1 1 CONSUMER GRIEVANCE REDRESSAL FORUM CENTRAL REGION (Formed under Section 42(5) of the Electricity Act 2003) 220 kv Substation Compound, HMTColony P.O. Kalamasery, Pin Phone No Website : cgrf.kseb.in, cgrf.ekm@gmail.com, CUG No Present (1) Shri. Narayanan M.K Chairperson (2) Smt. B. Soudamini Member (3) Shri. Jefrin Manuel Member Petitioner Sri. Alex Soharab. V.F, M/s. Southern Engineering Corporation, V/830-A, Development Area, Edayar, Muppathadom , Aluva. Respondent 1) The Asst. Exe. Engineer, Electrical Sub Division, Aluva Town 2) The Assistant Engineer, Electrical Section, Edayar ======================================================== No.CGRF-CR/Comp. 59/ Date: 12/1/2017 Background of the case: O R D E R The Petitioner Sri. Alex Soharab. V.F, M/s. Southern Engineering Corporation, is a 3 phase industrial consumer under Ele. Section. Edayar having Cons. No The connected load of the consumer was 20 kw. On 25/8/2014, they had applied for an additional load of 65 kw. As the existing 100 kva transformer was overloaded, an estimate for 3,95,000/- was prepared for installing a 100 kva transformer in his compound and the consumer agreed to meet the expenditure, as the transformer is proposed as exclusive for him. Also he agreed to bear the cost of RMU, if required in future.
2 2 On 23/2/2015, the consumer intimated his inconvenience to install the above transformer and hence the licensee suggested for installing the transformer at road side, which was objected by the neighbor. Hence another estimate for Rs. 1,89,030/- was prepared for enhancing the existing 100 kva transformer to 250 kva, after deducting the depreciation value of taken backing the existing 100 kva transformer. This was sanctioned and the petitioner remitted the amount on 25/3/2015. For giving an additional load of 65 kw, the meter was changed on 24/8/15 with TOD facility, the IR being zero. Then bill was issued regularly. Due to door locked condition, the readings were not taken during 10/15 & 11/15 and after taking reading in 1/12/15 a bill for Rs. 2,77,944/- was issued which included the consumption during 10/15 & 11/15. Then the average consumption was also revised and as it became high, the licensee demanded an ACD of Rs. 57,930/-. Aggrieved by this, the consumer approached CGRF, to get refund of Rs. 2,12,904/- which was remitted by him for the installation and development charges of transformer and to cancel the impugned bill for Rs. 2,77,944/- and ACD for Rs. 57,930/-. Subsequently, statement of facts was called for from the respondent and it was received on 24/9/2016. The Forum afforded an opportunity to hear the petitioner and respondent on 1/10/2016, 21/12/2016 & 4/1/2017. Both the parties were present for the hearing on 1/10/2016, 21/12/2016. Argument of the Petitioner: The Petitioner Sri. Alex Soharab. V.F, M/s. Southern Engineering Corporation, is having a 3 phase electric connection under LT IVA tariff with Cons. No under Ele. Section, Edayar. The connection was availed with a connected load of 20 kw till 3/8/2015. The petitioner enhanced the connected load to 85kW and the meter also changed on 24/8/2015. For this the existing 100 kva transformer has to be enhanced to 250 kva, by the licensee at an
3 3 estimated amount of Rs. 1,89,030/-, after deducting the depreciation value of taken backing the existing 100 kva transformer. The petitioner remitted an amount of Rs. 1, 89,030/- towards HT side work, because the load enhancement was a requirement for them. The petitioner has also constructed a transformer plinth and provided a crane Rs. 3,000/-, which was not included in the estimate. The cost included for constructing the transformer plinth in the sanctioned estimate was Rs. 20,874/-. The licensee had issued Rs. 2880/- on Rs. 2255/- on 1/10/2015 Rs. 7741/- on 2/11/2015 and the petitioner remitted the bills. The petitioner had enhanced their connected load to 85kW and started trial run from 4/12/2015 to 9/12/2015 without loading and the average consumption was between units. On account of the load enhancement, the meter also changed on 24/8/2015, but the licensee had not recorded the consumer s signature. Afterwards the licensee issued a bill for Rs. 2, 77,949/- on 1/12/2015. The petitioner filed an objection and remitted only Rs. 7471/- being the previous month s bill amount and subsequently the petitioner was paying monthly bills regularly. Also the petitioner requested to check the MRI, but KSEB had not done the testing. The Petitioner states that, their load is 85 kw, MD is at an average of 34 kva, the monthly bill is around Rs. 20,000/- and CD available in Rs. 40,000/-. The KSEBL demanded an amount of Rs. 57,930/- towards ACD along with the monthly bills dtd. 1/7/2016, but the petitioner paid an amount less by the ACD, arguing that, there is sufficient CD amount is available with the licensee i.e. around Rs. 40,000/- is available with KSEB as CD which is sufficient for 2 months current bill; whereas the monthly current bill is around 20,000/- only. Also the petitioner filed an objection letter dtd. 12/8/2016, at the section office.
