TWENTY FIFTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE New Orleans, Louisiana APRIL 10 TH & 11 TH, 2014

Size: px
Start display at page:

Download "TWENTY FIFTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE New Orleans, Louisiana APRIL 10 TH & 11 TH, 2014"

Transcription

1 TWENTY FIFTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE New Orleans, Louisiana APRIL 10 TH & 11 TH, 2014 WHAT IS A DEFAULT AND WHY DOES IT MATTER PRESENTED BY: Jarrod W. Stone, Esquire Manier & Herod 150 Fourth Avenue North, Suite 2200 Nashville, TN (615) Kimberly B. Czap Philadelphia Insurance Companies

2 A. What is a Default? 1. Introduction Many modern performance bonds condition the surety s potential liability upon the principal being in default under the bonded contract. Nonetheless, some courts have held that a surety s performance bond liability is coextensive with its principal s liability for breach of the bonded contract, which essentially renders the surety liable for any breach of the bonded contract (such a latent defects that are discovered post-completion). However, those courts have generally skipped any substantive analysis of whether the underlying breach (or the principal s failure to cure the breach) would constitute a material breach (or default) sufficient to trigger the surety s potential liability under a performance bond that conditions the surety s liability upon the principal s default. Thankfully for surety practitioners, a number of courts have recognized the important distinction between a mere breach and a material breach, as well as the corollary concepts of material breach and substantial performance. Moreover, more sophisticated parties have attempted to contractually define the events/conditions that would qualify as a default sufficient to trigger the surety s potential liability under a performance bond that conditions the surety s liability upon the principal s default. Nonetheless, an understanding of the concept of breach versus default and an understanding of the concept of material breach versus substantial performance are critical to the proper analysis of a surety's potential exposure under a performance bond that conditions the surety's duty to perform/potential liability under the principal's default. 2. Breach v. Default When faced with a potential claim against a performance bond that conditions the surety's duty to perform/potential liability upon the principal's default, a surety practitioner must understand widely accepted common-law distinction between the principal s mere breach of a bonded contract and the principal s default under a bonded contract. In the leading case on the issue of breach versus default, the Fifth Circuit has explained: Although the terms breach and default are sometimes used interchangeably, their meanings are distinct in construction suretyship law. Not every breach of a construction contract constitutes a default sufficient to require the surety to step in and remedy it. To constitute a legal default, there must be a (1) material breach or series of material breaches (2) of such magnitude that the obligee is justified in terminating the contract. Under this rationale, a default sufficient to trigger the surety's duty to perform/potential liability cannot occur as a matter of law unless the principal s breach of the bonded contract constitutes a material breach. Though a non-material breach of the bonded contract may give rise to a breach of contract claim against the principal, a non-material breach is not sufficient to trigger a default and, therefore, is not sufficient to trigger a claim against a performance bond conditioned upon the principal s default. 2

3 In jurisdictions recognizing the distinction between a mere breach and a material breach, the issue of whether a breach rises to the level of a material breach sufficient to support a declaration of default is most often litigated after the obligee terminates the principal s right to complete the bonded contract. To say the least, the determination of whether a breach should be considered a material breach giving rise to a default is fact intensive, and the legal standard for materiality is not uniform. A leading treatise has labeled the legal standard for materiality as amorphous and has commented that [a]lthough the materiality of breach is the paramount issue in every contract termination dispute, there surprisingly is no adequate common law legal standard by which material breach may be judged. Thus, if the jurisdiction at issue recognizes the well-established distinction between a mere breach and a material breach sufficient to constitute a default, the surety practitioner should endeavor to identify the specific factors a court would consider while attempting to answer the difficult question of whether a particular breach should be deemed material or nonmaterial. A discussion of the numerous factors that may be considered is beyond the scope of this publication. Nonetheless, the issue of whether a breach should be deemed material or non-material is often extremely fact intensive, which normally preclude summary judgment for being a potential remedy the surety can obtain. 3. Default v. Substantial Performance As noted above, the propriety of the determination of default will often center upon whether the breach constitutes a material breach because only a material breach should qualify as a default sufficient to trigger the surety's duty to perform/potential liability under a performance bond that conditions such potential liability upon the principal's default. Surety practitioners should be aware that some courts focus on the issue of whether the principal materially breached the bonded contract or whether the principal substantially perform its obligations under the bonded contract. A leading contract law treatise has explained: The doctrine of material breach is simply the converse of the doctrine of substantial performance. Substantial performance is performance without a material breach, and a material breach results in performance that is not substantial. Accordingly, a finding of substantial performance necessarily precludes a finding of a material breach. Similar to the question of material breach, the question of substantial performance is frequently litigated after the obligee terminates the principal s right to complete the bonded contract before final completion and acceptance, and the legal standard for substantial performance is not uniform. Courts can be broadly distributed into separate camps regarding their approaches to analyzing substantial performance. On the one hand, some courts view the question of substantial performance objectively and focus on whether the bonded project can be used for its intended purpose despite the existence of defects and/or whether the purpose of the bonded contract has been fulfilled. On the other hand, some courts force the trier of fact to analyze the underlying degree of defectiveness using amorphous standards like pervasive, unimportant, minor, trivial, or slight, which are subjective and/or relative terms, or focus on the intent of the principal using standards like inadvertence, an honest mistake, or willfulness. Unfortunately, the two latter types of analyses seem to result in an I know it when 3

4 I see it determination for substantial performance that provides little predictability and breeds future litigation regarding the same issues. Nonetheless, once a bonded project has reached and/or passed the point of substantial completion, the principal is generally deemed to have substantially performed its obligations under the bonded contract, and many courts conflate the terms substantial completion and substantial performance. Unless the bonded contract specifically provides otherwise, the term substantial completion generally refers to the point at which the underlying project is capable of being used for its intended purposes and/or the obligee has obtained, for all intents and purposes, all of the benefits it reasonably anticipated receiving under the contract. If substantial performance of a construction contract precludes a determination of a material breach sufficient to warrant a declaration of default and/or termination, final completion and acceptance of the bonded contract should theoretically preclude a later declaration of default and foreclose the surety s future liability for latent defects under a performance bond conditioned upon the principal s default. Because substantial completion precedes final completion and acceptance, by syllogism, substantial performance also precedes final completion. Consequently, final completion, like substantial performance, should preclude a finding of material breach. Because a contract that has been finally completed and accepted by the obligee should be deemed a contract that the principal has, at a minimum, substantially performed, no subsequent failure by the principal to cure a latent defect should be deemed a material breach, at least in jurisdictions equating substantial completion with substantial performance. When faced with this logical assertion, an obligee may argue that a latent defect is so serious that it should be deemed a material breach of the bonded contract regardless of the fact that the latent defect was discovered after final completion and acceptance of the bonded project. As a counter, surety professionals should argue that there are no varying degrees of materiality; to the contrary, a breach is either a material breach or it is not a material breach, and a finding of substantial performance precludes a finding of a material breach as a matter of law. In order for a post-completion latent defect to qualify as a material breach sufficient to constitute a default, the latent defect would have to somehow undo or negate the presumption of substantial performance that should be associated with the final completion and acceptance of the bonded contract. Consequently, no latent defect discovered after final completion and acceptance should be considered a material breach of the bonded contract unless that defect renders the completed construction unfit for its intended purpose. In other words, any latent defects discovered after final completion and acceptance, which do not render the completed construction unfit for its intended purpose (such as aesthetic or nonstructural defects), should be deemed unimportant, minor, trivial, slight, or immaterial as a matter of law. In any event, the phrase the surety s liability is co-extensive with its principal s liability simply has no place in the analysis. 4. Grounds for Termination Under Bonded Contracts as Defaults Although the permutations of what constitutes a material breach are boundless, three of the most common grounds are failure to make payment, failure to follow design drawings or specifications and a lack of timely performance. When the principal possesses contractual obligation to pay its subcontractors, a principal s failure to pay may constitute a material breach. For instance, in Manganaro Corp. v. HITT Contracting, Inc., the court held that a 4

