Jenna R. DiFrancesco Burns White LLC Pittsburgh, Pennsylvania 1. Due to recent technological developments, the production of natural gas in the United
|
|
- Cathleen Sanders
- 6 years ago
- Views:
Transcription
1 From Fracking to FERC to Finland, Part I : The Federal Energy Regulatory Commission Application Process for Natural Gas Pipelines A Case Study of the Rover Pipeline I. Introduction and Overview Jenna R. DiFrancesco Burns White LLC Pittsburgh, Pennsylvania 1 Due to recent technological developments, the production of natural gas in the United States has grown exponentially, as producers ability to extract natural gas from shale formations increases. With the increased production of shale gas comes the need for natural gas pipeline infrastructure to not only locally extract and gather gas, but to also transport natural gas from producing regions, like the Appalachian Basin, to consumers across the country and internationally. 2 Upon completion, the seven hundred and thirteen (713) mile Rover Pipeline will be capable of transporting over three billion cubic feet of natural gas per day (BCF\day) from the Marcellus and Utica Shale Basins across the United States and into the Canadian Union Gas Dawn Storage Hub in Ontario, Canada. The Rover Pipeline will enable transportation of domestically produced natural gas to markets in the Midwest, Northeast, East Coast, and the Gulf Coast, with direct deliveries to Ohio, West Virginia, Michigan, and Canada. The Rover Pipeline, currently under construction with an approximate cost of four billion two hundred million dollars ($4,200,000,000.00), will deliver up to sixty-eight (68) percent of transported gas for distribution to markets throughout the United States. The remaining natural gas will be delivered via an interconnect with the existing Vector Pipeline in Livingston County, Michigan, which will distribute the natural gas to local distribution companies, Michigan storage fields and 1 The opinions expressed in this article are the author s alone and should not be attributed to Burns White LLC. Nothing in this article should be construed as legal advice. 2 Paul W. Paromak, Interstate Natural Gas Pipelines: Process and Timing of FERC Permit Application Review, (Cong. Research Serv., CRS Report for Congress Order Code R43138, January 16, 2015). Paper 10A 1
2 on to the Dawn Hub in Canada, which has a broader network of distribution points back into the United States, the Northeast and into the Canadian market. 3 In addition to the extensive pipeline, which will transport natural gas through twenty-four (24) inch, thirty-six (36) inch and forty-two (42) inch pipeline, the Rover Pipeline will consist of four mainline compressor stations, six supply lateral compressor stations, and other ancillary facilities along the pipeline route. 4 The Rover Pipeline is slated to be placed into service in the first quarter of 2018, with Phase 1 of the project estimated to be in service by the end of this year. 5 Phase 1a of the project, running from Cadiz, Ohio to Defiance, Ohio, has already been completed as of August 31, 2017, when this portion of the Rover Pipeline was successfully put into service. 6 Section 7(c) of the Natural Gas Act of 1938 authorizes the Federal Energy Regulatory Commission (hereinafter also referred to as FERC and the Commission ) to formally issue certificates of public convenience and necessity (hereinafter also referred to as Certificate or Certificates ) for construction of interstate pipeline facilities. Prior to constructing the Rover Pipeline, Energy Transfer Partners, the Dallas based company primarily overseeing the project through ET Rover Pipeline Company LLC (hereinafter also referred to ET Rover ), was required to obtain a certificate from FERC, a process that took over a year and a half. While the process for obtaining certificates is lengthy and subject to detailed statutory requirements, including periods of public comment and an environmental review process, the process can oftentimes be expedited by utilizing the Commission s pre-filing procedures which were 3 The Facts on Rover Pipeline Project, Rover Pipeline Website, (September 19, 2017), 4 Ibid. 5 Press Release, Energy Transfer Partners, L.P., Energy Transfer Receives FERC Approval to Resume Horizontal Directional Drilling Operations on the Rover Pipeline Project (September 19, 2017), available at 6 Ibid. Paper 10A 2
3 established to encourage the certificate applicant to perform early project development and begin communicating with the community and other necessary governmental agencies well in advance of filing the certificate application. 7 Even after utilizing pre-filing procedures, it still took almost three (3) years for ET Rover to obtain the necessary approval for the Rover Pipeline from FERC. The statutory pre-filing process for interstate natural gas pipeline facilities allows the prospective certificate applicant to address certain community and environmental concerns prior to filing an application for a certificate. It also enables the certificate applicant to obtain the Commission s help in resolving issues prior to filing the formal application for a certificate of public convenience and necessity. In May of 2014, ET Rover formally undertook FERC s prefiling process in order to expedite the Certificate process for the Rover Pipeline. 8 Upon obtaining the required approval from FERC to utilize the pre-application procedure, ET Rover began implementation of community outreach programs and environmental analysis regarding the impact of the construction of the Rover Pipeline, as detailed in their formal Request to Initiate FERC Pre-Filing Review Process. 9 Utilizing pre-filing procedures, ET Rover was not only able to resolve certain environmental issues prior to the application process, thus expediting the pipeline through the FERC approval network, but they were also able to begin an early dialogue with members of the community who would be affected by construction of the Rover Pipeline. 10 Thus, the Rover Pipeline was able to enjoy the benefits of an expedited certificate application process, allowing ET Rover to move through the FERC regulatory network and obtain the certificate necessary to construct the Rover Pipeline. 7 Paul W. Paromak, Interstate Natural Gas Pipelines: Process and Timing of FERC Permit Application Review, (Cong. Research Serv., CRS Report for Congress Order Code R43138, January 16, 2015). 8 Request to Initiate FERC Pre-Filing Review Process, FERC Docket No. PF (June 25, 2014). 9 Ibid. 10 Interested parties or affected parties are commonly referred to as stakeholders, and will be referred to throughout this paper as the same. Paper 10A 3
4 II. Rover Pipeline: Utilization of Pre-filing Procedures with FERC Before embarking on utilization of any pre-filing or application procedures, the company who intends to build an interstate natural gas pipeline must first plan. The initial step in planning is identifying market issues, including market needs, and ensuring the ability to connect with other interstate pipelines, LNG-facilities, or natural gas processing plants. 11 The Rover Pipeline originated as a result of discussions with natural gas producers in the Marcellus and Utica Shale areas of Pennsylvania, West Virginia, and Ohio seeking to move their production to markets in the Midwest and Canada. 12 If market conditions support construction of an interstate natural gas pipeline, a pipeline route is then selected. Upon selecting a route, the surface owners owning the property along the route are contacted and easement negotiations are commenced. 13 Surveys are prepared, as are formal environmental resource reports that are eventually filed with the certificate application. 14 When utilizing FERC s pre-application procedure, several of the aforementioned planning steps will take place as part of the pre-filing process. The Commission allows applicants for interstate pipelines to utilize a pre-filing procedure that provides multiple benefits during the application process and encourages the pipeline applicant to engage in early project development with the community and other relevant government agencies. The goal of the Commission s pre-filing process is to notify all interested parties of the project, including potentially affected property owners, so that the pipeline company and the Commission can provide a forum to hear all relevant issues. Identifying and 11 Paul W. Paromak, Interstate Natural Gas Pipelines: Process and Timing of FERC Permit Application Review, (Cong. Research Serv., CRS Report for Congress Order Code R43138, January 16, 2015). 12 Request to Initiate FERC Pre-Filing Review Process, FERC Docket No. PF (June 25, 2014). 13 See Pre-filing for Natural Gas Pipelines, (Accessed September 9, 2017).. 14 Ibid. Paper 10A 4