4 4 In view of the above, the petitioner requests the Forum to direct KSEB to: 1) Refund transformer installation charges of Rs. 2, 12,904/- with interest. 2) Cancel the impugned bill for Rs. 2, 77,944/- dtd. 1/12/ ) Cancel the clam towards ACD. Version of the Respondent: As per sec. 46 of Electricity Act -2003, the State Commission may, by regulations, authorize a distribution licensee to charge from a person requiring a supply of electricity in pursuance of Section 43 any expenses reasonably incurred in providing any electric line or electrical plant used for the purpose of giving that supply. As the transformer enhanced is exclusively for him for giving additional load of 65 KW, the request of consumer for refunding the amount of Rs.2, 12,904/- is not genuine as per reg.37 of supply code Also he is liable to remit the current charge Rs.2, 12,904/- as the bill amount is based on the actual consumption and as per prevailing rules. Besides this the consumer is also liable to remit the ACD amount Rs.57, 930/-. Against this bill the consumer submitted an objection at section office. Then the Asst. Engineer directed the consumer to remit the testing fee for testing the meter, and allowed to remit the previous bill amount and the consumer remitted Rs. 7471/-. But the consumer had not remitted the testing fee. Again 2 times he informed the consumer to remit the meter testing fee, but the consumer not remitted the same. In the bill, the IR is zero is properly furnished and the parameters are match with actual consumption and hence bill amount Rs. 2, 77,944/- was issued to the consumer during 12/2015. The ACD of Rs. 57,930/- is calculated after considering this high consumption. The average monthly amount being Rs. 48,790/- and consequent deposit required is Rs. 97,940/- whereas the available deposit is Rs /- and hence balance amount required as ACD is Rs. 57,930/-.
5 5 As per Section 46 of Electricity Act 2003, The State Commission may, by regulations, authorize a distribution licensee to charge from a person requiring a supply of electricity in pursuance of section 43 any expenses reasonably incurred in providing any electric line or electrical plant used for the purpose of giving that supply. Further there is no doubt about the initial reading (IR) and the consumer has not willing to remit the meter testing fee and the petitioner has no complaint about the accuracy of meter, the petitioner is liable to pay the amount. Analysis and findings Having examined the petition in detail, and the statement of facts of the respondent, considering all the facts and circumstances in detail, and perusing all the documents of both sides, the Forum comes to the following observations, conclusions and decisions thereof. This petitioner has already heard on 1/10/2016, but more documents with respect to the downloaded data had to be collected from the licensee. It seems that by somehow the meter data was downloaded at TMR Angamaly and the details were received on 26/11/2016 and hence another hearing was held on 21/12/2016. On the hearing, clarification regarding the MF in the bill was also sought from the licensee and the same was received on 23/12/2016. Hence a third hearing with the respondent alone was also held on The Petitioner Sri. Alex Soharab. V.F, M/s. Southern Engineering Corporation, is having a 3 phase electric connection under LT IVA tariff with Cons. No under Ele. Section, Edayar. The connection was availed with a connected load of 20 kw till 3/8/2015. The petitioner enhanced the connected load to 85kW and the meter also changed on 24/8/2015. For this the existing 100 kva transformer has to be enhanced to 250 kva, by the licensee at an estimated amount of Rs. 1,89,030/-, after deducting the depreciation value of taken backing the existing 100 kva transformer. The petitioner remitted an amount of Rs. 1, 89,030/- towards HT side work, because the load enhancement
6 6 was a requirement for them. The petitioner has also constructed a transformer plinth and provided a crane Rs. 3,000/-, which was not included in the estimate. The cost included for constructing the transformer plinth in the sanctioned estimate was Rs. 20,874/-. The licensee had issued Rs. 2880/- on Rs. 2255/- on 1/10/2015 Rs. 7741/- on 2/11/2015 and the petitioner remitted the bills. The petitioner had enhanced their connected load to 85kW and started trial run from 4/12/2015 to 9/12/2015 without loading and the average consumption was between units. On account of the load enhancement, the meter also changed on 24/8/2015, but the licensee had not recorded the consumer s signature. Afterwards the licensee issued a bill for Rs. 2, 77,949/- on 1/12/2015. The petitioner filed an objection and remitted only Rs. 7471/- being the previous month s bill amount and subsequently the petitioner was paying monthly bills regularly. Also the petitioner requested to check the MRI, but KSEB had not done the testing. The Petitioner states that, their load is 85 kw, MD is at an average of 34 kva, the monthly bill is around Rs. 20,000/- and CD available in Rs. 40,000/-. The KSEBL demanded an amount of Rs. 57,930/- towards ACD along with the monthly bills dtd. 1/7/2016, but the petitioner paid an amount less by the ACD, arguing that, there is sufficient CD amount is available with the licensee i.e. around Rs. 40,000/- is available with KSEB as CD which is sufficient for 2 months current bill; whereas the monthly current bill is around 20,000/- only. On detailed examination of the petition, it needs to analyze the following points: 1) Eligibility of collecting transformer installation expenses 2) Accuracy of bill dtd. 1/12/2015 for an amount of Rs. 2, 77,944/-. 3) Eligibility of collecting the ACD amount of Rs. 57,930/-.