5 principal s failure to honor the payment requirements of an underlying subcontract within a reasonable time constituted a material breach by the principal. The subcontractor, therefore, possessed the right to terminate the subcontract with the principal due to the material breach. A limitation on the failure to make payment as a material breach exists when the principal possesses a good faith basis to challenge the propriety of the payments. In Pack v. Case, the court held that a material breach did not occur when a good faith dispute existed between the principal and the subcontractor regarding the amount owed to the subcontractor, the principal tenders the amount it believes that it owes the subcontractor and the principal possessed the unquestioned ability to pay the entire sum alleged by the subcontractor. The subcontractor, therefore, could not terminate the contract and assert that the principal had defaulted on the underlying contract. However, a principal s failure to deliver a finished property conforming to the designs of the obligee denies the obligee the benefit of the bargain and constitutes a material default. Although the common-law required perfect tender, including conformance to the obligee s designs, the doctrine of substantial performance, as outlined above, provides that a failure to conform to a design that still allows use for the intended purpose does not constitute a material breach. Lastly, a delay in timeliness of completion does not typically occasion a material breach unless the time of performance was an essential term or time was specified as of the essence in the underlying contract, which has been incorporated by reference into the bond. Obligees may also default under the underlying bonded contract with the principal and consequently discharge the surety. Any material breach of the bonded contract by the obligee may exonerate both the principal and the surety from liability and allow the principal and the surety to recover damages under either the bonded contract or in quantum meruit. For instance, in Stonington Water Street Associates, LLC v. Hodess Building Co., Inc., the court held that the obligee s decision to release the entire contract balance after the principal defaulted but before notifying the surety constituted a material default because the release of payment eliminated the surety s right to determine the use of the contract balances. The material breach constituted a sufficient basis for exoneration of the surety. 5. Default Under the AIA 311 and A1A 312 Performance Bonds Under the AIA A311 performance bond (the A311 Bond ), the surety s liability arises [w]henever Contractor shall be, and declared by Owner to be in default under the Contract. Many courts have held that a surety s liability under an A311 Bond is conditioned upon the principal s default under the bonded contract and the obligee s declaration that the principal is in default. The AIA A312 (1984 Version) performance bond (the A bond ) does not adhere to the common-law distinction between a breach and a default. The A bond s definition of Contractor Default may eliminate the common-law distinction between a simple breach of the bonded contract and a material breach of the bonded contract that can give rise to a default. Paragraph 12.3 of the A bond defines Contractor Default as [f]ailure of the Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Construction Contract. This definition makes no distinction between a minor failure to comply with the terms of the construction contract (a common law breach) and a material failure to comply with the terms of the construction contract (a common law default). 5

6 The AIA A312 (2010 Version) bond (the A bond ) moved toward adherence to the common law distinction between a breach and a default. Paragraph 14.3 defines a Contractor Default as a [f]ailure of the Contractor, which has not been remedied or waived, to perform or otherwise to comply with a material term of the Construction Contract. The addition of the word material to the A bond definition potentially signals that the A bond distinguishes between a minor default and a material default. B. What is a Declaration of Default and When is it Necessary Prior to Using Self Help Remedies 1. Declaration of Principal s Default of under AIA 311 Performance Bond The A311 bond provides less facial protection to a surety than the A1A 312 bonds because it contains no explicit provision requiring a notice of default as a condition precedent to any legal action on the bond. The A311 provides that: NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Principal shall promptly and faithfully perform said subcontract, then this obligation shall be null and void; otherwise it shall remain in full force and effect. Only later in does it state: Whenever Principal shall be, and be declared by Obligee to be in default under the subcontract, the Obligee having performed Obligee's obligations thereunder: (1) Surety may promptly remedy the default subject to the provisions of paragraph 3 herein, or; (2) Obligee after reasonable notice to Surety may, or Surety upon demand of Obligee, may arrange for the performance of Principal's obligation under the subcontract subject to the provisions of paragraph 3 herein; (3) The balance of the subcontract price, as defined below, shall be credited against the reasonable cost of completing performance of the subcontract... Relying upon the lack of facial notice requirements, a minority of courts have held that notice of default is not required under the A311 bond and the only precondition to termination was the failure of the principal to faithfully perform its contract. The Court of Appeals of New York has held that a formal declaration of default is not a condition precedent to the surety s potential liability under an AIA A311 Performance Bond in Walter Concrete Constr. Corp. v. Lederle Laboratories. The Court held that the AIA A311 Performance Bond contains no explicit provision requiring any notice of default as a condition precedent to any legal action on the bond.... In so holding, the Court noted that [h]ad the parties to the contract desired notice of default as a precursor to liability under the Bond, they could have elected to issue the more specific AIA-312, which by its terms requires pre-default notification be given to the contractor and surety by the owner. The Court further reasoned that the AIA A311 Performance Bond clearly anticipates liability for damages caused by [the principal] even if those damages could have been avoided by assumption of [the principal s] obligation under the subcontractor. Some courts, most notably the Fifth Circuit, Second Circuit and D.C. Circuit, have read the A311 as requiring a notice of default by the obligee because a surety would otherwise only have the right to perform for the principal if the obligee gave it notice. L&A Contracting Co. v. 6

7 S. Concrete Serv., Inc. is the seminal case in this category of cases. In L&A Contracting, the United States Court of Appeals for the Fifth Circuit expressly held that the surety s potential liability was conditioned upon the principal being in default of its performance obligations and the obligee having declared the principal to be in default. Although the Fifth Circuit did not expressly acknowledge that it was construing an AIA A311 Performance Bond, the Court noted the surety s potential liability under the performance bond would be triggered [w]henever Principal shall be, and shall be declared by Obligee to be in default under the subcontract, the Obligee having performed Obligee s obligations thereunder. The Fifth Circuit stressed the importance of a formal declaration of default by stating: Serious legal consequences attend a declaration of default, particularly in cases such as this case involving multi-million-dollars construction projects. Before a declaration of default, sureties face possible tort liability for meddling in the affairs of their principals. After a declaration of default, the relationship changes dramatically, and the surety owes immediate duties to the obligee. Additionally, as explained by the Texas Court of Appeals in Nova Casualty Company v. Turner Construction Company, the AIA bond 311 form may provide further protection by incorporating an underlying contract that requires a declaration of default or termination by the obligee. Although some courts have held that the A311 does create a notice of default requirement prior to the exercise of self-help remedies by the obligee and the underlying construction contract may provide further notice requirements, sureties should be cognizant of the local law regarding these issues. 2. Declaration of Principal s Default under AIA 312 Performance Bond (1984 Version) Unlike the A311, the A bond specifically provides that a surety s obligations do not arise until the obligee satisfies the requirements of paragraph 3 of the A bond. Paragraph 3 requires that: 3.1 The Owner has notified the Contractor and the Surety at its address described in Paragraph 10 below that the Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with the Contractor and the Surety to be held no later than fifteen days after receipt of such notice to discuss methods of performing the Construction Contract. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner s right, if any, subsequently to declare a Contractor Default; and 3.2 The Owner has declared a Contractor Default and formally terminated the Contractor s right to complete the contract. Such Contractor Default shall not be declared earlier than twenty days after the Contractor and the Surety have received notice as provided in Subparagraph 3.1; and 7

