularly reliable way to measure the true increase suspensions and debarments. 23 Because the ISDC statistics are reported in terms of actions, and not cases, the statistics should be taken with a grain of salt. Although the ISDC data clearly show that suspension and debarment activity is on the rise, it is unlikely that suspension and debarment cases have actually doubled over the past two fiscal years. There are a number of explanations for why suspensions and debarments are on the rise across the majority of federal agencies. The following are some of the primary reasons for the increase. 14. See Todd J. Canni, Shoot First, Ask Questions Later: An Examination and Critique of Suspension and Debarment Practices Under the FAR, Including A Discussion of the Mandatory Disclosure Rule, the IBM Suspension, and Other Noteworthy Developments, 38 Pub. Cont. L.J. 547, 579 (2009). 15. Individual agencies may still contract with a suspended or debarred contractor if they have documented in writing that a compelling reason to do so exists. See FAR 9.405(a), (c), and (d). 16. FAR 9.405; FAR (b). An exception to this rule exists for commercially available off-the-shelf items. See FAR (b) (d). 17. FAR (b) ( Debarment constitutes debarment of all divisions or other organizational elements of the contractor, unless the debarment decision is limited by its terms to specific divisions, organizational elements, or commodities. The debarring official may extend the debarment decision to include any affiliates of the contractor if they are [s] pecifically named; and [g]iven written notice of the proposed debarment and an opportunity to respond (see (c)). ); FAR (c) (similar provision for suspensions). 18. FAR (a) (b). See, e.g., Commercial Drapery Contractors, Inc. v. U.S., 133 F.3d 1, 5-6 (D.C. Cir. 1998) (upon suspension of contractor, agency official properly canceled existing contract after conferring with other contracting officials and with counsel). 19. By way of example, a contractor with a recent federal suspension or debarment on its record would have difficulty winning, or be prohibited from bidding on, certain contracts with the following state and local agencies as a result of those jurisdictions prequalification surveys or responsibility questionnaires: California Department of Transportation, New York State Department of Transportation, City of Seattle, City of Los Angeles, City of San Diego, Tennessee Department of Transportation, Washington State Department of Transportation, South Carolina Department of Transportation, Vermont Agency of Transportation, Virginia Department of Transportation, and West Virginia Department of Transportation. 20. For example, in 2010 a contractor was suspended by a federal agency amidst allegations the contractor had improperly received government contracts intended for small businesses. Just eighteen days later, the suspension was lifted, but in the wake of the suspension the contractor lost nearly a quarter of its workforce, and experienced a 30.9 percent decline in revenue. See Allison C. Lerner, Inspector General, National Science Foundation, Suspension & Debarment Overview 10 (June 23, 2011), available at oig/brussels2011/15lerner.pdf. 21. Compare ISDC FY11, supra note 3, with ISDC FY09/10, supra note In re Golden West Imaging, et. al, AFD No (April 18, 2011), available at A recent GAO study of Department of Defense suspension and debarment activity indicates that each suspension or debarment case accounts for an average of four suspension or debarment actions. See GAO , supra note 7, at 3. 3

4 ENHANCED SUSPENSION AND DEBARMENT PROGRAMS AND POLICIES The data indicates that the primary reason for the increase in suspensions and debarments is that, over the past few years, a number of federal agencies have significantly enhanced their suspension and debarment programs and policies through increased staffing, procedures, training, monitoring, and oversight. The impact of these improvements is best seen by comparing the agencies that have recently reported dramatic increases in the number of suspension and debarment actions, with those agencies reporting only marginal increases. Of the federal agencies reporting the greatest increases in suspension and debarment actions, most have only just in the past few years developed detailed and effective suspension and debarment programs and policies. For example, one of the agencies reporting the largest increase in suspension and debarment actions is the Department of Transportation (DOT), going from 15 actions in fiscal year 2009 to 185 in fiscal year 2011 (a 1,133 percent increase). 24 A audit by DOT s inspector general showed that DOT s suspension and debarment programs were limited by delays in department decisions and reporting, as well as deficiencies in its policies, procedures, and internal controls. 25 Since that audit, DOT has revamped its suspension and debarment policies and procedures to increase oversight and compliance, and has provided new training to its staff. 26 Another agency that has seen a dramatic increase in suspension and debarment actions is the U.S. Agency for International Development (USAID). Like DOT, a 2009 audit of USAID showed that its suspension and debarment programs and policies were insufficient. 27 In response, USAID revised its suspension and debarment programs and policies, and has signed additional staff to work on suspension and debarment issues. 28 As a result, USAID went from 15 suspension and debarment actions in fiscal year 2009 to 63 actions in fiscal year 2011 (a 320 percent increase). 29 By contrast, many of the agencies that have long had detailed and effective suspension and debarment programs and policies in place reported only marginal increases in their number of suspension and debarment actions over this same period of time. For example, unlike most of the other federal agencies, the Defense Logistics Agency (DLA), U.S. Navy, and General Services Administration (GSA) have long had dedicated suspension and debarment programs in place with full-time staff, detailed policies and procedures, and practices that encourage an active referral process. 30 These agencies have been amongst the highest in number of suspension and debarment actions taken over the past decade. 31 Yet, while the number of suspension and debarment actions more than doubled governmentwide between fiscal years 2009 and 2011, the total number of suspension or debarment actions taken by DLA, the U.S. Navy, and GSA increased by less than 20 percent. 32 This data reflects a strong correlation between the enhancement of suspension and debarment programs and policies and the increase in the number of suspension and debarment actions Compare ISDC FY11, supra note 3, with ISDC FY09/10, supra note See Office of Inspector General, U.S. Dept. of Transp., PT , DOT s FY 2011 Top Management Challenges 38 (Nov. 15, 2010), available at TMC%20for%20FY%202011%20-%20508.pdf; Office of Inspector General, U.S. Dept. of Transp., ZA , DOT s Suspension and Debarment Program Does Not Safeguard Against Awards to Improper Parties (Jan. 7, 2010), available at See ISDC FY11, supra note 3, at 16; DOT, PT , supra note 28, at See Office of Inspector General, USAID, P, Audit of USAID s Process for Suspension and Debarment (Oct. 1, 2009), available at files/audit-reports/ p.pdf; Tim Cox, Assistant Inspector General for Audit, USAID, The USAID Suspension & Debarment Experience 6 (CIGIE Suspension & Debarment Conference, Oct. 14, 2011), available at See Cox, supra note 30, at Compare ISDC FY11, supra note 3, with ISDC FY09/10, supra note 4; see also Cox, supra note 30, at See U.S. Gov t Accountability Office, GAO , Suspension and Debarment: Some Agency Programs Need Greater Attention, and Governmentwide Oversight Could Be Improved (2011); see also ISDC FY11, supra note 2; ISDC FY09/10, supra note Ibid. 32. Compare ISDC FY11, supra note 3, with ISDC FY09/10, supra note 4 (in fact, the number of actions taken by GSA decreased during that period). 33. See GAO , supra note 33 (concluding that the agencies with the most suspension or debarment actions also had the most comprehensive suspension and debarment programs and policies). 4