7 7 For meeting the expenditure towards enhancement of connected load the Regulation 36 of Supply Code 2014 is applicable which is reproduced below: 36. Expenditure for extension or up gradation or both of the distribution system to be borne by the consumer:- The expenditure for extension or upgradation or both of the distribution system undertaken exclusively for giving new service connection to any person or a collective body of persons or a developer or a builder, or for enhancing the load demand of a consumer or a collective body of consumers or a developer or a builder, shall be borne by the respective applicant or consumer or collective body of consumers or developer or builder, as the case may be, in the following cases:- (i) for meeting the demand of an applicant with a contract demand above one megawatt (MW); (ii) for meeting the additional demand of existing consumers, if the aggregate demand including the additional demand applied for, is above one megawatt (MW); (iii) for meeting the demand of the domestic or commercial or industrial complex or colony constructed by a developer or a builder with a demand above one megawatt (MW); (iv) for meeting the demand of a high rise building irrespective of its demand; (v) for meeting the demand of power intensive unit irrespective of its demand; and (vi) for meeting the demand of a consumer requesting for dedicated feeder or protected load status irrespective of its demand: Provided that, if due to technical reasons, the extension or upgradation or both to be undertaken by the licensee as per this regulation is more than the requirement of such consumer, the expenditure for such extension or upgradation or both to be realized from the consumer shall be limited to the proportionate expenditure. In this case the load enhancement required is only to an extent of 65 kw, even though, this enhancement is exclusively for meeting the additional load requirement of the consumer. Hence as per Regulation 36, the cost of enhancement shall be met by the licensee.
8 8 connection. It may be noted that, the regulation 37 is applicable for availing new The respondent says that the petitioner was not willing to remit the testing fee for testing the meter for the period of readings under dispute i.e. the readings taken in the bill dtd. 1/12/2015. The petitioner argues that the IR of the meter was not zero. This is also not available in the downloaded data submitted by the licensee. Further there is no evidence that the consumer was ready to remit the testing fee for testing the meter. For the bill dtd. 1/12/2015, amounting to Rs. 2, 77,944/-, it seems that IR is clearly shown in the bill. The respondent agreed that, while changing the meter, they had not recorded the petitioner s signature. The multiplication factor (MF) taken for the bills under dispute is 30. The AEE reports that an objection was filed by the consumer against this bill, the section staff inspected the premises and the MF was confirmed as 20. The AEE clarifies that, this bill can be revised with MF 20 and they have issued all the subsequent bills after this disputed bill with MF as 20. On analyzing the above facts, the respondent is not able to prove beyond doubt that, the IR of the replaced meter was zero. Also now it is not available from the downloaded data. There was no lockout or shutdown of the company during the disputed bill period as confirmed by the petitioner. Hence it can be assumed that the petitioner might have used the energy as per normal in the subsequent months after enhancement. As reliable data in respect of the reading is not available, Forum is of the opinion that, the subsequent 3 months average shall be taken as the consumption for each month in the disputed period, and bills may be issued accordingly. Also ACD may be recalculated and collected if required as per the above calculation.
9 9 Dissenting Note by Smt. B. Soudamini, (2 nd Member) I agree with the Decisions (2) and (3) below. But regarding the refund of transformer installation charges of Rs. 2,12,904/-, my view point is contrary to that of the others. In my opinion, Reg. 37 is applicable in this case, which is reproduced as below. 37. Expenditure for service line, plant etc., for providing supply.- (1) The consumer shall bear the expenditure for the service line or of the plant or of both, provided exclusively for him by the licensee. (2) The expenditure for line and plant mentioned in subregulation (1) above shall be determined as per the cost data approved by the Commission. In the present case, the petitioner was already availing supply from the respondents for 20 kw. Later, petitioner wanted enhancement of power by 65 kw. As the transformer of the respondents feeding supply to petitioner did not have enough capacity to cater this additional load, another transformer of 100 kva capacity had to be installed for the exclusive purpose of the petitioner. Hence this issue comes in the purview of Reg. 37 of Supply Code. Even though petitioner agreed to install the new transformer in his premises vide Lr. No. SEC/KSEB/Power/ /058/ , he later expressed difficulty in installing the transformer in his premises vide Lr. No. SEC/KSEB/Power/ /63/ The respondent is then seen to have approached another firm viz M.s, Aswathy Engineering Works for the space for installation of the new transformer, which was subsequently denied by the said firm on 28/2/2015. As a last option, the existing transformer catering power to the petitioner was enhanced by the respondents to 250 kva, in lieu of the exclusive transformer proposed for the petitioner and that too at the request of the petitioner. Hence the issue of the transformer enhancement has to be given the privilege of the circumstance, i.e. the request of the petitioner. As such, the petitioner is responsible for the transformer enhancement and is therefore bound to bear it s expenses as per Reg. 37. Sd/- B. Soudamini 2 nd Member
10 10 DECISION: 1) The amount remitted by the petitioner towards the enhancement of existing 100 kva transformer to 250 kva transformer is to be refunded. If the petitioner agrees the amount may be adjusted in future bills. 2) The bill dtd. 1/12/2015 for an amount of 2, 77,944/- is cancelled. This bill is to be revised after considering the average of succeeding 3 months consumption, as the consumption of each month in the above disputed bill period, and also taking correct M.F. 3) The monthly average consumption and amount is to be re-calculated after considering decision (2) above, and the revised CD amount required is to be worked out. If this is less than the available CD with the licensee, the licensee shall issue separate bill for collecting the balance CD required. Dated this 12 th day of January ) Sri. Narayanan M.K. Sd/- (CHAIRPERSON 2) Sri. Jefrin Manuel Sd/- 3 rd member Endt. On CGRF-CR/Comp. 59/16-17 Sri. Alex Soharab. V.F, M/s. Southern Engineering Corporation, V/830-A, Development Area, Edayar, Muppathadom , Aluva. Copy Submitted to: The Chief Engineer, Distribution Central, KSEB, Gandhi Square, DH Road, Kochi -16. Copy to: - (1) The Deputy Chief Engineer, Electrical Circle, KSEBL, Perumbavoor (2) The Executive Engineer, Electrical Division, Aluva (3) The Asst. Exe. Engineer, ESD, K.S.E.B, Aluva Town (4) The Asst. Engineer, Ele. Section, Edayar
BEFORE THE KERALA STATE ELECTRICITY REGULATORY COMMISSION. PETITION No. CP 02/17
BEFORE THE KERALA STATE ELECTRICITY REGULATORY COMMISSION PETITION No. CP 02/17 In the matter of : Non implementation of the order dated 29.05.2017 in P/005/2016 of Kerala State Electricity Ombudsman.
