1 August 2017 were approved by Product Certification Bureau Manager of the Polish Register of Shipping on 25 August 2017 Copyright by, GDAŃSK, AUGUST /14

2 CONTENTS 1. General provisions 3 2. Declaration 3 3. FCP certification process 4 4. Information for Organization Application Preparation for FPC Inspection Preparation for Initial Inspection and any other one Execution of Initial Inspection and any other one Post-inspection Activities Performed by the Organization Special FPC Inspections Evaluation and Decision Making Notification to Organization on Granting FPC Certification Surveillance of FPC System Suspension of FPC Certification Withdrawal of FPC Certification Restriction to FPC Certification Extent Extension of FPC Certification Scope Transfer of Rights Appeals Complaints Use of Certification Mark and Identification Code (Notification) Confidentiality Certificates issued by Notified Certification Bodies or Approvals of the System by Other Notified Bodies Information to the Notifying Body and the Notified Bodies Carrying out Similar Activity 13 2/14

3 1. General provisions 1.1. Certification body CERTIFICATION BODY: POLISH REGISTER OF SHIPPING Product Certification Bureau NOTIFICATION NO: 1463 ADDRESS: AL. GEN. JÓZEFA HALLERA GDAŃSK, POLAND TELEPHONE: FAX: INTERNET: The below principles apply in particular to: Certification of Factory Production Control for steel and aluminium structures for compliance with standards: PN-EN A1:2012; PN-EN A1:2012 and PN EN : Certification of Factory Production Control for building aggregates for compliance with standards: PN-EN A1:2010; PN-EN 13043:2004; PN-EN :2003; PN-EN :2006; PN-EN 13139:2003; PN-EN A1:2010; PN-EN 13450:2004; PN-EN :2003 and PN-EN : Declaration The Polish Register of Shipping Product Certification Bureau (PRS) is a certification body open to all applicants whose activity is covered by the scope of its accreditation. No unreasonable financial demands are imposed and certification availability depends neither on the size of organization nor the membership in any association or group. We declare: - impartiality of the conducted processes of assessment and verification of constancy of building products functional properties, - objectivity of building products certification activities, - confidentiality and professionalism of FPC inspectors and technical experts, - high level of services due to long-time management experience, - short terms of orders realization, - openness and practical approach, - non-conflict cooperation. 3/14

4 PRS Product Certification Bureau identifies, analyses and documents potential conflicts of interests resulting from certification process, including all conflicts due to any liaisons between PRS Product Certification Bureau and other parties. The Polish Register of Shipping Product Certification Bureau of offers Factory Production Control certification and product certification. Other parties cannot influence decisions made by the Product Certification Bureau. An Organization by choosing PRS Product Certification Bureau as a notified and accredited product certification body can be assured that a certification process will be performed by the team of experienced and competent FPC inspectors/technical experts. 3. FPC certification process The certification is available to all organizations and suppliers whose activity is covered by the accreditation scope applied for. The subject is a certification of a Factory Production Control (FPC), being the regulatory requirement for marking (by a manufacturer) construction products with CE construction mark. The certification is performed by the system 2+, in accordance with the Regulation of the European Parliament and the Council (EU) No. 305/2011 of 9 March Certification may be applied to an implemented Factory Production Control system, which means that it: complies with specified requirements, the manufacturer is aware of the responsibility for the product conformity with requirements, sufficient number of objective evidences exist documenting efficient implementation of the FPC system, an efficient surveillance is established in the scope of product design and manufacture. 4. Information for Organizations Having received a certification inquiry, the Manager of the Product Certification Bureau sends an Application for Certification of Factory Production Control Form 1/PCW-01/ZKP to the Organization. At the request of the Organization, the following documents are provided: o information on accreditation/notification, which is the basis for PRS Product Certification Bureau activity and on the accreditation scope, as well as Construction Products Regulation (CPR) requirements, general information on fees charged in relation to the FPC system certification and surveillance process, the Instructions for Certification of Factory Production Control, the above documents are also made available through INTERNET: The Manager of the Product Certification Bureau informs the Polish Centre for Accreditation (PCA) on activity conducted outside the territory of Poland to ensure that all locations, where key activities are performed, are properly assessed. 4/14

5 4.1. Application An Organization applying for certification submits to the Product Certification Bureau an Application for Certification of Factory Production Control Form 1/PCW-01/ZKP or a notice in any other documented form including information necessary for an offer preparation. In the case an Organization makes an invitation to tender for certification, the course of proceedings is in accordance with valid legal regulations. On the basis of information included in the Application, the price offer is prepared. The time-period necessary for planning and executing complete and efficient FPC inspection is determined in accordance with valid Procedure PCW-01/ZKP, where the principles for determining the inspection time are given. After the Organization accepts the offer, the agreement is sent to the Organization for signature. The agreement specifies conditions ensuring PRS Product Certification Bureau independent and professional action and includes an obligation for the Organization s necessary cooperation. After concluding an agreement and submitting required documentation to PRS, a Customer Service Officer assigns to the Organization an identification code to be used for marking all documents associated with certification of the given Organization. PRS Product Certification Bureau declares performance of the certification process within time-period agreed with the Organization. In case of the inspection of the Factory Production Control combined with certification of system conforming to ISO 9001 and/or ISO 3834, the proceedings is in accordance with the program of quality management system certification PCS-01/QMS and/or PCS-01/WELD, taking into account requirements of PCW-01/ZKP programme Preparation for FPC Inspection The FPC lead inspector and inspectors/experts are chosen from the register of FPC inspectors maintained by the Product Certification Bureau. As a principle, inspections are performed by FPC inspectors having appropriate competences, training, qualifications and professional experience. External FPC inspectors and technical experts may be appointed to the inspection team by the procedure specified in PC-02A Procedure for qualifying FPC experts/auditors/inspectors. FPC inspectors whose engagement could lead to impartial or discriminative actions, e.g. those which provide consultative services for the Organization, may not be appointed as members of the inspection team. Prior to each inspection, inspectors/ technical experts sign Impartiality Statement on Form 11/PCW-01/ZKP. The Product Certification Bureau notifies the Organization of the members of the FPC inspection team and, at request, makes available basic information concerning each member of the FPC team, in due advance, to enable the Organization to object against appointment of particular FPC inspector or technical expert and to make possible PRS to replace the inspection team member. 5/14

6 In case of conflict of interests, the Organization has the right to submit to the Product Certification Bureau an objection against particular FPC inspector/technical expert. In such case the inspection team is changed. If the Organization does not submit the objection, it is regarded as acceptance of the presented team of FPC inspectors/technical experts Preparation for Initial Inspection and any subsequent inspection The purpose of the initial inspection is to evaluate the implementation of FPC system, including its effectiveness and it covers at least: - the examination of FPC documentation, - the identification of legal requirements related to products covered with the requirements of CE marking and specific requirements, - the documentation of Initial Type Examination for the product covered with CE marking requirements, - the examination of design process (where applicable), - checking the responsibility, authorizations and qualifications of personnel employed at manufacturing and control, - checking of applied manufacturing procedures, - the control and checking of raw materials and component materials for the production, - checking the control and measuring equipment, - the control and examinations of finished product, - product identification and traceability, - the methods of control and keeping records on product assessment, - the declaration on performance properties of the product and its CE marking. Prior to inspection, the FPC lead inspector agrees with the Organization, by an , its date and extent, using the FPC Inspection Schedule - Form /PCW-01/ZKP. At developing the Inspection Schedule, the FPC lead inspector makes appropriate agreements with the Organization to enable objective assessment of the FPC system on the basis of inspections at manufacturing works, in accordance with FPC Inspection Questionnaire Form 6/PCW-01/ZKP. The Organization shall make accessible necessary machinery or objects associated with FPC inspection. The manufacturer s inspection equipment may be utilized, at its consent. If the Organization outsources execution of essential processes that require assessment within FPC system, it is obliged to gain subcontractor s consent and make any agreements related to the inspection. The inspection at subcontractor is covered by the Inspection Schedule after agreeing that with the Organization. 6/14

