1 Outback Regional Water Alliance Care of Tender Document Water Main Air Scouring for The Outback Regional Water Alliance Job Name: Water Main Air Scouring for the Outback Regional Water Alliance Project File: Closing: Time: 2:00pm Date: Friday 29 July 2016 Location: Longreach Shire Council June 2016

2 Action Statement & Document Control Version History Date Name Position 23/06/2016 Aidan Pugh Civil Engineer Approve Action required (Review/Endorse/Approve) Prepared by Aidan Pugh Company/Organisation George Bourne & Associates Title Engineer Location 67 Elm Street, Barcaldine, Qld Version no. A.0 Version date 23 June 2016 Status Tender File/M files ID / DOCUMENT CONTROL SHEET Contact for enquiries and proposed changes If you have any questions regarding this document or if you have a suggestion for improvements, please contact: Project Manager Neil Stiles Phone

3 Table of Contents Table of Contents 1.0 Conditions of Tender a 2.0 Tender Schedule g 3.0 Tender Form i 4.0 Individual Mobilisation Schedule k 5.0 Formal Instrument of Agreement Schedule of Work Dayworks Rates General Conditions of Contract Special Conditions of Contract Project Specification Appendix A Appendix B 38

4 Section A Conditions of Tender Page a SECTION A Conditions of Tender

5 Section A Conditions of Tender Page b A.0 CONDITIONS OF TENDER A.1. Tender documents The specific tender documents are:- Title Revision Date The Tender Document Water Main Air Scouring for Outback Regional Water Alliance June 2016 A.2. Principal The Principal for this project will be: PO Box 472 Longreach, QLD, 4730 Telephone: (07) Facsimile: (07) A.3. Superintendent The Superintendent for this project will be: Neil Stiles George Bourne & Associates (GBA) Consulting Civil Engineers 67 Elm Street (PO Box 169) BARCALDINE Qld 4725 Telephone: (07) Facsimile: (07) nstiles@gbassoc.com.au A.4. Issuing of Tender Documents Documents will be available from at the web address of tender number LRC Registration as a supplier is required. A.5. Tender Information to be Submitted A.5.1 Tenderer s Details Tenderers shall complete the Tender Form (Section C) or on an attachment if there is insufficient space. Where the Tenderer is: Not a firm or company full name and address of Tenderer. A firm name and address of firm, full name and address of each member of firm. A company name of company and address of registered office of the company.

6 Section A Conditions of Tender Page c A.5.2 Required Tender Information Tenderers should complete, endorse and lodge the following parts of the Tender Document: (a) Tender Schedule Section B; (b) Tender Form Section C (c) Schedule of Work Section 2; and (d) Dayworks Rates Section 3. (e) Individual Mobilisation Schedule Section D A.6. Site Visitation Notwithstanding Clause 12 of the General Conditions of Contract, a Summary of Clause 12 of AS 2124 is given below. No variation to the Contract will be considered on account of the Contractor s failure to: 1. Inspect the site and its surrounds to make an assessment of all local facilities and site conditions which may impact on their tender offer and the Contract; 2. Examine all tender information supplied by the Principal; and 3. Examine all other relevant information. A.7. Correspondence All correspondence between the Principal and Tenderers must be served through the Superintendent. Only written advice from the Superintendent shall be used for any changes to the tender. Under no circumstances may an oral advice be used at tender stage. A.8. Lodgement of Tender A.8.1. Each Tender must be submitted by the closing time in the following format: Format Tender Box Instructions for submission Electronically The Tenderer must provide: 1 x complete executed copy of the Tender in PDF format; and 1 x copy of the Response Schedules in MS Office format, and any other information in accordance with the requirements of the Electronic Tender Box (if any). A.8.2. Where a Tenderer lodges a non-conforming Tender: (a) the conforming and non-conforming Tenders must be submitted separately; and

7 Section A Conditions of Tender Page d (b) the non-conforming Tender must be clearly marked, ALTERNATIVE TENDER (in addition to being marked in conformity with Clause A.10). A.8.3. Tenders must be in the LG Tender Box by the Closing time. No late tenders will be accepted. A.8.4. Should the Principal decide to extend the closing time for the receipt of tenders, notification thereof will be given by advertisement and/or advice to known prospective Tenderers. A.8.5. Where tenders are submitted electronically it is the Tenderer s sole responsibility to ensure the tenderer receives an electronic receipt from the electronic tender box for each tender submitted. A.8.6. A Tenderer must not alter or add to the Tender Response unless required by the Conditions of Tender. A.8.7. A Tender is irrevocable for 90 days after the Closing Time. A Tenderer may withdraw their Tender at any time after the expiration of the tender validity period. A.8.8. The period in Clause A.8.7 may be extended by mutual agreement between the Tenderer and the Principal. A.8.9. Each Tender constitutes an offer by the Tenderer to the Principal to execute and complete the Work required under, and otherwise to satisfy the requirements of, the Specification on the terms and conditions of the Contract. A Tender Opening The Tender Opening will be closed to the public. A Submission of Tender does not Constitute a Contract The submission of a Tender does not constitute a contract between any party and the Principal. A.9. Tender Assessment The tender assessment will be based on the following weightings: Price 30% Capability 30% Methodology 25% Completion of Tender Schedules 15% A.9.1. Tender Price The Contract shall be a Lump Sum Contract.

8 Section A Conditions of Tender Page e A.9.2. Rejection of Tender The Principal reserves the right to reject any tender which: Is late subject to Clause A.8.3; or Is incomplete, obscure or irregular or contains omissions or erasures; or Contains, in the opinion of the Principal, amounts which are unreasonable; or Does not comply with a requirement/s of the Tender Documents. A.9.3. Acceptance of Tender The Principal is not bound to accept the lowest or any tender. Any determination made by the Principal in relation to the above matters will be final. The Principal shall evaluate tenders on the basis of best value for money. A.10. Alternative Proposals A Tenderer may submit an alternative tender for the works to be performed under this Contract, providing that the Tenderer also submits a conforming tender. Where an alternative tender is submitted, these Tender Documents shall include but not be limited to: A detailed description of the proposal; A statement clearly defining the manner in which it differs from the works as specified; Drawings; Specifications; and The information required in Clause A.5.2 of the Conditions of Tender. A.11. Free Competition Each Tenderer must allow for free competition through all processes of this tender and must not engage in uncompetitive behaviour. Uncompetitive behaviour includes but is not limited to: Colluding with other Tenderers; or Submission of inflated tenders to advantage others; or Practices which deny opportunities to others will not be tolerated. Failure to comply with this clause will result in the rejection of the Tender, at the sole discretion of the Principal.

9 Section A Conditions of Tender Page f A.12. Records The pricing schedule of unsuccessful Tenderers may, at the option of the Principal, be retained and kept as official records. Tenderers are advised that information provided in a tender may be subject to disclosure resulting from an application made under the Freedom of Information Act, A.13. Clarifications and Variations The Principal may issue to Tenderers before the closing time: a) additional information; and b) information clarifying or correcting information previously provided, to assist them in preparing their Tenders. If the Principal issues information to Tenderers, each Tenderer must take the information into account in the preparation of its Tender. After the Closing Time, the Principal may (without limiting its options): 1. request clarification or further information from any Tenderer; and 2. invite all Tenderers to change their Tenders in response to an alteration to the Specification or any of the terms and conditions of the Contract; and 3. negotiate with one or more Tenderers upon any aspect of their Tenders.

10 Section B Tender Schedule Page g SECTION B Tender Schedule

11 Section B Tender Schedule Page h B.0 TENDER SCHEDULE (a) Contact Details for the purposes of tender assessment as below: Name of Contact: Telephone No. (BH): Telephone No. (AH): Mobile No: Facsimile No: (b) (c) (d) ABN or ACN: Provide a statement of facts in detail as to the Tenderer s previous experience and achievements in performing similar or comparable work and its resources and ability to carry out the works. Provide programme of works showing the dates by which or the times within which the various stages or parts of the works are to be completed or executed. The program should be in a Gantt Chart type format and preferably electronically generated. Program to include a roster of how often tenderer will travel home and how many trips are included in the tendered price. A critical path shall be included for the program of works. (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) Provide an estimated monthly cash flow schedule. Provide details of proposed subcontractors (if any). Provide details of proposed suppliers (if any). Provide details of key personnel. Provide dot point details of the proposed work methods to be adopted for the major items of work. Details should include type & number of construction plant &/or equipment to be used Provide a list of alternative materials and/or equipment and their details, if alternatives are nominated. Area of Site required for the works, in particular if larger than what is provided for in the Contract. Status of Quality Assurance System/Accreditation. Public liability-cover Policy No. Work-cover status. Provide a list of assumptions made in the tender. Provide a list of any qualifications of the tender offer. Other information the tenderer may consider relevant to the tender.

12 Section C Tender Form Page i SECTION C Tender Form

13 Section C Tender Form Page j C.0 Tender Form Based on AS TENDER FORM Name of person, firm or company tendering USE BLOCK LETTERS Address Hereby tender(s) to perform the work for: Description of works Water Main Air Scouring for Outback Regional Water Alliance In accordance with the following Documents: The Tender Documents Water Main Air Scouring for Outback Regional Water Alliance For the Lump Sum of... Total being (excluding GST):... Dated this day of 2016 Signature of Tenderer...

14 Section D Individual Mobilisation Schedule Page k SECTION D Individual Mobilisation Schedule

15 Section D Individual Mobilisation Schedule Page l D.0 Individual Mobilisation Schedule The following Mobilisation Schedule should be completed to assist the Principal in determining value for money and cost savings associated with a single regional mobilisation. This schedule is for the councils information only and will not form part of the Contract. Items for Establishment and Cleanup / Disestablishment below shall be priced assuming that the scope of works is being undertaken independently for each Council. Notes: All rates are to be exclusive of GST. SCHEDULE OF RATES ITEM DESCRIPTION OF WORK UNIT QTY RATE AMOUNT Barcaldine Regional Council 1A Establishment Item 1 2A Cleanup / Disestablishment Item 1 Barcoo Shire Council 1B Establishment Item 1 2B Cleanup / Disestablishment Item 1 Boulia Shire Council 1C Establishment Item 1 2C Cleanup / Disestablishment Item 1 Diamantina Shire Council 1D Establishment Item 1 2D Cleanup / Disestablishment Item 1 1E Establishment Item 1 2E Cleanup / Disestablishment Item 1

16 Section 1 Formal Instrument of Agreement Page 1 SECTION 1 Formal Instrument of Agreement (Provided for information purposes only)

17 Section 1 Formal Instrument of Agreement Page 2 AS AUSTRALIAN STANDARD FORM OF FORMAL INSTRUMENT OF AGREEMENT AGREEMENT made... day of BETWEEN... (the Contractor) AND.(the Principal) IT IS AGREED that the annexed documents marked as follows: Contract Document, Dated... Water Main Air Scouring for Outback Regional Water Alliance Letter of acceptance, Dated AS General Conditions of Contract and Annexure. shall together comprise the contract between the parties AND if the Contractor or the Principal is two or more persons then they shall be bound jointly and severally. Signed by the Contractor:... Witness... Signed by the Principal:... Witness...

18 Section 2 Schedule of Work Page 3 SECTION 2 Schedule of Work

19 Section 2 Schedule of Work Page 4 2. Schedule of Work This is a Lump Sum Contract. The Superintendent shall be notified immediately of any discrepancies in quantities or omissions discovered in the Schedule of Work. The Schedule of Work is to be used as the basis for the assessment of Progress Claims during the Contract. Clause 3.1(a) of the General Conditions of Contract applies to this Lump Sum Contract. The quantities in the Schedule of Work are estimates only for which the Principal bears no responsibility. Any variance, deletions or omissions in these quantities, discovered during the Contract, shall not be deemed to be a variation. Notes: All rates are to be exclusive of GST.