5 addressing issues prior to the application process allows the incorporation of proposed mitigation measures into the project design, rather than having to address problems and potentially redesign a project during the application process. 15 Companies not involved in the pre-filing process forfeit the opportunity to address the concerns of interested parties prior to filing their Certificate Applications. While it is statutorily mandated that applicants for LNG facilities utilize the prefiling procedure, applicants for interstate natural gas pipelines are not required to use the prefiling process. 16 Prior to filing the necessary Request to Initiate the FERC Pre-Filing Review Process with the Commission, requesting FERC s approval for the prospective applicant to use the pre-filing process, prospective applicants must first meet to consult with FERC on the nature of the project, the content of the pre-filing request, and the status of the prospective applicant's progress toward obtaining the information required for the initial pre-filing request. This consultation will also include discussion of whether a third-party contractor is likely to be needed for the project and any prior solicitation by the applicant for prospective third-party contractors to prepare the environmental documentation for the project. 17 Representatives of ET Rover met with the Commission Staff on May 28, 2014 to discuss the Rover Pipeline Project and their intent to file a Request to Initiate the FERC Pre-Filing Review Process. 18 On June 25, 2014, ET Rover submitted a request to the Commission s Director Office of Energy Projects to issue a notice approving the use of the FERC Pre-Filing Review Process for the Rover Pipeline Project. 19 ET Rover specifically sought to use the pre-filing process to provide environmental records and assistance to FERC, so the Commission could conduct an 15 Ibid CFR (a), 18 CFR (b) CFR (d). 18 Request to Initiate FERC Pre-Filing Review Process, FERC Docket No. PF (June 25, 2014). 19 Ibid. Paper 10A 5
6 early review of environmental documentation and participate in ET Rover s public participation plan, thus facilitating the timely development of a complete record to support the conclusion that the Rover Pipeline Project was in the public convenience and necessity. 20 In their request to use pre-filing procedures, ET Rover stated that the pre-filing process would be beneficial in the following ways: assisting ET Rover in developing initial information about the proposal and identifying affected parties; facilitating issue identification, study needs, and issue resolution; conducting site visits, examining alternatives, meeting with agencies and stakeholders and participating in public information meetings (Open Houses); and, reviewing and commenting on the draft Resource Reports for the Certificate application. 21 In addition to stating the reason the applicant is requesting to use the pre-filing procedure, the request must also meet the statutory requirements as set forth in 18 CFR (d). The request to use pre-filing procedures must contain certain information, including the following: a description of the proposed schedule for the project, including the expected application filing date and the desired date for Commission approval; a detailed description of the project, including location maps and plot plans to scale for review of interested parties; a list of the relevant federal and state agencies with permitting requirements; a list and description of the interest of persons and organizations who have been contacted about the project; a description of what work has already been done, e.g., contacting stakeholders, route planning, or environmental surveys/studies; identification of any third parties under contract to develop the project; proposals for at least three prospective third-party contractors to assist in the preparation of the requisite environmental documentation; acknowledgement that a complete Environmental Report and complete application are required at the time of filing; and, a description of a Public 20 Ibid. 21 Ibid. Paper 10A 6
7 Participation Plan which identifies specific tools and actions to facilitate stakeholder communications and public information, including a project website and a single point of contact. 22 Once the Request to Initiate FERC Pre-Filing Review Process has been reviewed, FERC issues a notice approving or disapproving use of the pre-filing procedures, determining whether the prospective applicant has adequately addressed the statutory application requirements of 18 CFR The pre-filing process is deemed to have commenced on the date of FERC s notice, and the date of such notice is used in determining whether the date an application is filed is at least one hundred eighty (180) days after commencement of the pre-filing process. 23 Upon approval, the prospective applicant must then be prepared to meet the time sensitive requirements of 18 CFR (f), including the following: (1) Within seven (7) days and after consultation with Commission staff, the prospective applicant must establish the dates and locations for open houses and meetings with stakeholders (including agencies) and Commission staff; (2) Within fourteen (14) days, the prospective applicant must contract with the selected third-party contractor and contact all stakeholders not already informed about the project; and, (3) Within thirty (30) days, the prospective applicant must submit a stakeholder mailing list to Commission staff and file a draft of Resource Report 1, CFR (d) CFR (e)(3). Paper 10A 7
8 in accordance with (c) 24, and a summary of the alternatives considered or under consideration. In addition to the above requirements, the potential applicant must file status reports on a monthly basis detailing the applicant's project activities including surveys, stakeholder communications, and agency meetings. The potential applicant must also be prepared to attend site visits and other stakeholder and agency meetings arranged by the Commission staff. 25 One of the primary benefits of utilizing FERC s pre-application process is to initiate contact with stakeholders as early as possible, so their concerns can be addressed early in FERC s pipeline approval process. To facilitate communication with stakeholders, open houses and scoping meetings are held during the pre-application process. Open houses are sponsored by the pipeline company, and scoping meetings are sponsored by FERC. The applicant is able to share information about the project with the public at open houses, as well as listen to the concerns of affected stakeholders. These will often be attended by Commission staff to answer questions, discuss the pre-filing process, and invite individuals to participate in certain portions of the application proceedings. 26 ET Rover held thirteen (13) open houses throughout West Virginia, Ohio, Pennsylvania and Michigan during July and September of 2014 as required by the pre-application process. 27 FERC sponsored scoping meetings are utilized to identify relevant environmental issues pursuant to NEPA 28. Scoping, the process of defining and shaping the extent of an environmental impact statement (hereinafter referred to as the EIS ) or environmental assessment (hereinafter 24 This report is required for all applications under the Natural Gas Act. It must describe facilities associated with the project, special construction and operation procedures, construction timetables, future plans for related construction, compliance with regulations and codes, and permits that must be obtained CFR (f)(7). 26 Paul W. Paromak, Interstate Natural Gas Pipelines: Process and Timing of FERC Permit Application Review, (Cong. Research Serv., CRS Report for Congress Order Code R43138, January 16, 2015). 27 Request to Initiate FERC Pre-Filing Review Process, FERC Docket No. PF (June 25, 2014) U.S.C et seq. Paper 10A 8
9 referred to as the EA ), is a major opportunity for public involvement. Information gathered at scoping meetings assists the company in preparing environmental mitigation measures to present in its environmental resource reports filed with the Commission in its certificate application. This information also assists FERC in issuing more comprehensive environmental documentation to the public. 29 Not only are prospective applicants required to attend scoping meetings, it is statutorily mandated that they are prepared to provide a description of the proposed project and to answer questions from the public at scoping meetings. 30 Throughout November and December of 2014, ten (10) different scoping meetings were held by FERC, in Ohio, West Virginia and Michigan. 31 FERC s involvement in the pre-application process is not simply limited to review of filings and scoping meetings. Depending on the scope of the project, the Commission will also assist the prospective applicant in developing initial information about the proposal and identifying affected parties; issuing an environmental scoping notice and conducting such scoping necessary for the proposal; reviewing draft Resource Reports; conducting site visits; and, initiating the preparation of a preliminary Environmental Assessment or Draft Environmental Impact Statement. 32 Once the scoping comment period ends, the prospective applicant has fourteen (14) days to respond to issues raised during scoping. The scoping period for the Rover Pipeline closed on December 18, 2014, although comment letters continued to be posted on the Pre-filing Docket. Within sixty (60) days of the end of the scoping comment period, the prospective applicant must 29 Paul W. Paromak, Interstate Natural Gas Pipelines: Process and Timing of FERC Permit Application Review, (Cong. Research Serv., CRS Report for Congress Order Code R43138, January 16, 2015) CFR (f)(7). 31 Resource Report 1, FERC Docket No. CP (February 22, 2015) CFR (g) Paper 10A 9