7 4.4. Execution of Initial Inspection and any subsequent Inspection FPC Inspectors conduct examination of the Organization s FPC system in accordance with FPC Inspection Schedule transferred previously to the Organization, based on the documents of FPC system, recording inspection findings and positions of the interviewed persons. FPC Inspectors conduct examination of: o compliance with requirements contained in normative documents, through inspection of manufacturing works and Factory Production Control, o operation (continuous surveillance, relevance of assessment criteria and the system of acceptance/non-acceptance) of Factory Production Control. Identified nonconformities and/or observations are reported, in writing, to the Organization. At the end of inspection, the FPC inspection team meets with the Organization s management and designated personnel at a closing meeting, where the FPC lead inspector presents found nonconformities and observations and gives conclusions of the recommendations related to issuing/endorsing FPC Certificate. The lead inspector gains acceptance of the Management representative (FPC Proxy) for FPC Inspection Findings (Form 7/PCW-01/ZKP) and informs the Product Certification Bureau on the proceedings with nonconformities and/or agrees further proceedings of the Organization. The FPC lead inspector retains a copy of FPC Inspection Findings in the Organization, while its original is enclosed with FPC Inspection Report. In the case of FPC inspections carried out jointly with other certifying bodies or joined FPC inspections, the documents enclosed with the Inspection Report may be prepared using other forms, except for FPC Inspection Report Form 8/PCW-01/ZKP. After receiving the FPC Inspection Report, the Organization may send possible remarks on the Report to the Product Certification Bureau, within 10 days from the Report receipt date. The Product Certification Bureau is the owner of the Report Post-inspection Activities Performed by the Organization The Organization performs correction and corrective actions related to disclosed nonconformities and observations in accordance with own procedure. The Organization is informed on the need to analyze the grounds for nonconformities and describe the correction and corrective actions taken or planned for execution aimed at eliminating revealed nonconformities. The Organization is obliged to carry out these actions within 90 days, except when other execution dates have been agreed. FPC Certificate is issued under the condition that all correction and corrective actions are completed. Organization notifies, in writing, the Product Certification Bureau thereof by transferring appropriate evidences of performed correction and corrective actions. The FPC lead inspector decides on the form of assessment of these activities during the closing meeting. The assessment of correction and corrective actions may include an additional, special checking inspection or a documented evidence subject to assessment. 7/14

8 The assessment of effectiveness of carried out correction / corrective actions presented in the form of a documented evidence is made by FPC inspection team during next inspection of Organization s FPC system. Acceptance of the actions is confirmed by appropriate entry in the relevant Inspection Report Special FPC Inspections Special inspections may take place: when objective evidences are required to confirm implementation of correction and/or corrective actions. The FPC lead inspector notifies the Organization on the need to carry out special inspection on the closing meeting. The special checking inspection covers only he areas where nonconformities occurred; at the request of Organization, to extend the scope of granted certification; within the scope defined by the Manager of Product Certification Bureau, e.g. for examination of complaints against the Organization or in response to changes submitted by the Customer or within the framework of handling suspended Customers. The result of the special inspection is FPC Inspection Report in a written form. In the case of a negative result of the special checking inspection, the Manager of the Product Certification Bureau makes a decision on breaking the certification process. The Organization has the right to appeal against the decision to the Director for PRS Certification Division Evaluation and Decision Making Evaluation and decision making on certification are based on: FPC Inspection Report containing recommendation for the issue of a certificate and all conditions and observations; Comments to nonconformity and, where appropriate, to taken correction and corrective actions; Confirmation of information supplied to the Product Certification Bureau and applied at the review of Certification Information. The Manager of the Product Certification Bureau makes a decision on the issue or non-issue of final document (e.g. FPC Certificate). The assessment and decision making may not be subcontracted Notification to Organization of Granting FPC Certification FPC Customer Service Officer from the Product Certification Bureau notifies the Organization, by a letter, of the decision on granting certification. A Certificate draft is enclosed with the letter. In case of refusal to issue the Certificate, the notification shall include the reason thereof. The Organization has the right to appeal against the decision of the Manager of the Product Certification Bureau. The appeal is considered in accordance with valid PCW-01/ZKP Programme. The final document is delivered to the Organization after correction and corrective actions have been accepted and a payment for certification process has been transferred. 8/14

9 The FPC Certificate issued in the system 2+ is valid without time-limit until there are changes in examination methods and/or the requirements related to Factory Production Control contained in the harmonized standard, used for the assessment of performance of essential characteristics, and until changing significantly the construction product or its manufacturing conditions. The certificate maintains its validity provided it is not suspended or withdrawn by the unit certifying the factory production control. Issue of a certificate is also conditioned upon execution of surveillance inspection. At a request of the Organization, in accordance with the table B.1 of EN :2009+A1:2011 Standard, the Welding Qualification Certificate Welding Certificate associated with the FPC Certificate may be issued. The Welding Certificate is valid for a period of 3 years unless conditions specified for the FPC Certificate change. The Director for PRS Certification Division signs the certificates to be given to the Organization Surveillance of FPC System Continuous surveillance inspections are carried out in accordance with the provisions of harmonized standards, taking into account that the first inspection held after certification may not be performed later than 12 months after last day of the initial inspection. Surveillance inspections cover at least: review of all changes made in the Organization and the system, review of activities taken in relation to nonconformities identified during previous inspection, handling of claims and complaints, functioning of procedures for conformity assessment and review in accordance with the requirements of the Organization s FPC, surveillance of operation processes in accordance with the requirements of normative documents, use of an identification code, certification marks and/or reference to certification (if applicable). The Product Certification Bureau maintains certification on the basis of evidences that the Organization continues to fulfil requirements of appropriate reference document Suspension of FPC Certification Certification may be suspended in the case it has been found that the Organization did not proceed with the concluded Agreement on Certification and Surveillance of FPC System and in particular when: the certified system of the Customer permanently or to a great measure does not fulfil the certification requirements, including the requirements related to FPC efficiency, the certified Customer does not allow for carrying out FPC surveillance inspections with required frequency, the certified Customer itself requested certification suspension, the certified Customer fails to fulfil the financial obligations in relation to PRS, 9/14

10 the certified Customer has not taken, at agreed time, activities for implementation of changes in FPC which were due to the change of requirements contained in references the certification and surveillance of FPC system is based on. The certified Customer is informed that within the period of the FPC certificate suspension he should stop using the certification mark in all his advertising materials and products containing any reference to the status of a certified organization. Information on certification suspension is made public on PRS internet website. The Manager of the Product Certification Bureau defines the period of the certificate suspension. In most cases the suspension shall not exceed 6 months and in exceptional cases one year. Certificate validity may be reinstated upon receipt of the information from the certified Customer that he fulfils the suspension cease conditions. The Manager of the Product Certification Bureau makes the decision on reinstatement of the certificate. The Product Certification Bureau limits the scope of the Customer certification in order to exclude the part of certification where requirements are not fulfilled permanently or to a great measure by the Customer Withdrawal of FPC Certification FPC certification may be withdrawn in the below cases: - The Organization is not able to remove the reasons for certification suspension in due time; - The Organization stopped the manufacture of the products covered by the FPC certificate; - The Organization does not allow for carrying out inspections with required frequency; - The Organization fails to fulfil financial obligation in relation to PRS; - The Organization has not taken, at agreed time, activities which were due to the change of requirements contained in reference documents to be the base for certification; - The Organization has not carried out, at agreed time, the activities in response to the claim in relation to certified product, which was received in PRS Product Certification Bureau; - Surveillance over the Organization reveals inefficiency of the FPC system of the nature indicating necessary essential changing thereof; - At the written request of the Organization. Certification withdrawal is preceded by a written notification to the Organization describing the grounds thereof. The Manager of the Product Certification Bureau is the person making a decision on certification withdrawal. The certified Customer is informed that within the period of the FPC certificate withdrawal he should stop using the certification mark and identification number in all his advertising materials and products containing any reference to the status of a certified organization. The Product Certification Bureau decides on dissolving the Agreement on Certification and Surveillance of FPC System and withdraws certification. The Organization is notified of the fact by a letter which states the date of withdrawal. 10/14

