DOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Drainage Area to Special Protection Waters
|
|
- Bryan Gibbs
- 6 years ago
- Views:
Transcription
1 DOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION Drainage Area to Special Protection Waters Eagle Creek Hydro Power, LLC Toronto, Cliff Lake, & Swinging Bridge Hydroelectric Dam System Towns of Bethel, Forestburgh, Highland, Lumberland and Thompson, Sullivan County, New York PROCEEDINGS This docket is issued in response to an Application submitted to the Delaware River Basin Commission (DRBC or Commission) by Eagle Creek Hydro Power, LLC (Eagle Creek or docket holder) on December 12, 2017 (Application), to modify an existing hydroelectric power project to include a new 1.1 megawatt capacity minimum flow hydroelectric generating unit (Swinging Bridge Unit 3) at Swinging Bridge Dam associated with the Upper Mongaup Reservoir system. The Federal Energy Regulatory Commission (FERC) issued License No. P on April 14, 1992 for the Swinging Bridge Project. Eagle Creek has requested an amendment to the existing FERC license to include the new minimum flow unit and anticipates FERC approval in April The project also requires a Section 404 approval from the United States Army Corps of Engineers (USACE) and the amendment of the existing Section 401 water quality certificate issued by the New York State Department of Environmental Conservation (NYSDEC). The Application was reviewed for inclusion in the Comprehensive Plan and approval under Section 3.8 of the Delaware River Basin Compact. The Orange County Planning Department and Sullivan County Division of Planning and Environmental Management have been notified of pending action. A public hearing on this project was held by the DRBC on February 14, A. DESCRIPTION 1. Purpose. The purpose of this docket is to modify an existing hydroelectric power project to include the construction and operation of a new 1.1 megawatt (MW) hydroelectric turbine (Swinging Bridge Unit 3) located at the Swinging Bridge dam adjacent to the docket holder s existing operable 6.75 MW Swinging Bridge Unit 2 powerhouse and inoperable Unit 1 powerhouse. The new turbine will utilize the minimum flow releases from the Swinging Bridge Reservoir (SBR) bringing the total generating capacity of the Swinging Bridge Hydroelectric Project to 7.85 MW. No modifications to reservoir elevations or flows are proposed as a result of this Project. 2. Location. The Swinging Bridge Project consists of three facilities: Toronto, Cliff Lake, and Swinging Bridge. The Swinging Bridge facility utilizes flows from the Toronto and Cliff Lake storage reservoirs and the Mongaup River to generate electricity. The Toronto Reservoir releases
2 2 water to the Cliff Lake Reservoir via Black Lake Creek. A tunnel diversion then releases water from the Cliff Lake Reservoir to the SBR. The SBR is located at River Mile (Delaware River Mongaup River) in Sullivan County, New York. The Upper Mongaup Reservoirs and existing and proposed hydroelectric turbines at the SBR are located within the drainage area to the Upper Delaware Special Protection Waters (SPW). 3. Area Served. Energy produced by the Project supplies the regional grid where the SBR dam is located. The reservoirs themselves provide recreational uses and water storage to supplement stream flow in the main-stem Delaware River. For the purpose of defining the Area Served, the Application is incorporated herein by reference consistent with conditions contained in the DECISION section of this docket. 4. Physical Features. a. Reservoir and Dam Descriptions. The Mongaup Reservoir System was constructed in the 1920s and consists of the Toronto, Cliff Lake, Swinging Bridge, Mongaup Falls, and Rio Reservoirs. The reservoir system has an overall water storage capacity of approximately billion gallons, most of which is stored in the Toronto and Swinging Bridge Reservoirs. The reservoir system was designed to incorporate hydroelectric generation utilizing hydroelectric power generating turbines installed in downstream powerhouses of many of the dams. This docket continues approval of releases from the Upper Mongaup Reservoirs (Toronto, Cliff Lake and SBR) for hydroelectric generation at the SBR. The Mongaup Falls and Rio Reservoirs are approved separately in DRBC Docket No. D CP-1. The Toronto Dam is a 