20 Section 2 Schedule of Work Page 5 ITEM DESCRIPTION OF WORK UNIT QTY RATE AMOUNT 1 Regional Establishment LS 1 2 General Cleanup / Disestablishment LS 1 3 Barcaldine Regional Council 3.1 Alpha Air Scouring LS Aramac Air Scouring LS Barcaldine Air Scouring LS Barcaldine Pigging (Diameter >265mm) PS Jericho Air Scouring LS Muttaburra Air Scouring LS 1 4 Barcoo Shire Council Jundah Air Scouring LS Jundah Pigging (Raw water to water treatment plant) PS Stonehenge Air Scouring LS Stonehenge Pigging (Raw water to water treatment plant) PS Windorah Air Scouring LS Windorah Pigging (Raw water to water treatment plant) PS 1 5 Boulia Shire Council 5.1 Boulia Air Scouring LS 1 6 Diamantina Shire Council 6.1 Bedourie Air Scouring LS Birdsville Air Scouring LS 1

21 Section 2 Schedule of Work Page 6 ITEM DESCRIPTION OF WORK UNIT QTY RATE AMOUNT Ilfracombe Air Scouring LS Isisford Air Scouring LS Longreach Air Scouring LS Longreach Pigging (Diameter >265mm) PS Yaraka Air Scouring LS 1 Abbreviations: LS: Lump Sum PS Provisional Sum Subtotal GST (10%) TOTAL Tenderer:... Contact:... Address:... Telephone:... Fax:... Signature:... Date:

22 Section 3 Dayworks Rates Page 7 SECTION 3 Dayworks Rates

23 Section 3 Dayworks Rates Page 8 3. Dayworks Rates All rates are inclusive of the following items listed in Clause 41(f) in AS , General Conditions of Contract (GCOC): Overheads; Administrative costs; Site supervision; Establishment costs; Attendance; and Profit. Further to Clause 41 (f) of the GCOC, Dayworks Rates shall also include the costs of survey and consumables. These rates are to be held firm for the duration of the Contract. Plant Hire Rates are to include all of the above and the operator. LABOUR HOURLY RATE DESCRIPTION NORMAL TIME & HALF DOUBLE TIME Project manager Site Supervisor Forman Labourer PLANT HOURLY HOURLY DESCRIPTION RATE RATE (WORKING) (STANDDOWN) Body truck Scour equipment Pigging equipment Vac truck

24 Section 4 General Conditions of Contract Page 9 SECTION 4 General Conditions of Contract

25 Section 4 General Conditions of Contract Page GENERAL CONDITIONS OF CONTRACT 4.1. Application The General Conditions of Contract shall be the Australian Standard General Conditions of Contract AS , with identified amendments, including Annexures Part A and B, the General and AS Formal Instrument of Agreement (Section 1.0) Availability Copies of the General Conditions of Contract are available from Standards Australia

26 Section 4 General Conditions of Contract Page AS Annexure Part A ANNEXURE to the Australian Standard General Conditions of Contract PART A This Annexure shall be issued as part of the tender documents and is to be attached to the General Conditions of Contract and shall be read as part of the Contract. 1 The law applicable is that of the State or Territory of: (Clause 1) 2 Payments under the Contract shall be made at: (Clause 1) 3 The Principal: (Clause 2) Queensland Chief Executive Officer 4 The address of the Principal: Eagle Street PO Box 472 Longreach, QLD The Superintendent: (Clause 2) 6 The address of the Superintendent: Neil Stiles of George Bourne & Associates 67 Elm Street (PO Box 169) Barcaldine Qld Limits of accuracy applying to quantities for which the Principal accepted a rate or rates: (Clause 3.3(b)) 8 Bill of Quantities the alternative applying: (Clause 4.1) 9 The time for lodgement of the priced copy of the Bill of Quantities: (Clause 4.2) 10 # Contractor shall provide security in the amount of: (Clause 5.2) 11 # Principal shall provide security in the amount of: (Clause 5.2) Not applicable. Deleted from Contract Deleted from Contract Refer to Clause of the Special Conditions of Contract (SCOC) Nil

27 Section 4 General Conditions of Contract Page # The period of notice required of a party s intention to have recourse to retention moneys and/or to convert security: (Clause 5.5) 13 The percentage to which the entitlement to security and retention moneys is reduced: (Clause 5.7) 14 Interest on retention moneys and security the alternative applying: (Clause 5.9) 15 The number of copies to be supplied by the Principal: (Clause 8.3) 16 The number of copies to be supplied by the Contractor: (Clause 8.4) 17 The time within which the Superintendent must give a direction as to the suitability and return the Contractor s copies: (Clause 8.4) 18 Work which cannot be subcontracted without approval: (Clause 9.2) 19 The percentage for profit and attendance: (Clause 11(b)) 20 The amount or percentage for profit and attendance: (Clause 11(c)) 21 Insurance of the Works the alternative applying: (Clause 18) 22 The assessment for insurance purposes of the costs of demolition and removal of debris: (Clause 18(ii)) Seven (7) days Refer to Clause of the SCOC Alternative Two (2) Two(2) One (1) hard copy, One (1) uneditable electronic copy, Twenty-one (21) days All Works Ten (10)% Not Applicable Alternative One (1) $1,000,000

28 Section 4 General Conditions of Contract Page The assessment for insurance purposes of consultants fees: (Clause 18(iii)) 24 The value of materials to be supplied by the Principal: (Clause 18(iv)) 25 The additional amount or percentage: (Clause 18(v)) 26 Public Liability Insurance the alternative applying: (Clause 19) 27 The amount of Public Liability Insurance shall not be less than: (Clause 19) 28 The time for giving possession of the Site: (Clause 27.1) 29 The Date for Practical Completion: (Clause 35.2) 30 Liquidated Damages per day: (Clause 35.6) 31 Limit of Liquidated Damages (Clause 35.7) 32 Bonus per day for early Practical Completion: (Clause 35.8) 33 Limit of bonus: (Clause 35.8) 34 Extra costs for Delay or Disruption: (Clause 36) 35 The Defects Liability Period: (Clause 37) 36 The charge for overheads, profit, etc. for daywork: (Clause 41(f)) 37 Times for Payment Claims: (Clause 42.1) Nil Nil 0% Alternative One (1) $100, Refer to Clause 5.4 of the SCOC 31 December 2016 $ % of the Contract Sum Nil Not Applicable Not Applicable Twenty-Six (26) weeks Ten (10)% Last working weekday of calendar month

29 Section 4 General Conditions of Contract Page Unfixed Plant and Materials for which payment claims may be made notwithstanding that they are not incorporated in the Works: (Clause 42.1(ii)) 39 Retention Moneys on: (Clause 42.3) 40 Unfixed Plant or Materials the alternative applying: (Clause 42.4) 41 The rate of interest on overdue payments: (Clause 42.9) 42 The delay in giving possession of the Site which shall be a substantial breach: (Clause 44.7) 43 The alternative required in proceeding with dispute resolution: (Clause 47.2) 44 The person to nominate an arbitrator: (Clause 47.3) 45 Location of arbitration: (Clause 47.3) Refer to Clause 5.5 of the SCOC Refer to Clause of the SCOC Alternative Two (2) Eight (8)% Twenty-eight (28) days Alternative One (1) Institute of Arbitrators & Mediators Australia: Qld Chapter Chairperson Queensland

30 Section 4 General Conditions of Contract Page AS Annexure Part A ANNEXURE to the Australian Standard General Conditions of Contract PART B DELETIONS, AMENDMENTS AND ADDITIONS 1. The following Clauses or parts of Clauses have been deleted from the General conditions in AS : Clause 3.3 Clause 4 Clause 35.8 Adjustment for Actual quantities Schedule of Rates Bill of Quantities Bonus for Early Practical Completion 2. The following Clauses have been amended and differ from the corresponding Clauses in AS : Clause 1 Subcontractor includes a supplier or hirer of materials, plant or equipment. Clause 2 amended by Clause 5.16 of the Special Conditions of Contract Clause 2 amended by Clause 5.17 of the Special Conditions of Contract Clause 12 amended by Clause 5.19 of the Special Conditions of Contract Clause 26 amended by Clause 5.20 of the Special Conditions of Contract Clause 33.2 amended by Clause 5.22 of the Special Conditions of Contract Clause 41 (f) amended by Clause 3.0 of the Dayworks Rates section in the Contract Clause 42.1 amended by Clause 5.24 of the Special Conditions of Contract Clause 42.7 amended by Clause 5.26 of the Special Conditions of Contract Clause 42.8 amended by Clause 5.27 of the Special Conditions of Contract Clause 47 amended by Clause 5.29 of the Special Conditions of Contract 3. The following Clauses have been added to those of AS : Clause 26.2 as per Clause 5.21 of the Special Conditions of Contract Clause 40.1A as per Clause 5.23 of the Special Conditions of Contract Clause 49 as per Clause 5.28 of the Special Conditions of Contract

31 Section 5 Special Conditions of Contract Page 16 SECTION 5 Special Conditions of Contract

32 Section 5 Special Conditions of Contract Page SPECIAL CONDITIONS OF CONTRACT 5.1. Precedence of Documents Should there be any conflict between the documents comprising the Contract Documents, the order of precedence for interpretation shall be: Letter of Acceptance Formal Instrument of Agreement Special Conditions of Contract General Conditions of Contract Annexure to General Conditions of Contract Principal s Project Requirements Project Specification Other Contract Documents Tender Submission & Tender Clarification 5.2. Scope of Works Contractor The project is a Lump Sum contract for the Air Scouring of the water mains in townships of Alpha, Aramac, Barcaldine, Jericho, Muttaburra, Jundah, Stonehenge, Windorah, Boulia, Bedourie, Birdsville, Ilfracombe, Isisford, Longreach and Yaraka. Pigging of larger diameter mains and mains with heavier build up is included as a provisional item. Refer to Appendix B for the schematics of each town s reticulation. These schematics show the mains that require pigging and the mains that do not require any treatment. All other mains are to be Air Scoured. The Scope of Works for the Contractor is listed below:-. a) Site establishment, including accommodation, facilities, sanitation and services; b) Use air scouring to remove bio-films and sediment build up from the water mains shown in Appendix B Town Reticulation Schematics. c) Submission of the Workplace Health & Safety Plan and its operation. d) Submission of the Quality Management System, its operation and submission of records. e) Submission of Environmental Management Plan & its operation. f) Submission of Traffic Management Plan & its operation. g) Submission of Close out Report Principal a) Liaise with critical consumers prior to cleaning to discuss requirements for temporary water supply during cleaning

33 Section 5 Special Conditions of Contract Page 18 b) The initial letter drop notification to consumers of cleaning activities when the Contractor first arrives on site. (Refer to clause Notifications to Residents and Businesses") c) Provide standpipe and free water. d) Each council will supply one experienced representative to the cleaning on a part-time basis Supplied by Principal a) None Work by Others b) No works are specified for others Provisional Items a) Pigging of larger diameter pipes. Pipes over 265mm in Barcaldine and Longreach are to be priced for pigging as a provisional item. b) Pigging of raw water mains to the water treatment plants in Jundah, Stonehenge, and Windorah are to be priced for pigging as a provisional item Security & Retention Monies Security Nil security required Retention Money Retention moneys shall be deducted progressively as follows: Ten (10) per cent of the value of the work incorporated into the Works until five (5) per cent of the Contract Sum is reached Release of Security and Retention Monies 5.4. Possession of Site The full security amount shall be released upon issue of the Final Certificate Possession of site Possession of the Site or sufficient of the Site shall be given to enable the Contractor to commence further work under the Contract, to the Contractor when all of the following requirements have been fulfilled:- a) Once Two (2) days have elapsed from the date of Letter of Acceptance of Tender;

34 Section 5 Special Conditions of Contract Page 19 b) The Contractor has complied with Clause 21.1 of the GCOC; c) Receipt by the Superintendent of the submission of the Health & Safety Plan as required by Clause 6.2 of the Project Specification; d) Receipt by the Superintendent of the submission of Environmental Management Plan required by Clause 6.3 of the Project Specification; e) Receipt by the Superintendent of the submission of the Quality Management Plan as required by Clause 6.4 of the Project Specification; and f) Receipt by the Superintendent of the submission of Traffic Management Plan as required by Clause of the Project Specification Area available to the Contractor to perform the Works Please refer to Appendix B for a plan indicating the area that is available for the Contractor to perform the Works. The Superintendent shall be advised by the Contractor if there is any additional area required to perform the works &/or any proposals to obtain the additional area required. All costs, fees, lease or hire charges, permits, permissions, etc associated with obtaining and utilising the additional area for the Works shall be the Contractors responsibility Unfixed Plant and Materials for which payment claims may be made There are no unfixed Plant and Materials for which payment claims may be made notwithstanding that they are not incorporated in the Works Inspections / Hold Points The works to be included under this Contract shall be supervised by the Superintendent or Superintendent s representative. The Contactor shall give the Superintendent or Superintendent s representative a minimum of forty-eight (48) hours notice when the works are ready for inspection Site Meetings The Contractor shall attend Project Management Meetings with the Project Management Committee, comprising of the Superintendent, nominated representative, the Principal and other persons as required during the course of the work under the Contract. The meetings will be held on a fortnightly basis unless otherwise directed by the Superintendent. The Superintendent shall be responsible for the recording and issuing of minutes for meetings and meeting agendas.