8 3.3 The Owner has agreed to pay the Balance of the Contract Price to the Surety in accordance with the terms of the Construction Contract or to a contractor selected to perform the Construction Contract in accordance with the terms of the Contract with the Owner. Consequently, the surety must (1) notify the contractor and the surety that the obligee is considering declaring the contractor in default; (2) attempt to arrange a conference with the contractor and surety within fifteen days of the receipt of the notice to discuss methods of performing the construction contract; (3) wait at least twenty days after the contractor and the surety have received notice as provided in subparagraph 3.1; (4) declare a contractor default and formally terminate the contractor s right to complete the construction contract; and (5) agree to pay the balance of the contract price. Failure to satisfy these prerequisites should vitiate coverage under the bond. Additionally, the A312 also expressly incorporates the underlying contract. Consequently, an obligee must also comply with any further preconditions outlined in the underlying contract. 3. Declaration of Principal s Default under AIA 312 Performance Bond (2010 Version) The A bond reversed the course of adding further notice requirements set by the 1984 version by eliminating or weakening some of the A bond s preconditions. The A bond no longer required that the obligee attempt to arrange a conference with the contractor and the surety. Section 3.1 now only provides that an obligee may request such a conference when making its notice of intent to declare contractor default. The obligee is not required to request the conference prior to exercising its rights under the bond. However, pursuant to Section 3.1, the surety may also request a conference within five business days after receiving the obligee s Section 3.1 notice. If the surety requests a conference, the obligee must attend and the conference must be held within ten business days of the receipt of the obligee s notice of potential default, unless the obligee agrees to different timing. Section 3.2 eliminated the twenty day waiting period between the obligee s Section 3.1 notice of intent to default and the obligee s Section 3.1 declaration of contractor default and formal termination. Moreover, the A bond s requirements that the obligee wait fifteen days (after providing an additional demand for performance of its obligations under the performance bond) before declaring the surety to be in default, has been reduced to seven days. 8

CITY OF RICHMOND PERFORMANCE BOND

CITY OF RICHMOND PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS: That place of business is located at CITY OF RICHMOND PERFORMANCE BOND, the Contractor ( Principal ) whose principal and ( Surety ) whose address for delivery of Notices

More information

CRITERIA FOR CHOOSING BETWEEN CONSENSUS DOCS AND AIA BOND FORMS. I don't want no ConsensusDOCS bond form or do I???

CRITERIA FOR CHOOSING BETWEEN CONSENSUS DOCS AND AIA BOND FORMS. I don't want no ConsensusDOCS bond form or do I??? CRITERIA FOR CHOOSING BETWEEN CONSENSUS DOCS AND AIA BOND FORMS Or I don't want no ConsensusDOCS bond form or do I??? Deborah S. Griffin Gina A. Fonte Holland & Knight LLP Boston, MA 02116 Presented at

More information

E&S PERFORMANCE BOND

E&S PERFORMANCE BOND E&S PERFORMANCE BOND BETWEEN _ (Surety) AND THE NEW KENT COUNTY, VIRGINIA BOARD OF SUPERVISORS DATE: TAX MAP NO. OR SUBDIVISION NAME: AMOUNT OF SECURITY: BOND NUMBER: Prepared 10/01/2012 NEW KENT COUNTY

More information

KNOW YOUR BOND BEFORE YOU SIGN

KNOW YOUR BOND BEFORE YOU SIGN by Mark H. McCallum and Robert J. Duke...an important part of the surety underwriting process is to know and understand the terms of the construction contract. KNOW YOUR BOND BEFORE YOU SIGN A contractor

More information

PERFORMANCE BOND FOR DESIGN-BUILD PROJECTS SAMPLE. Document No. 620 First Edition, 2015 Design-Build Institute of America Washington, D.C.

PERFORMANCE BOND FOR DESIGN-BUILD PROJECTS SAMPLE. Document No. 620 First Edition, 2015 Design-Build Institute of America Washington, D.C. PERFORMANCE BOND FOR DESIGN-BUILD PROJECTS Document No. 620 First Edition, 2015 Design-Build Institute of America Washington, D.C. Design-Build Institute of America Contract Documents LICENSE AGREEMENT

More information

EXHIBIT WARRANTY BOND. (Address), hereinafter called Principal, and

EXHIBIT WARRANTY BOND. (Address), hereinafter called Principal, and EXHIBIT WARRANTY BOND ITEMS MDX PROCUREMENT/CONTRACT NO.: Bond No.: KNOW ALL PERSONS BY THESE PRESENTS: That we, (Name) of (Address), hereinafter called Principal, and (Name) of (Address), hereinafter

More information

In the United States Court of Federal Claims

In the United States Court of Federal Claims In the United States Court of Federal Claims No. 14-84C (Filed: November 19, 2014 FIDELITY AND GUARANTY INSURANCE UNDERWRITERS, et al. v. Plaintiffs, THE UNITED STATES OF AMERICA, Defendant. Tucker Act;

More information

Prufrex USA, Inc. TERMS AND CONDITIONS OF PURCHASE

Prufrex USA, Inc. TERMS AND CONDITIONS OF PURCHASE Prufrex USA, Inc. TERMS AND CONDITIONS OF PURCHASE 1 Contract Formation: These Terms and Conditions of Purchase (the "Terms and Conditions") apply to any purchases by Prufrex USA, Inc., its subsidiaries,

More information

CURTISS-MANES-SCHULTE, INC., Plaintiff, v. SAFECO INSURANCE COMPANY OF AMERICA, Defendant. No. 2:14-cv NKL

CURTISS-MANES-SCHULTE, INC., Plaintiff, v. SAFECO INSURANCE COMPANY OF AMERICA, Defendant. No. 2:14-cv NKL Page 1 CURTISS-MANES-SCHULTE, INC., Plaintiff, v. SAFECO INSURANCE COMPANY OF AMERICA, Defendant. No. 2:14-cv-04100-NKL UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF MISSOURI, CENTRAL DIVISION

More information

INTERNATIONAL FIDELITY INSURANCE COMPANY,

INTERNATIONAL FIDELITY INSURANCE COMPANY, Page 1 2 of 35 DOCUMENTS INTERNATIONAL FIDELITY INSURANCE COMPANY, a foreign corporation, ALLEGHENY CASUALTY COMPANY, a foreign corporation, Plaintiffs-Counter Defendants-Appellees, versus AMERICARIBE-MORIARTY

More information

On Bill Financing Energy Efficiency Upgrades - Utility Payment Bond. Page 1 of 9

On Bill Financing Energy Efficiency Upgrades - Utility Payment Bond. Page 1 of 9 Page 1 of 9 Bond Type Surety Bond Form and Version Number On Bill Financing - Principal Principal Email Obligee Obligee Email Name of surety company Surety NAIC Code Bond Number Bond Amount Surety Email

More information

SAMPLE SUBCONTRACTOR S PAYMENT BOND FOR DESIGN-BUILD PROJECTS. Document No. 635 First Edition, 2015 Design-Build Institute of America Washington, D.C.

SAMPLE SUBCONTRACTOR S PAYMENT BOND FOR DESIGN-BUILD PROJECTS. Document No. 635 First Edition, 2015 Design-Build Institute of America Washington, D.C. SUBCONTRACTOR S PAYMENT BOND FOR DESIGN-BUILD PROJECTS Document No. 635 First Edition, 2015 Design-Build Institute of America Washington, D.C. Design-Build Institute of America Contract Documents LICENSE

More information

2. Bond amount expressed as the financial limit of that obligation;

2. Bond amount expressed as the financial limit of that obligation; 12:13 BRUNER & O CONNOR ON CONSTRUCTION LAW 2. Bond amount expressed as the financial limit of that obligation; 3. Duration of the bond obligation; 4. Stated trigger of the surety s performance bond liability;

More information

18. PERFORMANCE AND DISCHARGE. Presented by Marisa Schatz, Georgiana Battisonnicol And Nancy Mora 10/28/2015

18. PERFORMANCE AND DISCHARGE. Presented by Marisa Schatz, Georgiana Battisonnicol And Nancy Mora 10/28/2015 18. PERFORMANCE AND DISCHARGE Presented by Marisa Schatz, Georgiana Battisonnicol And Nancy Mora STR Constructors and Arch Insurance Company v. NEWMAN Tile 1. Scintilla of Evidence" According to TheLawDictionary.com,

More information

PAYMENT BOND FOR DESIGN-BUILD PROJECTS SAMPLE. Document No. 625 First Edition, 2015 Design-Build Institute of America Washington, D.C.