10 file Resource Reports One (1) through Twelve (12) 33 (hereinafter also referred to as Resource Reports ) with the Commission. 34 In addition to requiring that the prospective applicant wait a period of one hundred eighty (180) days from receiving the Director s notice approving the use of the pre-filing process, the prospective applicant must also file revised drafts of any Resource Reports, if requested by Commission staff, at least sixty (60) days prior to filing an application 35. Once the requisite one hundred eighty (180) day period has passed, and at least sixty (60) days has gone by since original or revised Resource Reports have been filed, the prospective applicant may then begin the application process for a certificate for an interstate natural gas pipeline. III. FERC Application Process Federal statute bestows broad approval powers upon the Commission in overseeing the construction of interstate pipelines, beginning with the application process for the same. The application process for a certificate of public convenience and necessity is somewhat dependent on whether or not a voluntary pre-filing process was utilized by the pipeline applicant prior to submitting a formal application for a certificate with the Commission. Federal law mandates that construction or extension of natural gas facilities that are subject to the jurisdiction of FERC cannot be undertaken unless there is a certificate of public 33 The Resource Reports are as follows: Resource Report 1 - General Project Description; Resource Report 2 - Water Use and Quality; Resource Report 3 - Fish, Wildlife, and Vegetation; Resource Report 4 - Cultural Resources; Resource Report 5 Socioeconomics; Resource Report 6 - Geological Resources; Resource Report 7 Soils; Resource Report 8 - Land Use, Recreation, and Aesthetics; Resource Report 9 - Air Quality and Noise; Resource Report 10 Alternatives; Resource Report 11 - Reliability and Safety; and, Resource Report 12 - PCB Contamination. Federal Energy Regulatory Commission. Office of Energy Projects. Guidance Manual for Environmental Report Preparation for Applications Filed Under the Natural Gas Act. Volume I. December CFR (f) CFR (f)(11). Paper 10A 10
11 convenience and necessity issued by FERC authorizing such acts or operations. 36 Applications for certificates of public convenience and necessity must be made in writing to the Commission, verified under oath, and served upon interested parties. 37 The Commission is granted the regulatory discretion to designate the form, necessary information, and notice requirements, including interested parties and manner of service, for the application. 38 FERC may also issue temporary certificates of public convenience and necessity in cases of emergency, without notice or hearing, in order to maintain adequate service or to serve particular customers, pending the determination of an application for a certificate. 39 The formal application for a certificate must meet certain requirements regarding the contents of the same. The application must include a description of the proposed pipeline, route maps, construction plans, schedules, and a list of other statutory and regulatory requirements, including permits needed from other agencies. Environmental information must also be included in the application, including environmental reports analyzing route alternatives, studies of potential environmental impacts, cultural resources, soils, geology, aesthetic resources, and land use. 40 Much of the information that is part of the application for a certificate has already been presented to the Commission when pre-filing procedures are used. When the pipeline applicant has utilized the pre-application filing process, as Rover Pipeline did, the application for the certificate must be submitted at least one hundred eighty (180) days after FERC issues a notice approving use of the pre-filing procedures. 36 Section 7(c) of the Natural Gas Act [15 U.S.C. 717f]; 18 C.F.R See also 18 C.F.R , U.S. Code 717f(d). 38 Ibid U.S. Code 717f(c)(1)(B) 40 Congressional Research Service article. Paper 10A 11
12 The application for the Rover Pipeline was submitted on February 20, The docket for the Rover Pipeline, as is typical in projects of this magnitude, is voluminous and contains records from not only the Commission and the applicant, but from all interested parties. While FERC accepts and reviews all public comments during its application process, the filing of a public comment does not make the commenter party to the Certificate proceedings; only intervenors to the proceeding have the right to file briefs, attend hearings, and appeal the Commission s decision regarding the Certificate. 42 Once an application has been submitted to the Commission, a notice is issued to all interested parties. If the pre-application process has been utilized, the application is immediately reviewed and if necessary, data requests are issued upon completion of the review. In the event the pre-application process was not utilized, scoping is conducted to identify environmental issues. After reviewing the application, the Commission may issue a preliminary determination of need upon non-environmental factors. The environmental review process for Certificate Applications largely requires examination of the environmental impacts that construction of an interstate pipeline to ensure compliance with the National Environmental Policy Act (hereinafter referred to as NEPA, 42 U.S.C et seq.) and regulations promulgated by the Council of Environmental Quality (hereinafter referred to as CEQ, 40 C.F.R ). Under NEPA, federal agencies are required to consider not only the potential impacts of pipeline construction, but also to inform the public of those potential impacts prior to construction. The Energy Act of 2005 has appointed 41 Application for Certificate of Public Convenience and Necessary, FERC Docket No. CP (February 22, 2015). 42 Intervenors are also able to challenge final Commission actions in the U.S. Circuit Court of Appeals. A motion to intervene must be filed must be filed pursuant to the Commission s rules as set forth in 18 C.F.R An intervening party will receive the applicant s filings, FERC filed documents, as well as materials filed by other interested parties, and are required to mail their own filings to all other parties to the proceeding. Paper 10A 12
13 FERC as the lead agency coordinating all NEPA compliance and all necessary Federal authorizations in conjunction with Certificate approval. 43 During the environmental review process, an environmental impact statement (EIS) and environmental assessment (EA) are both drafted and circulated to cooperating agencies for review, formal drafts are issued, and a comment period commences allowing for public comment on both documents. a hearing is set and all interested parties are noticed of the same. 44 Cooperating agencies for a pipeline project often include the Environmental Protection Agency; the Department of Transportation s Pipeline and Hazardous Materials Safety Administration; the Department of the Interior s Bureau of Land Management, Fish and Wildlife Service; the National Park Service; and the Army Corps of Engineers, among others. A Commission order is rendered regarding the EA and the applicant is given the opportunity to respond to the same. Unlike the EA, the opportunity to respond to comments and revise the EIS is given prior to the issuance of an order. Once a final EIS has been issued, the Commission makes the final decision whether to approve or deny the project A Certificate will be issued to any qualified applicant, if it is found that the applicant is able and willing properly to do the acts and to perform the service proposed and to conform to the Natural Gas Act and the requirements, rules, and regulations of the Commission thereunder, and if the proposed service, sale, operation, construction, extension, or acquisition, is or will be required by the present or future public convenience and necessity. 47 Ultimately, FERC s decision whether to grant or deny a pipeline Certificate is based upon a determination whether the pipeline project would in the best interest of the public. The primary factors FERC reviews in 43 Paul W. Paromak, Interstate Natural Gas Pipelines: Process and Timing of FERC Permit Application Review, (Cong. Research Serv., CRS Report for Congress Order Code R43138, January 16, 2015). 44 Ibid. 45 Ibid. 46 Please see the accompanying Part II of this presentation by Jennifer Beresky for a more detailed explanation of environmental requirements of the application process, as many requirements for LNG facilities also apply to interstate pipelines U.S. Code 717f(e). Paper 10A 13