35 Section 5 Special Conditions of Contract Page 20 If required by emerging issues during construction, the Contractor shall advise the Superintendent without delay and a site meeting conducted at the discretion of the Superintendent Programming Procedures and Progress Reporting The Contractor shall provide to the Superintendent on a monthly basis a detailed one week behind and five week look ahead program of the work progress and programming Rise and Fall This Contract shall not be subject to rise and fall in price contingent on variation in rates of wages, price of materials or other factors, e.g. customs duty, freight charges, etc. for a period of twelve months from Close of Tender Site Facilities Personnel Accommodation Not used Sanitation Not used Services Not used Facilities for Other Contractors The Contractor shall, subject to the General Conditions of Contract, afford reasonable access and facilities to other Contractors Facilities for Superintendent and Principal Hours of Work Not required. Further to Clause 32 of the General Conditions of Contract, the normal hours of work will generally be as follows:- a) Monday to Friday 7:00 am to 6:00 pm; and b) Saturday 7:00 am to 3:00 pm.

36 Section 5 Special Conditions of Contract Page Public Enquiries Twenty-Four (24) Hour Access The Contractor must provide a telephone number to enable 24 hour contact by the Principal or Superintendent to a Contractors representative Customer Complaints The Contractor shall maintain a record of any complaints received from the Principal, landowners or the public. This will also include documentary evidence that complaints have been addressed and attended to, to the satisfaction of the Superintendent. All complaints must be discussed with the Superintendent without delay. A summary sheet of the complaint register shall be provided to the Superintendent upon request and at each site meeting. The Superintendent shall be notified of the circumstances in writing by the Contractor if any complaint is unresolved after 7 working days Notifications to Residents & Businesses The Contractor shall ensure that all residents and businesses affected by the works, including those that may be unduly affected by noise, are notified at least forty-eight (48) hours prior to the commencement of work. The initial letter drop shall take place when the Contractor first arrives on site. This letter shall be on Council letterhead, and issued to all residents and businesses that will be affected by the Works during the course of the Contract. The second letter is to be on the Contractor s letterhead and shall be delivered 48hrs prior to work commencing, at specific residents where the access will be required. This letter must show the date that access is required and a general description of the Works that are to be undertaken. Each letter shall be submitted to the Superintendent three business days prior to the letter being issued. The form and content of the notification shall be approved by the Superintendent. In the event that the Contractor finds dispute with the property owner and/or the owners wishes, the matter shall be immediately referred to the Superintendent. If the work does not commence as per the notice then a further notice shall be issued following the procedure as set out in the three paragraphs above.

37 Section 5 Special Conditions of Contract Page Disputes with Property Owners Permits / Fees Under no circumstances shall the Contractor enter into an argument, or be aggressive in any way with the property owner. The Superintendent shall be notified immediately when there are any concerns or demands by the property owner that, in the Contractor s opinion, the Contractor cannot reasonably satisfy. The Superintendent shall perform negotiations with the property Owner upon notification from the Contractor or the property owner. The Contractor shall not enter into any discussion with the property owner once the Contractor notifies the Superintendent that the Contractor is unable to restore property to the satisfaction of the Property owner. As required by legislation Payment to Local Subcontractors During the course of the Contract, the Principal reserves the right to make direct payment to local suppliers of goods and services that have been incorporated into the works under the Contract by the Contractor where such suppliers of goods and services provide satisfactory evidence to the Principal that the Contractor has not paid their claims for payment in full. Such direct payment, upon advice from the Superintendent that all services have been completed in accordance with the Contract requirements, shall then be deducted from the Progress and/or the Final Contract Payment/s due to the Contractor by the Principal. This Clause shall be read in conjunction with and in addition to Clause 43 of the General Conditions of Contract AS With each Progress Claim the builder shall submit certification from each of the local subcontractors and local suppliers engaged on the project that they have been paid all monies due, up to the date of the head Contractor's Progress Claim Measurement of Work The Australian Standard Method of Measurement of Civil Engineering Works and Associated Building Works shall apply unless otherwise scheduled or specified to the contrary in the Contract document The following additional definitions form part of Clause 2 of the General Conditions of Contract. GST means the goods and services tax imposed under the GST Legislation. A reference to an amount of GST is reference to the GST liability in respect of the supply in question; GST Legislation means the A New Tax System (Goods and Services Tax) Act 1999, associated legislation and any additional or substituted legislation providing for a value added tax, consumption tax, retail tax or other goods and services tax.

38 Section 5 Special Conditions of Contract Page Clause 2 is amended as follows: The following provisions are added to the definition of Practical Completion: (d) debris, rubbish, building materials, Constructional Plant and equipment has been removed from the Site and the Site has been cleaned (except that minor omissions from cleaning will not preclude Practical Completion); (e) all certificates and approvals associated with the work under the Contract which, pursuant to the Contract, the Contractor is required to obtain from any municipal, public or statutory authority or other certifier and which is required at law before the Works and every part of the Works can be occupied and used for their intended purpose or purposes have been issued or given and handed to the Principal; (f) Not Used (g) the Contractor has provided to the Superintendent: (i) operation & maintenance manuals; (ii) Quality Management System. (h) the Contractor has successfully completed, to the satisfaction of the Superintendent, all commissioning associated with the Contractor s scope of works which is required by the Contract; (i) all requirements of any municipal, public or statutory authority in relation to access to the Site which the Contractor is obliged to perform have been completed to the satisfaction of the municipal, public or statutory authority; The following paragraph is added to the beginning of Clause 3.2: Not used Clause 12 of the General Conditions of Contract LATENT CONDITIONS is amended as follows: Clause 12.1 Definition Latent conditions are (a) physical conditions on the Site or its surroundings, including artificial things but excluding weather conditions, which differ materially from the physical conditions which should reasonably have been anticipated by the Contractor at the time of the Contractor s tender if the Contractor had shall be modified to read Clause 12.1 Definition

39 Section 5 Special Conditions of Contract Page 24 Latent conditions are (a) physical conditions on the Site or its surroundings, including artificial things but excluding weather conditions, which differ materially from the physical conditions which should reasonably have been anticipated by a competent and experienced contractor at the time of the Contractor s tender if such a contractor had Clause 26 is renumbered Clause 26.1 with a heading inserted as follows: Removal from Site The following Clause 26.2 is added: 26.2 Key Personnel Notwithstanding the provisions of Clause 26.1, the Contractor shall: (a) (b) (c) (d) ensure that each of the key personnel listed in the attachment are engaged in the provision of the work under the Contract in the capacity set out in the attachment; only replace key personnel with people of similar qualifications, ability and experience to those people listed in the attachment; and before replacing any of the key personnel listed in the attachment, first obtain the written approval of the Superintendent. This approval shall not be unreasonably withheld. When seeking the approval of the Superintendent, the Contractor must provide the Superintendent with details of the qualifications and experience of the proposed replacement; and always have employed during the performance of the work under the Contract, persons in the positions of the key personnel who are approved by the Superintendent and who have at least the equivalent skill and experience of those persons listed in the attachment The following paragraphs are added at the end of Clause 33.2: Any program prepared or provided by the Contractor shall not be used as a Construction Program for the purposes of this Clause unless it has been approved by the Superintendent. Approval shall not be unreasonably withheld. The power of the Superintendent to require the Contractor to provide a Construction Program includes a power to direct: (a) the Contractor to provide an updated Construction Program where there has been a change in the Date for Practical Completion or where there have occurred any circumstances which have affected the progress of the work under the Contract; and

40 Section 5 Special Conditions of Contract Page 25 (b) what form the Construction Program shall take, what information shall be contained in it and the level of detail required of that information. The Program which the Contractor is required to provide pursuant to clause 5.8 of the Special Conditions is not a Construction Program. Nothing said or done by the Superintendent in relation to a Construction Program or draft Construction Program or a program provided pursuant to Clause 5.8 of the Special Conditions shall be construed as a direction to change or deviate from the Construction Program unless expressly directed in writing. This does not affect the power of the Superintendent to give a direction under clause A new Clause 40.1A is added as follows: 40.1A Notices This Clause 40.1A applies notwithstanding any other provision of the Contract to the contrary including (without limitation) clause The Principal shall only be liable to the Contractor for an amount calculated under Clause 40.5 or for an extension of time for Practical Completion for a variation where either: (a) the direction to perform the variation given by the Superintendent is in writing, expressly states that the direction constitutes a direction for a variation and identifies the work the subject of the direction; or (b) before performing the variation, the Contractor has notified the Superintendent in writing that in its view the direction constitutes a direction for a variation. Where the Contractor wishes to make a claim for an extension of time as a consequence of a variation, in addition to the notice it is required to give under this Clause, the Contractor shall give all notices required under Clause Clause 42.1 of the General Conditions of Contract - Payment Claims, Certificates, Calculations and Time for Payment The last line of the first paragraph shall have added: and GST. For the sake of clarification the supply (whether work done or otherwise) in respect of which claim is made (other than a claim for the release of retention) shall be treated as a separable taxable supply for the purposes of calculation of the GST after the last paragraph add the following paragraphs Within 14 days of issue of the Superintendent s payment certificate, the Contractor shall issue to the Principal a tax invoice complying with the GST legislation in respect of the relevant supply.