5 INCREASED OVERSIGHT AND SCRUTINY FROM THE LEGISLATIVE AND EXECUTIVE BRANCH Of course, the expansion of suspension and debarment programs and policies did not come about out of thin air. The initial catalyst for the expansion of these programs appears to have been a number of investigations and audits performed by ISDC, the Government Accountability Office, and various inspectors general over the past few years. 34 Their reports were highly critical of many agencies suspension and debarment programs. The revelations in these reports led to increased scrutiny and oversight from Congress and the White House. 35 Over the past few years, Congress has held a number of hearings regarding federal suspension and debarment, and several pieces of legislation have been introduced that would make suspension and debarment mandatory under certain circumstances. One such bill that has been enacted is the Consolidated Appropriations Act of Under that law, a contractor with a recent federal felony conviction or a delinquent tax liability is effectively suspended from federal contracting until the awarding agency has considered whether an actual suspension or debarment is appropriate. 37 More recently, Rep. Darrell Issa, R-Calif., chairmen of the House Oversight Committed, released a draft bill entitled the Stop Unworthy Spending Act (also referred to as the SUSPEND Act ), which would radically change federal suspension and debarment practice and procedure. 38 The SUSPEND Act would consolidate the suspension and debarment offices of over 41 civilian agencies into a single office within the General Services Administration called the Board of Civilian Suspension and Debarment ( BCSD ). 39 Noncivilian agencies, such as the Department of Defense, would also be able to opt into the consolidated BCSD suspension and debarment program. 40 THE MANDATORY DISCLOSURE RULE Another reason for the increase in suspension and debarment actions is the advent of the mandatory disclosure rule. Since 2008, all federal government contractors have been required to report to the agency any credible evidence of fraud and significant overpayments in connection with federal government contracts. 41 It is not hard to see why the mandatory disclosure rule has led to an increased number of suspension and debarment actions it requires contractors to disclose information to the agency that could get the contractor debarred, and if they do not disclose the information the agency can use nondisclosure itself as a basis for debarment. 34. See, e.g., ISDC FY11, supra note 3; ISDC FY09/10, supra note 4; DOT, PT , supra note 28; GAO , supra note 33; DOT, ZA , supra note 28; Office of Inspector General, DHS, OIG 10-50, DHS Use of Suspension and Debarment Actions for Poorly Performing Contractors (2010), available at Feb10.pdf; Office of Inspector General, DOD, D , Additional Actions Can Further Improve the DOD Suspension and Debarment Process (2011), available at mil/audit/reports/fy11/ pdf; Office of Inspector General, DOJ, Audit Rep , Audit of Statutory Suspension and Debarment Activities Within the Department of Justice (2012), available at Office of Inspector General, U.S. Department of Education, ED-OIG/I13L0001, U.S. Department of Education s Nonprocurement Suspension and Debarment Process (June 22, 2012), available at www2.ed.gov/about/offices/list/oig/aireports/i13l0001.pdf; see also Commission on Wartime Contracting in Iraq and Afghanistan, Final Report to Congress, Transforming Wartime Contracting: Controlling Costs, Reducing Risks (Aug. 2011), available at www. wartimecontracting.gov/docs/cwc_finalreport-lowres.pdf. 35. For instance, in November 2011, the White House (Office of Management and Budget) issued a memorandum requiring federal agencies to take specific action to remedy the deficiencies identified in GAO s August 2011 report, requiring each agency to appoint a senior accountable official to assess the agency s suspension and debarment program, including the adequacy of available training, resources, and staffing; ensure that the agency maintains effective internal controls and tracking capabilities; and ensure that the agency participates regularly on the ISDC. See Jacob J. Lew, Director, Office of Management and Budget, Executive Office of the President, M-12-02, Memorandum to the Heads of Executive Departments and Agencies (Nov. 15, 2011), available at Consolidated Appropriations Act of 2012, Pub. L. No , 125 Stat. 786 (2011). 37. Ibid. Congress has since extended the applicable provisions of this law through the end of fiscal year See Consolidated and Further Continuing Appropriations Act of 2013, Pub. L. No , 127 Stat. 198 (2013). Other legislation passed by Congress in 2012 affecting suspension and debarment include the following bills: National Defense Authorization Act for Fiscal Year 2013, Pub. L. No , 1682(a), Jan. 2, 2013, 126 Stat. 1632, 2086 (2013) (amending 15 U.S.C. 645(d)(2)(C) to make a contractor s misrepresentation of its status as a small business an independent basis for suspension or debarment); Honoring America s Veterans and Caring for Camp Lejeune Families Act of 2012, Pub. L. No , 706, 126 Stat. 1165, 1206 (2012) (amending 38 U.S.C. 8127(g) to extend mandatory debarment period to minimum of five years for a contractor that willfully misrepresents its status as a VOSB or SDVOSB). 38. The Stop Unworthy Spending Act or SUSPEND Act, Feb. 5, 2013 Discussion Draft, 113th Cong. (1st Sess. 2013), available at uploads/2013/02/draft_suspend_act_2-5.pdf. See also Press Release, H. Comm. Gov t Oversight, Issa: Stop Giving Taxpayer Dollars to Tax Cheats, Criminals, and Fraudsters (Feb. 7, 2013), See SUSPEND Act, supra note 41, See SUSPEND Act, supra note 41, 6401(f). 41. FAR , (b)(1)(iv), (a)(8), and

6 PREEMPTIVE STEPS CONTRACTORS CAN TAKE TO REDUCE THE RISK OF SUSPENSION AND DEBARMENT The best way for a contractor to avoid suspension or debarment is to implement policies and practices aimed at preventing misconduct from occurring. The most important and effective step that a contractor can take is to develop a values-based ethics program, which includes review and control procedures and training, and which establishes an ethical culture in the organization and encourages employees to do the right thing. It is critical that the commitment to the ethics program be company-wide; in particular, senior management must exhibit a real commitment to the program. In addition, a company should have a designated ethics officer who can facilitate training, answer questions, advise on ethics and compliance, and investigate complaints. 42 While implementing such a program does not guarantee the contractor immunity from suspension or debarment, it will undoubtedly reduce the risks. In addition, should misconduct occur, the fact that the contractor already has these measures in place will greatly reduce the chances that the contractor will ultimately be debarred. 43 HOW TO AVOID SUSPENSION AND DEBARMENT AFTER THE MISCONDUCT HAS OCCURRED Because the purpose of suspension and debarment under FAR Part 9.4 is to protect the government from doing business with nonresponsible contractors, rather than to punish contractors for past misconduct, 44 a contractor faced with a potential suspension or debarment is often in a position to avoid suspension or debarment even after the underlying misconduct has occurred. In fact, there are a number of actions that the contractor can take once it learns of the misconduct that still have the potential to reduce the chances of suspension or debarment (e.g., self-reporting, internal investigation, remedial measures, disciplinary actions, etc.). 45 But, if the contractor does not act immediately upon learning of the potential misconduct, it may miss its opportunity to establish a number of the key factors that would mitigate against debarment. 46 Because the appropriate strategy can vary dramatically on a case-by-case basis, and it will be to the contractor s benefit to bring in outside counsel at this initial stage to help evaluate its options and, if necessary, implement a mitigation strategy. The benefit of bringing in outside counsel at this early stage is that outside counsel is generally in a much better position to assess the circumstances and potential misconduct from a neutral point of view, and should have a better sense of what the SDO will look for in evaluating the case. Chances are bringing in outside counsel at this early stage will save the contractor money and reduce the likelihood of suspension or debarment. After receiving a notice of suspension or notice of proposed debarment, the contractor will need to determine what type of response is most likely to avoid or limit the suspension or debarment. There are essentially two distinct paths that a contractor can take to contest a proposed debarment or suspension. The first option is to contest the facts alleged in the notice. The contractor will not be debarred if it can show that there is no underlying factual basis for debarment. However, a frontal assault on the facts is risky if the contractor is unable to successfully dispute the facts, it will be more difficult for it to later establish the key mitigating factors (discussed later) that, if established, could avoid punishment even if the underlying misconduct did occur. 47 Since the existence of a cause for debarment does not necessarily require the contractor to be debarred, the contractor s second option is to focus on showing that it is presently responsible by establishing the mitigating factors set forth in the FAR. Before making the debarment decision, the SDO must consider the seriousness of the contractor s acts or omissions, together with any remedial measures or mitigating factors taken by the contractor. The agency must ascertain whether any mitigating factors or remedial measures show that the business risk of dealing with the individual has been eliminated to the extent that debarment is unnecessary See Steven A. Shaw, Government Tools to Encourage Ethical Conduct of their Contractors 5-6 (2009), available at pdf. 43. A compliance-only program is no longer considered sufficient, and in fact may be used as evidence against the contractor in a debarment proceeding. Id. 44. FAR 9.402(b). 45. See FAR (a)(1) (10). 46. Ibid. 47. In addition, this first option is particularly difficult to pursue if the contractor is facing debarment on the basis of a conviction or civil judgment, or suspension on the basis of an indictment. See FAR (b)(2), (b)(2). Under those circumstances, the contractor cannot raise a genuine issue of material fact by disputing the facts underlying the indictment, conviction or judgment. See FAR (d), (d). 48. Burke v. U.S. E.P.A., 127 F. Supp. 2d 235, 240 (D.D.C., 2001). 6