More informationAGREEMENT FOR SUPPLY OF LT ENERGY
AGREEMENT FOR SUPPLY OF LT ENERGY This agreement made on the.. day of.., 200 between the Development Commissioner, Cochin Special Economic Zone, Kakkanad for and on behalf of Cochin Special Economic Zone
More informationCase No.25/2016 Date of Grievance : Date of Order :
1 25/2016 CONSUMER GRIEVANCE REDRESSAL FORUM M.S.E.D.C.L., PUNE ZONE, PUNE Case No.25/2016 Date of Grievance : 19.07.2016 Date of Order : 14.09.2016 In the matter of recovery of arrears in the event of
More informationShri P J Patel, Gandhinagar Independent Member Harsha S Chauhan, Vadodara Technical Member Smt M M Marathe, MGVCL
BEFORE THE CONSUMER GRIEVANCES REDRESSAL FORUM MADHYA GUJARAT VIJ CO LIMITED CORPORATE OFFICE, 5 TH FLOOR SP VIDYUT BHAVAN, RACECOURSE, VADODARA 390 007 Subject Complainant Respondent Date of hearing Consumer
More informationAGREEMENT FOR SUPPLY OF HT ENERGY
AGREEMENT FOR SUPPLY OF HT ENERGY This agreement made on the.. day of.., 200 between the Development Commissioner, Cochin Special Economic Zone, Kakkanad for and on behalf of Cochin Special Economic Zone
More informationMaharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur Case No.
Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur Case No. CGRF(NUZ)/71/2014 Applicant Non applicant Quorum Present : M/s. Sanvijay Rolling
More informationCase No.06/2016 Date of Grievance : Date of Order :
1 06/2016 CONSUMER GRIEVANCE REDRESSAL FORUM M.S.E.D.C.L., PUNE ZONE, PUNE Case No.06/2016 Date of Grievance : 15.03.2016 Date of Order : 21.04.2016 In the matter of recovery of arrears in the event of
More informationAgreement for H.V./ L.V. Consumer.
As per the Maharashtra Electricity Regulatory Commission (Electricity Supply Code and other Conditions of Supply) Regulations, 2005 and Electricity Act 2003. Agreement for H.V./ L.V. Consumer. Articles
More informationCase No. 2 of Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in
More informationPUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No. 58 of 2017 Date of order: 11.06.2018 Present: Ms. Kusumjit Sidhu, Chairperon Sh. S.S. Sarna, Member
More informationCONSUMER GRIEVANCES REDRESSAL FORUM; MSEDCL NAGPUR (RURAL) ZONE NAGPUR COMPLAINT NO.7 /2015
CONSUMER GRIEVANCES REDRESSAL FORUM; MSEDCL NAGPUR (RURAL) ZONE NAGPUR COMPLAINT NO.7 /2015 Shri Nilesh M. Kolhe At.Aajanti Po.Tq.Hinganghat District - Wardha.,,VS.. Complainant 1. Executive Engineer,
More informationORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR **** **** ****
ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR-751012 **** **** **** Present: Shri B.K.Das, Chairperson Shri S.K.Jena, Member Shri K.C.Badu, Member Case No.77 of
More informationCONSUMER GRIEVANCES REDRESSAL FORUM; NAGPUR (RURAL) COMPLAINT NO. 352/2011
CONSUMER GRIEVANCES REDRESSAL FORUM; NAGPUR (RURAL) COMPLAINT NO. 352/2011 Shri Saibaba Mahila Bachat Gat, C/o Smt. Shraddha Raman Agrawal, Bachpai Chouk, Near Kundan Kuti, Murri Road, Gondiya-441601.,,VS....