41 Section 5 Special Conditions of Contract Page 26 The Superintendent shall not be obliged to make any assessment of the claim nor issue a payment certificate if the Contractor has not provided: (a) (b) (c) (d) (e) (f) The Principal with the security required by Clause 5.3 of the SCOC; The Superintendent with the program required by Clause 5.8 of the SCOC or any program required by the Superintendent under Clause 33.2; The Superintendent with the statutory declarations required by Clause 43.of the GCOC; The approval of the Superintendent with the Health and Safety Plan required by Clause 6.2 of the Project Specification (PS); The approval of the Superintendent with the Environmental Management Plan required by Clause 6.3 of the PS; The approval of the Superintendent with the Quality Plan required by Clause 6.4 of the PS Clause 42.5 of the General Conditions of Contract - Certificate of Practical Completion Not used The first paragraph of Clause 42.7 is deleted and replaced by the following paragraph: Within 28 days of the last to occur of the expiration of all Defects Liability Periods or the rectification by the Contractor of all defects in accordance with Clause 37, the Contractor shall lodge with the Superintendent a final payment claim and endorse it Final Payment Claim The final paragraph of Clause 42.8 is deleted and replaced by the following paragraph: The Principal shall release to the Contractor the balance of any retention moneys or security then held by the Principal: (i) (ii) if the Final Certificate certifies a nil balance or a balance owing by the Principal to the Contractor, within 14 days after the issue of the Final Certificate; or if the Final Certificate certifies a balance owing by the Contractor to the Principal, within 14 days of the payment by the Contractor to the Principal of all amounts owing by the Contractor to the Principal under the Contract A new clause QBSA Act and BACIP Act The parties acknowledge that their rights and obligations under the Contract are subject to the provisions of the Queensland Building Services Authority Act 1991 (QBSA Act) and the Building and Construction Industry Payments Act 2004 (BACIP Act) to the extent that they apply, and where there is any inconsistency between the Contract and the QBSA Act or BACIP Act, the

42 Section 5 Special Conditions of Contract Page 27 BACIP Act or BACIP Act shall prevail to the extent necessary to avoid the inconsistency Delete the existing Clauses 47.2 and 47.3 and replace with the following paragraphs: 47.2 Conference Within 7 days after receiving a notice of dispute, the parties shall confer at least once to resolve the dispute or to agree on methods of doing so. At every such conference each party shall be represented by the Chief Executive Officer or equivalent person having authority to agree to such resolution or methods. All aspects of every such conference except the fact of occurrence shall be privileged. If the dispute has not been resolved within 14 days of service of the notice of dispute, that dispute shall be and is hereby referred to expert determination Dispute Resolution (a) (b) Any dispute associated with this agreement will be referred to expert determination within 14 days of the failure of the parties to resolve the dispute by conference under clause If the parties cannot agree on an expert within 7 days, the expert will be appointed by an authorised officer of the Chartered Institute of Arbitrators.

43 Section 6 Project Specification Page 28 SECTION 6 Project Specification

44 Section 6 Project Specification Page PROJECT SPECIFICATION 6.1. Location The township of Longreach is located on the Landsborough Highway approximately 700km West of Rockhampton. Each of the other townships are between 30km and 800km drive from Longreach as shown in Appendix A Site Locality Plans. The work will be carried out on the water mains as shown in Appendix B Town Reticulation Mark Ups General The Contractor shall ensure that all employees, sub-contractors, suppliers and agents comply with, but not limited to: Government Acts and Legislation; Ordinances; Regulations; Local laws and by-laws; Codes of Practice; Policy and procedures which are in any way applicable to this Contract or the performance of the works under the Contract; Technical Specifications in this Contract; Australian Standards; Manufacturers Specifications; and Industry best practice. In the event of any inconsistency the Contractor shall seek direction from the Superintendent Workplace Health and Safety Requirements Principal Contractor The Principal shall appoint the successful Contractor as the Principal Contractor for the purposes of the Workplace Health and Safety Act, and current Regulations with all the duties and responsibilities as defined by that Act General Requirement The Contractor must be aware and comply with all Workplace Health and Safety policies, procedures and measures, adopted by the Principal; and/or The occupiers of any premises at or within which the Contractor will perform work under the Contract.

45 Section 6 Project Specification Page 30 In the event of any inconsistency, the Contractor shall comply with such procedures or measure as to produce the highest level of Workplace Health and Safety. All inconsistencies and subsequent amendments to the work practices must be notified to the Superintendent immediately, for approval, after the Contractor becomes aware of the inconsistency Workplace Health and Safety Plan Prior to commencing the work the Contractor shall submit to the Superintendent a Workplace Health and Safety Plan for review and approval. The Health and Safety Plan must be specific to the Contract. It will ensure that the works conform to the relevant requirements. The Workplace Health and Safety Plan shall consider the specific OH&S hazards and issues relevant to the Works. The plan shall document the systems and methods to be implemented for the Contract including traffic and pedestrian control. This plan will include the requirement for site visits and notification by the Principal, his agents and regulatory authorities Incident Notification The Contractor must promptly notify the Superintendent of ANY incident, injury, property or environmental damage which occurs during the Contract. All lost time incidents shall be immediately notified to the Superintendent. The Contractor must within 3 days of any such incident provide a report giving complete details of the incident, including results of investigations into its cause and any recommendations or strategies for prevention of a recurrence of the incident in the future Non Conformance For the purpose of Section 6.2 of the Project Specification, nonconformance shall be deemed to have occurred if: The work is not conducted in accordance with the Contractor s Workplace Health and Safety Plan, health and safety management procedures, and relevant legislation. Any work under the Contract is conducted in such a way as to endanger the health and safety of the Contractors employees or the Principal s or its Contractors and sub-contractors employees, agents, plant, equipment or materials, and the public. All non-conformances shall be recorded by the Contractor and provided, without delay, to the Superintendent. A failure by the Contractor to comply with the provisions of Section 6.2 of the Project Specification shall constitute a substantial breach, of the Contract, for the purpose of Clause 44 of the General Conditions of Contract.

46 Section 6 Project Specification Page Environmental Management Plan (EMP) Prior to commencing the work the Contractor shall submit to the Superintendent an EMP specific to the Contract for review and approval. The EMP shall include but not be limited to: An overview of the project; Identify the environmental issues relevant to the project; List each major construction activity and the equipment and materials associated with that activity; Describe any potential environmental hazard and consequence associated with each activity; Control Measures/Prevention Describe what actions are proposed to eliminate or minimise the consequence of hazards Quality General Requirements All non-conformances to work procedures, construction outcomes and materials quality and subsequent remedial action to the Contract works shall be issued to the Superintendent. The review and approval by the Superintendent must be completed, where practicable, prior to any remedial work being carried out Quality Plan Prior to commencing the work the Contractor shall submit to the Superintendent a Quality Plan for review and approval. The Quality Plan shall be specific to the Contract. The Quality Plan shall consider and respond to: Management of the Quality System; Work methods / execution procedures; Inspection and test plans; Hold points, witness points; Documentation to be used; and Material approval Quality Management System (QMS) Submissions and Approvals A copy of the completed QMS used on the project shall be submitted to the Superintendent, for review, one month prior to the expected Date of Practical Completion. The QMS shall be returned with comments prior to Practical Completion. Two weeks after Practical Completion a completed QMS is to be submitted to the Superintendent, addressing any comments during the review, for review and final approval.

47 Section 6 Project Specification Page Inspections/Hold Points The QMS shall be include the following inspections at the stages in the Works as given below:- Job Description Establishment Practical Completion prior to leaving the site Hold Point Hold Point Hold Point 6.6. As constructed drawings Not used Operation and Maintenance (O&M) Manual 6.8. Keys Provide a close out report listing of work completed and identify the lines with the most sediment. The amount of sediment removed from each main air scoured or pigged should be rated from 0 (clean) to 5 (very dirty). Not used.

48 Appendix A Appendix A Site Locality Plans

49 Appendix A Barcaldine Regional Council &

50 Appendix A Barcoo Shire Council & Diamantina Shire Council

51 Appendix A Boulia Shire Council

52 Appendix A Outback Regional Water Alliance Overview of all Councils

53 Appendix B Appendix B Town Distribution Mark Ups

54 Date Printed: 28/06/ :49:25 OUTBACK REGIONAL WATER ALLIANCE ALPHA WATER RETICULATION MAINS TO BE SCOURED Valve Hydrant Pipe Size LEGEND DESCRIPTION SYMBOL Mains to be Pigged Mains to be Excluded Mains to be Air Scoured WATER TREATMENT PLANT (1206m FROM RETIC. NETWORK) MACKELLAR ST. GORDON ST. HOOPER ST. BYRON ST. 1 1 DRYDEN ST. MILTON ST. BURNS ST. 1 1 SHAKESPEARE ST. MOORE ST. KENDAL ST. 25mm BORE RN: mm mm BORE RN: mm 20mm SWINBURNE ST mm BORE RN: BORE RN: TENNYSON ST. SCOTT ST. 32mm DUNNING ST. 25mm 25mm GOLDSTON ST. 40mm 20mm 20mm 40mm 20mm NEIL ST. 20mm 20mm 20mm 40mm 32mm 20mm 20mm 32mm 25mm 25mm 20mm 25mm 25mm 20mm 25mm 25mm 25mm HOOD ST. PRELIMINARY NOT FOR CONSTRUCTION 28 June 2016 at 10:49 CONSULTING GBA ENGINEERS /01 P1

55 Date Printed: 28/06/ :49:26 RAVEN ST. OUTBACK WATER REGIONAL ALLIANCE ARAMAC WATER RETICULATION MAINS TO BE SCOURED LEGEND DESCRIPTION SYMBOL Valve Hydrant Pipe Size Mains to be Pigged Mains to be Excluded Mains to be Air Scoured 40mm FORSYTH ST. McAULIFFE ST. MUTTABURRA RD. KINGSTON ST. 40mm KERR ST. 40mm GORDON ST. McWHANNEL ST. RULE ST. 40mm 40mm 40mm 40mm 40mm 40mm BURT ST. BARCALDINE RD. 1 PORTER ST. LODGE ST DRURY ST. 25mm WATER TREATMENT PLANT 20mm BOUNDARY ST. LAKES RD. PRELIMINARY NOT FOR CONSTRUCTION 28 June 2016 at 10:49 CONSULTING GBA ENGINEERS /02 P1

56 Date Printed: 28/06/ :49:27 1 MULGA RD. MELALEUCA ST. IRONWOOD DR. MALLEE RD. NEEDLEWOOD DR. PELTOPHORUM DR. LANDSBOROUGH HIGHWAY BAUHINIA ST. BOREE ST. GUM ST. BOTTLEBRUSH AVE. GIDYEA ST. PINE ST. CEDAR ST. MYALL ST. OSIER ST. COOLIBAH ST. BOX ST. WILLOW ST. BEECH ST. MAPLE ST. FIR ST. LEOPARDWOOD RD. ASH ST. ELM ST. YEW ST. OAK ST. ACACIA ST. POPLAR ST. LANDSBOROUGH HIGHWAY CYPRESS ST. PLUMB RD. JACARANDA RD. LANCEWOOD DR. 1 PINE RD. BRIGALOW ST. 1 BIRCH ST. WATTLE ST. WHITEWOOD RD. PLANE ST mm 1 300mm 1 ACACIA ST BORE RN:66904 GROUND LEVEL RESERVOIR 1 300mm PONOMA BORE RN:93744 GROUND LEVEL RESERVOIR mm CHESTNUT ST. 200mm MYRTLE ST. OUTBACK WATER REGIONAL ALLIANCE BARCALDINE WATER RETICULATION MAINS TO BE SCOURED PRELIMINARY NOT FOR CONSTRUCTION 28 June 2016 at 10:49 Valve Hydrant Pipe Size LEGEND DESCRIPTION SYMBOL Mains to be Pigged Mains to be Excluded Mains to be Air Scoured WATER TREATMENT PLANT GBA CONSULTING ENGINEERS /03 P1

57 Date Printed: 28/06/ :49:29 40mm 40mm PLAYFAIR ST. EDISON ST. HUXLEY ST. TO BLACKALL RD. DAVY ST. 1 TYNDALL ST. 1 PASTEUR ST. DARWIN ST. OUTBACK WATER REGIONAL ALLIANCE JERICHO WATER RETICULATION MAINS TO BE SCOURED LEGEND DESCRIPTION SYMBOL Valve Hydrant Pipe Size Mains to be Pigged Mains to be Excluded Mains to be Air Scoured FARADAY ST. BESSEMER ST. BORE RN: mm 1 WATER TREATMENT PLANT LYON ST. 40mm 40mm 40mm 40mm 40mm PRELIMINARY NOT FOR CONSTRUCTION 28 June 2016 at 10:49 CONSULTING GBA ENGINEERS /04 P1