7 FAR (a) sets forth several relevant mitigating factors the agency should consider. 49 The contractor has the burden of demonstrating to the satisfaction of the SDO that sufficient mitigating factors make debarment unnecessary (i.e., that it is presently responsible ). 50 These mitigating factors include the following: EFFECTIVE STANDARDS AND CONTROLS IN PLACE 51 The first mitigating factor is whether the contractor had effective standards of conduct and internal control systems in place at the time of the misconduct or had adopted such procedures prior to any government investigation of the misconduct. This factor centers on the values-based ethics program previously discussed. SELF-DISCLOSURE AND DEGREE OF COOPERATION 52 Another mitigating factor is the extent to which a contractor timely self-discloses the misconduct to the agency, and thereafter voluntarily cooperates with investigative authorities. A contractor s voluntary cooperation may be so substantial that such cooperation seriously mitigates the need for debarment or seriously reduces the period of debarment necessary to protect the government. 53 Further, [c]ooperation can take a number of forms, including bringing the activity cited as the cause for debarment to the appropriate government agency in a timely manner and providing the results of the respondent s internal investigation to the government. 54 Where the contractor has conducted an internal investigation, the agency will insist on full disclosure of the circumstances underlying the misconduct, including complete copies of the contractor s internal investigation reports, regardless of privilege. 55 While the agency may consider this as evidence that the contractor is presently responsible, a contractor s disclosure of only a sanitized copy of an investigative report will be given less weight. 56 If the contractor only self-reports its misconduct after learning that the agency is conducting an inquiry into the incident, then this will have little effect toward mitigating against debarment. 57 In addition, conduct that is to be expected in an enforcement proceeding (such as producing requested information and attending hearings) is insufficient to establish voluntary cooperation and present responsibility 58 nor will a guilty plea in exchange for leniency in sentencing. 59 PAYMENT OF ALL JUDICIAL AND ADMINISTRATIVE FINES, SANCTIONS, AND RELATED MONETARY OBLIGATIONS 60 Another mitigating factor exists if the contractor has paid or has agreed to pay all criminal, civil, and administrative liability for the improper activity, including any investigative or administrative costs incurred by the government, and has made or agreed to make full restitution. 61 The SDO may consider information showing that a respondent has fulfilled or promptly made arrangements to fulfill judicial and administrative sanctions, including any restitution. 62 However, an SDO may give little weight to payment of a court-imposed sanction, 63 or if payment is made by a third party The SDO may consider other factors if appropriate in light of the circumstances of each case. See FAR Burke, 127 F. Supp. 2d at 240; see also Joseph Construction Company, Inc. v. Veterans Administration, 595 F. Supp. 448, 451 (N.D. Ill. 1984); In re Lake Doctors, Inc., et al., EPA Cases Nos , -01, 1995 WL , at *7 (Aug. 14, 1995). 51. FAR (a)(1). 52. FAR (a)(2) (4). 53. In re Gary Boblitt, EPA Case No , 1998 WL , at *3 (March 24, 1998); see also In re Caschem, Inc., EPA Case No , 1998 WL , at *7 (May 12, 1998); In re Kelley Technical Coatings, Inc., EPA Case No , 1997 WL , at *6 (Aug. 28, 1997) ( Similarly, in a proper case, a respondent s voluntary cooperation after an investigation commences may be so extraordinary that, in conjunction with other information in the record, the government s trust in the respondent may be restored and a determination of present responsibility warranted. ); see, e.g., In re Robert Schlosser, EPA Case No (Dec. 2, 1992) (respondent placed his own safety at risk by wearing a body wire to assist the government to obtain evidence against his employer). 54. In re Cimarron Aircraft Corp., EPA Case No , 1995 WL , at *9 (June 7, 1995). 55. See Shaw, supra note 11, at Ibid. 57. See In re John R. Fields, EPA Case No , 1995 WL , at *7 (Nov. 13, 1995). 58. See In re Kelley Technical Coatings, Inc., supra note 56, at *6 59. See In re Caschem, Inc., supra note 56, at *6 60. FAR (a)(5). 61. Ibid. 62. In re Robert Edward Caron, EPA Case No , 1999 WL , at *9 (Jan. 28, 1994). 63. See In re Michael Gruttadauria, EPA Case No , 1999 WL , at *4 (July 30, 1994) ( For purposes of this debarment inquiry, Mr. Gruttadauria appears to have fulfilled the court imposed sanctions. Fulfillment of the court s sentence is mandatory. This action sheds little if any light on the current state of Mr. Gruttadauria s business ethics. Without more, the fact Mr. Gruttadauria fulfilled the court imposed sanctions carries limited mitigation weight. It does not provide persuasive support for a conclusion that debarment is unnecessary. ). 64. See In re Stuart B. Cooper, EPA Case No , 1998 WL , at *7 (June 25, 1998) (the mitigating effect of the payment is minimized, if not eliminated, if a third party directly or indirectly pays the fine on the contractor s behalf). 7

8 APPROPRIATE DISCIPLINARY ACTION 65 Evidence that a company has taken appropriate disciplinary action against the individuals responsible for the misconduct is another factor considered by the SDO in determining whether a period of debarment is necessary. The contractor is likely to receive credit on this factor if it suspends or terminates the responsible employee, but is unlikely to receive credit if the employee simply resigns. 66 The sooner the employee is terminated following the misconduct, the more it mitigates against debarment, particularly if the employee is terminated or suspended prior to the agency giving notice of a proposed debarment. 67 IMPLEMENTATION OF EFFECTIVE REMEDIAL MEASURES AND TIME ELAPSED SINCE THE OFFENSE 68 A contractor s implementation of remedial measures taken after the misconduct is also a relevant mitigation factor. 69 A contractor may demonstrate by evidence of remedial measures that it is presently responsible. The more time that has elapsed since the misconduct, and the longer the remedial measure has been in place, the more it will mitigate against debarment. 70 ACKNOWLEDGMENT OF RESPONSIBILITY AND RECOGNITION OF THE SERIOUSNESS OF THE MISCONDUCT 71 The most important mitigating factor is whether the contractor s senior management acknowledges responsibility for, and genuinely recognizes the seriousness of, the misconduct at issue. 72 For this factor to weigh in the contractor s favor, it is important that the contractor s senior management take steps that reflect a sincere comprehension of the serious nature of the past misconduct, as well as acceptance of responsibility for the past misconduct. 73 A contractor s acknowledgment of responsibility for the misconduct is given significant mitigating weight against debarment. 74 On the flip side, a contractor s failure to accept responsibility for misconduct is considered an aggravating factor. 75 ADMINISTRATIVE AGREEMENTS As an alternative to suspension or debarment, the agency may be willing to enter into an administrative agreement with the contractor. The administrative agreement will identify the misconduct that formed the basis for the action, state the remedial measures taken by the contractor to show present responsibility, and require audits and periodic reporting to verify compliance. Administrative agreements generally require the contractor to meet certain agency-imposed requirements to avoid suspension or debarment and remain eligible for new contracts FAR (a)(6). 66. See In re Caschem, Inc., supra note 56, at * See In re Golden West Imaging, et. al, supra note 25, at 5-6; In re Caschem, Inc., supra note 56, at *7; In re Ulysses Cruises, Inc., EPA Cases Nos , -02, 1999 WL , at *8 (April 26, 1999). 68. FAR (a)(7) (9). 69. FAR (a)(7); see also In re John R. Fields, supra note 60, at * See In re Cimarron Aircraft Corp., supra note 57, * FAR (a)(10). 72. See Shaw, supra note 11, at See In re Kelley Technical Coatings, Inc., supra note 56, at *7 (this mitigating factor was established when senior management took steps to remediate the misconduct, acknowledged that as the ultimate supervisor it was responsible for the misconduct, and took steps to train its employees to avoid a reoccurrence of the misconduct). 74. See In re Caschem, Inc., supra note 56, at *9 ( CASCHEM s acknowledgment of responsibility, as demonstrated through the remedial measures discussed in the following section, is given significant weight in reaching a recommendation that a period of debarment is not warranted. ); In re Ulysses Cruises, Inc., supra note 70, at *9 ( The transfer of vessel staffing and operation to a specialist company with effective policies and procedures, and the absence of new violation citations directly demonstrate acknowledgment of corporate responsibility and commitment to appropriate standards of business conduct.. Respondent s demonstrated remedial measures discussed in the following section, is given significant weight in reaching a recommendation that a period of debarment is not warranted. ); In re Kelley Technical Coatings, Inc., supra note 46, at *7 ( Mr. Williams [KTC s president and CEO] presentation reflected a sincere comprehension of the serious nature of the past misconduct as well as acceptance of responsibility for the environmental noncompliance of KTC. Mr. William s acknowledgement of responsibility is of mitigative value in the determination that a period of debarment is not warranted for KTC. ). 75. See In re Lake Doctors, Inc., et al., supra note 47, at * See Shaw, supra note 11, at 7; see also Manuel, supra note 10, at 10. 8