14 determining whether the proposed pipeline is in the public interest include the following: the possibility of overbuilding; the subsidization by existing customers; potential environmental impacts; and, avoiding the unnecessary use of eminent domain. Of the aforementioned factors, the majority of FERC s review is encompassed by environmental review. 48 On February 2, 2017, FERC issued the Certificate of Public Convenience and Necessity for the construction of the Rover Pipeline. The Certificate not only grants the approval to construct an interstate pipeline, but also dictates the terms and conditions upon which approval is being granted, including the authorized pipeline routes, and any construction or environmental mitigations measures required for the project. 49 The FERC issued Certificate also confers eminent domain authority on the developer by the authority granted in 15 U.S. Code 717f(h), which provides, When any holder of a Certificate of public convenience and necessity cannot acquire by contract, or is unable to agree with the owner of property to the compensation to be paid for, the necessary right-of-way to construct, operate, and maintain a pipe line or pipe lines for the transportation of natural gas, and the necessary land or other property, in addition to right-of-way, for the location of compressor stations, pressure apparatus, or other stations or equipment necessary to the proper operation of such pipe line or pipe lines, it may acquire the same by the exercise of the right of eminent domain in the district court of the United States for the district in which such property may be located, or in the State courts. 48 Paul W. Paromak, Interstate Natural Gas Pipelines: Process and Timing of FERC Permit Application Review, (Cong. Research Serv., CRS Report for Congress Order Code R43138, January 16, 2015). 49 Ibid. Paper 10A 14
15 In the event that an application is denied, the applicant (and the public) has the option to overturn the decision within FERC, or by using the federal court system. If pursuing the matter through the FERC system, the applicant may either ask FERC to rehear the case, or have the case referred to a FERC Administrative Law Judge. 50 Receiving a certificate of public convenience and necessity is not the final hurdle to clear prior to beginning construction on the pipeline. The company will also need to obtain Clean Water Act, Coastal Zone Management Act and Clean Air Act permits before any earth can be moved. Furthermore, the pipeline developer should always be cognizant of state and local regulations that must be complied with. The Rover Pipeline has also had some challenges and setbacks during both the approval process and the construction phase. Once a Certificate is obtained, FERC still retains the power to oversee the construction of the project. The Commission is granted broad powers to oversee environmental matters related to natural gas projects and was recently involved in regulating environmental issues that arose during Phase I of construction, when multiple pipeline related environmental incidents occurred. 51 IV. Current Status of the Federal Energy Regulatory Commission FERC is an independent federal agency in charge of regulating the interstate transmission of electricity, natural gas, and oil. The Commission is headed by five Commissioners, although it was not until recently that a quorum of Commissioners were seated on the board. Commissioners serve five-year terms and have an equal vote on regulatory matters. 50 Ibid. 51 Steven Mufson, U.S. Blocks Major Pipeline After 18 Leaks and a 2 Million Gallon Spill of Drilling Mud, The Washington Post, May 10, at Paper 10A 15
16 On August 3, 2017, FERC achieved a quorum of commissioners when the Senate approved two Republicans to serve on the commission. Upon approval, Neil Chatterjee 52 and Robert F. Powelson 53 joined Democrat Commissioner Cheryl A. LaFleur. Furthermore, Neil Chatterjee was confirmed as the FERC Chairman on August 10, 2017, replacing Cheryl A. LaFleur, who had been the acting chairman since January 25, Ms. LaFleur was acting Chairman when Rover Pipeline was issued its certificate on February 2, Two additional nominees to serve on the Commission are Kevin McIntyre 55 and Rich Glick 56. Both nominees received unanimous votes from the Senate Energy and Natural Resources Committee and are awaiting a vote before the full Senate. It is the hope of many natural gas producers that with five Commissioners in place, the rate of application review and issuance of certificates will increase. In addition to regulating interstate pipelines and LNG-facilities, FERC handles a vast number of other matters in the electric, hydropower, and oil industries. Other duties include: regulating the transmission and wholesale sales of electricity in interstate commerce; reviewing certain mergers and acquisitions and corporate transactions by electricity companies; regulating the transportation of oil by pipeline in interstate commerce; monitoring and investigating energy markets; and, licensing and inspecting private, municipal, and state hydroelectric projects. 52 Prior to joining FERC, Neil Chatterjee, of Kentucky, was an energy advisor to Senate Majority Leader Mitch McConnell. 53 Prior to joining FERC, Robert F. Powelson served on the Pennsylvania Public Utility Commissioners and as president of the National Association of Regulatory Utility Commissioners. 54 See (Accessed September 19, 2017). 55 Kevin McIntyre is a Republican former energy industry advisor with the global firm Jones Day. It is believed he will replace Neil Chatterjee as the FERC Chairman upon appointment. 56 Rich Glick currently serves as the Democratic General Counsel for the Senate Committee on Energy and Natural Resources. Paper 10A 16
17 V. Conclusion The Rover Pipeline will be a major mode of transporting natural gas upon completion, capable of delivering billions of cubic feet of gas daily to markets across the United States and Canada. There are numerous agencies to deal with when constructing and operating a pipeline of the caliber as the Rover Pipeline and the Federal Energy Regulatory Commission played a major role in the ensuring the pipeline was built in a way that was environmentally acceptable under NEPA and DOT standards, but also in a way that comported with the communities that the pipeline affects. Without a Certificate from FERC, the Rover Pipeline would not be a reality and recent challenges to the pipeline continue to keep FERC involved in oversight of the Rover Pipeline. With a recently achieved quorum and the prospect of filling all five Commissioner seats on the horizon, it would appear that many more pipelines like the Rover Pipeline will work their way through the pre-application and application process in the future. Jenna R. DiFrancesco Burns White LLC th Street Pittsburgh, PA jrdifrancesco@burnswhite.com Paper 10A 17
Congressional Roll Call Votes on the Keystone XL Pipeline
Congressional Roll s on the Keystone XL Pipeline Lynn J. Cunningham Information Research Specialist Beth Cook Information Research Specialist January 22, 2015 Congressional Research Service 7-5700 www.crs.gov
More informationApplying for Presidential Permits for Border Crossing Facilities (Mexico)
Applying for Presidential Permits for Border Crossing Facilities (Mexico) Fact Sheet BUREAU OF WESTERN HEMISPHERE AFFAIRS January 21, 2009 Bureau of Western Hemisphere Affairs Presidential Permits for
More informationTHE AMERICAN LAW INSTITUTE Continuing Legal Education Environmental Law 2017
1 THE AMERICAN LAW INSTITUTE Continuing Legal Education Environmental Law 2017 Cosponsored by the Environmental Law Institute February 9-10, 2017 Washington, D.C. Executive Orders on the Keystone and Dakota
More informationSandra Y. Snyder Regulatory Attorney for Environment & Personnel Safety
Interstate Natural Gas Association of America Submitted via www.regulations.gov May 15, 2017 U.S. Environmental Protection Agency Office of Regulatory Policy and Management Office of Policy 1200 Pennsylvania
More informationBILLING CODE P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission
This document is scheduled to be published in the Federal Register on 05/16/2017 and available online at https://federalregister.gov/d/2017-09805, and on FDsys.gov BILLING CODE 6717-01-P DEPARTMENT OF
More informationRouting the Alaska Pipeline Project through the Tetlin National Wildlife Refuge What responsibilities do agencies have under ANILCA?