PAYMENT BOND FOR DESIGN-BUILD PROJECTS SAMPLE. Document No. 625 First Edition, 2015 Design-Build Institute of America Washington, D.C. PAYMENT BOND FOR DESIGN-BUILD PROJECTS Document No. 625 First Edition, 2015 Design-Build Institute of America Washington, D.C. Design-Build Institute of America Contract Documents LICENSE AGREEMENT By

More information

PERFORMANCE BOND. Surety Bond No. STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS: COUNTY OF

PERFORMANCE BOND. Surety Bond No. STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS: COUNTY OF PERFORMANCE BOND Surety Bond No. STATE OF TEXAS COUNTY OF KNOW ALL MEN BY THESE PRESENTS: That we,, as Principal, and Contractor Name & Address, as Surety, are hereby held and firmly bound unto Surety

More information

SOURCE ONE SURETY, LLC.

SOURCE ONE SURETY, LLC. SOURCE ONE SURETY, LLC. 15233 VENTURA BOULEVARD, SUITE 500 SHERMAN OAKS, CA 91403 GENERAL INDEMNITY AGREEMENT THIS General Agreement of Indemnity (hereinafter called Agreement ), is made and entered into

More information

TWENTY FOURTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE Charleston, South Carolina April 18th & 19th, 2013

TWENTY FOURTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE Charleston, South Carolina April 18th & 19th, 2013 TWENTY FOURTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE Charleston, South Carolina April 18th & 19th, 2013 DON T BE PUT OFF BY SETOFF PRESENTED BY: Toby Pilcher The Hanover Insurance Group

More information

CONTRACTOR INFORMATION - Attach most recent company year-end financial statement or tax return.

CONTRACTOR INFORMATION - Attach most recent company year-end financial statement or tax return. This program is not intended for use on the following types of contracts; Subdivision Completion Multi-year Terms Indefinite Quantity Service Contracts Design Build Efficiency Guarantees Software Programs

More information

ENGINEERING, PROCUREMENT, CONSTRUCTION SURETY PAYMENT BOND Page 1 of 10

ENGINEERING, PROCUREMENT, CONSTRUCTION SURETY PAYMENT BOND Page 1 of 10 Page 1 of 10 Bond Type Surety Bond Form and Version Number ENGINEERING, PROCUREMENT, CONSTRUCTION SURETY PAYMENT BOND 2018 03-04 XBRL-CET ENGINEERING, PROCUREMENT, CONSTRUCTION SURETY PAYMENT BOND Principal

More information

TWENTIETH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS

TWENTIETH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS TWENTIETH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE Clearwater, Florida th st APRIL 30 & MAY 1, 2009 BACK TO THE FUTURE: HAS BRAMBLE REVIVED THE A311 BONDS AND DO WE REALLY WANT TO GO THERE?

More information

September 16, 2016 CCTA Contract No. 427 Caltrans Contract No. 04-4H1604 Balfour Interchange Project

September 16, 2016 CCTA Contract No. 427 Caltrans Contract No. 04-4H1604 Balfour Interchange Project September 16, 2016 CCTA Contract No. 427 Caltrans Contract No. 04-4H1604 Balfour Interchange Project Addendum No. 6 Dear Contractor: This addendum is being issued to the contract for construction on State

More information

PROPOSAL BOND FOR DESIGN-BUILD PROJECTS SAMPLE. Document No. 610 First Edition, 2015 Design-Build Institute of America Washington, D.C.

PROPOSAL BOND FOR DESIGN-BUILD PROJECTS SAMPLE. Document No. 610 First Edition, 2015 Design-Build Institute of America Washington, D.C. PROPOSAL BOND FOR DESIGN-BUILD PROJECTS Document No. 610 First Edition, 2015 Design-Build Institute of America Washington, D.C. Design-Build Institute of America Contract Documents LICENSE AGREEMENT By

More information

TWENTY FIFTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE New Orleans, Louisiana APRIL 10 TH & 11 TH, 2014

TWENTY FIFTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE New Orleans, Louisiana APRIL 10 TH & 11 TH, 2014 TWENTY FIFTH ANNUAL SOUTHERN SURETY AND FIDELITY CLAIMS CONFERENCE New Orleans, Louisiana APRIL 10 TH & 11 TH, 2014 SURETY LOSS: METHODS FOR SEEKING REIMBURSEMENT PRESENTED BY: Jeffrey S. Price Manier

More information

EXHIBIT F-1 (I) FORM OF DESIGN-BUILD LETTER OF CREDIT VIRGINIA DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VA ATTN: [ ]

EXHIBIT F-1 (I) FORM OF DESIGN-BUILD LETTER OF CREDIT VIRGINIA DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VA ATTN: [ ] EXHIBIT F-1 (I) FORM OF DESIGN-BUILD LETTER OF CREDIT IRREVOCABLE STANDBY DESIGN-BUILD LETTER OF CREDIT ISSUER PLACE FOR PRESENTATION OF DRAFT APPLICANT BENEFICIARY [ ] [Name and address of banking institution

More information

QUOTE DOCUMENTS FOR CALLANAN GYM FLOOR REPLACEMENT center Street. Des Moines, Iowa QUOTE # Q7088

QUOTE DOCUMENTS FOR CALLANAN GYM FLOOR REPLACEMENT center Street. Des Moines, Iowa QUOTE # Q7088 QUOTE DOCUMENTS FOR CALLANAN GYM FLOOR REPLACEMENT 3010 center Street Des Moines, Iowa 50312 QUOTE # Q7088 Owner Des Moines Independent Community School District 1917 Dean Avenue Des Moines, IA 50316 DES

More information

QUOTE DOCUMENTS FOR KING PARKING EXPANSION Forest Avenue. Des Moines, Iowa QUOTE # Q6747. Owner

QUOTE DOCUMENTS FOR KING PARKING EXPANSION Forest Avenue. Des Moines, Iowa QUOTE # Q6747. Owner QUOTE DOCUMENTS FOR KING PARKING EXPANSION 1849 Forest Avenue Des Moines, Iowa QUOTE # Q6747 Owner Des Moines Independent Community School District 1917 Dean Avenue Des Moines, Iowa 50316 DES MOINES PUBLIC

More information

GENERAL APPLICATION AND AGREEMENT OF INDEMNITY CONTRACTORS FORM

GENERAL APPLICATION AND AGREEMENT OF INDEMNITY CONTRACTORS FORM MERCHANTS BONDING COMPANY (MUTUAL) MERCHANTS NATIONAL BONDING INC. P.O. Box 14498 Des Moines iowa 50306-3498 Phone (800) 678-8171 FAX (515) 243-3854 GENERAL APPLICATION AND AGREEMENT OF INDEMNITY CONTRACTORS

More information

GENERAL APPLICATION AND AGREEMENT OF INDEMNITY CONTRACTORS FORM

GENERAL APPLICATION AND AGREEMENT OF INDEMNITY CONTRACTORS FORM MERCHANTS BONDING COMPANY (MUTUAL) MERCHANTS NATIONAL BONDING, INC. P.O. Box 14498, Des Moines, iowa 50306-3498 Phone (800) 678-8171 FAX (515) 243-3854 GENERAL APPLICATION AND AGREEMENT OF INDEMNITY CONTRACTORS

More information

Bid Addendum #1 Bid # 13/14-01FA: Furniture and Equipment Bid Issued March 19, 2014

Bid Addendum #1 Bid # 13/14-01FA: Furniture and Equipment Bid Issued March 19, 2014 Bid Addendum #1 Bid # 13/14-01FA: Issued March 19, 2014 *This addendum forms a part of the Agreement documents and modifies the original bid documents. The following revisions, clarifications, deletions

More information

EXHIBIT CONSTRUCTION CONTRACT BOND

EXHIBIT CONSTRUCTION CONTRACT BOND Bond Number: Bond Number: EXHIBIT CONSTRUCTION CONTRACT BOND This Agreement made the day of, 20, between, a corporation organized and existing under the laws of the State of Florida, with its principal

More information

SEVES USA INC. PPC Insulators Division North America Purchase Order Terms & Conditions. Title and risk of loss. Governing Terms & Conditions.