9 LIMITED JUDICIAL REVIEW OF SUSPENSIONS AND DEBARMENTS If suspended or debarred by an agency, the contractor can challenge the agency s decision by bringing an action in federal district court under the Administrative Procedure Act. 77 However, the standard applied on review is highly deferential to the agency. The court will not set aside the debarment or suspension unless the agency s actions were arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law. 78 In evaluating a debarment under this standard, the court s inquiry is limited to determining whether the agency examined the case facts and articulated a satisfactory explanation for its decision, including a rational connection between the facts found and the choice made. 79 SUMMARY OF BEST PRACTICES To summarize, the best way for a government contractor to avoid the corporate death penalty is to create and implement a comprehensive values-based ethics and compliance program, and to maintain that program from the top down. Should a contractor learn that it has committed misconduct that could form the basis for suspension or debarment, it is critical that it take immediate action to investigate and mitigate the misconduct. Failing to act with vigilance, or withholding information subject to the mandatory disclosure rule, will significantly increase the contractor s chances of being suspended or debarred. If the contractor learns of misconduct that might put it at risk of suspension or debarment, there are two simple steps it can immediately take to significantly reduce the likelihood of suspension or debarment: Bring in outside counsel to provide an unbiased assessment of the situation, and to help direct an internal investigation and mitigation if necessary; and Make sure that the contractor s senior management is heavily involved and at the forefront of all mitigation and remedial efforts. Although dealing with misconduct may be unpleasant, sometimes you have to do something unpleasant to avoid something even worse. And in the world of government contracts, there is nothing worse than being debarred. ABOUT THE AUTHOR Adam K. Lasky is an attorney at Oles Morrison Rinker & Baker LLP, where he counsels contractors on a range of government contracts and construction law matters. He has represented contractors involved in disputes before both state and federal courts, boards of appeal, and administrative agencies. He can be reached at Lasky@oles.com or See Burke v. U.S. E.P.A., 127 F. Supp. 2d 235, 238 (D.D.C. 2001); see also Agility Def. & Gov t Services, Inc. v. U.S. Dept. of Def., CV-11-S-4111-NE, 2012 WL , at *6 (N.D. Ala., June 26, 2012) ( debarment or suspension of an affiliate, not itself accused of wrongdoing, presents a justiciable controversy ). 78. Burke, 127 F. Supp. 2d at Ibid. (internal quotations omitted). For a compendium of case law concerning judicial review of debarment and suspension decisions, see David M. Sims, Esq., Debarment Program Manager, U.S. Dept. of the Interior, Case Law Compendium: Debarment and Suspension (Nov. 16, 2012), available at 9

10 CONTACTS ADAM K. LASKY Oles Morrison Rinker & Baker LLP navigant.com About Navigant Navigant Consulting, Inc. (NYSE: NCI) is a specialized, global professional services firm that helps clients take control of their future. Navigant s professionals apply deep industry knowledge, substantive technical expertise, and an enterprising approach to help clients build, manage, and/or protect their business interests. With a focus on markets and clients facing transformational change and significant regulatory or legal pressures, the firm primarily serves clients in the healthcare, energy, and financial services industries. Across a range of advisory, consulting, outsourcing, and technology/analytics services, Navigant s practitioners bring sharp insight that pinpoints opportunities and delivers powerful results. More information about Navigant can be found at navigant.com. linkedin.com/company/navigant twitter.com/navigant 2017 Navigant Consulting, Inc. All rights reserved A Navigant Consulting, Inc. ( Navigant ) is not a certified public accounting or audit firm. Navigant does not provide audit, attest, or public accounting services. See navigant.com/about/legal for a complete listing of private investigator licenses. This publication is provided by Navigant for informational purposes only and does not constitute consulting services or tax or legal advice. This publication may be used only as expressly permitted by license from Navigant and may not otherwise be reproduced, recorded, photocopied, distributed, displayed, modified, extracted, accessed, or used without the express written permission of Navigant.

February 2012 National 8(a) Winter Conference Current Issues in Federal Suspension and Debarment

February 2012 National 8(a) Winter Conference Current Issues in Federal Suspension and Debarment February 2012 National 8(a) Winter Conference Current Issues in Federal Suspension and Debarment Don Carney Rick Oehler Christine Williams Perkins Coie LLP 1 Perkins Coie Offices: 18 across the United

More information

Advising Construction Contractors on New Obligations with Respect to Suspended and Debarred Entities: ABA Public Contract Law Section Webinar June

Advising Construction Contractors on New Obligations with Respect to Suspended and Debarred Entities: ABA Public Contract Law Section Webinar June Advising Construction Contractors on New Obligations with Respect to Suspended and Debarred Entities: ABA Public Contract Law Section Webinar June 28, 2012 Speakers David Sims, Department of Interior,

More information

DoD SUSPENSION AND DEBARMENT: PROTECTING THE GOVERNMENT AND PROMOTING CONTRACTOR RESPONSIBILITY

DoD SUSPENSION AND DEBARMENT: PROTECTING THE GOVERNMENT AND PROMOTING CONTRACTOR RESPONSIBILITY DoD SUSPENSION AND DEBARMENT: PROTECTING THE GOVERNMENT AND PROMOTING CONTRACTOR RESPONSIBILITY Introduction Rodney A. Grandon Deputy General Counsel (Contractor Responsibility) Department of the Air Force

More information

A Practitioner s Guide to Suspension, Debarment and Contractor Responsibility

A Practitioner s Guide to Suspension, Debarment and Contractor Responsibility A Practitioner s Guide to Suspension, Debarment and Contractor Responsibility Introduction Rodney A. Grandon Deputy General Counsel (Contractor Responsibility & Conflict Resolution) Department of the Air

More information

PART 25-GOVERNMENTWIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) AND GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (GRANTS) Subpart A-General

PART 25-GOVERNMENTWIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) AND GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (GRANTS) Subpart A-General PART 25-GOVERNMENTWIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) AND GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (GRANTS) 25.100 Purpose. Subpart A-General (a) Executive Order (E.O.) 12549 provides

More information

FEDERAL CONTRACTS AND GRANTS. Agencies Have Taken Steps to Improve Suspension and Debarment Programs

FEDERAL CONTRACTS AND GRANTS. Agencies Have Taken Steps to Improve Suspension and Debarment Programs United States Government Accountability Office Committee on Oversight and Government Reform, House of Representatives May 2014 FEDERAL CONTRACTS AND GRANTS Agencies Have Taken Steps to Improve Suspension

More information

National Credit Union Administration (NCUA). Proposed Suspension and Debarment Procedures with request for

National Credit Union Administration (NCUA). Proposed Suspension and Debarment Procedures with request for This document is scheduled to be published in the Federal Register on 03/21/2018 and available online at https://federalregister.gov/d/2018-05626, and on FDsys.gov 7535-01-U NATIONAL CREDIT UNION ADMINISTRATION

More information

Subpart E Entitlement

Subpart E Entitlement 3016.60 CFR Ch. II). The date from which interest is computed is not extended by litigation or the filing of any form of appeal. Subpart E Entitlement SOURCE: 65 FR 49480, Aug. 14, 2000, unless otherwise

More information

PART 24 GOVERNMENT DEBAR- MENT AND SUSPENSION AND GOVERNMENTWIDE REQUIRE- MENTS FOR DRUG-FREE WORK- PLACE (GRANTS)

PART 24 GOVERNMENT DEBAR- MENT AND SUSPENSION AND GOVERNMENTWIDE REQUIRE- MENTS FOR DRUG-FREE WORK- PLACE (GRANTS) Pt. 24 Unauthorized ex parte communications shall not be taken into consideration in deciding any matter in issue. [50 FR 45912, Nov. 5, 1985, as amended at 52 FR 27130, July 17, 1987; 57 FR 20201, May

More information

DRAFT: SUBJECT TO CHANGE PRIOR TO COMMISSION ACTION TEXAS TRANSPORTATION COMMISSION

DRAFT: SUBJECT TO CHANGE PRIOR TO COMMISSION ACTION TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION ALL Counties MINUTE ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose the repeal of.00-.0 and propose new.00-.,

More information

October 17, Dear Vendors: Reference: RFQ No. FY Subject: Enterprise Risk Management Evaluation

October 17, Dear Vendors: Reference: RFQ No. FY Subject: Enterprise Risk Management Evaluation October 17, 2018 Dear Vendors: Reference: RFQ No. FY19-17106 Subject: Enterprise Risk Management Evaluation AAMVA is hereby requesting quotes on Enterprise Risk Management assessment. Please make sure

More information

Testimony of Scott Amey, General Counsel Project On Government Oversight (POGO) before the House Committee on Oversight and Government Reform

Testimony of Scott Amey, General Counsel Project On Government Oversight (POGO) before the House Committee on Oversight and Government Reform Testimony of Scott Amey, General Counsel Project On Government Oversight (POGO) before the House Committee on Oversight and Government Reform Protecting Taxpayers from Banned and Risky Contractors and

More information

AVIATION AUTHORITY POLICY. 400: FISCAL MATTERS Effective: 06/02/16

AVIATION AUTHORITY POLICY. 400: FISCAL MATTERS Effective: 06/02/16 PURPOSE: To establish a policy by which a Contractor (as defined below) may be suspended or debarred from doing business with the Authority. GENERAL: The Authority will strive to only solicit offers from,