11 The Organization may appeal against the decision on certificate withdrawal to the Director for PRS Certification Division. PRS makes information on the Organization s certification withdrawal public in the Internet. The Manager of the Product Certification Bureau informs the notifying body and notified bodies carrying similar activity on each case of certificate withdrawal Restriction to FPC Certification Extent Certification extent is restricted with the purpose to exclude the part of certification where requirements are not fulfilled permanently or to a great measure by the Organization. Certification extent may be restricted or temporarily restricted after an inspection which disclosed that the Organization is not able to carry out activities within the full scope of granted certification, or without inspection at the request of the Organization. Each restriction shall be in accordance with the requirements of the standard being the base for certification Extension of FPC Certification Scope Certification extension means changing the scope of already granted certification, within the framework of the same harmonized technical specification or different parts of a technical specification. The extension process is initiated with submission of a written application by the Organization. The extension process may be combined with the surveillance inspections or additional special checking inspections. The application shall contain information on extension scope and on changes introduced in FPC system since previous FPC inspection at site. Together with an application letter, the Organization shall send technical particulars for the products, FPC system documents amended respectively to the extension scope, as well as other applicable documents as agreed with the Product Certification Bureau. Certification extension is of formal nature and is generally executed by the documentation review. In the process of certification extension, the need for special FPC inspection is determined on individual basis and depends on the kind of extension applied for by the Organization and on the results of previous FPC inspections. A revised certificate is issued as a result of completion of the extension process Transfer of Rights Transfer of rights from the Agreement on Surveillance of FPC System is effected at the request of the Organization, as a result of changes of its legal status. If the document issued by an appropriate court enclosed to the request and the entries in current FPC Manual indicate that only the legal status of the Organization has changed, PRS Product Certification Bureau may decide on transfer of rights from the agreement without carrying out FPC inspection. 11/14

12 If it is clear after review of the presented documents that not only the legal status, but also other changes took place, the decision on transfer of rights needs an inspection to be made Appeals The Organization may turn to PRS, in writing, in matters concerning the decisions made by the Manager of the Product Certification Bureau, who is responsible for all decisions made at all stages of the process of considering appeals. Persons designated for consideration of appeals are not the same as those who were engaged in the FPC inspections and making decision on certification. Submission, consideration of, and making decisions on, appeals do not result in any discriminative actions against the Organization submitting the appeal. The Certification Division Secretariat receives and registers the appeals. The request for consideration of an appeal shall include: the name of the Organization, the surname, address, phone, fax, of the person submitting the appeal, clear description of the appeal subject. Information on actions taken with the purpose to settle the appeal, report on the course of its consideration and results of these activities are transferred by the Customer Service Officer to the person who submitted the appeal. Accepted appeals are considered within 14 days from the date of their receipt. The Director for PRS Certification Division makes a decision as regards the reasonability of the appeal. If the appeal concerns the decision made by the Director for PRS Certification Division, respective decision is made by the President of the PRS Board. PRS Product Certification Bureau notifies formally the person submitting the appeal on completion of the appeal consideration process Complaints A person or an Organization may submit to PRS, in writing, a complaint concerning activity of the Product Certification Bureau or a certified Customer. Each complaint is registered by the Certification Division Secretariat and accepted for consideration by the Manager of the Product Certification Bureau. If the complaint concerns the certified Customer then: o during examination of the complaint, efficiency of FPC is taken into account, o the complaint is directed to the Client for receiving his position in respect of complaint subject. The process of accepting, assessing and decision making in relation to complaints is covered with the principle of maintaining confidentiality in relation to the person submitting the complaint and to its subject. The Director for PRS Certification Division makes, reviews and approves decisions communicated to the person submitting the complaint. 12/14

13 After completion of the complaint consideration, the Director for PRS Certification Division, within not more than 14 days from the date of receiving the complaint letter, notifies formally the person submitting the complaint on completion of the process of its consideration. The Director for PRS Certification Division, together with the Customer and the person submitting the complaint, decides if, and if so then to what degree, the subject of complaint and the way of its settlement should be made public Use of Certification Mark and Identification Code (Notification) The Organization has the right to use certification marks in accordance with the conditions specified in the agreement. Principles of using identification code of a notified body are given on the website The Organization granted valid FPC certificate places the identification code on the CE marked product label (or on the product) and in the Declaration of performance. In case of unjustified use of certification mark or the identification code, actions foreseen in the a.m. Principles will be taken Confidentiality The Product Certification Bureau has established for all levels of its organizational structure, including FPC inspectors and external technical experts acting on behalf of the Bureau, appropriate, lawful settlements concerning protection of information received during certification activities. All persons engaged in certification process sign the confidentiality declaration in which they oblige themselves to keep any information and documentation submitted by the Organization confidential. The Product Certification Bureau may not disclose any information related to the certified Organization to a third Party without consent of the Party interested. If legal regulations require disclosing any information to a third party, the Organization is notified of the contents of disclosed information within the scope permitted by the law Certificates issued by Notified Certification Bodies or Approvals of the System by Other Notified Bodies The PRS Product Certification Bureau recognizes certificates issued by notified certification bodies on the basis of received reports from assessments performed by these bodies Information to the Notifying Body and the Notified Bodies Carrying out Similar Activity The Manager of the Product Certification Bureau informs the notifying body: - of refusal, restriction and withdrawal of a certificate, - of any circumstances which may have adverse influence on the notification scope and conditions, - of each demand from the market surveillance bodies for information on executed tasks associated with a conformity assessment, 13/14

14 - at request, of taken actions tied with conformity assessment, being subject of the notification and on other performed tasks, including cross-border and subcontracting activity. The Manager of PRS Product Certification Bureau transfers information on the cases where conformity assessment results were negative and, upon demand, on the cases with positive results, to other bodies notified on the basis of the same EU harmonization regulations, carrying out similar activity in scope of a conformity assessment and dealing with the same products. Approved Manager of PRS Product Certification Bureau Formal approval is put on the original document. 14/14

APPLICATION FORM. DIRECTIVE 96/98/EC ON MARINE EQUIPMENT, as Amended

APPLICATION FORM. DIRECTIVE 96/98/EC ON MARINE EQUIPMENT, as Amended To: ABS Europe Ltd. Date: We hereby apply for the Conformity Assessments at ABS Europe Ltd. Under the Council Directive 96/98/EC on Marine Equipment, as amended. We hereby confirm that the same application

More information

STATUTORY INSTRUMENTS. S.I. No. 47 of 2018 EUROPEAN UNION (NON-AUTOMATIC WEIGHING INSTRUMENTS) REGULATIONS 2018

STATUTORY INSTRUMENTS. S.I. No. 47 of 2018 EUROPEAN UNION (NON-AUTOMATIC WEIGHING INSTRUMENTS) REGULATIONS 2018 STATUTORY INSTRUMENTS. S.I. No. 47 of 2018 EUROPEAN UNION (NON-AUTOMATIC WEIGHING INSTRUMENTS) REGULATIONS 2018 2 [47] S.I. No. 47 of 2018 EUROPEAN UNION (NON-AUTOMATIC WEIGHING INSTRUMENTS) REGULATIONS

More information

JCM_MN_GL_TPE_ver01.0

JCM_MN_GL_TPE_ver01.0 Joint Crediting Mechanism Guidelines for Designation as a Third-Party Entity CONTENTS 1. Objectives... 2 2. Scope and applicability... 2 3. Normative references... 2 4. Terms and definitions... 2 5. Requirements