58 Date Printed: 28/06/ :49:30 DEVON ST. LORD ST. 1 1 SWORD ST. 40mm OUTBACK WATER REGIONAL ALLIANCE MUTTABURRA WATER RETICULATION MAINS TO BE SCOURED LEGEND DESCRIPTION SYMBOL Valve Hydrant Pipe Size Mains to be Pigged Mains to be Excluded Mains to be Air Scoured WATER TREATMENT PLANT 1 1 EDKINS ST. BRUFORD ST. CORNISH ST. 75mm 75mm 75mm mm 25mm FRANK ST. 32mm MARY ST. GARDEN ST. TOZER ST. BRIDGE ST. KLUGH ST. LORD ST. PRELIMINARY NOT FOR CONSTRUCTION 28 June 2016 at 10:49 CONSULTING GBA ENGINEERS /05 P1

59 Date Printed: 28/06/ :35:56 RACECOURSE RD. WELLSHOT ST. DEVON ST. BUTTON ST. LEICHHARDT ST. 1 18mm 40mm 1 MITCHELL ST mm 25mm 25mm FLINDERS ST. MAIN ST. OUTBACK WATER REGIONAL ALLIANCE ILFRACOMBE WATER RETICULATION MAINS TO BE SCOURED LEGEND DESCRIPTION SYMBOL Valve Hydrant Mains to be Air Scoured Mains to be Excluded Mains to be Pigged Pipe Size SCOUR HILL RD. MURRAY ST. 20mm TORRS ST. CHURCH ST. WATER TREATMENT PLANT (302m FROM RETIC. NETWORK) PRELIMINARY NOT FOR CONSTRUCTION 28 June 2016 at 10:35 CONSULTING GBA ENGINEERS /01 P1

60 OUTBACK WATER REGIONAL ALLIANCE ISISFORD WATER RETICULATION MAINS TO BE SCOURED PRELIMINARY NOT FOR CONSTRUCTION 28 June 2016 at 10:36 LEGEND DESCRIPTION SYMBOL Valve 1 Hydrant Pipe Size Mains to be Pigged Mains to be Excluded Mains to be Air Scoured ST. BEES ST. 1 NOTE All untreated water mains to be excluded from works ST. CYRIL ST. ST. OSYTH ST. ST. CATHERINE ST. WATER TREATMENT PLANT 1 ST. HELENA ST. ST. DENYS ST. ST. ANN ST. 1 1 ST. ST. FRANCIS ST. ST. MARY ST. CROSS ST. ST. AGNES ST. Date Printed: 28/06/ :36:00 ST. CHAD ST. CONSULTING GBA ENGINEERS /02 P1

61 Date Printed: 28/06/ :36:04 THRUSH RD STORK RD LARK ST. RAVEN RD CURLEW RD MINER RD WOMPOO RD 150 DOVE ST. COOT ST. STILT ST. ROBIN RD BROLGA RD QUARRIAN RD. QUAIL RD mm BOWER RD 300mm SUNBIRD ST mm LONGREACH - JUNDAH ROAD PARROT LANE 110mm mm 200mm 200mm 200mm 200mm 200mm 200mm 200mm 200mm 200mm EAGLE ST COCKATOO LANE EMU ST. CORELLA LANE CANARY LANE KINGFISHER ST. CRANE ST. PIGEON LANE IBIS ST. CASSOWARY ST mm mm 200mm 200mm OWL ST. BUSTARD ST. MAGPIE LANE GALAH ST. WREN ST. HAWK LANE FALCON ST. GREBE ST. CROW LANE SPOONBILL ST. FINCH LANE SNIPE ST mm WONGA STREET 1 1 PELICAN ST. 300mm 1 SANDPIPER ST. 300mm 375mm 4 300mm 300mm KOOKABURRA CRT. SWAN ST mm mm ROSELLA ST. LONGREACH - WINTON ROAD HERON ST. 80mm 80mm TERN ST. 300mm KITE ST. 80mm 300mm 1 1 SPARROW ST. CURRAWONG ST. DUCK ST. 1 80mm 1 OUTBACK WATER REGIONAL ALLIANCE LONGREACH WATER RETICULATION MAINS TO BE SCOURED Valve Hydrant Pipe Size LEGEND DESCRIPTION SYMBOL Mains to be Pigged Mains to be Excluded Mains to be Air Scoured WATER TREATMENT PLANT PLOVER ST. SWALLOW ST. Refer to Cramsie detail GULL ST. LONGREACH - MUTABURRA ROAD JABIRU ST LONGREACH - ILFRACOMBE ROAD 80mm 80mm BLUEBIRD CRT. 100 GULL ST. TEAL ST. PRELIMINARY NOT FOR CONSTRUCTION 28 June 2016 at 10:36 CRAMSIE DETAIL NTS GBA CONSULTING ENGINEERS /03 P1 80mm 80mm CRAMSIE RD. 80mm

62 OUTBACK WATER REGIONAL ALLIANCE YARAKA WATER RETICULATION MAINS TO BE SCOURED PRELIMINARY NOT FOR CONSTRUCTION 28 June 2016 at 10:36 LEGEND Valve DESCRIPTION SYMBOL Hydrant Pipe Size Mains to be Pigged Mains to be Excluded Mains to be Air Scoured BRASS ST. JARLEY ST. WATER TREATMENT PLANT 40mm 40mm JARLEY ST. 40mm QUILP ST. 40mm MARTON ST. NELL ST. Date Printed: 28/06/ :36:06 GARLAND ST. CONSULTING GBA ENGINEERS /04 P1

63 Date Printed: 30/06/ :18:10 90mm 90mm 25mm BORE NO. 9 WASHDOWN BAY BORE NO. 7 POWERHOUSE BORE BORE NO. 6 RN:10928 ABANDONED BORE NO. 2 RN:10928 ABANDONED BORE NO mm 110mm OUTBACK REGIONAL WATER ALLIANCE BOULIA WATER RETICULATION MAINS TO BE SCOURED LEGEND DESCRIPTION SYMBOL Valve Hydrant Pipe Size Mains to be Pigged Mains to be Excluded Mains to be Air Scoured WATER TREATMENT PLANT BORE NO. 5 RN:93060 ABANDONED BORE NO. 4 RN:69551 BORE NO. 8 SES BORE PRELIMINARY NOT FOR CONSTRUCTION 30 June 2016 at 16:18 CONSULTING GBA ENGINEERS

Professional Services Agreement (short form)

Professional Services Agreement (short form) Professional Services Agreement (short form) Contract Details Item No Item Details 1 Project [#insert name of project and description] 2 JCU Name: James Cook University Address: 1 James Cook Drive, Townsville,

More information

Conditions of Offer For the Provision of an Offer to Supply Goods

Conditions of Offer For the Provision of an Offer to Supply Goods Conditions of Offer For the Provision of an Offer to Supply Goods Contents 1. DEFINITIONS AND INTERPRETATION... 3 2. COMPLIANCE WITH THE INVITATION... 5 3. OFFER VALIDITY PERIOD... 5 4. FORMAT OF OFFER...

More information

CONSULTANCY SERVICES AGREEMENT

CONSULTANCY SERVICES AGREEMENT DATED 2010 [INSERT NAME OF CUSTOMER] (Customer) CAVALLINO HOLDINGS PTY LIMITED ACN 136 816 656 ATF THE DAYTONA DISCRETIONARY TRUST T/A INSIGHT ACUMEN (Consultant) CONSULTANCY SERVICES AGREEMENT Suite 5,

More information

ICON DRILLING PURCHASE ORDER TERMS & CONDITIONS

ICON DRILLING PURCHASE ORDER TERMS & CONDITIONS ICON DRILLING ABN 75 067 226 484 PURCHASE ORDER TERMS & CONDITIONS Acceptance of this offer is subject to the terms and conditions of this Agreement. Acceptance of materials, work or services, payment

More information

Model letters for use by the Contractor

Model letters for use by the Contractor 178 Appendices Model letters for use by the Contractor Letter to the Engineer c.c. Employer ML 1.3 Sub - Clause 1.3 Communications We confirm the agreement made between us on (date) in respect of site

More information

Access Agreement. Queensland Rail Limited. [Insert name of Operator] [Insert name of Access Holder]

Access Agreement. Queensland Rail Limited. [Insert name of Operator] [Insert name of Access Holder] Queensland Rail Limited [Insert name of Operator] [Insert name of Access Holder] Access Agreement [Note: This agreement is a standard access agreement and is based on the following assumptions, that: the

More information

Design and Construct Contract - Standard User Funding Agreement

Design and Construct Contract - Standard User Funding Agreement QCA Draft 8 September 2014 Aurizon Network Pty Ltd [insert Trustee] Design and Construct Contract - Standard User Funding Agreement (amended form of AS 4902-2000) Ref: QRPA15047 9101397 11391098/5 L\313599357.2

More information

OEM Supply Agreement

OEM Supply Agreement OEM Supply Agreement PAAMA Agrico Pvt. Ltd. OEM Supply Agreement between PAAMA Agrico Pvt Ltd & (here in after referred to as the SUPPLIER) Preamble PAPL has approached THE SUPPLIER for the supply of products

More information

TRADE CREDIT APPLICATION

TRADE CREDIT APPLICATION TRADE CREDIT APPLICATION Legal Name: Trading Name: Business Postal Address: BOX NUMBER POST CODE TOWN / SUBURB CITY Physical Address: NUMBER / STREET TOWN / SUBURB CITY POST CODE Email for Receiving Invoices

More information

FIDIC Conditions of Contract for Construction

FIDIC Conditions of Contract for Construction FIDIC Conditions of Contract for Construction 1 1 General Provisions 2 1 1.1 Definitions 1.1.1 The Contract Contract means the Contract Agreement, the Letter of Acceptance, the Letter of Tender, these

More information

TRADING TERMS OF KLINGER LTD

TRADING TERMS OF KLINGER LTD 1. INTERPRETATION 1.1 In these terms of trade: (1) Business Day means a day other than Saturday, Sunday or a public holiday in the place in which a document is received or an act is done, as may be applicable;

More information

The Corporation of The Township of Lanark Highlands. TENDER #PW Resurfacing Lavant Mill Road

The Corporation of The Township of Lanark Highlands. TENDER #PW Resurfacing Lavant Mill Road The Corporation of The TENDER #PW 2016-02 Resurfacing Name of Firm or Individual Address Telephone and Fax Number Email Address Name of Person Signing for Firm Position of Person Signing for Firm TENDERS

More information

CONDITIONS OF TENDERING (E-SUBMISSION)

CONDITIONS OF TENDERING (E-SUBMISSION) INDEX CLAUSE PAGE NO. DESCRIPTION NO. 1 TENDER DOCUMENT B 2 2 COMPLIANCE WITH CONDITIONS OF TENDERING B 2 3 ADDENDA B 2 4 COMPLETION OF TENDER B 2 5 DEVIATION FROM SPECIFICATION B 2 6 DRAWINGS, PROPOSALS

More information

STANDARD TERMS AND CONDITIONS

STANDARD TERMS AND CONDITIONS STANDARD TERMS AND CONDITIONS EDL GROUP OPERATIONS PTY LTD ACN 055 555 416 of Building 17, 2404 Logan Road, Eight Mile Plains, Queensland, Australia ("EDL") EDL requires that the Supplier supply EDL with

More information

General Terms of Contract

General Terms of Contract APPENDIX III General Terms of Contract GENERAL CONDITIONS OF CONTRACT 1. GENERAL PROVISIONS 1. 1 Definitions Unless the context otherwise requires, the following terms whenever used in this Contract have

More information

[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION EDITION

[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION EDITION [JURISDICTION] S AMENDMENTS TO AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION - 1997 EDITION This document modifies portions of the General Conditions of the Contract for Construction