More information

CITY OF CHICAGO DEPARTMENT OF PROCUREMENT SERVICES DEBARMENT RULES

CITY OF CHICAGO DEPARTMENT OF PROCUREMENT SERVICES DEBARMENT RULES CITY OF CHICAGO DEPARTMENT OF PROCUREMENT SERVICES DEBARMENT RULES Effective March 28, 2012-1 - City of Chicago Debarment Rules Section I. Scope of Rules. These Rules: (a) Prescribe policies and procedures

More information

Due Diligence: The Sentencing Guidelines and the Lawyer s Role in Corporate Compliance and Ethics Programs. by Steven Carr

Due Diligence: The Sentencing Guidelines and the Lawyer s Role in Corporate Compliance and Ethics Programs. by Steven Carr Due Diligence: The Sentencing Guidelines and the Lawyer s Role in Corporate Compliance and Ethics Programs by Steven Carr North Carolina Bar Foundation Continuing Legal Education December 9, 2005 Due Diligence:

More information

31414 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 MAY 3,

31414 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 MAY 3, 31414 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 MAY 3, 2012 1.03 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS RESOLUTION TO AMEND DEBARMENT

More information

Debarment and Suspension of Government Contractors: An Overview of the Law Including Recently Enacted and Proposed Amendments

Debarment and Suspension of Government Contractors: An Overview of the Law Including Recently Enacted and Proposed Amendments Debarment and Suspension of Government Contractors: An Overview of the Law Including Recently Enacted and Proposed Amendments Kate M. Manuel Legislative Attorney August 16, 2010 Congressional Research

More information

N.J.A.C. 17: Causes for debarment of a firm(s) or an individual(s)

N.J.A.C. 17: Causes for debarment of a firm(s) or an individual(s) N.J.A.C. 17:19-4.1 Causes for debarment of a firm(s) or an individual(s) (a) In the public interest, the DPMC may debar a firm or an individual for any of the following causes: 1. Commission of a criminal

More information

Memorandum. Summary. Federal Acquisition Regulation U.S.C. 403(7)(D). 2

Memorandum. Summary. Federal Acquisition Regulation U.S.C. 403(7)(D). 2 Memorandum To: Interested Parties From: National Employment Law Project Date: September 6, 2018 Re: Authority of Federal Contracting Officers to Consider Labor and Employment Law Violations When Making

More information

Offices of Inspectors General and Law Enforcement Authority: In Brief

Offices of Inspectors General and Law Enforcement Authority: In Brief Offices of Inspectors General and Law Enforcement Authority: In Brief Wendy Ginsberg Analyst in American National Government September 8, 2014 Congressional Research Service 7-5700 www.crs.gov R43722 Summary

More information

ATTACHMENT A. CERTIFICATION REGARDING MINORITY BUSINESS ENTERPRISES (applicable if an MBE goal is set)

ATTACHMENT A. CERTIFICATION REGARDING MINORITY BUSINESS ENTERPRISES (applicable if an MBE goal is set) ATTACHMENT A BID/PROPOSAL AFFIDAVIT Page 1 of 7 A. AUTHORIZED REPRESENTATIVE I HEREBY AFFIRM THAT: I am the (title) and the duly authorized representative of (business) and that I possess the legal authority

More information

Minnesota Department of Health Tribal Governments Grant Agreement

Minnesota Department of Health Tribal Governments Grant Agreement Instructions for completing this form are in blue and bracketed. Fill in every blank and delete all instructions, including these instructions, before sending this document to Financial Management for

More information

APPENDIX A INITIAL TECHNICAL PROPOSAL FORMS. 3. Acknowledgement of Receipt of Addenda Form

APPENDIX A INITIAL TECHNICAL PROPOSAL FORMS. 3. Acknowledgement of Receipt of Addenda Form APPENDIX A INITIAL TECHNICAL PROPOSAL FORMS 1. Transmittal Letter 2. Bid/Proposal Affidavit 3. Acknowledgement of Receipt of Addenda Form 3. MBE Attachment M1-A This form MUST be provided or the Proposal

More information

ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, Inc. REPRESENTATIONS AND CERTIFICATIONS (Must be completed and returned)

ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, Inc. REPRESENTATIONS AND CERTIFICATIONS (Must be completed and returned) ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, Inc. REPRESENTATIONS AND CERTIFICATIONS (Must be completed and returned) Date: The Contractor, by checking the appropriate boxes, makes the following

More information

ICAO VENDOR SANCTION POLICY. Approved by the Council and published by its decision

ICAO VENDOR SANCTION POLICY. Approved by the Council and published by its decision ICAO VENDOR SANCTION POLICY Approved by the Council and published by its decision 23 March 2017 Table of Contents 1. BACKGROUND... 3 2. PURPOSE AND OBJECTIVE... 3 3. DEFINITIONS... 3 4. THE SANCTIONS BOARD...

More information

Suspension and Debarment Policy

Suspension and Debarment Policy Suspension and Debarment Policy Kentucky Housing Corporation, as the housing finance agency for the Commonwealth of Kentucky, is charged with the allocation and administration of multiple federal and state

More information

Attachment C Federal Clauses & Certifications

Attachment C Federal Clauses & Certifications 1.0 No Obligation by the Federal Government. (1) The Purchaser and Contractor acknowledge and agree that, notwithstanding any concurrence by the Federal Government in or approval of the solicitation or

More information

SIGAR ENABLING LEGISLATION

SIGAR ENABLING LEGISLATION SIGAR ENABLING LEGISLATION (AS AMENDED) This is a conformed text of Section 1229 of the National Defense Authorization Act for Fiscal Year 2008, Pub. L. No. 110 181 (Jan. 28, 2008), 122 STATUTES AT LARGE

More information

Debarment and Suspension of Government Contractors: An Overview of the Law Including Recently Enacted and Proposed Amendments

Debarment and Suspension of Government Contractors: An Overview of the Law Including Recently Enacted and Proposed Amendments Debarment and Suspension of Government Contractors: An Overview of the Law Including Recently Enacted and Proposed Amendments Kate M. Manuel Legislative Attorney August 16, 2010 Congressional Research

More information

Appendix G PARKING CITATION PROCESSING SERVICES (PCPS) Jury Service Ordinance

Appendix G PARKING CITATION PROCESSING SERVICES (PCPS) Jury Service Ordinance Appendix G PARKING CITATION PROCESSING SERVICES (PCPS) Jury Service Ordinance Title 2 ADMINISTRATION Chapter 2.203.010 through 2.203.090 CONTRACTOR EMPLOYEE JURY SERVICE APPENDIX G Page 1 of 3 2.203.010

More information

Presentation to the. Mexico City. Phillip Herr. April 18, 2012

Presentation to the. Mexico City. Phillip Herr. April 18, 2012 Perspectives of a SAI Unauthorized to Impose Sanctions: The Experience of the U.S. Government Accountability Office Presentation to the International Forum on Supreme Auditing Mexico City Phillip Herr

More information

Indicative Sanctions Guidance

Indicative Sanctions Guidance Indicative Sanctions Guidance AAT is a registered charity. No. 1050724 Indicative Sanctions Guidance Contents Introduction... 3 Policy detail... 4 Sanctions... 5 Aggravating factors... 7 Mitigation...

More information

Contract Spending: Escaping the Dark Ages

Contract Spending: Escaping the Dark Ages Contract Spending: Escaping the Dark Ages In 2009, the federal government awarded more than $523 billion in federal contracts contracts for goods, including complex weapons systems, and services. 1 Following

More information

Health Care Fraud and Abuse Laws Affecting Medicare and Medicaid: An Overview

Health Care Fraud and Abuse Laws Affecting Medicare and Medicaid: An Overview Health Care Fraud and Abuse Laws Affecting Medicare and Medicaid: An Overview name redacted Legislative Attorney July 22, 2016 Congressional Research Service 7-... www.crs.gov RS22743 Summary A number

More information

( ) SAP Vendor: AGREEMENT FOR INSTALLATION OF UTILITY FACILITY ON STRUCTURE

( ) SAP Vendor: AGREEMENT FOR INSTALLATION OF UTILITY FACILITY ON STRUCTURE BRIDGE D-401 AGRMT No: (8.12.2005) SAP Vendor: AGREEMENT FOR INSTALLATION OF UTILITY FACILITY ON STRUCTURE THIS AGREEMENT, numbered in COMMONWEALTH files, made and entered into this day of, by and between

More information

PROFESSIONAL ETHICS COMMITTEE PROCEDURES MANUAL

PROFESSIONAL ETHICS COMMITTEE PROCEDURES MANUAL PROFESSIONAL ETHICS COMMITTEE PROCEDURES MANUAL NOVEMBER 19, 2014 NEW YORK STATE SOCIETY OF CERTIFIED PUBLIC ACCOUNTANTS 14 WALL STREET NEW YORK, NEW YORK 10005 PROFESSIONAL ETHICS COMMITTEE PROCEDURES

More information

CBA. Procurement: General Procurement Policies

CBA. Procurement: General Procurement Policies Procurement: General Procurement Policies Standard Procurement Processes Except as described below regarding exceptions, procurements by the District must be conducted using a standard procurement process.