SEVES USA INC. PPC Insulators Division North America Purchase Order Terms & Conditions. Title and risk of loss. Governing Terms & Conditions. SEVES USA INC. PPC Insulators Division North America Purchase Order Terms & Conditions Governing Terms & Conditions This Purchase Order ( Order ) constitutes the offer of Seves USA Inc. USA, Inc. ( Seves

More information

Construction Law Survival Manual. Reviewing and Revising Construction Contracts

Construction Law Survival Manual.  Reviewing and Revising Construction Contracts Reviewing and Revising Construction Contracts Presented by James D. Fullerton 1 www.fullertonlaw.com JFullerton@FullertonLaw.com James D. Fullerton Fullerton & Knowles, P.C. 12642 Chapel Rd. Clifton, VA

More information

SEVENTH ANNUAL NORTHEAST SURETY AND FIDELITY CLAIMS CONFERENCE OCTOBER 24-25, 1996

SEVENTH ANNUAL NORTHEAST SURETY AND FIDELITY CLAIMS CONFERENCE OCTOBER 24-25, 1996 SEVENTH ANNUAL NORTHEAST SURETY AND FIDELITY CLAIMS CONFERENCE OCTOBER 24-25, 1996 BID PACKAGES DETERMINING THE REMAINING SCOPE OF WORK TO COMPLETE AREAS OF CONCERN PRESENTED BY: William H. Ver Eecke,

More information

SURETY TODAY PRESENTATION. Given by Michael A. Stover and George J. Bachrach Wright, Constable & Skeen, LLP Baltimore, MD December 11, 2017

SURETY TODAY PRESENTATION. Given by Michael A. Stover and George J. Bachrach Wright, Constable & Skeen, LLP Baltimore, MD December 11, 2017 SURETY TODAY PRESENTATION Given by Michael A. Stover and George J. Bachrach Wright, Constable & Skeen, LLP Baltimore, MD December 11, 2017 Bankruptcy: The Debtor s and the Surety s Rights to the Bonded

More information

PROSECUTION AND PROGRESS

PROSECUTION AND PROGRESS PROSECUTION AND PROGRESS 1.01 SUBLETTING OR ASSIGNMENT OF CONTRACT A. Work by Contractor: 1. The Contractor shall perform, with its own organization and forces, work amounting to no less than 30% of the

More information

Attachment 1 Federal Requirements for Procurements in Excess of $150,000 Not Including Construction or Rolling Stock Contracts

Attachment 1 Federal Requirements for Procurements in Excess of $150,000 Not Including Construction or Rolling Stock Contracts 1.0 No Obligation by the Federal Government. (1) The Purchaser and Contractor acknowledge and agree that, notwithstanding any concurrence by the Federal Government in or approval of the solicitation or

More information

Graciano Corp. v Lanmark Group, Inc NY Slip Op 33388(U) December 28, 2018 Supreme Court, New York County Docket Number: /14 Judge: Eileen

Graciano Corp. v Lanmark Group, Inc NY Slip Op 33388(U) December 28, 2018 Supreme Court, New York County Docket Number: /14 Judge: Eileen Graciano Corp. v Lanmark Group, Inc. 2018 NY Slip Op 33388(U) December 28, 2018 Supreme Court, New York County Docket Number: 652750/14 Judge: Eileen Bransten Cases posted with a "30000" identifier, i.e.,

More information

In this appeal, Environmental Staffing Acquisition Corp. ( En-Staff ) argues that the trial court erred in sustaining the

In this appeal, Environmental Staffing Acquisition Corp. ( En-Staff ) argues that the trial court erred in sustaining the PRESENT: All the Justices ENVIRONMENTAL STAFFING ACQUISITION CORPORATION OPINION BY v. Record No. 111067 JUSTICE CLEO E. POWELL April 20, 2012 B & R CONSTRUCTION MANAGEMENT, INC. FROM THE CIRCUIT COURT

More information

STATE OF MICHIGAN COURT OF APPEALS

STATE OF MICHIGAN COURT OF APPEALS STATE OF MICHIGAN COURT OF APPEALS NORTHLINE EXCAVATING, INC., Plaintiff-Appellee, FOR PUBLICATION October 15, 2013 9:05 a.m. v No. 304964 Livingston Circuit Court COUNTY OF LIVINGSTON LIVINGSTON LC No.

More information

IC Chapter 7. Bonding, Escrow, and Retainages

IC Chapter 7. Bonding, Escrow, and Retainages IC 4-13.6-7 Chapter 7. Bonding, Escrow, and Retainages IC 4-13.6-7-0.1 Application of certain amendments to chapter Sec. 0.1. The amendments made to this chapter by P.L.133-2007 apply only to public works

More information

BUILDING PERMIT PERFORMANCE AND MAINTENANCE BOND (Owner and/or Contractor Form)

BUILDING PERMIT PERFORMANCE AND MAINTENANCE BOND (Owner and/or Contractor Form) BUILDING PERMIT PERFORMANCE AND MAINTENANCE BOND (Owner and/or Contractor Form) KNOW ALL MEN BY THESE PRESENTS: Bond Number: That ( OWNER ) and ( CONTRACTOR ), both as principals, hereinafter collectively

More information

UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF NORTH CAROLINA CHARLOTTE DIVISION CIVIL ACTION NO: 3:07-CV DCK

UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF NORTH CAROLINA CHARLOTTE DIVISION CIVIL ACTION NO: 3:07-CV DCK United States Surety v. Hanover R.S. Limited Partnership et al Doc. 27 UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF NORTH CAROLINA CHARLOTTE DIVISION CIVIL ACTION NO: 3:07-CV-00381-DCK UNITED

More information

The Troubled Public Construction Project: When is it Time to Call in the Surety?

The Troubled Public Construction Project: When is it Time to Call in the Surety? City Attorneys Department League of California Cities Annual Conference October 6, 2005 The Troubled Public Construction Project: When is it Time to Call in the Surety? Michael N. Conneran, Esq. Hanson,

More information

NAPA SANITATION DISTRICT

NAPA SANITATION DISTRICT IMPROVEMENT AGREEMENT SANITARY SEWER IMPROVEMENTS NAPA CREEK CONDOMINIUMS THIS AGREEMENT is made as of this day of, 20 by and between NCCH 103 Napa, LP, a Delaware limited partnership (" DEVELOPER ) and

More information

FIDELITY AND GUAR. INS. UNDERWRITERS

FIDELITY AND GUAR. INS. UNDERWRITERS FIDELITY AND GUAR. INS. UNDERWRITERS v. U.S. Cite as 119 Fed.Cl. 195 (2014) 4. United States O113.12(2) FIDELITY AND GUARANTY INSUR- ANCE UNDERWRITERS, et al., Plaintiffs, v. The UNITED STATES of America,

More information

POLE ATTACHMENT LICENSE AGREEMENT SKAMANIA COUNTY PUD

POLE ATTACHMENT LICENSE AGREEMENT SKAMANIA COUNTY PUD POLE ATTACHMENT LICENSE AGREEMENT SKAMANIA COUNTY PUD PARTIES: PUBLIC UTILITY DISTRICT No. 1 of SKAMANIA COUNTY, WASHINGTON, a Washington municipal corporation, hereinafter called PUD, and [Name] a [State

More information

SURETY TODAY PRESENTATION Given by Michael A. Stover and George J. Bachrach Wright, Constable & Skeen, LLP Baltimore, MD February 13, 2017