More information

TERMS AND CONDITIONS FOR THE SUPPLY OF SERVICES

TERMS AND CONDITIONS FOR THE SUPPLY OF SERVICES TERMS AND CONDITIONS FOR THE SUPPLY OF SERVICES THE CUSTOMER'S ATTENTION IS PARTICULARLY DRAWN TO THE PROVISIONS OF CLAUSE 8 (LIMITATION OF LIABILITY). 1. Interpretation The following definitions and rules

More information

KATESTONE CONSULTING SERVICES AGREEMENT

KATESTONE CONSULTING SERVICES AGREEMENT KATESTONE CONSULTING SERVICES AGREEMENT DATE [insert date] AGREEMENT NO. [insert agreement #] PARTIES Katestone Environmental Pty Ltd ACN 097 270 276 16 Marie Street Milton QLD 4064 Fax No.: (07) 3369

More information

PARADISE TIMBERS PTY LTD APPLICATION FOR COMMERCIAL CREDIT

PARADISE TIMBERS PTY LTD APPLICATION FOR COMMERCIAL CREDIT PARADISE TIMBERS PTY LTD ABN 41 010 596 353 P O Box 3230 HELENSVALE TOWN CENTRE QLD 4212 128 Millaroo Drive GAVEN QLD 4211 Accounts: accounts@paradise-timbers.com.au Sales: sales@paradise-timbers.com.au

More information

Rollingstock Sale Agreement

Rollingstock Sale Agreement Rollingstock Sale Agreement Queensland Rail Limited [insert name of counterparty] For the sale of [insert rollingstock details]. Legal Reference: 16/6304 Form Queensland Rail Limited Legal Team GPO Box

More information

VILLAGE OF ALERT BAY

VILLAGE OF ALERT BAY TENDER NO. 2018-01 2018 Sanitary Sewer Upgrade Master Municipal Construction Documents - 2009 Lump Sum Contract Canadian Construction Documents Committee 2 February 2018 CONTENTS The complete Contract

More information

NOTICE OF REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND RELATED SERVICES. This is a REQUEST FOR PROPOSAL by UMATILLA SCHOOL DISTRICT

NOTICE OF REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND RELATED SERVICES. This is a REQUEST FOR PROPOSAL by UMATILLA SCHOOL DISTRICT NOTICE OF REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND RELATED SERVICES This is a REQUEST FOR PROPOSAL by UMATILLA SCHOOL DISTRICT FOR ARCHITECTURAL AND RELATED SERVICES IN RELATION TO THE 2016 BOND ISSUE

More information

SPECIAL CONDITIONS OF CONTRACT (FOR USE WITH THE ACQS HKIA/HKIS STANDARD FORM OF BUILDING CONTRACT WITH QUANTITIES 2005 EDITION)

SPECIAL CONDITIONS OF CONTRACT (FOR USE WITH THE ACQS HKIA/HKIS STANDARD FORM OF BUILDING CONTRACT WITH QUANTITIES 2005 EDITION) (FOR USE WITH THE ACQS HKIA/HKIS STANDARD FORM OF BUILDING CONTRACT WITH QUANTITIES 2005 EDITION) Context General A. These Special Conditions of Contract are to be read in conjunction with the Conditions

More information

SAMPLE TENDER DOCUMENTS REQUEST FOR TENDER # 2018-XXX. Contract # XXXX-XXXX #Project Name #Project Limits #Project Description

SAMPLE TENDER DOCUMENTS REQUEST FOR TENDER # 2018-XXX. Contract # XXXX-XXXX #Project Name #Project Limits #Project Description SAMPLE TENDER DOCUMENTS REQUEST FOR TENDER # 2018-XXX Contract # XXXX-XXXX #Project Name #Project Limits #Project Description ELECTRONIC BID SUBMISSIONS ONLY Bid Submissions shall be received by the Bidding

More information

GENERAL PANEL SERVICES AGREEMENT

GENERAL PANEL SERVICES AGREEMENT GENERAL PANEL SERVICES AGREEMENT Dated 2012 Parties Legal Aid Commission (A.C.T.) [Insert practitioner s full name] Legal Aid Commission (A.C.T.) 2 Allsop Street Canberra ACT 2601 Ph: (02) 6243 3411 Fax:

More information

MUNICIPALITY OF NORRISTOWN REQUEST FOR PROPOSALS: To Provide Business Privilege Tax Audit Services for the Municipality of Norristown

MUNICIPALITY OF NORRISTOWN REQUEST FOR PROPOSALS: To Provide Business Privilege Tax Audit Services for the Municipality of Norristown MUNICIPAL COUNCIL Sonya D. Sanders President Derrick D. Perry, Vice President Heather Lewis, District 2 Valerie Scott Cooper, District 3 Hakim Jones, District 4 Olivia Brady, At Large Crandall O. Jones

More information

incorporate, or which are implied by trade, custom, practice or course of dealing.

incorporate, or which are implied by trade, custom, practice or course of dealing. CUSTOMER TERMS AND CONDITIONS 1. INTERPRETATION 1.1 Definitions. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business. Conditions: the terms

More information

OPICO LIMITED STANDARD TERMS AND CONDITIONS OF SALE

OPICO LIMITED STANDARD TERMS AND CONDITIONS OF SALE ISSUE DATE: March 2018 OPICO LIMITED STANDARD TERMS AND CONDITIONS OF SALE 1. INTERPRETATION 1.1 Definitions: "Business Day" "Conditions" "Contract" Data Protection Legislation "Dealer" End Customer "Force

More information

THE CHARTERED INSTITUTE OF MANAGEMENT ACCOUNTANTS. and. xxxxxxxxx RESEARCH AGREEMENT

THE CHARTERED INSTITUTE OF MANAGEMENT ACCOUNTANTS. and. xxxxxxxxx RESEARCH AGREEMENT THE CHARTERED INSTITUTE OF MANAGEMENT ACCOUNTANTS and xxxxxxxxx RESEARCH AGREEMENT 1 THIS AGREEMENT is made on the date of the last signature on page 12 BETWEEN: (1) (1) THE CHARTERED INSTITUTE OF MANAGEMENT

More information

INSTRUCTIONS TO TENDERERS

INSTRUCTIONS TO TENDERERS INSTRUCTIONS TO TENDERERS BEAVER COUNTY 2018 YEAR GRAVEL HAUL CONTRACT INSTRUCTIONS TO TENDERERS 1. BACKGROUND 1.1 Beaver County is seeking a tender for (the Work ), as more particularly set out in Schedule

More information

PROSECUTION AND PROGRESS

PROSECUTION AND PROGRESS PROSECUTION AND PROGRESS 1.01 SUBLETTING OR ASSIGNMENT OF CONTRACT A. Work by Contractor: 1. The Contractor shall perform, with its own organization and forces, work amounting to no less than 30% of the

More information

PURCHASE OF GOODS AND/OR SERVICES TERMS AND CONDITIONS

PURCHASE OF GOODS AND/OR SERVICES TERMS AND CONDITIONS PURCHASE OF GOODS AND/OR SERVICES TERMS AND CONDITIONS 1. These terms apply to orders that we place with you for Goods and/or Services. They supersede terms and conditions that you may provide to us. Purchase

More information

Abridged general conditions. for consultancy services for building and construction works (ABR Abridged)

Abridged general conditions. for consultancy services for building and construction works (ABR Abridged) Abridged general conditions for consultancy services for building and construction works (ABR Abridged) These 'Abridged general conditions for consultancy services for building and construction works (ABR

More information

BASF Tanzania Limited Standard Terms and Conditions of Sale

BASF Tanzania Limited Standard Terms and Conditions of Sale 1. SCOPE OF APPLICATION All current and future supplies of products and services (including any literature or other information) offered by BASF to the Customer (collectively referred to as the Goods )

More information

Section III. Contract for Supply and Delivery of Goods

Section III. Contract for Supply and Delivery of Goods Section III. Contract for Supply and Delivery of Goods FPU.SF 19.18 IOM office-specific Ref. No.: IOM Project Code: LEG Approval Code / Checklist Code AGREEMENT FOR THE SUPPLY AND DELIVERY OF GOODS Between

More information

TERMS OF TRADING AGREEMENT

TERMS OF TRADING AGREEMENT Incorporating KAILIS BROS Pty Ltd (ACN 008 723 000), NATIONAL FISHERIES Pty Ltd (ACN 009 412 382), TRILOR Pty Ltd (ACN 008 877 290) and CENVILL PTY LTD (ACN 009 013 843). Operating Address: 23 CATALANO

More information

WATER SUPPLY AGREEMENT

WATER SUPPLY AGREEMENT Replenishing Groundwater Since 1965 Northern Division Office ABN: 42 671 751 039 Southern Division Office 112 Airdmillan Rd, AYR Q 4807 28 Ninth Street, HOME HILL Q 4806 PO Box 720, AYR Q 4807 PO Box 376,

More information

Constitution. The Cancer Council NSW ABN Registered as a Company Limited by Guarantee on 30 September 2005

Constitution. The Cancer Council NSW ABN Registered as a Company Limited by Guarantee on 30 September 2005 Constitution The Cancer Council NSW ABN 51 116 463 846 Registered as a Company Limited by Guarantee on 30 September 2005 i Contents 1. NATURE OF COMPANY AND LIABILITY... 1 1.1 Nature of Company... 1 1.2

More information

GENERAL TERMS AND CONDITIONS 1. Term: This Contract will apply from the Commencement Date and will continue until further notice unless this Contract

GENERAL TERMS AND CONDITIONS 1. Term: This Contract will apply from the Commencement Date and will continue until further notice unless this Contract GENERAL TERMS AND CONDITIONS 1. Term: This Contract will apply from the Commencement Date and will continue until further notice unless this Contract is terminated in accordance with its terms. 2. Supply:

More information

DISPUTE RESOLUTION RULES

DISPUTE RESOLUTION RULES DISPUTE RESOLUTION RULES First Issued: March 1998 Amended: November 1999 Amended: July 2000 Amended: September 2001 Amended: September 2003 Amended: October 2004 Amended: May 2005 Amended: September 2005

More information

TOWN OF LABRADOR CITY FORM OF TENDER TLC RESIDENTIAL GARBAGE COLLECTION CONTRACT TENDER OF ADDRESS TELEPHONE NUMBER

TOWN OF LABRADOR CITY FORM OF TENDER TLC RESIDENTIAL GARBAGE COLLECTION CONTRACT TENDER OF ADDRESS TELEPHONE NUMBER TOWN OF LABRADOR CITY FORM OF TENDER TLC-13-18 RESIDENTIAL GARBAGE COLLECTION CONTRACT TENDER OF ADDRESS TELEPHONE NUMBER 1. The undersigned bidder has carefully examined the proposed project and all conditions

More information

General Terms and Conditions for the Provision of Services and Work of FAG Aerospace GmbH & Co. KG

General Terms and Conditions for the Provision of Services and Work of FAG Aerospace GmbH & Co. KG Our performance of services (Dienstleistungen) and work (Werkleistungen) such as, for example, testing, engineering and development services (hereinafter "performance") in relation to any company, commercial

More information

Terms and Conditions of the Supply of Goods

Terms and Conditions of the Supply of Goods Terms and Conditions of the Supply of Goods 1. INTERPRETATION 1.1 Definitions. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business. Conditions:

More information

Gas Compliance Reporting Manual. Energy Coordination Act 1994

Gas Compliance Reporting Manual. Energy Coordination Act 1994 Gas Compliance Reporting Manual Energy Coordination Act 1994 January 2017 This document is available at the Economic Regulation ERA s website at www.erawa.com.au. For further information, contact: Economic

More information

ROADS, PUBLIC WORKS & TRANSPORT SECTOR TENDER DOCUMENT

ROADS, PUBLIC WORKS & TRANSPORT SECTOR TENDER DOCUMENT NAIROBI CITY COUNTY ROADS, PUBLIC WORKS & TRANSPORT SECTOR TENDER DOCUMENT FOR THE SUPPLY AND DELIVERY OF ONE (1) NO. 18M 3 (20 TON) POTHOLE PATCHING TRUCK FOR THE ROADS, PUBLIC WORKS & TRANSPORT SECTOR

More information

Version 3.0 December Self-Lay Agreement. for services connecting to our existing network. Scheme Location Reference Date

Version 3.0 December Self-Lay Agreement. for services connecting to our existing network. Scheme Location Reference Date Version 3.0 December 2017 Self-Lay Agreement for services connecting to our existing network Scheme Location Reference Date THIS AGREEMENT is made the day of 20 (note this date to be completed by Thames

More information

Financiers' Certifier Direct Deed

Financiers' Certifier Direct Deed Document for Release Execution Version Stage One - East West Link The Minister for Roads on behalf of the Crown in right of the State of Victoria State Aquenta Consulting Pty Ltd Financiers' Certifier

More information

Provider Contract for the Provision of Legal Aid Services and Specified Legal Services

Provider Contract for the Provision of Legal Aid Services and Specified Legal Services Provider Contract for the Provision of Legal Aid Services and Specified Legal Services The Parties to this Contract The Secretary for Justice (the Secretary) and (the Provider) The Secretary and the Provider

More information

Republic of Uganda. Bidding Document for Framework Contracts for Supplies

Republic of Uganda. Bidding Document for Framework Contracts for Supplies Republic of Uganda Bidding Document for Framework Contracts for Supplies Subject of Procurement: Supply of Electrical [Lot 1] and Plumbing Materials [Lot 2] Under Framework Contract Procurement Reference

More information

General Contractor shall provide their own dumpster. Dumpster shall be located in parking lot behind Gymnasium. Coordinate location with Owner.