Routing the Alaska Pipeline Project through the Tetlin National Wildlife Refuge What responsibilities do agencies have under ANILCA? The Alaska Pipeline Project (APP) is proposing a pipeline route that
More information160 FERC 61,058 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
160 FERC 61,058 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Neil Chatterjee, Chairman; Cheryl A. LaFleur, and Robert F. Powelson. California Independent System Operator
More informationTABLE OF CONTENTS. Jurisdiction and authority of commission. CHAPTER 1 PRELIMINARY PROVISIONS
GAS AND HAZARDOUS LIQUIDS PIPELINES ACT - ENACTMENT Act of Dec. 22, 2011, P.L. 0, No. 127 Cl. 66 An Act Providing for gas and hazardous liquids pipelines and for powers and duties of the Pennsylvania Public
More informationUNITED STATES OF AMERICA 134 FERC 62,197 FEDERAL ENERGY REGULATORY COMMISSION. Clean River Power 15, LLC Project No
UNITED STATES OF AMERICA 134 FERC 62,197 FEDERAL ENERGY REGULATORY COMMISSION Clean River Power 15, LLC Project No. 13874-000 ORDER ISSUING PRELIMINARY PERMIT AND GRANTING PRIORITY TO FILE LICENSE APPLICATION
More informationWhen States Fail To Act On Federal Pipeline Permits
Portfolio Media. Inc. 111 West 19 th Street, 5th Floor New York, NY 10011 www.law360.com Phone: +1 646 783 7100 Fax: +1 646 783 7161 customerservice@law360.com When States Fail To Act On Federal Pipeline
More informationUNITED STATES DISTRICT COURT MIDDLE DISTRICT OF FLORIDA JACKSONVILLE DIVISION
Sabal Trail Transmission, LLC v..587 Acres of Land in Hamilton County Florida et al Doc. 28 UNITED STATES DISTRICT COURT MIDDLE DISTRICT OF FLORIDA JACKSONVILLE DIVISION SABAL TRAIL TRANSMISSION, LLC,
More informationORAL ARGUMENT NOT YET SCHEDULED IN THE UNITED STATES COURT OF APPEALS FOR THE SECOND CIRCUIT
ORAL ARGUMENT NOT YET SCHEDULED IN THE UNITED STATES COURT OF APPEALS FOR THE SECOND CIRCUIT Catskill Mountainkeeper, Inc., Clean Air Council, Delaware-Otsego Audubon Society, Inc., Riverkeeper, Inc.,
More informationBEFORE THE TENNESSEE REGULATORY AUTHORITY NASHVILLE, TENNESSEE. May 5, 2015 ORDER GRANTING CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY
BEFORE THE TENNESSEE REGULATORY AUTHORITY NASHVILLE, TENNESSEE May 5, 2015 IN RE: ) ) PETITION OF PLAINS AND EASTERN CLEAN LINE ) LLC FOR A CERTIFICATE OF CONVENIENCE AND ) NECESSITY APPROVING A PLAN TO
More information153 FERC 61,356 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING SERVICE AGREEMENT. (Issued December 29, 2015)
153 FERC 61,356 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Southwest Power Pool,
More informationOil and Gas, Natural Resources, and Energy Journal
Oil and Gas, Natural Resources, and Energy Journal Volume 3 Number 3 The 2017 Survey on Oil & Gas September 2017 Maryland Davin L. Seamon Follow this and additional works at: http://digitalcommons.law.ou.edu/onej
More informationIN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF NEW JERSEY
Case 3:17-cv-11991-FLW-TJB Document 1 Filed 11/22/17 Page 1 of 19 PageID: 1 Columbia Environmental Law Clinic Morningside Heights Legal Services Susan J. Kraham #026071992 Edward Lloyd #003711974 435 West
More informationFEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 OFFICE OF ENERGY PROJECTS In Reply Refer To: OEP/DG2E/Gas Branch 4 Rover Pipeline, LLC Rover Pipeline Project Docket No. CP15-93-000 November
More informationUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING. (Issued July 19, 2018)
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Kevin J. McIntyre, Chairman; Cheryl A. LaFleur, Neil Chatterjee, Robert F. Powelson, and Richard Glick. Constitution
More informationPresidential Permits for Border Crossing Energy Facilities
Presidential Permits for Border Crossing Energy Facilities Adam Vann Legislative Attorney Paul W. Parfomak Specialist in Energy and Infrastructure Policy August 1, 2017 Congressional Research Service 7-5700
More informationEnergy Policy Act of 2005
ENERGY AND UTILITIES E-NEWS ALERT AUGUST 8, 2005 Energy Policy Act of 2005 On August 8, 2005, President Bush signed into law the Energy Policy Act of 2005 1 (the Act ). The Act is the most comprehensive
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-2006-022-2 DELAWARE RIVER BASIN COMMISSION Teva Pharmaceuticals Groundwater Withdrawal City of Philadelphia, Philadelphia County, Pennsylvania PROCEEDINGS This docket is issued in response
More information8.130, 8.201, 8.235, 8.310, and 8.315, relating to General Applicability and Standards; Definitions;
Railroad Commission of Texas Page 1 of 16 The Railroad Commission of Texas (Commission) proposes amendments to 8.1, 8.5, 8.101, 8.130, 8.201, 8.235, 8.310, and 8.315, relating to General Applicability
More informationMEMO INFORMATION, MINERALS PROGRAM. DATE: October 2, 2001 Revised October 19, 2001, August 2, 2004, and January 12, 2006
MEMO INFORMATION, MINERALS PROGRAM TO: FROM: Whom It May Concern The Division of Reclamation, Mining and Safety DATE: October 2, 2001 Revised October 19, 2001, August 2, 2004, and January 12, 2006 RE:
More informationCHAPTER 20. GAS AND HAZARDOUS LIQUID PIPELINE SAFETY
CHAPTER 20. GAS AND HAZARDOUS LIQUID PIPELINE SAFETY Subchapter Section 1. General Provisions... 165:20-1-1 3. Pipeline Assessments... 165:20-3-1 5. Safety Regulations for Gas Pipelines... 165:20-5-1 7.