More informationCase No. 99 of Smt. Chandra Iyengar, Chairperson Shri Vijay. L. Sonavane, Member Shri. Azeez M. Khan, Member
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Email: mercindia@merc.gov.in Website: www.mercindia.org.in / www.merc.gov.in
More informationBEFORE THE FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES IN SOUTHERN POWER DISTRIBUTION COMPANY OF A.P LIMITED TIRUPATI
BEFORE THE FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES IN SOUTHERN POWER DISTRIBUTION COMPANY OF A.P LIMITED TIRUPATI On this the ----------- day of July 2014 In C.G.No: 201/2013-14/ Kadapa Circle Present
More informationWest Bengal State Electricity Distribution Company Limited
West Bengal State Electricity Distribution Company Limited C:\ (SOP) regulation 2010.docAnnexure A1 Application form to be used for transfer of service/meter in case of change of ownership or occupancy
More informationBEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)
BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai
More informationPUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH. Smt.Romila Dubey, Chairperson Shri Gurinder Jit Singh, Member
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No.70 of 2014 Date of Order: 22.04.2015 Present: Smt.Romila Dubey, Chairperson Shri Gurinder Jit Singh,
More informationREGISTERED CONSUMERS GRIEVANCES REDRESSAL FORUM AT KASUMPTI SHIMLA-9 No. CGRF/Comp. No. 1453/1/17/005
REGISTERED CONSUMERS GRIEVANCES REDRESSAL FORUM AT KASUMPTI SHIMLA-9 No. CGRF/Comp. No. 1453/1/17/005 Dated:- KBM Food Product, V/s. HPSEBL & Others. Complaint No 1453/1/17/005 1. KBM Food Product, 2.
More informationDate of Admission : Date of Decision :
1 Case No. 668/2018 BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM AURANGABAD ZONE, AURANGABAD. Case No. CGRF/AZ/AUR/R/668/2018/08 Registration No. 2018020042 Date of Admission : 14.02.2018 Date of Decision
More informationTHE TAMIL NADU ELECTRICITY REGULATORY COMMISSION
THE TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under Section 82(1) of the Electricity Act, 2003) (Central Act 36 of 2003) PRESENT : Thiru S. Kabilan Thiru B. Jeyaraman - Chairman - Member
More informationCASE No. 337 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member ORDER
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationCase No. 16 of 2007 Date: 19/12/2007. In the matter of Shri Sachin P. Sakpal V/S
Before Maharashtra State Electricity Distribution Co. Limited Consumer Grievances Redressal Forum, Pune Zone, 925,Kasabapeth Building, IInd flr. Pune-11 Case No. 16 of 2007 Date: 19/12/2007 In the matter
More informationCONSUMER GRIEVANCES REDRESSAL FORUM-I OF SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED
CONSUMER GRIEVANCES REDRESSAL FORUM-I OF SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED 01.08.2018 Forum for Redressal of Consumer Grievances TSSPDCL has been established as per Sub-Section (5)
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@merc.gov.in
More informationCase No. 68 of Coram. Shri. I. M. Bohari, Member Shri. Mukesh Khullar, Member. M/s RattanIndia Nasik Power Ltd.
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationCase No. 135 of Shri Vijay L. Sonavane, Member Smt. Chandra Iyengar, Member. (1) M/s B.S.Channabasappa & Sons...Petitioner 1
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel No 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercgovin Website:
More informationSupply shall generally be given at the following voltages on the basis of contracted load:
Classification of Supply- Supply shall generally be given at the following voltages on the basis of contracted load: Consumers availing supply at lower voltage than above classification will be required
More informationShri P J Patel, Gandhinagar Independent Member Harsha S Chauhan, Vadodara Technical Member Medha M Marathe, MGVCL
BEFORE THE CONSUMER GRIEVANCES REDRESSAL FORUM MADHYA GUJARAT VIJ CO LIMITED CORPORATE OFFICE, 5 TH FLOOR SP VIDYUT BHAVAN, RACECOURSE, VADODARA 390 007 Subject Complainant Respondent Date of hearing Consumer
More informationCase No.139 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationBEFORE THE CONSUMER GRIEVANCES REDRESSAL FORUM O R D E R
BEFORE THE CONSUMER GRIEVANCES REDRESSAL FORUM M. S. ELECTRICITY DISTRIBUTION CO.LTD. (NAGPUR ZONE RURAL) NAGPUR. Application/Case No. CGRF/NZ/Rural/ 29 of 2006 Applicant : M/S. Shyam Rice Industries,
More informationTAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement)
TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 30A CHENNAI, WEDNESDAY, AUGUST 3, 2005 Aadi 18, Parthiba, Thiruvalluvar Aandu - 2036 Part VI --- Section 2 (Supplement) NOTIFICATIONS BY HEADS OF
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION
KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. 1824/CT/KSERC/2012 Dated, Thiruvananthapuram 10 th September, 2013 Kerala State Electricity Regulatory Commission (Connectivity and Intrastate
More informationBEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)
BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014
104 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014 ELECTRICITY ACT, 2003. No./MERC/Tech/Open Access Transmission/Regulations/2014/561. In exercise
More informationMaharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur. Case No.
Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur Case No. CGRF(NUZ)/52/2012 Applicant : M/s. MPM Pvt.Ltd, M-22, MIDC, Hingna Road, Nagpur
More informationINDEX. Sr. No. Particulars Page No.
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Mumbai DRAFT Maharashtra Electricity Regulatory Commission (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination
More informationBEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)
BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai
More informationORDER Dated: 11 th August, 2004
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005. Tel. 22163964 / 22163965, Fax No. 22163976 E-mail mercindia@mercindia.com
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX Part A: PRELIMINARY 4 1. Short Title, extent and commencement 4 2. Definitions 4 3. Eligibility to seek
More informationJHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI (Case No.23/ ) QUORUM Shri Mukhtiar Singh, Chairperson Shri P. C. Verma, Member.
JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI (Case No.23/2007-08) IN THE MATTER OF QUORUM Shri Mukhtiar Singh, Chairperson Shri P. C. Verma, Member. An application for setting aside the letter
More information4. PROCEDURE FOR RELEASE OF NEW CONNECTION AND MODIFICATION IN EXISTING CONNECTION
4. PROCEDURE FOR RELEASE OF NEW CONNECTION AND MODIFICATION IN EXISTING CONNECTION Licensee s obligation to supply 4.1 The licensee shall, on an application by the owner or occupier of any premises located
More informationMaharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Zone, Nagpur Case No.
Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Zone, Nagpur Case No. CGRF(NZ)/68/2017 Applicant : Smt.Isha Santosh Gedam, Flat No. 501, Nirmiti Heights
More informationSEVENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004
Bhopal, dated: 12 th July, 2006 No.1740&MPERC&2006. In exercise of powers conferred by Section 181 (1) of the Electricity Act, 2003 (No. 36 of 2003) and also in compliance of the notification dated 08
More informationNo:- CGRF/AZ/AUR/U/ 446 / 2013 /30 Date :-
CONSUMER GRIEVANCE REDRESSAL FORUM MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. Old Power House Premises, Dr. Ambedkar Road, Phone: 0240-2336172 No:- CGRF/AZ/AUR/U/ 446 / 2013 /30 Date :- To,
More informationCase No. 111 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member. Maharashtra State Electricity Distribution Co.
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in
More informationNORTHERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED WARANGAL
NORTHERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED WARANGAL FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES Forum for Redressal of Consumer Grievances APNPDCL has been established as per Sub - Section (5)
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION
KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No.1/1/KERC-2005/IV Dated, Thiruvananthapuram, December 14, 2005. KERALA ELECTRICITY SUPPLY CODE (FIRST AMENDMENT) REGULATIONS, 2005 STATEMENT
More informationSEVENTEENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004.
Notified on 25/06/2010 Bhopal, 14 th June, 2010 No. 1548 /MPERC/2010. In exercise of powers conferred by Section 181(1) and 181 (2) (x) read with Section 50 of the Electricity Act, 2003 and for removal
More informationORDER (passed on 02/07/2015)
5(A Govt. of Maharashtra Undertaking) CIN : U40109MH2005SGC153645 PHONE NO. : 25664314/25664316 Consumer Grievance Redressal Forum FAX NO. 26470953 Vidyut Bhavan, Gr. Floor, Email: cgrfbhandupz@mahadiscom.in
More informationBEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)
BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai
More informationBEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)
BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai
More informationBEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)
BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai
More informationConsumer Grievance Redressal Forum and Ombudsman
Consumer Grievance Redressal Forum and Ombudsman KERC have formulated Regulation known as Karnataka Electricity Regulatory Commission (Consumer Grievance Redressal Forum and Ombudsman) Regulations 2004
More informationJHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI. Case No. 21 & 23 of 2010 ORDER
JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI Case No. 21 & 23 of 2010 Dated: 6 th October 2010 Shri Mukhtiar Singh, Chairperson Shri T. Munikrishnaiah, Member (Tech) ORDER IN THE MATTER OF
More informationBefore the Appellate Board National Electric Power Regulatory Authority (NEPRA) Islamic Republic of Pakistan
Before the Appellate Board National Electric Power Regulatory Authority (NEPRA) Islamic Republic of Pakistan No. NEPRA/AB/Appeal-170/POI-2016/89/..le/ NEPRA Office, Atta Turk Avenue (East), G5/1, Islamabad
More informationNo. K/E/1473/1732 K/E/1476/1735 of Date of registration : 12/11/2018 Date of order : 26/12/2018 Total days : 44
Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) 421301 Ph 2210707, Fax 2210707, E-mail : cgrfkalyan@mahadiscom.in No. K/E/1473/1732 K/E/1476/1735
More informationConsumer Grievance Redressal Forum and Ombudsman
Consumer Grievance Redressal Forum and Ombudsman KERC have formulated Regulation known as Karnataka Electricity Regulatory Commission (Consumer Grievance Redressal Forum and Ombudsman) Regulations 2004
More informationDETAILED PROCEDURE FOR GRANT OF CONNECTIVITY & OPEN ACCESS IN INTRA-STATE TRANSMISSION SYSTEM
DETAILED PROCEDURE FOR GRANT OF CONNECTIVITY & OPEN ACCESS IN INTRA-STATE TRANSMISSION SYSTEM 1. Introduction: 1.1 The Kerala State Electricity Regulatory Commission notified KSERC (Connectivity and Intra-state
More informationSOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED
SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED COMPLAINT HANDLING PROCEDURE OF DISTRIBUTION LICENSEE (APPROVED BY OERC) 1. This "Complaint Handling Procedure relating to Distribution Activity (Complaint
More informationORDER (Date of Hearing : 23 rd November, 2010) (Date of Order : 24 th November, 2010)
MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION, BHOPAL Sub : In the matter of petition for approval of cost sharing scheme by prospective EHT ORDER (Date of Hearing : 23 rd November, 2010) (Date of Order
More informationCASE No. 156 of In the matter of
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationThe Himachal Pradesh Electricity Supply Code, 2009 CHAPTER - 1 GENERAL
HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. HPERC/390-09 Shimla 2, 26 th May, 2009 In exercise of powers conferred by Section 50 and clause (x) of sub-section (2) of Section 181of
More informationCase No. DH/CGRF-1595/2017 Date of Institution: Date of Hearing: Date of Order: 25/01/2017
FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES DAKSHIN HARYANA BIJLI VITRAN NIGAM D-BLOCK, Ground Floor, Vidyut Sadan, Vidyut Nagar, Hisar-125 005 Telephone No. 01662-223081 (website: www.dhbvn.com) (e-mail
More informationCASE No. 173 of Coram. Shri Anand B. Kulkarni, Chairperson Shri Mukesh Khullar, Member
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:
More informationHARYANA ELECTRICITY REGULATORY COMMISSION. Notification. The 10th August, Electricity Supply Code. (1) recovery of electricity charges,
HARYANA ELECTRICITY REGULATORY COMMISSION Regulation No: HERC/ 05 /2004 Notification The 10th August, 2004 Electricity Supply Code Where as the Electricity Act, 2003 provides that the Commission shall
More informationMaharashtra Electricity Regulatory Commission, Mumbai.