More information

In the United States Court of Federal Claims

In the United States Court of Federal Claims In the United States Court of Federal Claims Case No. 08-261C Filed Under Seal: September 23, 2008 Refiled: October 14, 2008 FOR PUBLICATION WATTS-HEALY TIBBITTS A JV, Plaintiff, Bid Protest; New Responsibility

More information

Robert F. Meunier and Trevor B. A. Nelson

Robert F. Meunier and Trevor B. A. Nelson IS IT TIME FOR A SINGLE FEDERAL SUSPENSION AND DEBARMENT RULE? Robert F. Meunier and Trevor B. A. Nelson I. Introduction... 554 II. Historical Perspective... 556 III. Resolve Conceptual Issues First...

More information

10/14/2015. Introduction: Exclusion, Revocation, and Civil Monetary Penalties. OIG Exclusion and CMS Billing Revocation. OIG Civil Monetary Penalties

10/14/2015. Introduction: Exclusion, Revocation, and Civil Monetary Penalties. OIG Exclusion and CMS Billing Revocation. OIG Civil Monetary Penalties Julie E. Kass, Ober Kaler jekass@ober.com Katie Fink, OIG katie.fink@oig.hhs.gov 1 Introduction: Exclusion, Revocation, and Civil Monetary Penalties OIG Exclusion and CMS Billing Revocation Overview of

More information

Testimony of Scott Amey, General Counsel Project On Government Oversight (POGO) before the Commission on Wartime Contracting in Iraq and Afghanistan

Testimony of Scott Amey, General Counsel Project On Government Oversight (POGO) before the Commission on Wartime Contracting in Iraq and Afghanistan Testimony of Scott Amey, General Counsel Project On Government Oversight (POGO) before the Commission on Wartime Contracting in Iraq and Afghanistan Deficient Contractor Accountability Leaves Agencies

More information

MONTEFIORE HEALTH SYSTEM ADMINISTRATIVE POLICY AND PROCEDURE SUBJECT: SUMMARY OF FEDERAL AND STATE NUMBER: JC31.1 FALSE CLAIMS LAWS

MONTEFIORE HEALTH SYSTEM ADMINISTRATIVE POLICY AND PROCEDURE SUBJECT: SUMMARY OF FEDERAL AND STATE NUMBER: JC31.1 FALSE CLAIMS LAWS MONTEFIORE HEALTH SYSTEM ADMINISTRATIVE POLICY AND PROCEDURE SUBJECT: SUMMARY OF FEDERAL AND STATE NUMBER: JC31.1 FALSE CLAIMS LAWS OWNER: DEPARTMENT OF COMPLIANCE EFFECTIVE: REVIEW/REVISED: SUPERCEDES:

More information

Corruption in Procurement

Corruption in Procurement Corruption in Procurement Presentation to the Institute of Brazilian Issues Christopher Yukins The George Washington University November 3, 2009 Topics 2 Introduction Christopher Yukins/GWU Law School

More information

Professional Responsibility: Beyond Pure Ethics and Circular 230 (Outline)

Professional Responsibility: Beyond Pure Ethics and Circular 230 (Outline) College of William & Mary Law School William & Mary Law School Scholarship Repository William & Mary Annual Tax Conference Conferences, Events, and Lectures 1994 Professional Responsibility: Beyond Pure

More information

31 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

31 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see TITLE 31 - MONEY AND FINANCE SUBTITLE III - FINANCIAL MANAGEMENT CHAPTER 35 - ACCOUNTING AND COLLECTION SUBCHAPTER II - ACCOUNTING REQUIREMENTS, SYSTEMS, AND INFORMATION 3512. Executive agency accounting

More information

National Association of Professional Background Screeners Member Code of Conduct and Member Procedures for Review of Member Conduct

National Association of Professional Background Screeners Member Code of Conduct and Member Procedures for Review of Member Conduct Original Approval: 6/03 Last Updated: 7/6/2017 National Association of Professional Background Screeners Member Code of Conduct and Member Procedures for Review of Member Conduct The NAPBS Member Code

More information

Version 20 November 2014 FAO SANCTIONS PROCEDURES

Version 20 November 2014 FAO SANCTIONS PROCEDURES FAO SANCTIONS PROCEDURES 2 0 1 4 Table of Contents Section 1: Introduction... 1 1.1 Objectives... 1 1.2 Definitions... 2 1.3 The Sanctions Committee... 4 1.3.1 Mandate... 4 1.3.2 Composition... 4 1.3.3

More information

The Role of Federal Inspectors in Investigating Wrongdoing in Public Procurement

The Role of Federal Inspectors in Investigating Wrongdoing in Public Procurement The Role of Federal Inspectors in Investigating Wrongdoing in Public Procurement Michael E. Horowitz Inspector General, U.S. Dept. of Justice and Chair, Council of the Inspectors General ICN Cartel Workshop

More information

WASHINGTON COUNTY PUBLIC SCHOOLS Downsville Pike, Hagerstown, Maryland 21740

WASHINGTON COUNTY PUBLIC SCHOOLS Downsville Pike, Hagerstown, Maryland 21740 WASHINGTON COUNTY PUBLIC SCHOOLS 10435 Downsville Pike, Hagerstown, Maryland 21740 MANDATORY BID/PROPOSAL AFFIDAVIT COMAR 21.05.08.07 Bidder shall complete and submit this bid/proposal affidavit to the

More information

GAO. Testimony Before the Committee on Small Business, House of Representative

GAO. Testimony Before the Committee on Small Business, House of Representative GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, November 19, 2009 United States Government Accountability Office Testimony Before the Committee on Small Business, House of Representative

More information

U.S. DEPARTMENT OF AGRICULTURE. Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions

U.S. DEPARTMENT OF AGRICULTURE. Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions U.S. DEPARTMENT OF AGRICULTURE Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions This certification is required by the regulations implementing

More information

BROCKTON AREA TRANSIT AUTHORITY

BROCKTON AREA TRANSIT AUTHORITY BROCKTON AREA TRANSIT AUTHORITY The following Terms and Clauses are applicable to all contracts, procurements and purchase orders except as noted. By accepting this contract or purchase order the vendor

More information

Required Federal Forms

Required Federal Forms ATTACHMENT D Required Federal Forms Forms to be Submitted with the Proposal 10-F: Certification of Consultant, Commissions & Fees 10-O1: Consultant Proposal DBE Commitment 15-H: 12-G: 10-P: 10-Q: Good

More information

Law Enforcement Targets Pharmaceutical and Medical Device Executives

Law Enforcement Targets Pharmaceutical and Medical Device Executives Law Enforcement Targets Pharmaceutical and Medical Device Executives Contributed by Kirk Ogrosky, Arnold & Porter LLP Senior executives at pharmaceutical and medical device companies are on notice from

More information

Case 2:74-cv MJP Document 21 Filed 04/03/2006 Page 1 of 9 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE

Case 2:74-cv MJP Document 21 Filed 04/03/2006 Page 1 of 9 UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE Case :-cv-00-mjp Document Filed 0/0/0 Page of 0 SUSAN B. LONG, et al., v. UNITED STATES DISTRICT COURT WESTERN DISTRICT OF WASHINGTON AT SEATTLE Plaintiffs, UNITED STATES INTERNAL REVENUE SERVICE, Defendant.