More information

E/ECE/TRANS/505/Rev.3

E/ECE/TRANS/505/Rev.3 20 October 2017 Agreement Concerning the Adoption of Harmonized Technical United Nations Regulations for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and

More information

INTERFACE TERMS & CONDITIONS

INTERFACE TERMS & CONDITIONS INTERFACE TERMS & CONDITIONS. Page 1 of 5 Version / Revision No. 2.1 1. General Interface NRM Limited ( Interface ) offers third party certification services ( Services ) in order for prospective and existing

More information

LMS Certifications Pvt. Ltd MANAGEMENT SYSTEM CERTIFICATION AGREEMENT

LMS Certifications Pvt. Ltd MANAGEMENT SYSTEM CERTIFICATION AGREEMENT 1 PARTIES OF THE AGREEMENT: CERTIFICATION BODY: LMS LMS Certifications Pvt. Ltd. (LMS) Business Id. No.: U74140UP2008PTC036356 (Here in after only LMS) Client: Company name: Location: Acting for: Registered

More information

STATUTORY INSTRUMENTS. S.I. No.?????????? of 2016

STATUTORY INSTRUMENTS. S.I. No.?????????? of 2016 STATUTORY INSTRUMENTS S.I. No.?????????? of 2016 EUROPEAN UNION (EQUIPMENT AND PROTECTIVE SYSTEMS INTENDED FOR USE IN POTENTIALLY EXPLOSIVE ATMOSPHERES) REGULATIONS, 2016. 1 STATUTORY INSTRUMENTS S.I.

More information

APPOINTMENT OF ZURICH ENGINEERING AS A NOTIFIED BODY IN THE UNITED KINGDOM UNDER ARTICLE 20 OF THE PRESSURE EQUIPMENT DIRECTIVE - DIRECTIVE 2014/68/EU

APPOINTMENT OF ZURICH ENGINEERING AS A NOTIFIED BODY IN THE UNITED KINGDOM UNDER ARTICLE 20 OF THE PRESSURE EQUIPMENT DIRECTIVE - DIRECTIVE 2014/68/EU Sent By email: tim.webster@uk.zurich.com Mr Tim Webster Zurich Management Services Ltd, (trading as Zurich Engineering) 126 Hagley Road Birmingham B16 9PF - 27 June 2016 Dear Tim, APPOINTMENT OF ZURICH

More information

Working document 01/2014 on Draft Ad hoc contractual clauses EU data processor to non-eu sub-processor"

Working document 01/2014 on Draft Ad hoc contractual clauses EU data processor to non-eu sub-processor ARTICLE 29 DATA PROTECTION WORKING PARTY 757/14/EN WP 214 Working document 01/2014 on Draft Ad hoc contractual clauses EU data processor to non-eu sub-processor" Adopted on 21 March 2014 This Working Party

More information

Bureau of Indian Standards (Amendment) Rules, 2009

Bureau of Indian Standards (Amendment) Rules, 2009 Ministry : Ministry of Consumer Affairs, Food and Public Distribution Department / Board : Consumer Affairs Notification No : GSR938(E) Date of Notification : 31.12.2009 Date of Publication : 31.12.2009

More information

SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018

SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018 SFPE ANSI Accredited Standards Development Procedures Date: March 2, 2018 1 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. ORGANIZATION... 3 3. RECORDS... 4 4. MEMBERSHIP... 4 5. INTEREST CATEGORIES... 6 6.

More information

EUROPEAN TERRITORIAL COOPERATION. Interreg V-A Poland-Denmark-Germany-Lithuania-Sweden (South Baltic) Programme

EUROPEAN TERRITORIAL COOPERATION. Interreg V-A Poland-Denmark-Germany-Lithuania-Sweden (South Baltic) Programme EUROPEAN TERRITORIAL COOPERATION Interreg V-A Poland-Denmark-Germany-Lithuania-Sweden (South Baltic) Programme 2014-2020 THE MONITORING COMMITTEE - Rules of Procedure - approved by the Monitoring Committee

More information

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY [27th January 2014] Supplement to Official Gazette 939 S.I. 7 of 2014 PUBLIC PROCUREMENT ACT (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY 1.

More information

TITLE III--IMPROVING THE SAFETY OF IMPORTED FOOD

TITLE III--IMPROVING THE SAFETY OF IMPORTED FOOD TITLE III--IMPROVING THE SAFETY OF IMPORTED FOOD SEC. 301. FOREIGN SUPPLIER VERIFICATION PROGRAM. (a) In General.--Chapter VIII (21 U.S.C. 381 et seq.) is amended by adding at the end the following: "SEC.

More information

Date Reference 1 (14) 1 December 2015 TSA XXX-XXX

Date Reference 1 (14) 1 December 2015 TSA XXX-XXX AGREEMENT GOVERNING THE DELEGATION OF STATUTORY CERTIFICATION AND SERVICES FOR VESSELS REGISTERED IN SWEDEN between THE SWEDISH TRANSPORT AGENCY and XXX Issued on 1 December 2015, with effects from 1 January

More information

PROCEDURES ISSUE 1, REVISION 7 QAI SUBCOMMITTEE ON ACCREDITATION. Approved by Board on Conformity Assessment on May 2, 2017

PROCEDURES ISSUE 1, REVISION 7 QAI SUBCOMMITTEE ON ACCREDITATION. Approved by Board on Conformity Assessment on May 2, 2017 PROCEDURES ISSUE 1, REVISION 7 QAI SUBCOMMITTEE ON ACCREDITATION Approved by Board on Conformity Assessment on May 2, 2017 The American Society of Mechanical Engineers Two Park Avenue New York, NY 10016-5990

More information

ADMINISTRATIVE PROVISION

ADMINISTRATIVE PROVISION Belgian public limited company INFRABEL ADMINISTRATIVE PROVISION Y15 QUALIFICATION OF SUPPLIERS Name Date Signature Created by Reviewed by Approved by Geert Robbroeckx Dirk Dupont Frédéric Tilmans Translated

More information

E/ECE/324 Rev.2 E/ECE/TRANS/505} ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE

E/ECE/324 Rev.2 E/ECE/TRANS/505} ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE 5 October 1995 ENGLISH Original: ENGLISH and FRENCH ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE AGREEMENT CONCERNING THE ADOPTION OF UNIFORM TECHNICAL PRESCRIPTIONS FOR WHEELED VEHICLES,

More information

The Quality Housing Components. Certification Regulations

The Quality Housing Components. Certification Regulations The Quality Housing Components Certification Regulations February 1, 2005 Center for Better Living This document is a temporary English translation of the Quality Housing Components Certification Regulations.