Maharashtra Electricity Regulatory Commission, Mumbai. Maharashtra Electricity Regulatory Commission (Consumer Grievance Redressal Forum & Ombudsman) Regulations, 2003 ELECTRICITY ACT, 2003 No.MERC / LEGAL
More informationPROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT)
PROCEDURES AND GUIDELINES FOR APPLYING SERVICE CONNECTION AT 11 KV / 33 KV HIGH TENSION (HT) & 132 KV EXTRA HIGH TENSION (EHT) Note. The procedures and guidelines mentioned herein are in accordance with
More informationSangeeta Verma Secretary. No. Secy/ UPERC/Supply Code/ Lucknow: Dated Sir,
Uttar Pradesh Electricity Regulatory Commission Kisan Mandi Bhawan, II Floor, Gomti Nagar, Lucknow-226010 Phone 2720821 Fax 2720423 E-mail secretary@uperc.org Sangeeta Verma Secretary No. Secy/ UPERC/Supply
More informationIN THE GAUHATI HIGH COURT (THE HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH)
IN THE GAUHATI HIGH COURT (THE HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH) WP(C) No. 2882/2005 M/s. Ladi Steel Industries Pvt. Limited, a private limited company duly incorporated under
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@merc.gov.in
More informationBEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member
BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member In the matter of: Fixation of transmission tariff for 7.2 KM 400 KV dedicated
More informationBEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA
BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA Petition No. 82 of 2012 M/S Himachal Chamber of Commerce and Industry C/O Goel Diesel Service, Bhupper, Poanta Sahib, Distt. Sirmour
More informationJammu and Kashmir State Electricity Regulatory Commission
DRAFT INVITING OBJECTIONS, SUGGESTIONS AND COMMENTS Part-III Laws, Regulations and Rules passed there under Jammu and Kashmir State Electricity Regulatory Commission NOTIFICATION No. /JKSERC/ 2010 Jammu
More informationCENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION
CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION No.L-7/105(121)/2007-CERC Dated the 25 th January, 2008 In exercise of powers conferred by Section 178 of the Electricity Act, 2003 and
More informationCONSUMER GRIEVANCE REDRESSAL FORUM M.S.E.D.C.L., PUNE ZONE, PUNE. Case No.07/2016 Date of Grievance : Date of Order :
1 07/2016 CONSUMER GRIEVANCE REDRESSAL FORUM M.S.E.D.C.L., PUNE ZONE, PUNE Case No.07/2016 Date of Grievance : 15.03.2016 Date of Order : 13.05.2016 In the matter of removal of meter and disconnection
More informationIN THE MATTER OF GRIEVANCE NO. K/DOS/001/482 OF OF MRS.
Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) 421301 Ph 2210707, Fax 2210707, E-mail : cgrfkalyan@mahadiscom.in IN THE MATTER OF GRIEVANCE NO.
More informationV/s. Maharashtra State Electricity Distribution Company Limited Through it s Nodal Officer/Addl.EE... (Hereinafter referred as Licensee)
Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) 421301 Ph 2210707, Fax 2210707, E-mail : cgrfkalyan@mahadiscom.in No. K/E/1269/1496 of 2017-18
More informationBEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)
BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai
More informationPUNJAB STATE ELECTRICITY REGULATORY COMMISSION
PUNJAB STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION The 4th October, 2013 No. PSERC/Secy/Regu. 88 Punjab State Electricity Regulatory Commission hereby approves the guidelines for handling of consumer
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM
KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM Present: Shri. S. Venugopal, Member Shri. K. Vikraman Nair, Member OP No 56 / 18 In the matter of : Petition for grant of approval for
More informationBEFORE THE COMPLAINANT GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. Representation No. N-G(S) dtd. 25/06/2012 V/S
BEFORE THE COMPLAINANT GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba,
More informationNational Electric Power Regulatory Authority Islamic Republic of Pakistan
National Electric Power Regulatory Authority Islamic Republic of Pakistan NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk, E-mail: registrar@nepra.org.pk
More informationMAHARASHTRA ELECTRICITY REGULATORY COMMISSION
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 INDEX Sr.No. Particulars Page No.