SURETY TODAY PRESENTATION Given by Michael A. Stover and George J. Bachrach Wright, Constable & Skeen, LLP Baltimore, MD February 13, 2017 SURETY TODAY PRESENTATION Given by Michael A. Stover and George J. Bachrach Wright, Constable & Skeen, LLP Baltimore, MD February 13, 2017 SURETY CASE LAW UPDATE WHAT WE HAVE FOUND INTERESTING OVER THE

More information

CONTRACT FOR ROOF REMOVAL AND REPLACEMENT - Milford Middle School

CONTRACT FOR ROOF REMOVAL AND REPLACEMENT - Milford Middle School CONTRACT FOR ROOF REMOVAL AND REPLACEMENT - Milford Middle School THIS AGREEMENT made this day of, 2013 between the Milford School District, a New Hampshire school district having a usual place of business

More information

HARRISBURG SCHOOL DISTRICT CONSULTING CONTRACT AGREEMENT

HARRISBURG SCHOOL DISTRICT CONSULTING CONTRACT AGREEMENT HARRISBURG SCHOOL DISTRICT CONSULTING CONTRACT AGREEMENT THIS CONSULTING CONTRACT AGREEMENT (this Agreement ) is made this 21 st day of September 2015, by and between HARRISBURG SCHOOL DISTRICT (the District

More information

TORTIOUS BAD FAITH CLAIMS AGAINST SURETIES - NOT IN NEVADA. Great American Insurance Company v. General Builders, Inc.

TORTIOUS BAD FAITH CLAIMS AGAINST SURETIES - NOT IN NEVADA. Great American Insurance Company v. General Builders, Inc. TORTIOUS BAD FAITH CLAIMS AGAINST SURETIES - NOT IN NEVADA by Sharon A. Parker, Associate* Construction in Las Vegas is booming. There are currently over 100 major construction projects at various stages

More information

ATTACHMENT B: SAMPLE CONTRACT (AGREEMENT)

ATTACHMENT B: SAMPLE CONTRACT (AGREEMENT) ATTACHMENT B: SAMPLE CONTRACT (AGREEMENT) CITY OF PLACERVILLE PAVEMENT REHABILITATION PROJECT PROJECT NO. xxxx THIS AGREEMENT ( Agreement ) approved by the City Council this 26th day of June, in the year

More information

(01/31/13) Principal Name /PIA No. PAYMENT AND INDEMNITY AGREEMENT No.

(01/31/13) Principal Name /PIA No. PAYMENT AND INDEMNITY AGREEMENT No. PAYMENT AND INDEMNITY AGREEMENT No. THIS PAYMENT AND INDEMNITY AGREEMENT (as amended and supplemented, this Agreement ) is executed by each of the undersigned on behalf of each Principal (as defined below)

More information

CONSTRUCTION LICENSE AGREEMENT

CONSTRUCTION LICENSE AGREEMENT CONSTRUCTION LICENSE AGREEMENT This Construction License Agreement (this 11 Agreement") is made and entered into as of, 2013 (the "Effective Date 11 ) by and between (a) the City of Los Angeles ("City''),

More information

FORM 32 PERFORMANCE BOND UNDER SECTION 85.1 OF THE ACT Construction Act

FORM 32 PERFORMANCE BOND UNDER SECTION 85.1 OF THE ACT Construction Act FORM 32 PERFORMANCE BOND UNDER SECTION 85.1 OF THE ACT Construction Act No. (the Bond ) Bond Amount $ (name of the contractor*) as a principal, hereinafter [collectively] called the Contractor, and, THE

More information

FIRST INDEMNITY OF AMERICA INSURANCE COMPANY INDEMNITY AGREEMENT

FIRST INDEMNITY OF AMERICA INSURANCE COMPANY INDEMNITY AGREEMENT FIRST INDEMNITY OF AMERICA INSURANCE COMPANY Agreement Number: Execution Date: Click here to enter text. Click here to enter text. INDEMNITY AGREEMENT DEFINITIONS: Surety: First Indemnity of America Insurance

More information

What You Should Know About General Agreements of Indemnity and Why You Should Know It

What You Should Know About General Agreements of Indemnity and Why You Should Know It What You Should Know About General Agreements of Indemnity and Why You Should Know It Summary When a contractor (for purposes of this discussion, contractor includes subcontractor) first seeks surety credit,

More information

CONSIGNMENT AGREEMENT - FINE JEWELRY

CONSIGNMENT AGREEMENT - FINE JEWELRY CONSIGNMENT AGREEMENT Contemplating a Vendor and Retailer Relationship concerning Fine Jewelry AGREEMENT made to be effective as of, by and between, a corporation located at ("Vendor") and a corporation

More information

TOWN OF HERNDON, VIRGINIA ORDINANCE DECEMBER 13, 2016

TOWN OF HERNDON, VIRGINIA ORDINANCE DECEMBER 13, 2016 TOWN OF HERNDON, VIRGINIA ORDINANCE DECEMBER 13, 2016 Ordinance-to amend and reenact Chapter 30 (Finance & Taxation), Article VIII (Fiscal Procedures), Division 2 (Procurement), of the Herndon Town Code,

More information

PURCHASE ORDER TERMS AND CONDITIONS

PURCHASE ORDER TERMS AND CONDITIONS PURCHASE ORDER TERMS AND CONDITIONS 1. SERVICES & DELIVERABLES. Seller agrees to provide to CORTEC PRECISION SHEETMETAL (or its subsidiaries, if such subsidiaries are designated as the contracting parties

More information

CONSTRUCTION LEGAL EDGE FALL 2008

CONSTRUCTION LEGAL EDGE FALL 2008 CONSTRUCTION LEGAL EDGE FALL 2008 This newsletter is informational only and should not be construed as legal advice. 2008, Pietragallo Gordon Alfano Bosick & Raspanti, LLP. All rights reserved. Articles

More information

FILED: NEW YORK COUNTY CLERK 01/23/2012 INDEX NO /2011 NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 01/23/2012. Plaintiff, Defendants.

FILED: NEW YORK COUNTY CLERK 01/23/2012 INDEX NO /2011 NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 01/23/2012. Plaintiff, Defendants. FILED: NEW YORK COUNTY CLERK 01/23/2012 INDEX NO. 105989/2011 NYSCEF DOC. NO. 3 RECEIVED NYSCEF: 01/23/2012 MIN-WDF-Supelemental Summons 2. SUPREME COURT OF THE STATE OF NEW YORK COUNTY OF NEW YORK...

More information

IN THE SUPREME COURT OF THE STATE OF KANSAS. No. 113,037 SYLLABUS BY THE COURT

IN THE SUPREME COURT OF THE STATE OF KANSAS. No. 113,037 SYLLABUS BY THE COURT IN THE SUPREME COURT OF THE STATE OF KANSAS No. 113,037 WAGNER INTERIOR SUPPLY OF WICHITA, INC., Appellant, v. DYNAMIC DRYWALL, INC., et al., Defendants, (PUETZ CORPORATION and UNITED FIRE & CASUALTY COMPANY),

More information

AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)

AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) EJCDC C-520, Agreement Between Owner and Contractor for Construction Contract (Stipulated Price). Deletions by Engineer

More information

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT Case: 16-30496 Document: 00513899296 Page: 1 Date Filed: 03/06/2017 IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT United States Court of Appeals Fifth Circuit FILED March 6, 2017 Lyle W.