More informationFERC & National Hydropower Update. Chuck Sensiba
FERC & National Hydropower Update Chuck Sensiba 2018 NWHA Annual Conference February 23, 2018 Topics of Discussion FERC leadership FERC license term policy FERC dam safety focus Alaska federal land use
More information161 FERC 61,084 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
161 FERC 61,084 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Neil Chatterjee, Chairman; Cheryl A. LaFleur, and Robert F. Powelson. Valley Crossing Pipeline, LLC Docket
More informationJOHN D. RUNKLE ATTORNEY AT LAW 2121 DAMASCUS CHURCH ROAD CHAPEL HILL, N.C
JOHN D. RUNKLE ATTORNEY AT LAW 2121 DAMASCUS CHURCH ROAD CHAPEL HILL, N.C. 27516 919-942-0600 jrunkle@pricecreek.com VIA EMAIL & MAIL May 15, 2018 U.S. Environmental Protection Agency Office of General
More informationCongressional Roll Call Votes on the Keystone XL Pipeline
Congressional Roll Call Votes on the Keystone XL Pipeline Lynn J. Cunningham Senior Research Librarian April 4, 2017 Congressional Research Service 7-5700 www.crs.gov R43870 Summary TransCanada s proposed
More informationCase 1:16-cv NAM-DJS Document 1 Filed 05/16/16 Page 1 of 33 IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF NEW YORK
Case 116-cv-00568-NAM-DJS Document 1 Filed 05/16/16 Page 1 of 33 IN THE UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF NEW YORK CONSTITUTION PIPELINE COMPANY, LLC v. Plaintiff, NEW YORK STATE
More informationNational Oceanic and Atmospheric Administration. Resource Agency Procedures for Conditions and Prescriptions in Hydropower
3410-11-P 4310-79-P 3510-22-P DEPARTMENT OF AGRICULTURE Office of the Secretary 7 CFR Part 1 DEPARTMENT OF THE INTERIOR Office of the Secretary 43 CFR Part 45 DEPARTMENT OF COMMERCE National Oceanic and
More information133 FERC 61,214 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability Corporation
133 FERC 61,214 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. North
More informationNovember 7, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426
November 7, 2014 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: Tennessee Gas Pipeline Company, L.L.C., Docket No. PF14-22-000 Northeast
More informationA Federal Legislative & Regulatory Update
A Federal Legislative & Regulatory Update Desmarie Waterhouse Vice President of Government Relations & Counsel American Public Power Association MMEA 2017 Fall Conference October 5, 2017 2 #PublicPower
More informationUNITED STATES DISTRICT COURT MIDDLE DISTRICT OF FLORIDA JACKSONVILLE DIVISION
Sabal Trail Transmission, LLC v..89 Acres of Land in Suwannee County Florida et al Doc. 39 UNITED STATES DISTRICT COURT MIDDLE DISTRICT OF FLORIDA JACKSONVILLE DIVISION SABAL TRAIL TRANSMISSION, LLC, Plaintiff,
More informationMEMORANDUM OF UNDERSTANDING. Among
MEMORANDUM OF UNDERSTANDING Among THE WHITE HOUSE COUNCIL ON ENVIRONMENTAL QUALITY, THE U.S. DEPARTMENT OF ENERGY, THE U.S. DEPARTMENT OF DEFENSE, THE U.S. DEPARTMENT OF THE ARMY, THE ADVISORY COUNCIL
More informationSewage Disposal ARTICLE II SEWAGE RETAINING TANKS
15 201 Sewage Disposal 15 205 ARTICLE II SEWAGE RETAINING TANKS History: Adopted by the Board of Supervisors of Center Township as Ordinance No. 2006 05 02, as amended by Ordinance No. 2013 08 07, August
More informationFederal Energy Policy Update Developments Affecting Renewable Energy. Federal Energy Policy Update Developments Affecting Renewable Energy
Federal Energy Policy Update Developments Affecting Renewable Energy Kevin J. McIntyre, Jones Day Eighth Annual Conference: Renewable Energy in the Midwest Presented by Law Seminars International October
More informationENTERED Office of Proceedings April 19, 2016 Part of Public Record
EXPEDITED CONSIDERATION REQUESTED 240521 BEFORE THE SURFACE TRANSPORTATION BOARD Finance Docket No. 36025 ENTERED Office of Proceedings April 19, 2016 Part of Public Record TEXAS CENTRAL RAILROAD AND INFRASTRUCTURE,
More informationPUBLIC UTILITY COMMISSION OF TEXAS (PUC) DOCKET NO
Application of Oncor Electric Delivery Company, LLC to Amend a Certificate of Convenience and Necessity for a Proposed Littman Phillips Andrews Tap 138 kv Transmission Line in Andrews County, Texas (Littman
More informationTESTIMONY BY SCOTT SLESINGER LEGISLATIVE DIRECTOR OF THE NATURAL RESOURCES DEFENSE COUNCIL
TESTIMONY BY SCOTT SLESINGER LEGISLATIVE DIRECTOR OF THE NATURAL RESOURCES DEFENSE COUNCIL The Federal Permitting Process for Major Infrastructure Projects, Including the Progress made by the Federal Permitting
More informationA BILL. To enhance the management and disposal of spent nuclear fuel and high-level radioactive
A BILL To enhance the management and disposal of spent nuclear fuel and high-level radioactive waste, to assure protection of public health and safety, to ensure the territorial integrity and security
More informationDOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Drainage Area to Special Protection Waters
DOCKET NO. D-2001-038 CP-3 DELAWARE RIVER BASIN COMMISSION Drainage Area to Special Protection Waters Eagle Creek Hydro Power, LLC Toronto, Cliff Lake, & Swinging Bridge Hydroelectric Dam System Towns
More informationFebruary 20, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Magalie R. Salas, Secretary
Transcontinental Gas Pipe Line Corporation 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 713-215-2000 February 20, 2007 Federal Energy Regulatory Commission 888 First Street,
More informationLEGISLATIVE RESEARCH COMMISSION PDF VERSION
CHAPTER 365 PDF p. 1 of 14 CHAPTER 365 (SB 257) AN ACT relating to electric generating facilities and declaring an emergency. Be it enacted by the General Assembly of the Commonwealth of Kentucky: SECTION
More informationBEFORE THE FEDERAL ENERGY REGULATORY COMMISSION : : : : : : : : : : : : : : : : : : : : : : : COMMENTS OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION
BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Calpine Corporation, Dynegy Inc., Eastern Generation, LLC, Homer City Generation, L.P., NRG Power Marketing LLC, GenOn Energy Management, LLC, Carroll County
More information4 Sec. 102 FEDERAL WATER POLLUTION CONTROL ACT
APPENDIX 1 Pertinent Parts, Clean Water Act FEDERAL WATER POLLUTION CONTROL ACT (33 U.S.C. 1251 et seq.) An act to provide for water pollution control activities in the Public Health Service of the Federal
More informationExports of Liquefied Natural Gas (LNG)
PRESENTED AT 14 th Annual Gas and Power Institute September 10 11, 2015 Houston, Texas Exports of Liquefied Natural Gas (LNG) Steven A. Porter Steven A. Porter Assistant General Counsel Electricity & Fossil
More informationDeepwater Port License Application: Liberty Natural Gas LLC, Port Ambrose Deepwater Port;
This document is scheduled to be published in the Federal Register on 10/16/2015 and available online at http://federalregister.gov/a/2015-25727, and on FDsys.gov BILLING CODE 4910-81-P DEPARTMENT OF TRANSPORTATION
More informationWest Virginia Manufactured Housing Construction Safety Standards Act. Chapter 21, Article 9 Code of West Virginia and Legislative Rule
West Virginia Manufactured Housing Construction Safety Standards Act Chapter 21, Article 9 Code of West Virginia and Legislative Rule CHAPTER 21. LABOR. ARTICLE 9. MANUFACTURED HOUSING CONSTRUCTION AND
More informationTESTIMONY OF THE PIPELINE SAFETY TRUST North State Street, Suite 609 Bellingham, WA (360)
TESTIMONY OF THE PIPELINE SAFETY TRUST 1155 North State Street, Suite 609 Bellingham, WA 98225 (360) 543-5686 http://www.pipelinesafetytrust.org Presented by: Carl Weimer, Executive Director BEFORE THE
More information129 FERC 62,208 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. KW Sackheim Development Project No