General Contractor shall provide their own dumpster. Dumpster shall be located in parking lot behind Gymnasium. Coordinate location with Owner. ADDENDUM No. 1 Project: Carpet Replacement South Ripley Elementary Versailles, Indiana Project No: 1839.01 Date: October 12, 2018 This addendum is a part of the bid documents. Acknowledge receipt on the

More information

FAST RESERVE TENDER RULES AND STANDARD CONTRACT TERMS

FAST RESERVE TENDER RULES AND STANDARD CONTRACT TERMS FAST RESERVE TENDER RULES AND STANDARD CONTRACT TERMS ISSUE #2 DATED 1 APRIL 2013 DRAFT DOCUMENT Network Operations National Grid Electricity Transmission plc National Grid House Warwick Technology Park

More information

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY

S.I. 7 of 2014 PUBLIC PROCUREMENT ACT. (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY [27th January 2014] Supplement to Official Gazette 939 S.I. 7 of 2014 PUBLIC PROCUREMENT ACT (Act No. 33 of 2008) PUBLIC PROCUREMENT REGULATIONS, 2014 ARRANGEMENTS OF REGULATIONS PART 1 - PRELIMINARY 1.

More information

RFP ATTACHMENT I: ACKNOWLEDGEMENT OF RFP TERMS AND CONDITIONS

RFP ATTACHMENT I: ACKNOWLEDGEMENT OF RFP TERMS AND CONDITIONS HOW TO RESPOND TO THIS ATTACHMENT By submitting a Proposal, the Proposer, on behalf of itself and its Partners/Subconsultants acknowledges and agrees that: 1. PROPOSER AUTHORIZATION: The signatories are

More information

PROFESSIONAL SERVICES CONTRACT GENERAL SERVICES BETWEEN COPPER VALLEY ELECTRIC ASSOCIATION, INC. AND

PROFESSIONAL SERVICES CONTRACT GENERAL SERVICES BETWEEN COPPER VALLEY ELECTRIC ASSOCIATION, INC. AND PROFESSIONAL SERVICES CONTRACT GENERAL SERVICES BETWEEN COPPER VALLEY ELECTRIC ASSOCIATION, INC. AND Contract Number Draft CVEA Professional Services Agreement INDEX SECTION 1. SCOPE OF SERVICES...1 SECTION

More information

Procurement of Single Phase Pre-Paid Meters and Miniature Circuit Breakers for The Last Mile Connectivity Project (AFD/EU) (e-procurement System)

Procurement of Single Phase Pre-Paid Meters and Miniature Circuit Breakers for The Last Mile Connectivity Project (AFD/EU) (e-procurement System) BIDDING DOCUMENT for Procurement of Single Phase Pre-Paid Meters and Miniature Circuit Breakers for The Last Mile Connectivity Project (AFD/EU) (e-procurement System) 1. SUPPLY OF SINGLE PHASE PRE-PAID

More information

Financiers' Certifier Direct Deed

Financiers' Certifier Direct Deed RFP Version Stage One - East West Link [ ] State [ ] Financiers' Certifier Contents 1. Defined terms & interpretation... 1 1.1 Project Agreement definitions... 1 1.2 Defined terms... 1 1.3 Interpretation...

More information

Collaborative Research Agreement. (Draft)

Collaborative Research Agreement. (Draft) Collaborative Research Agreement (Draft) The University of Tokyo (the University ) and [Company Name] (the Partner ; the University and the Partner being collectively referred to as the Parties and each

More information

To all CIMB Bank Gold Investment Account via CIMB Clicks (hereinafter referred to as "GIA via CIMB Clicks") customers,

To all CIMB Bank Gold Investment Account via CIMB Clicks (hereinafter referred to as GIA via CIMB Clicks) customers, Notice (Date of Notification: 9 November 2015) To all CIMB Bank Gold Investment Account via CIMB Clicks (hereinafter referred to as "GIA via CIMB Clicks") customers, We wish to inform you that the below

More information

12-Inch Water Line Replacement Across Panther Branch SJRA Project No. WDPR N001 SECTION PROPOSAL FORM

12-Inch Water Line Replacement Across Panther Branch SJRA Project No. WDPR N001 SECTION PROPOSAL FORM SECTION 00 41 00.02 To: The San Jacinto River Authority 1577 Dam Site Road G & A Building, 3 rd Floor Receptionist Conroe, Texas 77304 Project: 12-Inch Water Line Replacement Across Panther Branch at Grogan

More information

Contract for Consultancy Services (Small)

Contract for Consultancy Services (Small) Rail Industry Safety and Standards Board (RISSB Contract for Consultancy Services (Small Part 1: Contract Details Item 1 Consultant: [Insert full name of the party / parties that make up the Consultant]

More information

The lowest or any Tender will not necessarily be accepted, and the Township reserves the right to award any portion of this Tender.

The lowest or any Tender will not necessarily be accepted, and the Township reserves the right to award any portion of this Tender. Closing Date: Wednesday, August 31 st, 2016 Closing Time: Award Date: 4:00 p.m. Wednesday, September 7th, 2016 at 7:00 pm during the Regular Meeting of Council Sealed Tenders will be clearly marked and

More information

ATM ACCESS AUSTRALIA LIMITED ATM ACCESS CODE

ATM ACCESS AUSTRALIA LIMITED ATM ACCESS CODE Effective 1 January 2011 Version 003 ATM ACCESS AUSTRALIA LIMITED ABN 52 130 571 103 A Company limited by Guarantee ATM ACCESS CODE Commencement Date: 3 March 2009 Copyright 2009 ATM Access Australia Limited

More information

Deed of Company Arrangement

Deed of Company Arrangement Deed of Company Arrangement Matthew James Donnelly Deed Administrator David Mark Hodgson Deed Administrator Riverline Enterprises Pty Ltd ACN 112 906 144 (Administrators Appointed) trading as Matera Construction

More information

Draft Regulation. 9. This Regulation comes into force on (insert the. Part 2 GAZETTE OFFICIELLE DU QUÉBEC, December 12, 2007, Vol. 139, No.

Draft Regulation. 9. This Regulation comes into force on (insert the. Part 2 GAZETTE OFFICIELLE DU QUÉBEC, December 12, 2007, Vol. 139, No. Part 2 GAZETTE OFFICIELLE DU QUÉBEC, December 12, 2007, Vol. 139, No. 50 3893 3.2.3. A trustee in bankruptcy or a liquidator is exempt from the requirement to hold a licence if the trustee or liquidator

More information

STANDARD TERMS AND CONDITIONS FOR TENDERS, PROPOSALS, CONTRACTS AND QUOTATIONS

STANDARD TERMS AND CONDITIONS FOR TENDERS, PROPOSALS, CONTRACTS AND QUOTATIONS STANDARD TERMS AND CONDITIONS FOR TENDERS, PROPOSALS, CONTRACTS AND QUOTATIONS City of Thunder Bay Supply Management Division Page 1 of 6 SCOPE The following Standard Terms and Conditions for Tenders,

More information

CITY INSOLVENCY DISCUSSION GROUP - CONSTRUCTION CONTRACTS AND INSOLVENCY -

CITY INSOLVENCY DISCUSSION GROUP - CONSTRUCTION CONTRACTS AND INSOLVENCY - CITY INSOLVENCY DISCUSSION GROUP - CONSTRUCTION CONTRACTS AND INSOLVENCY - Background I practice in the building and construction industry as a mediator and conciliator, assisting contracted parties in

More information

Business Details. Contact Details. Director/Principal Details. Business Addresses. Trade References

Business Details. Contact Details. Director/Principal Details. Business Addresses. Trade References APPLICATION FOR A 30 DAY CREDIT ACCOUNT Locked Bag 1500 Dandenong South VIC 3174 Australia P. 03 9215 2222 F. (03) 9215 2346 admin@pattersoncheney.com.au Business Details Business Business Numbers ABN

More information

Services Agreement. Grains Research and Development Corporation (GRDC) [insert name of the Service Provider] (Service Provider) REF: [INSERT REF HERE]

Services Agreement. Grains Research and Development Corporation (GRDC) [insert name of the Service Provider] (Service Provider) REF: [INSERT REF HERE] Services Agreement 2017 REF: [INSERT REF HERE] [INSERT TITLE HERE] Grains Research and Development Corporation (GRDC) [insert name of the Service Provider] (Service Provider) Contents 1. INTERPRETATION

More information

GENERAL TERMS AND CONDITIONS OF TENDER

GENERAL TERMS AND CONDITIONS OF TENDER LPG.WR.SRT.19.TENDERS.01/2018-19 CRFQ No. 1000305784 Date: - 11.06.2018 TENDER FOR PROVIDING SERVICES FOR IN-HOUSE PRESSURE TESTING AND PAINTING [STATUTORY TESTING OF LPG CYLINDERS] OF LPG CYLINDERS AT

More information

STANDARD MASTER SERVICES AGREEMENT

STANDARD MASTER SERVICES AGREEMENT STANDARD MASTER SERVICES AGREEMENT HUGE CONNECT (PTY) LIMITED and herein referred to as Huge Connect 1 INTERPRETATION 1.1 In this Agreement the following expressions shall have the following meanings respectively:

More information

Deed. Lookout Road Hard Rock Quarry. Planning Agreement

Deed. Lookout Road Hard Rock Quarry. Planning Agreement Deed Lookout Road Hard Rock Quarry Planning Agreement Under s93f of the Environmental Planning and Assessment Act 1979 Date: lindsaytaylorlawyers Level 9, Suite 3, 420 George Street, Sydney NSW 2000, Australia

More information

Request for Proposal. Physical Security Professional Review. ASIS Chapter Calgary / Southern Alberta

Request for Proposal. Physical Security Professional Review. ASIS Chapter Calgary / Southern Alberta Request for Proposal Physical Security Professional Review ASIS Chapter 162 - Calgary / Southern Alberta August 2013 Table of Contents 1. Project Scope... 4 1.1 Introduction... 4 1.2 Purpose... 4 1.3 Project

More information

(1 May 2008 to date) ELECTRICITY REGULATION ACT 4 OF 2006

(1 May 2008 to date) ELECTRICITY REGULATION ACT 4 OF 2006 (1 May 2008 to date) [This is the current version and applies as from 1 May 2008, i.e. the date of commencement of the Electricity Regulation Amendment Act 28 of 2007 - to date] ELECTRICITY REGULATION