More information

Terms and Conditions of the Supply of Goods

Terms and Conditions of the Supply of Goods Terms and Conditions of the Supply of Goods 1. INTERPRETATION 1.1 Definitions. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business. Conditions:

More information

CONSTRUCTION LIEN CLAIM

CONSTRUCTION LIEN CLAIM CONSTRUCTION LIEN CLAIM TO: THE CLERK, COUNTY OF In accordance with the terms and provisions of the Construction Lien Law, P.L. 1993, c.318, 2A:44A-1 et seq., notice is hereby given that: 1. has on claimed

More information

CONTRACT AND BOND FORMS FOR

CONTRACT AND BOND FORMS FOR CONTRACT AND BOND FORMS FOR RPL-5948(064) & RPSTPLE-5948(077) On Sunland Drive from the intersection with U.S. 395 north approximately 3.8 miles to the intersection with West Line Street (U.S. 168) APRIL

More information

Newark Unified School District 5715 Musick Ave., Newark, California Telephone (510) ; FAX (510)

Newark Unified School District 5715 Musick Ave., Newark, California Telephone (510) ; FAX (510) Newark Unified School District 5715 Musick Ave., Newark, California 94560 Telephone (510) 818-4115; FAX (510) 797-6913 Dave Marken, Superintendent of Schools Elaine Neilsen, Chief Business Official November

More information

ROGERS CORPORATION - TERMS AND CONDITIONS OF PURCHASE

ROGERS CORPORATION - TERMS AND CONDITIONS OF PURCHASE ROGERS CORPORATION - TERMS AND CONDITIONS OF PURCHASE THE FOLLOWING TERMS AND CONDITIONS, AND THOSE SPECIFIED ON THE FACE OF THIS PURCHASE ORDER, SHALL EXCLUSIVELY GOVERN THE PURCHASE OF ALL MATERIALS

More information

General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work)

General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work) General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work) U.S. Department of Housing and Urban Development Office of Public and Indian Housing Office of Labor Relations

More information

INSTRUCTIONS TO BIDDERS Medical Center

INSTRUCTIONS TO BIDDERS Medical Center Revisions: Revisions were made to these Instructions to Bidders to conform to recent changes to the Code of Virginia and to changes in policy. Revised paragraphs are indicated by a vertic al line in the

More information

DIVISION ONE. ARIZONA REGISTRAR OF CONTRACTORS, Defendant/Appellant. No. 1 CA-CV

DIVISION ONE. ARIZONA REGISTRAR OF CONTRACTORS, Defendant/Appellant. No. 1 CA-CV IN THE ARIZONA COURT OF APPEALS DIVISION ONE SHELLEY MAGNESS and COLORADO STATE BANK & TRUST COMPANY, N.A., Co-Trustees of The Shelley Magness Trust UDA 6/25/2000, Plaintiff/Appellee, v. ARIZONA REGISTRAR

More information

NOTE- All drafts must be pre-approved by Vectren before final execution. Please contact Vectren Credit Risk for assignment of document number.

NOTE- All drafts must be pre-approved by Vectren before final execution. Please contact Vectren Credit Risk for assignment of document number. NOTE- All drafts must be pre-approved by Vectren before final execution. Please contact Vectren Credit Risk for assignment of document number. GUARANTY AGREEMENT GTYSCO##-### THIS GUARANTY AGREEMENT GTYSCO##-###

More information

THIRD AMENDED AND RESTATED AGREEMENT FOR INDIGENT CARE SERVICES BETWEEN INDIAN RIVER COUNTY HOSPITAL DISTRICT AND INDIAN RIVER MEMORIAL HOSPITAL, INC.

THIRD AMENDED AND RESTATED AGREEMENT FOR INDIGENT CARE SERVICES BETWEEN INDIAN RIVER COUNTY HOSPITAL DISTRICT AND INDIAN RIVER MEMORIAL HOSPITAL, INC. THIRD AMENDED AND RESTATED BETWEEN INDIAN RIVER COUNTY HOSPITAL DISTRICT AND INDIAN RIVER MEMORIAL HOSPITAL, INC. THIS THIRD AMENDED AND RESTATED AGREEMENT FOR INDIGENT CARE SERVICES (this Agreement or

More information

OF FLORIDA THIRD DISTRICT JULY TERM, NORTH AMERICAN SPECIALTY ** LOWER INSURANCE COMPANY, TRIBUNAL NO ** Appellee.

OF FLORIDA THIRD DISTRICT JULY TERM, NORTH AMERICAN SPECIALTY ** LOWER INSURANCE COMPANY, TRIBUNAL NO ** Appellee. NOT FINAL UNTIL TIME EXPIRES TO FILE REHEARING MOTION AND, IF FILED, DISPOSED OF. IN THE DISTRICT COURT OF APPEAL OF FLORIDA THIRD DISTRICT JULY TERM, 2005 WMS CONSTRUCTION, INC., ** Appellant, ** vs.

More information

Request for Quotation Q. Steamboat Springs Emergency Solar Tower Phones

Request for Quotation Q. Steamboat Springs Emergency Solar Tower Phones Request for Quotation 792-18Q Steamboat Springs Emergency Solar Tower Phones Due: April 6, 2018 2:00 p.m. Mountain Time Buyer: Colorado Mountain College Purchasing Department 802 Grand Avenue Glenwood

More information

AGREEMENT OF SALE BY AND BETWEEN THE PHILADELPHIA PARKING AUTHORITY AND.

AGREEMENT OF SALE BY AND BETWEEN THE PHILADELPHIA PARKING AUTHORITY AND. AGREEMENT OF SALE BY AND BETWEEN THE PHILADELPHIA PARKING AUTHORITY AND. PPA Contract No. THIS AGREEMENT effective as of day of, 2012 by and between The Philadelphia Parking Authority, an agency of the

More information

NO. COA NORTH CAROLINA COURT OF APPEALS. Filed: 4 December Appeal by defendants from Amended Judgment entered 8 March

NO. COA NORTH CAROLINA COURT OF APPEALS. Filed: 4 December Appeal by defendants from Amended Judgment entered 8 March NO. COA12-636 NORTH CAROLINA COURT OF APPEALS Filed: 4 December 2012 SOUTHERN SEEDING SERVICE, INC., Plaintiff, v. Guilford County No. 09 CVS 12411 W.C. ENGLISH, INC.; LIBERTY MUTUAL INSURANCE COMPANY;

More information

Reginella Construction Company v. Travelers Casualty & Surety Co

Reginella Construction Company v. Travelers Casualty & Surety Co 2014 Decisions Opinions of the United States Court of Appeals for the Third Circuit 6-11-2014 Reginella Construction Company v. Travelers Casualty & Surety Co Precedential or Non-Precedential: Non-Precedential

More information

General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work)

General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work) General Conditions for Non-Construction Contracts Section I (With or without Maintenance Work) U.S. Department of Housing and Urban Development Office of Public and Indian Housing Office of Labor Relations

More information

CONTRACT AWARD. Period of Contract: August 1, 2011 through July 31, 2012 (With the option to renew for four additional 12-month periods)

CONTRACT AWARD. Period of Contract: August 1, 2011 through July 31, 2012 (With the option to renew for four additional 12-month periods) Date of Award: July 27, 2011 CONTRACT AWARD Contract ID: 00000000000000000000##### Replaces Contract: 0###0 Procurement Officer: Telephone: 785/###-#### E-Mail Address: Web Address: Item: Agency/Business

More information

* * * * * * * (Court composed of Judge Dennis R. Bagneris, Sr., Judge Terri F. Love, Judge Edwin A. Lombard)

* * * * * * * (Court composed of Judge Dennis R. Bagneris, Sr., Judge Terri F. Love, Judge Edwin A. Lombard) DENNIS LOPEZ AND CAROLYN LOPEZ VERSUS US SPRINT COMMUNICATIONS COMPANY, ABC CONSTRUCTION COMPANY AND XYZ CORPORATION * * * * * * * * * * * NO. 2007-CA-0052 COURT OF APPEAL FOURTH CIRCUIT STATE OF LOUISIANA

More information

State of Iowa, Board of Regents Standard Terms and Conditions

State of Iowa, Board of Regents Standard Terms and Conditions State of Iowa, Board of Regents Standard Terms and Conditions 1. Supplier s Responsibility. Supplier shall obtain all necessary permits and comply with all applicable laws, ordinances, rules, regulations,