129 FERC 62,208 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION KW Sackheim Development Project No. 13224-000 ORDER ISSUING PRELIMINARY PERMIT AND GRANTING PRIORITY TO FILE LICENSE APPLICATION
More informationBEFORE THE ENERGY AND NATURAL RESOURCES COMMITTEE TESTIMONY OF COMMISSIONER TYRONE J. CHRISTY ON BEHALF OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION
BEFORE THE ENERGY AND NATURAL RESOURCES COMMITTEE TESTIMONY OF COMMISSIONER TYRONE J. CHRISTY ON BEHALF OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION REGARDING IMPLEMENTATION OF TRANSMISSION PROVISIONS
More informationTennessee Gas Pipeline Company, L.L.C. Orion Project Negotiated Rate and Non-Conforming Agreement Filing Docket Nos. RP and CP
April 23, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Tennessee Gas Pipeline Company, L.L.C. Orion Project Negotiated Rate
More informationPENNSYLVANIA LAWMAKERS FAIL TO ADDRESS PRESSING NEEDS REGARDING NATURAL GAS INDUSTRY IN BUDGET
Volume 18 Number 3 October 2011 PENNSYLVANIA LAWMAKERS FAIL TO ADDRESS PRESSING NEEDS REGARDING NATURAL GAS INDUSTRY IN 2011 12 BUDGET Francis A. Muracca, II Pittsburgh 1.412.394.7939 famuracca@jonesday.com
More informationDOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Southeastern Pennsylvania Ground Water Protected Area
DOCKET NO. D-1997-003 CP-3 DELAWARE RIVER BASIN COMMISSION Southeastern Pennsylvania Ground Water Protected Area Aqua Pennsylvania, Inc. Bubbling Springs Groundwater Withdrawal Whitemarsh Township, Montgomery
More informationUNITED STATES OF AMERICA105 FERC 61,307 FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA105 FERC 61,307 FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; Nora Mead Brownell, Joseph T. Kelliher, and Suedeen G. Kelly.. Duke Energy North
More informationRULES OF PRACTICE AND PROCEDURE
RULES OF PRACTICE AND PROCEDURE 501. APPLICABILITY OF RULES OF PRACTICE AND PROCEDURE a. General. These rules shall be known and designated as Rules of Practice and Procedure before the Oil and Gas Conservation
More informationREPORT TO CONGRESS. Background
REPORT TO CONGRESS Under the Temporary Payroll Tax Cut Continuation Act of 2011 Section 501(b)(2) Concerning the Presidential Permit Application of the Proposed Keystone XL Pipeline On December 23, 2011,
More informationCUSHMAN PROJECT FERC Project No Settlement Agreement for the Cushman Project
CUSHMAN PROJECT FERC Project No. 460 Settlement Agreement for the Cushman Project January 12, 2009 Cushman Project FERC Project No. 460 Settlement Agreement for the Cushman Project Table of Contents Page
More informationWhere will they be located and what are their dimensions? And what do they look like? Height, Width, Length
I ET Rover Pipeline Tuesday Sept. 16, 2014 5:30-7:30 Spring Meadows Country Club 1129 Ripley Rd., Linden, Ml. Wednesday Sept. 17, 2014 5:30-7:30 Metamora Lions Club 3790 N. Oak Street Metamora, Ml 48455
More informationIOWA INDUSTRIAL ENERGY GROUP
IOWA INDUSTRIAL ENERGY GROUP MARCH 2016 IIEG 2016 SPRING CONFERENCE April 12, 2016 The IIEG Spring Conference focuses on energy and the election year. The speakers will provide us with discussion regarding
More informationUS Code (Unofficial compilation from the Legal Information Institute) TITLE 43 - PUBLIC LANDS CHAPTER 38 CRUDE OIL TRANSPORTATION SYSTEMS
US Code (Unofficial compilation from the Legal Information Institute) TITLE 43 - PUBLIC LANDS CHAPTER 38 CRUDE OIL TRANSPORTATION SYSTEMS Please Note: This compilation of the US Code, current as of Jan.
More informationTHE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL INTRODUCED BY PAYTON, BRIGGS AND GOODMAN, SEPTEMBER 22, 2010
PRINTER'S NO. 0 THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. Session of 0 INTRODUCED BY PAYTON, BRIGGS AND GOODMAN, SEPTEMBER, 0 REFERRED TO COMMITTEE ON ENVIRONMENTAL RESOURCES AND ENERGY, SEPTEMBER,
More informationUNITED STATES OF AMERICA 118 FERC 62,159 FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA 118 FERC 62,159 FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Snohomish County, Project No. 12687-000 Washington Washington Tidal Energy Company Project
More informationL. Regulation of surface water transfers. (a) Certificate Required. No person, without first obtaining a certificate from the Commission,
143-215.22L. Regulation of surface water transfers. (a) Certificate Required. No person, without first obtaining a certificate from the Commission, may: (1) Initiate a transfer of 2,000,000 gallons of
More informationSubject: Opinion on Whether Trinity River Record of Decision is a Rule
United States General Accounting Office Washington, DC 20548 May 14, 2001 The Honorable Doug Ose Chairman, Subcommittee on Energy Policy, Natural Resources, and Regulatory Affairs Committee on Government
More information136 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING TARIFF REVISIONS. (Issued July 1, 2011)
136 FERC 61,005 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Southwest
More informationEnvironmental Planning and Assessment Amendment (Infrastructure and Other Planning Reform) Act 2005 No 43
New South Wales Environmental Planning and Assessment Amendment (Infrastructure and Other Planning Reform) Act 2005 No 43 Contents Page 1 Name of Act 2 2 Commencement 2 3 Amendment of Environmental Planning
More informationCHAPTER 22 REGULATING THE SITING OF A REGIONAL POLLUTION CONTROL FACILITY
CHAPTER 22 REGULATING THE SITING OF A REGIONAL POLLUTION CONTROL FACILITY ARTICLE 1 - REGULATIONS AND PROCEDURES 3 22.1.01. DEFINITIONS... 3 22.1.02. CITY APPROVAL OF REGIONAL POLLUTION CONTROL FACILITIES...
More informationGUNNISON COUNTY COLORADO NORTH FORK VALLEY COAL RESOURCE SPECIAL AREA REGULATIONS
GUNNISON COUNTY COLORADO NORTH FORK VALLEY COAL RESOURCE SPECIAL AREA REGULATIONS Adopted by the Gunnison County Board of County Commissioners November 18, 2003 BOCC Resolution No. 2003-62 North Fork Valley
More informationFIRST READING: SECOND READING: PUBLISHED: PASSED: TREATMENT AND DISPOSAL OF WASTEWATER BY LAND APPLICATION
FIRST READING: SECOND READING: PUBLISHED: PASSED: TREATMENT AND DISPOSAL OF WASTEWATER BY LAND APPLICATION A RESOLUTION TO DELETE IN ITS ENTIRETY CHAPTER 13.30 ENTITLED TREATMENT AND DISPOSAL OF WASTEWATER
More information165 FERC 61,016 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ACCEPTING TARIFF REVISIONS. (Issued October 12, 2018)
165 FERC 61,016 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Kevin J. McIntyre, Chairman; Cheryl A. LaFleur, Neil Chatterjee, and Richard Glick. Midcontinent Independent
More informationBEYOND DAKOTA ACCESS PIPELINE Why the Energy Industry Should Embrace Tribal Consultation
BEYOND DAKOTA ACCESS PIPELINE Why the Energy Industry Should Embrace Tribal Consultation Troy A. Eid Pipeline Safety Trust Annual Conference New Orleans, Louisiana November 3, 2017 GREENBERG TRAURIG, LLP
More informationUNITED STATES OF AMERICA 118 FERC 62,141 FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA 118 FERC 62,141 FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Snohomish County, Project No. 12698-000 Washington ORDER ISSUING PRELIMINARY PERMIT (Issued
More information(764936)
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Martha O. Hesse, Chairman; Charles G. Stalon, Charles A. Trabandt, Elizabeth Anne Moler and Jerry J. Langdon. The Kansas
More informationLatham & Watkins Finance Department
Number 1242 September 29, 2011 Client Alert Latham & Watkins Finance Department Pipeline Safety Snapshot: Potential New Legislative and Regulatory Changes to Pipeline Safety Requirements Taken together,
More informationARTICLE 1 GENERAL PROVISIONS - EAGLE COUNTY
ARTICLE 1 GENERAL PROVISIONS - EAGLE COUNTY TABLE OF CONTENTS ARTICLE 1 GENERAL PROVISIONS TABLE OF CONTENTS PAGE Section 1-100. Title and Short Title... 1-1 Section 1-110. Authority... 1-1 Section 1-120.