More information

ARTICLE 29 DATA PROTECTION WORKING PARTY

ARTICLE 29 DATA PROTECTION WORKING PARTY ARTICLE 29 DATA PROTECTION WORKING PARTY 18/EN WP 257 rev.01 Working Document setting up a table with the elements and principles to be found in Processor Binding Corporate Rules Adopted on 28 November

More information

ACT No 486/2013 Coll. of 29 November 2013 concerning customs enforcement of intellectual property rights

ACT No 486/2013 Coll. of 29 November 2013 concerning customs enforcement of intellectual property rights ACT No 486/2013 Coll. of 29 November 2013 concerning customs enforcement of intellectual property rights The National Council of the Slovak Republic has adopted the following Act: This Act sets out: PART

More information

Official Journal of the European Union L 334/25

Official Journal of the European Union L 334/25 12.12.2008 Official Journal of the European Union L 334/25 COMMISSION REGULATION (EC) No 1235/2008 of 8 December 2008 laying down detailed rules for implementation of Council Regulation (EC) No 834/2007

More information

Table of Contents. 9 Intellectual Property Policy

Table of Contents. 9 Intellectual Property Policy Society of Motion Picture and Television Engineers Intellectual Property Policy Extracted from Standards Operations Manual Approved by Board 2012-06-17 Effective 2013-08-05 9 Intellectual Property Policy

More information

Ordinance on Electromagnetic Compatibility

Ordinance on Electromagnetic Compatibility English is not an official language of the Swiss Confederation. This translation is provided for information purposes only and has no legal force. Ordinance on Electromagnetic Compatibility (OEMC) 734.5

More information

Feed Act (86/2008, amendments up to 565/2014 included)

Feed Act (86/2008, amendments up to 565/2014 included) Ministry of Agriculture and Forestry, Finland NB: Unofficial translation; legally binding texts are those in Finnish and Swedish. Feed Act (86/2008, amendments up to 565/2014 included) Chapter 1 General

More information

IAF/ILAC Multi-Lateral Mutual Recognition Arrangements (Arrangements): Requirements and Procedures for Evaluation of a Regional Group

IAF/ILAC Multi-Lateral Mutual Recognition Arrangements (Arrangements): Requirements and Procedures for Evaluation of a Regional Group IAF/ILAC Multi-Lateral Mutual Recognition Arrangements (Arrangements): Requirements and Procedures for Evaluation of a Regional Group IAF/ILAC-A1:01/2018 Copyright IAF/ILAC 2018 IAF and ILAC encourage

More information

Food Act 1. Passed RT I 1999, 30, 415 Entered into force in accordance with 66.

Food Act 1. Passed RT I 1999, 30, 415 Entered into force in accordance with 66. Issuer: Riigikogu Type: act In force from: 01.01.2017 In force until: 30.06.2017 Translation published: 20.12.2016 Food Act 1 Amended by the following acts Passed 25.02.1999 RT I 1999, 30, 415 Entered

More information

Chapter One. Section I. General provisions

Chapter One. Section I. General provisions LAW ON MEDICAL DEVICES In force from 12.06.2007 Published SG * No.46 of 12 June 2007 Chapter One GENERAL PRINCIPLES Section I. General provisions Article 1. (1) This Law shall regulate: 1. the conditions

More information

JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) OBJECTION PROCEDURES BASED ON THE GUIDELINES FOR ENVIRONMENTAL AND SOCIAL CONSIDERATIONS (Translation

JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) OBJECTION PROCEDURES BASED ON THE GUIDELINES FOR ENVIRONMENTAL AND SOCIAL CONSIDERATIONS (Translation JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) OBJECTION PROCEDURES BASED ON THE GUIDELINES FOR ENVIRONMENTAL AND SOCIAL CONSIDERATIONS (Translation of Japanese Version) April 2010 1 CONTENTS 1. Policy

More information

PROCEDURE FOR HANDLING APPLICATIONS FOR MEMBERSHIP IN IAF

PROCEDURE FOR HANDLING APPLICATIONS FOR MEMBERSHIP IN IAF Page 1 of 10 International Accreditation Forum, Inc. IAF Procedures Document PROCEDURE FOR HANDLING APPLICATIONS FOR MEMBERSHIP IN IAF IAF PR 5:2006 Accreditation reduces risk for business and its customers

More information

ANSI Essential Requirements: Due process requirements for American National Standards

ANSI Essential Requirements: Due process requirements for American National Standards ANSI Essential Requirements: Due process requirements for American National Standards Edition: January 2008 Editorial Correction to 3.1: March 11, 2008 Copyright by the American National Standards Institute

More information

DEED OF AMENDMENT OF ARTICLES OF ASSOCIATION EUROPEAN CO-OPERATION FOR ACCREDITATION (EA)

DEED OF AMENDMENT OF ARTICLES OF ASSOCIATION EUROPEAN CO-OPERATION FOR ACCREDITATION (EA) This document is an unofficial English translation of a document prepared in Dutch. In preparing this document, an attempt has been made to translate as literally as possible without jeopardising the overall

More information

API Monogram Program Alternative Marking of Products License Agreement Application. REVISION 3 FM-011.pdf

API Monogram Program Alternative Marking of Products License Agreement Application. REVISION 3 FM-011.pdf API Monogram Program Alternative Marking of Products License Agreement Application REVISION 3 FM-011.pdf Contents Part 1 Scope Part 2 General API Monogram Marking Requirements Part 3 Alternative API Marking

More information

Operating Procedures ANSI Executive Standards Council Edition: January 2015

Operating Procedures ANSI Executive Standards Council Edition: January 2015 Operating Procedures ANSI Executive Standards Council Edition: January 2015 Copyright by the American National Standards Institute (ANSI), 25 West 43 Street, 4 th Floor, New York, New York 10036. This

More information

Has Decreed. Article 2 This decision shall be published in the Official Gazette and shall be enforced as of the next day of publication.

Has Decreed. Article 2 This decision shall be published in the Official Gazette and shall be enforced as of the next day of publication. Decree of The Minister of Trade and Industry No. ( ) of 2006 On the Enactment of the Executive Regulations of the Consumer Protection Law Issued By Law (67) of 2006 Minister of Trade and Industry After

More information

Translation in English is for informative purposes only. Legally binding is text in Latvian.

Translation in English is for informative purposes only. Legally binding is text in Latvian. APPROVED with the Minutes No. VeA 2013/10/ERAF-01 of the sitting of the Procurement commission of the Ventspils University College of 16 th of April, 2013 NEGOTIATED PROCEDURE REGULATIONS Development of

More information

IAF Guidance on Cross Frontier Accreditation

IAF Guidance on Cross Frontier Accreditation (IAF) IAF Guidance Document IAF Guidance on Cross Frontier Accreditation (IAF GD 3:2003) Guidance on Cross Frontier Accreditation Page 2 of 10 The (IAF) operates a programme of conformity assessment which

More information

CTR Carbide Dies (Birmingham) Ltd & Rectory Tool Company Ltd

CTR Carbide Dies (Birmingham) Ltd & Rectory Tool Company Ltd CTR Carbide Dies (Birmingham) Ltd & Rectory Tool Company Ltd PURCHASING TERMS & CONDITIONS 1) Definitions The Company shall mean CTR Carbide Dies (Birmingham) Ltd and Rectory Tool Company Ltd. Goods shall

More information

Annex 1: Standard Contractual Clauses (processors)

Annex 1: Standard Contractual Clauses (processors) Annex 1: Standard Contractual Clauses (processors) For the purposes of Article 26(2) of Directive 95/46/EC for the transfer of personal data to processors established in third countries which do not ensure

More information

LAW ON PRODUCT SAFETY. (Directive 2001/95/EC)

LAW ON PRODUCT SAFETY. (Directive 2001/95/EC) LAW ON PRODUCT SAFETY (Directive 2001/95/EC) GENERAL PROVISIONS Contents Article 1 With this Law shall regulate the general product safety requirements, the manner of prescribing the technical regulations

More information

InterNational Electrical Testing Association Operating Principles and Procedures

InterNational Electrical Testing Association Operating Principles and Procedures InterNational Electrical Testing Association Operating Principles and Procedures 1. GENERAL These Operating Principles and Procedures describe the method used by the InterNational Electrical Testing Association

More information

OPEI Operating Procedures for ANSI Accredited U.S. TAGs to ISO TC 23 SC 13 and SC 17

OPEI Operating Procedures for ANSI Accredited U.S. TAGs to ISO TC 23 SC 13 and SC 17 341 South Patrick Street Alexandria, VA 22314 (703) 549-7600 www.opei.org OPEI Operating Procedures for ANSI Accredited U.S. TAGs to ISO TC 23 SC 13 and SC 17 1 Table of Contents 1.0 GENERAL... 3 2.0 FUNCTIONS