More information

Request For Proposals Hwy 124 E ADA Door Opener Hallsville City Hall

Request For Proposals Hwy 124 E ADA Door Opener Hallsville City Hall Request For Proposals 2018-1 202 Hwy 124 E ADA Door Opener Hallsville City Hall The City of Hallsville, Missouri (the City ) seeks bids from qualified contractors for all materials and labor to install

More information

TENDER OF COMPLETION CONTRACTOR TO CITY AND RELEASE AGREEMENT. This TENDER OF COMPLETION CONTRACTOR TO CITY AND RELEASE

TENDER OF COMPLETION CONTRACTOR TO CITY AND RELEASE AGREEMENT. This TENDER OF COMPLETION CONTRACTOR TO CITY AND RELEASE TENDER OF COMPLETION CONTRACTOR TO CITY AND RELEASE AGREEMENT This TENDER OF COMPLETION CONTRACTOR TO CITY AND RELEASE AGREEMENT ( Agreement ), dated the 24th day of August, 2016, is entered into by and

More information

TRADING TERMS OF KLINGER LTD

TRADING TERMS OF KLINGER LTD 1. INTERPRETATION 1.1 In these terms of trade: (1) Business Day means a day other than Saturday, Sunday or a public holiday in the place in which a document is received or an act is done, as may be applicable;

More information

DEVELOPMENT CONTRACT FOR PUBLIC IMPROVEMENTS. WHEREAS,, (the Developer ), whose. business address is, is the owner and developer of

DEVELOPMENT CONTRACT FOR PUBLIC IMPROVEMENTS. WHEREAS,, (the Developer ), whose. business address is, is the owner and developer of PROJECT NO. CONTRACT TYPE DEVELOPMENT CONTRACT FOR PUBLIC IMPROVEMENTS WHEREAS,, (the Developer ), whose business address is, is the owner and developer of real property located in the corporate limits

More information

Legal & Ethical Applications: Exam #1: Review LAWS 3930 & FoE 1, 3, 4, 9, and 11 & Microecon. & Chapters 5, Page 1 of 8

Legal & Ethical Applications: Exam #1: Review LAWS 3930 & FoE 1, 3, 4, 9, and 11 & Microecon. & Chapters 5, Page 1 of 8 Review LAWS 3930 & FoE 1, 3, 4, 9, and 11 & Microecon. & Chapters 5, Page 1 of 8 print name on the line above as your signature INSTRUCTIONS: 1. This Exam #1 must be completed within the allocated time

More information

Warehouse Agreement. WHEREAS, Warehouse Operator is in the business of warehousing and storing goods; and

Warehouse Agreement. WHEREAS, Warehouse Operator is in the business of warehousing and storing goods; and Warehouse Agreement This Warehouse Agreement, dated as of [DATE] (this Agreement ), is entered into between [WAREHOUSE OPERATOR NAME], a [STATE OF ORGANIZATION] [TYPE OF ENTITY] ( Warehouse Operator )

More information

City of Signal Hill Cherry Avenue Signal Hill, CA

City of Signal Hill Cherry Avenue Signal Hill, CA City of Signal Hill 2175 Cherry Avenue Signal Hill, CA 90755-3799 May 5, 2009 AGENDA ITEM TO: FROM: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL BARBARA MUÑOZ DIRECTOR OF PUBLIC WORKS SUBJECT: CONTRACT

More information

THIS CONTRACT is executed as of this day of, 2017, effective as of October 1, 2017 (the Effective Date ), by and between the CITY OF

THIS CONTRACT is executed as of this day of, 2017, effective as of October 1, 2017 (the Effective Date ), by and between the CITY OF CONTRACT BETWEEN THE CITY OF JACKSONVILLE AND REPUBLIC SERVICES OF FLORIDA, LIMITED PARTNERSHIP d/b/a SOUTHLAND RECYCLING SERVICES FOR RECEIPT, PROCESSING AND SALE OF RESIDENTIAL RECYCLING MATERIALS THIS

More information

Getting ready for Ontario s new Construction Act. Understanding the key changes and how to prepare for them. Howard Krupat

Getting ready for Ontario s new Construction Act. Understanding the key changes and how to prepare for them. Howard Krupat Getting ready for Ontario s new Construction Act Understanding the key changes and how to prepare for them Howard Krupat Getting ready for Ontario s new Construction Act Understanding the key changes and

More information

GIA # Execution Date:

GIA # Execution Date: GIA # Execution Date: INDEMNITY AGREEMENT This Indemnity Agreement ( Agreement ) is made as of the Execution Date set forth above by Indemnitors for the purpose of indemnifying Surety in connection with

More information

SOUTHERN CALIFORNIA EDISON COMPANY ENERGY SERVICE PROVIDER SERVICE AGREEMENT

SOUTHERN CALIFORNIA EDISON COMPANY ENERGY SERVICE PROVIDER SERVICE AGREEMENT Agreement Number: This Energy Service Provider Service Agreement (this Agreement ) is made and entered into as of this day of,, by and between ( ESP ), a organized and existing under the laws of the state

More information

UNITED STATES DISTRICT COURT DISTRICT OF SOUTH DAKOTA SOUTHERN DIVISION

UNITED STATES DISTRICT COURT DISTRICT OF SOUTH DAKOTA SOUTHERN DIVISION UNITED STATES DISTRICT COURT DISTRICT OF SOUTH DAKOTA SOUTHERN DIVISION UNITED STATES OF AMERICA, FOR THE USE AND BENEFIT OF ASH EQUIPMENT CO., INC. D/B/A AMERICAN HYDRO; AND ASH EQUIPMENT CO., INC., A

More information

SAMPLE. It is agreed that this proposal may not be withdrawn within a period of thirty (30) days after the date set for the opening thereof.

SAMPLE. It is agreed that this proposal may not be withdrawn within a period of thirty (30) days after the date set for the opening thereof. INSTRUCTIONS TO BIDDERS The undersigned has examined the location of the proposed work and is familiar with the plans, specifications and the conditions existing at the site of the work and its environs.

More information

UNITED STATE BANKRUPTCY COURT EASTERN DISTRICT OF MICHIGAN SOUTHERN DIVISION. Case No wsd. Greektown Holdings, L.L.C., et al.

UNITED STATE BANKRUPTCY COURT EASTERN DISTRICT OF MICHIGAN SOUTHERN DIVISION. Case No wsd. Greektown Holdings, L.L.C., et al. UNITED STATE BANKRUPTCY COURT EASTERN DISTRICT OF MICHIGAN SOUTHERN DIVISION In re: Case No. 08-53104-wsd Greektown Holdings, L.L.C., et al. Chapter 11 Debtors. / Hon. Walter Shapero OPINION GRANTING DEBTOR

More information

STATE OF LOUISIANA COURT OF APPEAL, THIRD CIRCUIT **********

STATE OF LOUISIANA COURT OF APPEAL, THIRD CIRCUIT ********** STATE OF LOUISIANA COURT OF APPEAL, THIRD CIRCUIT 15-152 TONY BERARD, ET UX. VERSUS THE LEMOINE COMPANY, LLC, ET AL. ********** APPEAL FROM THE FIFTEENTH JUDICIAL DISTRICT COURT PARISH OF LAFAYETTE, NO.

More information

PRESENT: Lemons, C.J., Goodwyn, Powell, Kelsey, and McCullough, JJ., and Russell and Millette, S.JJ.

PRESENT: Lemons, C.J., Goodwyn, Powell, Kelsey, and McCullough, JJ., and Russell and Millette, S.JJ. PRESENT: Lemons, C.J., Goodwyn, Powell, Kelsey, and McCullough, JJ., and Russell and Millette, S.JJ. HENSEL PHELPS CONSTRUCTION COMPANY OPINION BY v. Record No. 151780 SENIOR JUSTICE LEROY F. MILLETTE,

More information