More informationM/s. Neelsidhi Developers - Complainant The Emerald, 2 nd floor, Plot No. 195 B, Besides, Neelsidhi Towers, Sector -12, Vashi, Navi Mumbai
(A Govt. of Maharashtra Undertaking) CIN : U40109MH2005SGC153645 PHONE NO. : 25664314/25664316 Consumer Grievance Redressal Forum FAX NO. 26470953 VidyutBhavan, Gr. Floor, Email: cgrfbhandupz@mahadiscom.in
More informationORISSA ELECTRICITY REGULATORY COMMISSION DISTRIBUTION (CONDITIONS OF SUPPLY) CODE, 2004
ORISSA ELECTRICITY REGULATORY COMMISSION DISTRIBUTION (CONDITIONS OF SUPPLY) CODE, 2004 2 THE ORISSA GAZETTE EXTRA ORDINARY PUBLISHED BY AUTHORITY No.710, CUTTACK, FRIDAY, MAY 28, 2004 / JAISTHA 7, 1926
More informationThe Orissa Electricity (Duty) Act, 1961.
The Orissa Electricity (Duty) Act, 1961. An Act to levy a duty on the consumption of electrical energy on the State of Orissa. Be it enacted by the legislature of the State of Orissa in the Twelfth year
More informationNET METERING CONNECTION AGREEMENT
NET METERING CONNECTION AGREEMENT This Agreement is made and entered into at Mumbai on this day of 20 between,(i)... (name of consumer), having its premises at... and Consumer No. (hereinafter referred
More informationGrievances No.K/DOS/015/874 of and No. K/DOS/016/875 of
Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) 421301 Ph 2210707, Fax 2210707, E-mail : cgrfkalyan@mahadiscom.in Date of Grievance : 08/10/2013
More informationConsultation Paper. JSERC (Distribution Standards of Performance) Regulations, 2015 Consultation Paper
Consultation Paper JSERC (Distribution Standards of Performance) Regulations, 2015 Consultation Paper JSERC SOP Regulations Consultation Paper Table of Contents Preamble 2 Objective 2 Legislative mandate
More informationTHE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)
THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO) (NO. 4/99) (Issued under OERC Order Dt. 31.03.99 in Case No. 25/98) Western Electricity Supply Company of Orissa Limited Registered office:
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram. November 27, Tamil Nadu Electricity Board
KERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram Present : Shri.M.K.G.Pillai, Chairman Shri.C.Balakrishnan, Member November 27, 2004 Tamil Nadu Electricity Board Petitioner Petition No.DP18
More informationNEPRA Office Building, G-511, Attaturk Avenue (East), Islamabad "
0" 1 National Electric Power Regulatory Authority Islamic Republic of Pakistan wat **-414' NEPRA Office Building, G-511, Attaturk Avenue (East), Islamabad "-- - 06 Phone: 051-9206500, Fax: 051-2600026
More informationBefore the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th floor, Cuffe Parade, Mumbai
Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th floor, Cuffe Parade, Mumbai 400 005. CASE No. 17 of 2002 In the matter of Application of M/s Chalet Hotels
More informationBEFORE THE COMMISSIONER, H.R. & C.E.ADMN.DEPARTMENT, CHENNAI-34.
BEFORE THE COMMISSIONER, H.R. & C.E.ADMN.DEPARTMENT, CHENNAI-34. Wednesday the 17 th day of October, Two thousand and Eighteen. Present:Thiru.T.K.Ramachandran, I.A.S., Principal Secretary /Commissioner
More informationAGREEMENT FOR SALE OF POWER. THIS AGREEMENT FOR SALE OF POWER is made and executed at on the day of, 2017 ( Agreement ) BY AND BETWEEN
AGREEMENT FOR SALE OF POWER THIS AGREEMENT FOR SALE OF POWER is made and executed at on the day of, 2017 ( Agreement ) BY AND BETWEEN National Aluminium Company Limited (NALCO) a company incorporated under
More informationORDER (Date of hearing 24 th November, 2012) (Date of order 10 th December, 2012)
ORDER (Date of hearing 24 th November, 2012) (Date of order 10 th December, 2012) M/s Birla Corporation Ltd. - Petitioner Unit Satna Cement Works, PO Birla Vikas, Satna 485005 (MP). V/s MP Poorv Kshetra
More informationConsumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) Ph: & Ext: - 122
Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) 421301 Ph: 2210707 & 2328283 Ext: - 122 IN THE MATTER OF GRIEVANCE NO. K/E/255/281 OF 2009-2010
More informationTHE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW
Petition No 851 & 861 of 2012 Before THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Date of Order: 20.03.2013 IN THE MATTER OF: Deemed Energy claim of RPSCL Petition No 851 of 2012 BETWEEN
More informationCase No. 20 of 2007 Date: 11/01/2008. In the matter of Mr. Sudhir.V.Batra
Before Maharashtra State Electricity Distribution Co. Limited Consumer Grievances Redressal Forum, Pune Zone, 925,Kasabapeth Building, IInd flr. Pune-11 Case No. 20 of 2007 Date: 11/01/2008 In the matter
More information