More informationUNITED STATES OF AMERICA 118 FERC 62,144 FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA 118 FERC 62,144 FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Snohomish County, Project No. 12689-000 Washington ORDER ISSUING PRELIMINARY PERMIT (Issued
More informationCONTRACT FOR SUPPLY OF WATER FROM THE CITY OF INDEPENDENCE, MISSOURI TO PUBLIC WATER SUPPLY DISTRICT NO. 16 OF JACKSON COUNTY, MISSOURI
CONTRACT FOR SUPPLY OF WATER FROM THE CITY OF INDEPENDENCE, MISSOURI TO PUBLIC WATER SUPPLY DISTRICT NO. 16 OF JACKSON COUNTY, MISSOURI THIS CONTRACT, made and entered into this day of, 2013, by and between
More informationEvery person, corporation or company now engaged, or which shall hereafter engage, in the business of
ARTICLE 8. TRANSPORTATION OF OILS. 22-8-1. Scope of article. Every person, corporation or company now engaged, or which shall hereafter engage, in the business of transporting or storing petroleum, by
More informationISSUING AGENCY: New Mexico Renewable Energy Transmission Authority ( Authority ). [ NMAC - N, 12/15/2011]
TITLE 17 CHAPTER 8 PART 3 PUBLIC UTILITIES AND UTILITY SERVICES RENEWABLE ENERGY EMINENT DOMAIN 17.8.3.1 ISSUING AGENCY: New Mexico Renewable Energy Transmission Authority ( Authority ). [17.8.3.1 NMAC
More informationDELAYED PIPELINE CONSTRUCTION IN APPALACHIA. By Jennifer Thompson Reed Smith LLP October 2018
DELAYED PIPELINE CONSTRUCTION IN APPALACHIA By Jennifer Thompson Reed Smith LLP October 2018 Agenda Federal CondemnaJon Under the Natural Gas Act CondemnaJon PracJce and Procedure Overview of Pipeline
More informationCITY OF AUBURN HILLS COUNTY OF OAKLAND STATE OF MICHIGAN ORDINANCE NO. TEXT AMENDMENT TO ZONING ORDINANCE
DRAFT 4-02-14 CITY OF AUBURN HILLS COUNTY OF OAKLAND STATE OF MICHIGAN ORDINANCE NO. TEXT AMENDMENT TO ZONING ORDINANCE AN ORDINANCE TO AMEND ARTICLE XIII. I-1, LIGHT INDUSTRIAL DISTRICTS, ARTICLE XIV.
More informationRULES AND REGULATIONS Title 52 PUBLIC UTILITIES
RULES AND REGULATIONS Title 52 PUBLIC UTILITIES PENNSYLVANIA PUBLIC UTILITY COMMISSION [ 52 PA. CODE CH. 59 ] [ L-2008-2034622 ] Liquid Fuels Pipeline Regulations The Pennsylvania Public Utility Commission
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION STIPULATION AND AGREEMENT
For Settlement Discussion Purposes Only Draft November 29, 2016 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Texas Eastern Transmission, LP ) Docket No. RP17- -000 ) STIPULATION
More informationALABAMA PUBLIC SERVICE COMMISSION ADMINISTRATIVE CODE CHAPTER 770-X-7 GAS PIPELINE SAFETY RULES TABLE OF CONTENTS
Chapter 770-X-7 ALABAMA PUBLIC SERVICE COMMISSION ADMINISTRATIVE CODE CHAPTER 770-X-7 GAS PIPELINE SAFETY RULES TABLE OF CONTENTS 770-X-7-.01 Applicability 770-X-7-.02 Operating And Maintenance Plans Filings
More informationJeremy A. Mercer. Partner
Jeremy A. Mercer Jeremy is an experienced commercial litigator who, for more than a decade, has focused on energy, with an emphasis on oil and gas litigation. His extensive experience in the shale and
More informationDOCKET NO. D CP-4 DELAWARE RIVER BASIN COMMISSION. Special Protection Waters
DOCKET NO. D-1991-042 CP-4 DELAWARE RIVER BASIN COMMISSION Special Protection Waters Borough of Alburtis Groundwater Withdrawal Borough of Alburtis and Lower Macungie Township, Lehigh County, Pennsylvania
More informationCompliance and Certification Committee Charter
Compliance and Certification Committee Charter Filed with FERC for approval on November 17, 2015, in Docket No. RR15-11-001. February 08, 2018 NERC Report Title Report Date I Table of Contents Preface...
More information152 FERC 61,253 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
152 FERC 61,253 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.
More informationBy the authority vested in me as President by the Constitution and the laws of the United States of America, I hereby direct the following:
THE WHITE HOUSE Office of the Press Secretary FOR IMMEDIATE RELEASE October 19, 2018 October 19, 2018 MEMORANDUM FOR THE SECRETARY OF THE INTERIOR THE SECRETARY OF COMMERCE THE SECRETARY OF ENERGY THE
More informationthe third day of January, one thousand nine hundred and ninety-six prescribe personnel strengths for such fiscal year for the Armed
INFORMATION TECHNOLOGY MANAGEMENT REFORM ACT (Now the Clinger/Cohen Act) s.1124 One Hundred Fourth Congress of the United States of America AT THE SECOND SESSION Begun and held at the City of Washington
More information60 National Conference of State Legislatures. Public-Private Partnerships for Transportation: A Toolkit for Legislators
60 National Conference of State Legislatures Public-Private Partnerships for Transportation: A Toolkit for Legislators Ap p e n d i x C. Stat e Legislation Co n c e r n i n g PPPs f o r Tr a n s p o rtat
More informationCONSOLIDATED TRANSMISSION OWNERS AGREEMENT. RATE SCHEDULE FERC No. 42
Rate Schedules --> TOA-42 Rate Schedule FERC No. 42 CONSOLIDATED TRANSMISSION OWNERS AGREEMENT RATE SCHEDULE FERC No. 42 Effective Date: 4/16/2012 - Docket #: ER12-1095-000 - Page 1 Rate Schedules -->
More informationAshe County, NC Ordinance Chapter 163: Regulation of Wind Energy Systems
Ashe County, NC Ordinance Chapter 163: Regulation of Wind Energy Systems Section 1 Authority and Purpose Inasmuch as Ashe County has determined that certain windmills are possibly exempt under the North
More informationNonmetallic Mining Reclamation Permit Application Required.
Article C: Sec. 16-1-12 Permitting Nonmetallic Mining Reclamation Permit Application Required. No person may engage in nonmetallic mining or in nonmetallic mining reclamation without possessing a nonmetallic
More informationORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA:
ORD-3258 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 AN ORDINANCE TO AMEND SECTIONS 30-57, 30-58, 30-60, 30-60.1, 30-71, 30-73, 30-74 AND 30-77 AND ADD SECTIONS 30-62
More informationState and Federal Legislative Process
State and Federal Legislative Process Amy Zubaly Executive Director Florida Municipal Electric Association (850) 224-3314, ext. 1 azubaly@publicpower.com www.publicpower.com Michael J. Nolan President
More informationRECENT DEVELOPMENTS IN HYDROELECTRIC REGULATION. David R. Poe and Seth T. Lucia
RECENT DEVELOPMENTS IN HYDROELECTRIC REGULATION David R. Poe and Seth T. Lucia FIVE TOPICS TO BE COVERED Municipal preference in preliminary permits(western Minnesota Municipal Power Agency et al. v. FERC,
More informationThe Middleby Corporation and Viking Range LLC, Provisional Acceptance of a Settlement
This document is scheduled to be published in the Federal Register on 04/14/2017 and available online at https://federalregister.gov/d/2017-07557, and on FDsys.gov 6355-01-M CONSUMER PRODUCT SAFETY COMMISSION
More information