More information

General Part of the Economic Activities Code Act 1

General Part of the Economic Activities Code Act 1 Issuer: Riigikogu Type: act In force from: 06.07.2017 In force until: 02.01.2018 Translation published: 10.07.2017 General Part of the Economic Activities Code Act 1 Amended by the following acts Passed

More information

AMERICAN IRON AND STEEL INSTITUTE PROCEDURES FOR ANSI-APPROVED STANDARDS FOR COLD-FORMED STEEL DESIGN AND CONSTRUCTION

AMERICAN IRON AND STEEL INSTITUTE PROCEDURES FOR ANSI-APPROVED STANDARDS FOR COLD-FORMED STEEL DESIGN AND CONSTRUCTION AMERICAN IRON AND STEEL INSTITUTE PROCEDURES FOR ANSI-APPROVED STANDARDS FOR COLD-FORMED STEEL DESIGN AND CONSTRUCTION June 13, 2017 (Approved) American Iron & Steel Institute 25 Massachusetts Avenue,

More information

National Chiao Tung University s Organization of the Faculty Grievances Committee and the Procedure and Guidelines to Reviewing Grievances

National Chiao Tung University s Organization of the Faculty Grievances Committee and the Procedure and Guidelines to Reviewing Grievances National Chiao Tung University s Organization of the Faculty Grievances Committee and the Procedure and Guidelines to Reviewing Grievances Approved at the 4 th Academic Affairs Meeting for Academic Year

More information

Transition document Transition document, Version: 4.1, October 2017

Transition document Transition document, Version: 4.1, October 2017 Transition document Transition document, Version: 4.1, October 2017 Transition from a HACCP certification to a FSSC 22000 certification 1 Introduction... 2 2 General requirements for a transition to FSSC

More information

ACCREDITED PROCEDURES FOR THE DEVELOPMENT OF AMERICAN NATIONAL STANDARDS

ACCREDITED PROCEDURES FOR THE DEVELOPMENT OF AMERICAN NATIONAL STANDARDS ACCREDITED PROCEDURES FOR THE DEVELOPMENT OF AMERICAN NATIONAL STANDARDS 2 Revised Procedures published February 29, 2016. DEVELOPMENT OF AMERICAN NATIONAL STANDARDS APPA International (hereafter referred

More information

ANSI Essential Requirements: Due process requirements for American National Standards

ANSI Essential Requirements: Due process requirements for American National Standards ANSI Essential Requirements: Due process requirements for American National Standards Edition: January 20178 Revision to: 4.1.3 Copyright by the American National Standards Institute (ANSI), 25 West 43rd

More information

PART 1 Regulations Governing the Rhode Island Motor Vehicle Arbitration Board

PART 1 Regulations Governing the Rhode Island Motor Vehicle Arbitration Board 470 RICR 00 00 1 TITLE 470 MOTOR VEHICLE ARBITRATION BOARD CHAPTER 00 N/A SUBCHAPTER 00 N/A PART 1 Regulations Governing the Rhode Island Motor Vehicle Arbitration Board 1.1 Purpose and Scope A. These

More information

STATUTORY INSTRUMENTS. S.I. No. 555 of 2017

STATUTORY INSTRUMENTS. S.I. No. 555 of 2017 STATUTORY INSTRUMENTS. S.I. No. 555 of 2017 EUROPEAN COMMUNITIES (CARRIAGE OF DANGEROUS GOODS BY ROAD AND USE OF TRANSPORTABLE PRESSURE EQUIPMENT) (AMENDMENT) (NO. 3) REGULATIONS 2017 2 [555] S.I. No.

More information

SUBJECT: NATIONAL GUIDELINES ON THE ISSUANCE OF COMPLIANCE CERTIFICATE FOR AGRICULTURAL AND FISHERIES MACHINERY

SUBJECT: NATIONAL GUIDELINES ON THE ISSUANCE OF COMPLIANCE CERTIFICATE FOR AGRICULTURAL AND FISHERIES MACHINERY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 SUBJECT: NATIONAL GUIDELINES ON THE ISSUANCE OF COMPLIANCE CERTIFICATE

More information

Procedure Manual Control Union Certifications Annex A3. Terms of Contract part 1

Procedure Manual Control Union Certifications Annex A3. Terms of Contract part 1 Terms of Contract applicable to the inspection and certification activities by Control Union Certifications BV, hereinafter called the Company 1. General 1.1 For those items not covered in these Terms

More information

EU STANDARD CONTRACTUAL CLAUSES (PROCESSORS)

EU STANDARD CONTRACTUAL CLAUSES (PROCESSORS) EU STANDARD CONTRACTUAL CLAUSES (PROCESSORS) For the purposes of transfer of personal data to processors established in third countries outside of the European Union which do not ensure an adequate level

More information

Financial Dispute Resolution Service (FDRS)

Financial Dispute Resolution Service (FDRS) RULES FOR Financial Dispute Resolution Service (FDRS) DATE: 1 April 2015 Contents... 1 1. Title... 1 2. Commencement... 1 3. Interpretation... 1 Part 1 Core features of the Scheme... 3 4. Purpose of the

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 1995R2868 EN 23.03.2016 005.002 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COMMISSION REGULATION (EC) No 2868/95 of 13 December

More information

Act on making products available on the market (Product Safety Act)

Act on making products available on the market (Product Safety Act) Übersetzung durch den Sprachendienst des Bundesministeriums für Arbeit und Soziales. Translation provided by the Language Service of the Federal Ministry of Labour and Social Affairs. Stand: Die Übersetzung

More information

SSLI \6.0 v1.0

SSLI \6.0 v1.0 SCHEDULE 3 STANDARD CONTRACTUAL CLAUSES (PROCESSORS) For the purposes of Article 26(2) of Directive 95/46/EC for the transfer of Personal Data to Processors established in third countries which do not

More information

Complaints Handling Procedure

Complaints Handling Procedure Page: 1 of 9 1. Purpose & Scope: This procedure aims to describe the steps adopted by RACS Quality for: - Complaints Handling. - Handling of Appeal against a certification decision. - Handling of Request

More information

BY-LAWS INTERNATIONAL BUSINESS MACHINES CORPORATION. Adopted April 29,1958. As Amended Through. December 12, 2017

BY-LAWS INTERNATIONAL BUSINESS MACHINES CORPORATION. Adopted April 29,1958. As Amended Through. December 12, 2017 BY-LAWS of INTERNATIONAL BUSINESS MACHINES CORPORATION Adopted April 29,1958 As Amended Through December 12, 2017 TABLE OF CONTENTS ARTICLE I -- Definitions 1 ARTICLE II -- MEETINGS OF STOCKHOLDERS SECTION

More information

INTERNATIONAL ELECTROTECHNICAL COMMISSION

INTERNATIONAL ELECTROTECHNICAL COMMISSION INTERNATIONAL ELECTROTECHNICAL COMMISSION QC 001002-2 Third edition 1998-06 IEC Quality Assessment System for Electronic Components (IECQ) Rules of Procedure Part 2: Documentation Reference number QC 001002-2:1998(E)

More information

CONSOLIDATED VERSION OF THE EOTA STATUTES April

CONSOLIDATED VERSION OF THE EOTA STATUTES April CONSOLIDATED VERSION OF THE EOTA STATUTES April 15 2015 original version, fixed by Royal Decree of 8 September 1994, published in the Belgian Official Journal p. 24785 of October 1, 1994, and published

More information

Decree No of 13 January 2011

Decree No of 13 January 2011 Decree No. 2011-48 of 13 January 2011 TITLE I - DOMESTIC ARBITRATION CHAPTER I The arbitration agreement Article 1442 The arbitration agreement shall be either in the form of an arbitration clause or of

More information

Amended and Restated Bylaws National Weather Association

Amended and Restated Bylaws National Weather Association Amended and Restated Bylaws Of National Weather Association Page 1 of 22 Contents SECTION 1: ASSOCIATION DEFINED... 4 1.1 Name... 4 1.2 Purpose... 4 1.3 Tax Exempt Status... 4 1.4 Tax Year... 4 1.5 Location...