More information

PFIZER NEW ZEALAND LIMITED trading as Pfizer Consumer Healthcare (NZ) ("PCH") ("Supplier")

PFIZER NEW ZEALAND LIMITED trading as Pfizer Consumer Healthcare (NZ) (PCH) (Supplier) PFIZER NEW ZEALAND LIMITED trading as Pfizer Consumer Healthcare (NZ) ("PCH") ("Supplier") TERMS AND CONDITIONS OF SALE 1. ORDERS 1.1 The Supplier reserves the right to accept or decline, in whole or in

More information

COUNTY OF OSWEGO PURCHASING DEPARTMENT

COUNTY OF OSWEGO PURCHASING DEPARTMENT COUNTY OF OSWEGO PURCHASING DEPARTMENT County Office Building 46 East Bridge Street Oswego, NY 13126 315-349-8234 Fax 315-349-8308 www.oswegocounty.com Daniel Stevens, Purchasing Director May 18, 2017

More information

CTR Carbide Dies (Birmingham) Ltd & Rectory Tool Company Ltd

CTR Carbide Dies (Birmingham) Ltd & Rectory Tool Company Ltd CTR Carbide Dies (Birmingham) Ltd & Rectory Tool Company Ltd PURCHASING TERMS & CONDITIONS 1) Definitions The Company shall mean CTR Carbide Dies (Birmingham) Ltd and Rectory Tool Company Ltd. Goods shall

More information

Introduction Agreement

Introduction Agreement Introduction Agreement between Spigo Malta Ltd. and Introducer Table of Contents 1.Interpretation...3 2.Introductions...4 3.Anti-bribery compliance...5 4.Commission and payment...6 5.Obligations of Spigo...8

More information

What is this Agreement about?

What is this Agreement about? What is this Agreement about? The Contract Details, the Terms & Conditions and the Schedules set out the basis upon which AirData will provide the Services requested by You. Words that are capitalised

More information

1.2. This book covers the three Agreements published by JBCC (see 2.1 below) and the MBSA 2014 Domestic Subcontract Agreement.

1.2. This book covers the three Agreements published by JBCC (see 2.1 below) and the MBSA 2014 Domestic Subcontract Agreement. JBCC March 2014 AGREEMENTS 1 2 3 4 5 6 7 Text books available concerning JBCC 2014 General - Contract Documents issued by JBCC Synopsis of important changes JBCC PBA 2007 2014 Contract Data Tender process

More information

THIS INDEPENDENT ENGINEER'S AGREEMENT (this Independent Engineer's Agreement) is made on [ ]

THIS INDEPENDENT ENGINEER'S AGREEMENT (this Independent Engineer's Agreement) is made on [ ] THIS INDEPENDENT ENGINEER'S AGREEMENT (this Independent Engineer's Agreement) is made on [ ] AMONG (1) REGIONAL TRANSPORTATION DISTRICT (RTD); (2) DENVER TRANSIT PARTNERS, LLC, a limited liability company

More information

THIS AGREEMENT is made the day of 2017

THIS AGREEMENT is made the day of 2017 THIS AGREEMENT is made the day of 2017 (Ref. Insert reference number/name) BETWEEN (1) United Utilities Water Limited whose registered office is at Haweswater House, Lingley Mere Business Park, Lingley

More information

Photovoltaic Inverter Network Connection Agreement

Photovoltaic Inverter Network Connection Agreement Photovoltaic Inverter Network Connection Agreement Power and Water Corporation (PWC) ABN: 15 947 352 360 / / (Day/Month/Year) Customer: Customer s ABN: (Commercial Customers Only) Note to customers 1.

More information

CARBON LINK LTD T/A CPL ACTIVATED CARBONS: CONDITIONS OF SALE

CARBON LINK LTD T/A CPL ACTIVATED CARBONS: CONDITIONS OF SALE CARBON LINK LTD T/A CPL ACTIVATED CARBONS: CONDITIONS OF SALE 1. GENERAL In these conditions the company means Carbon Link Ltd, trading as CPL Activated Carbons and the customer means the person or company

More information

RSR LIMITED TERMS AND CONDITIONS OF SUPPLY (GOODS AND SERVICES)

RSR LIMITED TERMS AND CONDITIONS OF SUPPLY (GOODS AND SERVICES) RSR LIMITED TERMS AND CONDITIONS OF SUPPLY (GOODS AND SERVICES) 1. DEFINITIONS In these Conditions: Business Day means a day other than a Saturday, Sunday or public holiday in England when banks in London

More information

DOCUMENT INSTRUCTIONS TO BIDDERS

DOCUMENT INSTRUCTIONS TO BIDDERS DOCUMENT 00 21 13 Bidders shall follow the instructions in this document, and shall submit all documents, forms, and information required for consideration of a Bid. Oakland Unified School District ( District

More information

Occupational Safety and Health Act 1984

Occupational Safety and Health Act 1984 Western Australia Occupational Safety and Health Act 1984 As at 29 Nov 2012 Version 07-e0-01 Western Australia Occupational Safety and Health Act 1984 CONTENTS Part I Preliminary 1. Short title 2 2. Commencement

More information

LFMI MEDIA SERVICES LIMITED T/A RUE POINT MEDIA

LFMI MEDIA SERVICES LIMITED T/A RUE POINT MEDIA Dated: September 2017 LFMI MEDIA SERVICES LIMITED T/A RUE POINT MEDIA TERMS AND CONDITIONS FOR THE SUPPLY OF SERVICES 1. INTERPRETATION 1.1 THE FOLLOWING DEFINITIONS AND RULES OF INTERPRETATION APPLY IN

More information

SUPPLY AGREEMENT TERMS AND CONDITIONS OF PURCHASE (INFLIGHT SERVICES) SELLER IS ADVISED TO READ THESE TERMS & CONDITIONS CAREFULLY

SUPPLY AGREEMENT TERMS AND CONDITIONS OF PURCHASE (INFLIGHT SERVICES) SELLER IS ADVISED TO READ THESE TERMS & CONDITIONS CAREFULLY SUPPLY AGREEMENT TERMS AND CONDITIONS OF PURCHASE (INFLIGHT SERVICES) SELLER IS ADVISED TO READ THESE TERMS & CONDITIONS CAREFULLY THIS SUPPLY AGREEMENT (the Agreement ) is made on the applicable dates

More information

TERMS AND CONDITIONS OF SALES

TERMS AND CONDITIONS OF SALES 1. Acceptance No Contract, Order or information (literature, drawings etc.) provided to or by the Purchaser shall be binding on Infra Green Ltd unless confirmed in the Infra Green Ltd Order Confirmation.

More information

THE TECHNICAL UNIVERSITY OF KENYA TENDER DOCUMENT FOR

THE TECHNICAL UNIVERSITY OF KENYA TENDER DOCUMENT FOR 1 THE TECHNICAL UNIVERSITY OF KENYA TENDER DOCUMENT FOR ANNUAL TENDERS FOR SUPPLY AND DELIVERY OF BRANDED EXAMINATION ANSWER BOOKLETS, FOLDERS AND ENVELOPES TUK/04/2018/2019 ALL TENDERERS ARE ADVISED TO

More information

Corporations Act 2001 Company Limited by Guarantee. CONSTITUTION OF ALLIED HEALTH PROFESSIONS AUSTRALIA LTD ACN Amended 1 August 2017

Corporations Act 2001 Company Limited by Guarantee. CONSTITUTION OF ALLIED HEALTH PROFESSIONS AUSTRALIA LTD ACN Amended 1 August 2017 Corporations Act 2001 Company Limited by Guarantee CONSTITUTION OF ALLIED HEALTH PROFESSIONS AUSTRALIA LTD ACN 083 141 664 Amended 1 August 2017 INTRODUCTION 1. Objects 1.1 The objects for which the Company

More information

(THIS FORM HAS 7 PAGES AND MUST BE COMPLETED IN FULL)

(THIS FORM HAS 7 PAGES AND MUST BE COMPLETED IN FULL) PRIME INDUSTRIAL PRODUCTS PTY LTD ACN 131 559 772 69 CRAIGIE STREET, PO BOX 5003 BUNBURY WESTERN AUSTRALIA 6230 PHONE: 08 9780 1111 FAX: 08 9726 0399 EMAIL: admin@primesupplies.com.au 30 DAY CREDIT ACCOUNT

More information

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY LIGHTING, MAINTENANCE, AND COMPENSATION AGREEMENT

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY LIGHTING, MAINTENANCE, AND COMPENSATION AGREEMENT STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY LIGHTING,, AND COMPENSATION AGREEMENT CONTRACT NO. FINANCIAL PROJECT NO. F.E.I.D. NO. Page 1 of 6 THIS AGREEMENT, entered into this day of, year

More information

Home Building Amendment Act 2014 No 24

Home Building Amendment Act 2014 No 24 New South Wales Home Building Amendment Act 2014 No 24 Contents Page 1 Name of Act 2 2 Commencement 2 3 Schedule 2 Amendment of NSW Self Insurance Corporation Act 2004 No 106 48 Schedule 3 Repeals 50 New

More information

STANDARD TERMS AND CONDITIONS FOR THE SUPPLY OF GOODS AND SERVICES

STANDARD TERMS AND CONDITIONS FOR THE SUPPLY OF GOODS AND SERVICES . DEFINITIONS: In this document the following words shall have the following meanings: 1.1 "Agreement" means these Terms and Conditions; 1.2 "Customer" means the organisation or person who purchases goods

More information

FINAL SUPPLY CHAIN SOLUTION LTD TERMS AND CONDITIONS FOR THE SUPPLY OF LOGISTICS SERVICES

FINAL SUPPLY CHAIN SOLUTION LTD TERMS AND CONDITIONS FOR THE SUPPLY OF LOGISTICS SERVICES SUPPLY CHAIN SOLUTION LTD TERMS AND CONDITIONS FOR THE SUPPLY OF LOGISTICS SERVICES Supply Chain Solution Ltd is not a common carrier and only accepts goods for carriage and/or storage on that condition

More information

ACCOUNT OPENING / CREDIT APPLICATION FORM

ACCOUNT OPENING / CREDIT APPLICATION FORM SECTION 1 COMPANY DETAILS Company Name Trading Name (if different) Company Registered Office Address Town County Postcode ACCOUNT OPENING / CREDIT APPLICATION FORM Company Registration Number Invoice Address

More information

OSWEGO COUNTY PURCHASING DEPARTMENT. Purchasing Director Purchasing Clerk Purchasing Clerk

OSWEGO COUNTY PURCHASING DEPARTMENT. Purchasing Director Purchasing Clerk Purchasing Clerk OSWEGO COUNTY PURCHASING DEPARTMENT County Office Building 46 East Bridge Street Oswego, NY 13126 Phone (315) 349-8307 Fax (315) 349-8308 dstevens@oswegocounty.com Daniel Stevens Tamara Allen Purchasing

More information

INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR, WEST BENGAL TENDER DOCUMENT FOR

INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR, WEST BENGAL TENDER DOCUMENT FOR .. INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR, WEST BENGAL TENDER DOCUMENT FOR Demolition of irreparable / dilapidated Quarter Nos. B-4, B-5, B-6, B-7, B-8, B-10, B-17, B-18, B-19, B-20, C1-29, C1-30, C1-31,

More information

AGREEMENT BETWEEN OWNERS OF PATENT RIGHTS

AGREEMENT BETWEEN OWNERS OF PATENT RIGHTS AGREEMENT BETWEEN OWNERS OF PATENT RIGHTS THIS AGREEMENT is made by and between the United States of America as represented by the Secretary of the Navy through the Naval Research Laboratory ( NRL or the

More information