More information

United States Government Accountability Office GAO. Report to Congressional Committees. September 2006 DISASTER RELIEF

United States Government Accountability Office GAO. Report to Congressional Committees. September 2006 DISASTER RELIEF GAO United States Government Accountability Office Report to Congressional Committees September 2006 DISASTER RELIEF Governmentwide Framework Needed to Collect and Consolidate Information to Report on

More information

Responding to Government Investigations

Responding to Government Investigations Responding to Government Investigations Robert N. Nicholson, Esq. Nicholson & Eastin, LLP The information contained herein is for general educational purposes only, and is not intended to be legal advice

More information

SCOTT COUNTY COMMUNITY DEVELOPMENT AGENCY ( Scott County CDA ) SHAKOPEE, MINNESOTA REQUEST FOR PROPOSALS FOR BOND COUNSEL. Issued: June 2, 2017

SCOTT COUNTY COMMUNITY DEVELOPMENT AGENCY ( Scott County CDA ) SHAKOPEE, MINNESOTA REQUEST FOR PROPOSALS FOR BOND COUNSEL. Issued: June 2, 2017 SCOTT COUNTY COMMUNITY DEVELOPMENT AGENCY ( Scott County CDA ) SHAKOPEE, MINNESOTA REQUEST FOR PROPOSALS FOR BOND COUNSEL Issued: June 2, 2017 Proposals Due: Thursday, June 22, 2017 SCOTT COUNTY CDA, Shakopee,

More information

District of Columbia False Claims Act

District of Columbia False Claims Act District of Columbia False Claims Act 2-308.03. Claims by District government against contractor (a) (1) All claims by the District government against a contractor arising under or relating to a contract

More information

WORLD BANK SANCTIONS PROCEDURES

WORLD BANK SANCTIONS PROCEDURES WORLD BANK SANCTIONS PROCEDURES As adopted by the World Bank as of April 15, 2012 ARTICLE I INTRODUCTORY PROVISIONS Section 1.01. Legal Basis and Purpose of these Procedures. (a) Fiduciary Duty. It is

More information

Office of Public Transit Signature of Authorization Form REQUIRED OF ALL APPLICANTS

Office of Public Transit Signature of Authorization Form REQUIRED OF ALL APPLICANTS LEGAL & AUTHORIZING SIGNATURES Office of Public Transit Signature of Authorization Form REQUIRED OF ALL APPLICANTS Agency Name: Telephone: Web Address: Primary Mailing Address/City/State/Zip: Secondary

More information

MIGA SANCTIONS PROCEDURES ARTICLE I

MIGA SANCTIONS PROCEDURES ARTICLE I MIGA SANCTIONS PROCEDURES As adopted by MIGA as of June 28, 2013 ARTICLE I INTRODUCTORY PROVISIONS Section 1.01. Purpose of these Procedures. These MIGA Sanctions Procedures (the Procedures ) set out the

More information

Attachment 1 Federal Requirements for Procurements in Excess of $150,000 Not Including Construction or Rolling Stock Contracts

Attachment 1 Federal Requirements for Procurements in Excess of $150,000 Not Including Construction or Rolling Stock Contracts 1.0 No Obligation by the Federal Government. (1) The Purchaser and Contractor acknowledge and agree that, notwithstanding any concurrence by the Federal Government in or approval of the solicitation or

More information

In the Supreme Court of the United States

In the Supreme Court of the United States No. 15-513 In the Supreme Court of the United States STATE FARM FIRE AND CASUALTY COMPANY, v. Petitioner, UNITED STATES, EX REL. CORI RIGSBY, ET AL., Respondents. On Writ of Certiorari to the United States

More information

Health Care Compliance Association

Health Care Compliance Association Volume Fourteen Number One Published Monthly Meet Our 10,000th member: Vernita Haynes, Compliance & Privacy Analyst, University of Virginia Health System page 17 Feature Focus: 2012 OIG Work Plan: Part

More information

POLICIES AND PROCEDURES FOR DETECTING AND PREVENTING FRAUD, WASTE AND ABUSE

POLICIES AND PROCEDURES FOR DETECTING AND PREVENTING FRAUD, WASTE AND ABUSE MAIMONIDES MEDICAL CENTER SUBJECT: FALSE CLAIMS AND PAYMENT FRAUD PREVENTION 1. PURPOSE Maimonides Medical Center is committed to fully complying with all laws and regulations that apply to health care

More information

DEPARTMENT OF TRANSPORTATION

DEPARTMENT OF TRANSPORTATION 730:25-3-4. Proposals; right to suspend or debar from bidding (a) All proposal blanks will be obtained from the Department's Office Engineer in Oklahoma City, Oklahoma. (b) Proposal blanks will be stamped

More information

Corruption in Procurement

Corruption in Procurement Corruption in Procurement Presentation to the Institute of Brazilian Issues Christopher Yukins The George Washington University 2 Topics Introduction Christopher Yukins/GWU Law School Anti-Corruption in

More information

Tools Regulatory Review Materials California Accountancy Act

Tools Regulatory Review Materials California Accountancy Act Article 1.5 Continuing Education Tools Regulatory Review Materials California Accountancy Act 5026. Continuing education requirement The Legislature has determined it is in the public interest to require

More information

CERTIFICATION OF PROSPECTIVE CONTRACTOR REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION

CERTIFICATION OF PROSPECTIVE CONTRACTOR REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION BIDDER/PROPOSER: CERTIFICATION OF PROSPECTIVE CONTRACTOR REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION PRIMARY COVERED TRANSACTIONS MUST BE COMPLETED BY BIDDER FOR CONTRACT VALUE

More information

Messenger Service Requirements to Open a Main Office

Messenger Service Requirements to Open a Main Office Messenger Service Requirements to Open a Main Office www.dmv.pa.gov PUB-462 (12-17) This publication contains the messenger service contract requirements packet. The packet includes application information,

More information

CHAPTER 4 ENFORCEMENT OF RULES

CHAPTER 4 ENFORCEMENT OF RULES 400. GENERAL PROVISIONS CHAPTER 4 ENFORCEMENT OF RULES 401. THE CHIEF REGULATORY OFFICER 402. BUSINESS CONDUCT COMMITTEE 402.A. Jurisdiction and General Provisions 402.B. Sanctions 402.C. Emergency Actions

More information

2 C.F.R and 2 C.F.R. Part 200, Appendix II, Required Contract Clauses

2 C.F.R and 2 C.F.R. Part 200, Appendix II, Required Contract Clauses 2 C.F.R. 200.326 and 2 C.F.R. Part 200, Appendix II, Required Contract Clauses Requirements under the Uniform Rules. A non-federal entity s contracts must contain the applicable contract clauses described

More information

AMENDED RULE 26 EXPERT WITNESS DISCLOSURE REQUIREMENTS

AMENDED RULE 26 EXPERT WITNESS DISCLOSURE REQUIREMENTS CONSTRUCTION H. JAMES WULFSBERG, ESQ. Wulfsberg Reese Colvig & Fristman Professional Corporation DAVID J. HYNDMAN, ESQ. Wulfsberg Reese Colvig & Fristman Professional Corporation navigant.com About Navigant

More information

SEMIANNUAL REPORT TO THE CONGRESS

SEMIANNUAL REPORT TO THE CONGRESS Smithsonian Institution Office of the Inspector General SEMIANNUAL REPORT TO THE CONGRESS April 1, 2017 September 30, 2017 Cover: Photograph by Susana A. Raab, Anacostia Community Museum. The Smithsonian

More information

Responding to Government Investigations: What to do when the Government Knocks. Gabriel Colwell Partner Squire Patton Boggs (US) LLP

Responding to Government Investigations: What to do when the Government Knocks. Gabriel Colwell Partner Squire Patton Boggs (US) LLP Responding to Government Investigations: What to do when the Government Knocks Gabriel Colwell Partner Squire Patton Boggs (US) LLP Today s Agenda Corporate Criminal Liability Enforcement Environment General

More information

FEDERAL TRANSIT ADMINISTRATION REQUIREMENTS FOR PROFESSIONAL SERVICES CONTRACTS > $10,000

FEDERAL TRANSIT ADMINISTRATION REQUIREMENTS FOR PROFESSIONAL SERVICES CONTRACTS > $10,000 FEDERAL TRANSIT ADMINISTRATION REQUIREMENTS FOR PROFESSIONAL SERVICES CONTRACTS > $10,000 1.0 GENERAL This Contract is subject to the terms of a financial assistance contract between the Santa Cruz Metropolitan

More information

15 USC 80b-3. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

15 USC 80b-3. NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see TITLE 15 - COMMERCE AND TRADE CHAPTER 2D - INVESTMENT COMPANIES AND ADVISERS SUBCHAPTER II - INVESTMENT ADVISERS 80b 3. Registration of investment advisers (a) Necessity of registration Except as provided

More information

Directive. Staff Manual - Staff Rules Office of Ethics and Business (EBC) Bank Access to Information Policy Designation Public

Directive. Staff Manual - Staff Rules Office of Ethics and Business (EBC) Bank Access to Information Policy Designation Public Directive Staff Manual - Staff Rules - 03.00 Office of Ethics and Business (EBC) Bank Access to Information Policy Designation Public Catalogue Number Issued Effective May 14, 2012 Retired September 15,

More information

DESIGN - BUILD PROPOSAL OF

DESIGN - BUILD PROPOSAL OF DESIGN - BUILD PROPOSAL OF (Proposer's Firm Name) (Prequalified Name, if Applicable) (Proposing Firm's Physical Address - City - State -- Zip) F.E.I.D. No. Telephone No. FAX No. Email Address for constructing

More information

REQUEST FOR PROPOSAL. No Ruby Training Services. July American Association of Motor Vehicle Administrators

REQUEST FOR PROPOSAL. No Ruby Training Services. July American Association of Motor Vehicle Administrators REQUEST FOR PROPOSAL No. 16-076 Ruby Training Services July 2017 American Association of Motor Vehicle Administrators Table of Contents 1. INTRODUCTION... 2 1.1. PURPOSE AND BACKGROUND... 2 1.2. OBJECTIVE...