More information

ACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016

ACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016 ACCREDITED STANDARDS COMMITTEE (ASC) Z540 OPERATING PROCEDURES 2016 Accredited Standards Committee (ASC) procedure is used for the ASC Z540 Standards Committee. This version of the Accredited Standards

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS L 115/12 Official Journal of the European Union 27.4.2012 II (Non-legislative acts) REGULATIONS COMMISSION DELEGATED REGULATION (EU) No 363/2012 of 23 February 2012 on the procedural rules for the recognition

More information

(Acts whose publication is obligatory) COMMISSION REGULATION ( EC ) No 2868/95. of 13 December 1995

(Acts whose publication is obligatory) COMMISSION REGULATION ( EC ) No 2868/95. of 13 December 1995 15. 12. 95 [ EN Official Journal of the European Communities No L 303/1 I (Acts whose publication is obligatory) COMMISSION REGULATION ( EC ) No 2868/95 of 13 December 1995 implementing Council Regulation

More information

AGREEMENT GOVERNING THE DELEGATION OF STATUTORY CERTIFICATION SERVICES FOR SHIPS REGISTERED IN FINLAND

AGREEMENT GOVERNING THE DELEGATION OF STATUTORY CERTIFICATION SERVICES FOR SHIPS REGISTERED IN FINLAND AGREEMENT GOVERNING THE DELEGATION OF STATUTORY CERTIFICATION SERVICES FOR SHIPS REGISTERED IN FINLAND between THE FINNISH TRANSPORT SAFETY AGENCY and RO 1 GENERAL 1.1. This Agreement is concluded between

More information

IRS 2. Edition 4. Internal rules of standardization Part 2: Establishment and work of technical committees for standards and related documents

IRS 2. Edition 4. Internal rules of standardization Part 2: Establishment and work of technical committees for standards and related documents IRS 2 Edition 4 Internal rules of standardization Part 2: Establishment and work of technical committees for standards and related documents Belgrade, April 2016 No. 484/3-51-02/2016 from 2016-04-01 Copyright

More information

The Act on Processing of Personal Data

The Act on Processing of Personal Data The Act on Processing of Personal Data Act No. 429 of 31 May 2000 as amended by section 7 of Act No. 280 of 25 April 2001, section 6 of Act No. 552 of 24 June 2005 and section 2 of Act No. 519 of 6 June

More information

Fraud, Waste and Abuse Case Procedures

Fraud, Waste and Abuse Case Procedures 10461 Mill Run Circle, Suite 1250 Owings Mills, MD 21117 phone 877.776.2200 local 410.581.6222 fax 410.581.6228 online www.bocusa.org Fraud, Waste and Abuse Case Procedures For BOC Accredited Facilities

More information

Standards Act 18 of 2005 section 34

Standards Act 18 of 2005 section 34 Republic of Namibia 1 Annotated Statutes MADE IN TERMS OF section 34 Government Notice 249 of 2013 (GG 5290) came into force on date of publication: 20 September 2013 The Government Notice which publishes

More information

Quality Assurance Agreement

Quality Assurance Agreement Quality Assurance Agreement between the company CGR B-E GmbH, Emil-Beerli-Straße 20, 40822 Mettmann hereinafter referred to as "Purchaser" and the company ; registered office: hereinafter referred to as

More information

WIPO WORLD INTELLECTUAL PROPERTY ORGANISATION ARBITRATION RULES

WIPO WORLD INTELLECTUAL PROPERTY ORGANISATION ARBITRATION RULES APPENDIX 3.17 WIPO WORLD INTELLECTUAL PROPERTY ORGANISATION ARBITRATION RULES (as from 1 October 2002) I. GENERAL PROVISIONS Abbreviated Expressions Article 1 In these Rules: Arbitration Agreement means

More information

MEMBERSHIP RULES GIFT ASSOCIATES INTERCHANGE NETWORK, INC.

MEMBERSHIP RULES GIFT ASSOCIATES INTERCHANGE NETWORK, INC. MEMBERSHIP RULES GIFT ASSOCIATES INTERCHANGE NETWORK, INC. ARTICLE I DEFINITIONS 1.1 Access Agreement. A one (1) year agreement entered into by and between the Service Provider and a Member incorporating

More information

Ordinance on electrical low-voltage equipment

Ordinance on electrical low-voltage equipment This English translation is for information purposes only and is not legally binding Ordinance on electrical low-voltage equipment of 25 November 2015 The Swiss Federal Council, based on Article 3 and

More information

Operating Procedures ANSI Executive Standards Council Edition: May 2017

Operating Procedures ANSI Executive Standards Council Edition: May 2017 Operating Procedures ANSI Executive Standards Council Edition: May 2017 Copyright by the American National Standards Institute (ANSI), 25 West 43 Street, 4 th Floor, New York, New York 10036. This material

More information

Utility Models Act. Passed RT I 1994, 25, 407 Entry into force

Utility Models Act. Passed RT I 1994, 25, 407 Entry into force Issuer: Riigikogu Type: act In force from: 01.01.2015 In force until: In force Translation published: 23.12.2014 Amended by the following acts Passed 16.03.1994 RT I 1994, 25, 407 Entry into force 23.05.1994

More information

Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards

Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards Association of Pool & Spa Professionals ANSI Accredited Procedures for Development of American National Standards (Approved by ANSI November 23, 2015 Replaces Previous Procedures Dated May 21, 2010) The

More information

BINDING CORPORATE RULES PRIVACY policy. Telekom Albania. Çaste që na lidhin.

BINDING CORPORATE RULES PRIVACY policy. Telekom Albania. Çaste që na lidhin. BINDING CORPORATE RULES PRIVACY policy Telekom Albania Çaste që na lidhin. Table of Contents preamble...... 4 1 SCOPE..... 5 1.1 Legal Nature of the Binding Corporate Rules Privacy..... 5 1.2 Area of Application...

More information

FITNESS TASMANIA - CODE OF PRACTICE FOR FITNESS FACILITIES

FITNESS TASMANIA - CODE OF PRACTICE FOR FITNESS FACILITIES FITNESS TASMANIA - CODE OF PRACTICE FOR FITNESS FACILITIES PART 1 INTRODUCTION Objectives The objectives of the Fitness Tasmania Code of Practice are:- 1.1 To provide a high value service which will enhance

More information

BY-LAWS of the SUPERVISORY BOARD OF GRUPA LOTOS SPOLKA AKCYJNA

BY-LAWS of the SUPERVISORY BOARD OF GRUPA LOTOS SPOLKA AKCYJNA BY-LAWS of the SUPERVISORY BOARD OF GRUPA LOTOS SPOLKA AKCYJNA consolidated text as of 17 December 2009 I. GENERAL PROVISIONS 1 The Supervisory Board of Grupa LOTOS S.A. shall act under the Commercial

More information

CHAPTERS 61B-75 Through 79, FLORIDA ADMINISTRATIVE CODE

CHAPTERS 61B-75 Through 79, FLORIDA ADMINISTRATIVE CODE Department of Business and Professional Regulation CHAPTERS 6B-75 Through 79, FLORIDA ADMINISTRATIVE CODE Division of Florida Condominiums, Timeshares, and Mobile Homes 60 Blair Stone Rd Tallahassee, Florida

More information

NASHVILLE BAR ASSOCIATION LAWYER REFERRAL AND INFORMATION SERVICE PLAN

NASHVILLE BAR ASSOCIATION LAWYER REFERRAL AND INFORMATION SERVICE PLAN NASHVILLE BAR ASSOCIATION LAWYER REFERRAL AND INFORMATION SERVICE PLAN I. PURPOSE 1.1 The purposes of the Lawyer Referral and Information Service (hereinafter, The Service ) are: (c) (d) (e) To make legal

More information

CHAPTER XX DISPUTE SETTLEMENT. SECTION 1 Objective, Scope and Definitions. ARTICLE [1] Objective. ARTICLE [2] Scope

CHAPTER XX DISPUTE SETTLEMENT. SECTION 1 Objective, Scope and Definitions. ARTICLE [1] Objective. ARTICLE [2] Scope Disclaimer: The negotiations between the EU and Japan on the Economic Partnership Agreement (the EPA) have been finalised. In view of the Commission's transparency policy, we are hereby publishing the

More information

PDA STANDARDS DEVELOPMENT PROGRAM Policies and Procedures

PDA STANDARDS DEVELOPMENT PROGRAM Policies and Procedures PDA STANDARDS DEVELOPMENT PROGRAM Policies and Procedures Approved by the PDA Executive Management July 15, 2016 Approved by the ANSI Executive Standards Council March 01, 2017 Parenteral Drug Association

More information

Request for Proposal. RFP # Non-Profit, Sports Photography

Request for Proposal. RFP # Non-Profit, Sports Photography County of Prince George FINANCE DEPARTMENT P.O. BOX 68 6602 Courts Drive PRINCE GEORGE, Virginia 23875 (804) 722-8710 Fax (804) 732-1966 Request for Proposal RFP # 17-0303-1, Sports Photography This procurement

More information

RULES AND REGULATIONS OF THE ALAMEDA COUNTY BAR ASSOCIATION. CRIMINAL COURT APPOINTED ATTORNEYS PROGRAM (Effective May 1, 2013)

RULES AND REGULATIONS OF THE ALAMEDA COUNTY BAR ASSOCIATION. CRIMINAL COURT APPOINTED ATTORNEYS PROGRAM (Effective May 1, 2013) RULES AND REGULATIONS OF THE ALAMEDA COUNTY BAR ASSOCIATION CRIMINAL COURT APPOINTED ATTORNEYS PROGRAM (Effective May 1, 2013) A. Preamble The purpose of the Criminal Court Appointed Attorneys Program

More information

FOREIGN TRADE ARBITRATION LAW. Chapter I General provisions

FOREIGN TRADE ARBITRATION LAW. Chapter I General provisions Article 1. Purpose of the Law FOREIGN TRADE ARBITRATION LAW Chapter I General provisions The purpose of this Law is to regulate relations pertaining to arbitral proceedings of suits brought by a citizen

More information

ASEAN SECTORAL MUTUAL RECOGNITION ARRANGEMENT FOR GOOD MANUFACTURING PRACTICE (GMP) INSPECTION OF MANUFACTURERS OF MEDICINAL PRODUCTS

ASEAN SECTORAL MUTUAL RECOGNITION ARRANGEMENT FOR GOOD MANUFACTURING PRACTICE (GMP) INSPECTION OF MANUFACTURERS OF MEDICINAL PRODUCTS ASEAN SECTORAL MUTUAL RECOGNITION ARRANGEMENT FOR GOOD MANUFACTURING PRACTICE (GMP) INSPECTION OF MANUFACTURERS OF MEDICINAL PRODUCTS The Governments of Brunei Darussalam, the Kingdom of Cambodia, the

More information

Agreement between the Government of India and the International Atomic Energy Agency for the Application of Safeguards to Civilian Nuclear Facilities

Agreement between the Government of India and the International Atomic Energy Agency for the Application of Safeguards to Civilian Nuclear Facilities Atoms for Peace Information Circular INFCIRC/754 Date: 29 May 2009 General Distribution Original: English Agreement between the Government of India and the International Atomic Energy Agency for the Application

More information

CITY OF SOUTH BAY INVITATION TO BIDS ON CITY OWNED SURPLUS REAL ESTATE. BID No

CITY OF SOUTH BAY INVITATION TO BIDS ON CITY OWNED SURPLUS REAL ESTATE. BID No CITY OF SOUTH BAY INVITATION TO BIDS ON CITY OWNED SURPLUS REAL ESTATE BID No. 2017-07 See, Attached List of City Owned Surplus Real Estate which is Available Bid Opening Date: January 26, 2018 at 2:00

More information

CHARTER THE BANK OF NOVA SCOTIA AUDIT AND CONDUCT REVIEW COMMITTEE OF THE BOARD

CHARTER THE BANK OF NOVA SCOTIA AUDIT AND CONDUCT REVIEW COMMITTEE OF THE BOARD CHARTER THE BANK OF NOVA SCOTIA AUDIT AND CONDUCT REVIEW COMMITTEE OF THE BOARD The Audit and Conduct Review Committee of the Board of Directors (the Committee ) has the responsibilities and duties as

More information

INTERNATIONAL ELECTROTECHNICAL COMMISSION

INTERNATIONAL ELECTROTECHNICAL COMMISSION INTERNATIONAL ELECTROTECHNICAL COMMISSION QC 001002-1 Third edition 1998-06 IEC Quality Assessment System for Electronic Components (IECQ) Rules of Procedure Part 1: Administration Reference number QC

More information

Republic of Uganda. Bidding Document for Framework Contracts for Supplies

Republic of Uganda. Bidding Document for Framework Contracts for Supplies Republic of Uganda Bidding Document for Framework Contracts for Supplies Subject of Procurement: Supply of Electrical [Lot 1] and Plumbing Materials [Lot 2] Under Framework Contract Procurement Reference

More information

CLINICAL TRIAL AGREEMENT [Identification of the trial, Person in charge of research] Sponsor of the Trial: Institution:

CLINICAL TRIAL AGREEMENT [Identification of the trial, Person in charge of research] Sponsor of the Trial: Institution: CLINICAL TRIAL AGREEMENT [Identification of the trial, Person in charge of research] Sponsor of the Trial: Institution: 2 (20) APPENDIX 1 Parties................................ 4 2 Scope of the agreement................................4

More information

DATA PROCESSING ADDENDUM. 1.1 The User and When I Work, Inc. ("WIW") have entered into the Terms of Service, for the provision of the Service.

DATA PROCESSING ADDENDUM. 1.1 The User and When I Work, Inc. (WIW) have entered into the Terms of Service, for the provision of the Service. DATA PROCESSING ADDENDUM 1. BACKGROUND 1.1 The User and When I Work, Inc. ("WIW") have entered into the Terms of Service, for the provision of the Service. 1.2 In the event that WIW Processes User Personal

More information

An Introduction to Authorised Economic Operators (AEO)

An Introduction to Authorised Economic Operators (AEO) Tax and Duty Manual An Introduction to Authorised Economic Operators (AEO) This document should be read in conjunction with the Instruction Manual on Authorised Economic Operators, published by Simplifications

More information

An unofficial translation of LOV nr 04: Act on measurement units, measurements and standard time.

An unofficial translation of LOV nr 04: Act on measurement units, measurements and standard time. Act on measurement units, measurements and standard time An unofficial translation of LOV 2007-01-26 nr 04: Act on measurement units, measurements and standard time. (Comment: The delegation of power is

More information

the other Party has otherwise failed to carry out its obligations under this Agreement; or

the other Party has otherwise failed to carry out its obligations under this Agreement; or CHAPTER TWENTY DISPUTE SETTLEMENT ARTICLE 20.1: COOPERATION The Parties shall at all times endeavor to agree on the interpretation and application of this Agreement, and shall make every attempt through

More information

Collection of Laws No. 93/2009 ACT. dated 26 March on auditors, and amending certain other legislation (the Auditors Act).

Collection of Laws No. 93/2009 ACT. dated 26 March on auditors, and amending certain other legislation (the Auditors Act). Collection of Laws No. 93/2009 ACT dated 26 March 2009 on auditors, and amending certain other legislation (the Auditors Act). The Parliament has enacted the following act of the Czech Republic: TITLE

More information