More information

POLICY STATEMENT. Topic: False Claims Act Date Effective: 10/13/08. X Revised New Section: Corporate Compliance Number: 10.05

POLICY STATEMENT. Topic: False Claims Act Date Effective: 10/13/08. X Revised New Section: Corporate Compliance Number: 10.05 The Arc of Ulster-Greene 471 Albany Avenue Kingston, NY 12401 845-331-4300 Fax: 331-4931 www.thearcug.org POLICY STATEMENT Topic: False Claims Act Date Effective: 10/13/08 X Revised New Section: Corporate

More information

World Bank Group Directive

World Bank Group Directive World Bank Group Directive Staff Rule 3.00 - Office of Ethics and Business Conduct (EBC) Bank Access to Information Policy Designation Public Catalogue Number EXC10.03-DIR.111 Issued September 15, 2016

More information

CODE OF ETHICS CODE OF ETHICS BYLAWS CODE OF ETHICS REGULATIONS STATEMENT OF ETHICS VIOLATION INITIAL SCREENING INQUIRY

CODE OF ETHICS CODE OF ETHICS BYLAWS CODE OF ETHICS REGULATIONS STATEMENT OF ETHICS VIOLATION INITIAL SCREENING INQUIRY CODE OF ETHICS I II III IV CODE OF ETHICS BYLAWS CODE OF ETHICS REGULATIONS STATEMENT OF ETHICS VIOLATION INITIAL SCREENING INQUIRY I ARTICLE II CODE OF ETHICS CODE OF ETHICS PREAMBLE Section 1. Dedication

More information

SMITH AMENDMENT UPDATE DECEMBER 2006 Sheldon I. Cohen 1

SMITH AMENDMENT UPDATE DECEMBER 2006 Sheldon I. Cohen 1 SMITH AMENDMENT UPDATE DECEMBER 2006 Sheldon I. Cohen 1 On October 30, 2000, Congress enacted a new law, known as the Smith Amendment, which prohibited the Department of Defense from granting or renewing

More information

General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work)

General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work) General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work) U.S. Department of Housing and Urban Development Office of Public and Indian Housing Office of Labor Relations

More information

The McNulty Memorandum Principles of Federal Prosecution of Business Organizations

The McNulty Memorandum Principles of Federal Prosecution of Business Organizations The McNulty Memorandum Principles of Federal Prosecution of Business Organizations Gabriel L. Imperato, Esq.//Broad and Cassel Fort Lauderdale, Florida Judith Waltz, Esq.//Foley and Lardner LLP San Francisco,

More information

Chapter 3 Sources. Section 1 Supplies and Services Section 2 Publicizing Purchase Actions Section 3 Contractor Qualifications...

Chapter 3 Sources. Section 1 Supplies and Services Section 2 Publicizing Purchase Actions Section 3 Contractor Qualifications... Sam Chapter 3 Sources Section 1 Supplies and Services............................................... 65 3.1.1 Priority of Sources............................................... 65 3.1.1.a Existing assets..................................................

More information

Interstate Commission on the Potomac River Basin 30 West Gude Dr., Suite 450 Rockville, MD

Interstate Commission on the Potomac River Basin 30 West Gude Dr., Suite 450 Rockville, MD Interstate Commission on the Potomac River Basin 30 West Gude Dr., Suite 450 Rockville, MD 20850 301-984-1908 www.potomacriver.org Request for Proposal A Review of the Potomac River Low Flow Allocation

More information

NCTA Disciplinary Procedure

NCTA Disciplinary Procedure NCTA Disciplinary Procedure The Nebraska College of Technical Agriculture (NCTA) Disciplinary Procedure is adapted for NCTA from Article IV: Student Code of Conduct Disciplinary Procedures of the UNL Student

More information

Bank Procedure. Bank Procedure: Sanctions Proceedings and Settlements in Bank Financed Projects. Bank Access to Information Policy Designation Public

Bank Procedure. Bank Procedure: Sanctions Proceedings and Settlements in Bank Financed Projects. Bank Access to Information Policy Designation Public Bank Procedure Bank Procedure: Sanctions Proceedings and Settlements in Bank Financed Projects Bank Access to Information Policy Designation Public Catalogue Number MDCAO6.03-PROC.106 Issued June 28, 2016

More information

In This Issue. West Virginia Mine Deaths Highlight Need for Congressional Action on Mine Safety

In This Issue. West Virginia Mine Deaths Highlight Need for Congressional Action on Mine Safety May 20, 2014 Vol. 2, No. 10 In This Issue Citizen Health & Safety West Virginia Mine Deaths Highlight Need for Congressional Action on Mine Safety Open, Accountable Government DATA Act Becomes Law, Increased

More information

Recitals. Grant Agreement

Recitals. Grant Agreement If you circulate this grant agreement internally, only offices that require access to the tax identification number AND all individuals/offices signing this grant agreement should have access to this document.

More information

Sanctions Board Decision No. 75 (Sanctions Case No. 260) IDA Grant No. H668-SL Sierra Leone

Sanctions Board Decision No. 75 (Sanctions Case No. 260) IDA Grant No. H668-SL Sierra Leone AHSANCTIOi\tS BOARD Date of issuance: November 6, 2014 Sanctions Board Decision No. 75 (Sanctions Case No. 260) IDA Grant No. H668-SL Sierra Leone Decision of the World Bank Group 1 Sanctions Board imposing

More information

General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work)

General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work) General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work) U.S. Department of Housing and Urban Development Office of Public and Indian Housing Office of Labor Relations

More information

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA. Plaintiff, Civil Action No. CONSENT OF DEFENDANT SIEMENS AKTIENGESELLSCHAFT

UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA. Plaintiff, Civil Action No. CONSENT OF DEFENDANT SIEMENS AKTIENGESELLSCHAFT Case 1:08-cv-02167-RJL Document 1-2 Filed 12/12/08 Page 1 of 31 UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA U.S. SECURITIES AND EXCHANGE Commission, 100 F. Street, NE Washington, D.C. 20549,

More information

Corporate Administration Detection and Prevention of Fraud and Abuse CP3030

Corporate Administration Detection and Prevention of Fraud and Abuse CP3030 Corporate Administration Detection and Prevention of Fraud and Abuse CP3030 Original Effective Date: May 1, 2007 Revision Date: April 5, 2017 Review Date: April 5, 2017 Page 1 of 3 Sponsor Name & Title:

More information

ADMINISTRATIVE HEARINGS COUNTY OF MECKLENBURG 12 DHR 00926

ADMINISTRATIVE HEARINGS COUNTY OF MECKLENBURG 12 DHR 00926 STATE OF NORTH CAROLINA IN THE OFFICE OF ADMINISTRATIVE HEARINGS COUNTY OF MECKLENBURG 12 DHR 00926 DR. KAREN J. WILLIAMS, LPC, Petitioner, v. FINAL DECISION NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN

More information

ADMINISTRATIVE AGREEMENT BETWEEN INCHCAPE SHIPPING SERVICES HOLDINGS LTD. AND THE DEPARTMENT OF THE NAVY

ADMINISTRATIVE AGREEMENT BETWEEN INCHCAPE SHIPPING SERVICES HOLDINGS LTD. AND THE DEPARTMENT OF THE NAVY A. PREAMBLE: ADMINISTRATIVE AGREEMENT BETWEEN INCHCAPE SHIPPING SERVICES HOLDINGS LTD. AND THE DEPARTMENT OF THE NAVY 1. This Administrative Agreement (hereinafter "Agreement") is entered into between

More information

Responsibility Determinations Under the Federal Acquisition Regulation: Legal Standards and Procedures

Responsibility Determinations Under the Federal Acquisition Regulation: Legal Standards and Procedures Responsibility Determinations Under the Federal Acquisition Regulation: Legal Standards and Procedures Kate M. Manuel Legislative Attorney August 18, 2010 Congressional Research Service CRS Report for

More information