1,620 feet long earthen dam with a maximum height of 103 feet. Toronto Reservoir has a surface area of approximately 860 acres and a useable water storage capacity of 7.74 billion gallons. The Cliff Lake Dam consists of two earth embankment sections, a 100 feet long by 25 feet high concrete overflow spillway with flashboards, and a 150 feet long by 36 feet high nonoverflow section. Cliff Lake Reservoir has a surface area of approximately 190 acres and a useable water storage capacity of 0.79 billion gallons. The Swinging Bridge Dam is a 975 feet long earthen dam with a maximum height of 135 feet. SBR has a surface area of approximately 1,000 acres and a useable water storage capacity of 5.48 billion gallons. DRBC Docket No. D CP-1 was approved on May 10, 2012 and describes the Mongaup Falls and Rio Reservoir system along with the hydroelectric projects located therein. b. Swinging Bridge Powerhouse Descriptions. There are two existing powerhouses at the Swinging Bridge facility, each containing one generator-turbine unit (Units 1 and 2). The Unit 1 and Unit 2 powerhouses are located approximately 330 feet and 472 feet downstream of the dam, respectively. Unit 1 was formerly supplied water by a steel lined concrete penstock, 10 feet in diameter by 692 feet long, until it was
3 3 filled with a cementitious material after the unit was taken out of service. Unit 2 is supplied with water from SBR by a concrete lined tunnel, 9.75 feet in diameter by 784 feet long, connected to a steel penstock, 10 feet in diameter by approximately 188 feet long. The current total authorized installed capacity of the Project is MW. Unit 1 has an installed capacity of 5.0 MW and has been out of service since Unit 2 has an installed capacity of 6.75 MW. Eagle Creek does not have any current plans to rehabilitate or use Unit 1 and proposes to amend the current total installed capacity of the Swinging Bridge Project by removing the capacity associated with the Project s inoperable 5.0 MW turbine-generator unit (Unit 1) and adding the installed capacity associated with the new 1.1 MW minimum base flow turbine-generator unit (Unit 3). Through this amendment, the capacity of the inoperable Unit 1 will be removed and the new Unit 3 will be added, resulting in an amendment to the Project s total installed capacity from MW to 7.85 MW. The proposed Swinging Bridge Unit 3, with a hydraulic capacity of 112 cfs at best gate, will be housed in a new powerhouse directly adjacent to the Project s Unit 2 powerhouse. The existing flow regime of the Swinging Bridge Project will not change due to this amendment. Flow to the new minimum base flow powerhouse will use the same intake and penstock as the current minimum flow valve and Unit 2 powerhouse and the discharge point of the new minimum base flow powerhouse will be located directly adjacent to the existing valve and Unit 2 powerhouse. The new Unit 3 powerhouse will continue to provide the required minimum flow downstream of the Swinging Bridge Dam by itself or in conjunction with Unit 2 or the existing minimum flow release valve in accordance with required water release requirements. Installation of new Unit 3 will require construction activities in the previously disturbed, upland area located immediately north of the existing Unit 2 powerhouse, including the following: Construction of a new, 30-foot long by 30-foot wide concrete and steel powerhouse; A new penstock section (4-feet diameter by 20-feet long) connected to the existing penstock bifurcation that provides water to the minimum flow valve in the Unit 2 powerhouse; and Tailrace excavation ranging from approximately 6-feet wide by 20-feet long for a draft tube and tailrace for the new powerhouse. The docket holder is required to submit final construction plans related to the new powerhouse project to the Commission s Executive Director prior to the start of construction. (see Condition C.II.f.). c. Cost. The overall cost of the of the new Powerhouse project is estimated to be $3,889, d. Relationship to the Comprehensive Plan. The Mongaup Reservoir System was included in the Comprehensive Plan in February Docket No. D CP-1 was approved on May 10, 2007 and continued approval of the reservoirs while adding the hydro-electric projects to the Comprehensive Plan. This docket will continue approval of the Upper Mongaup Reservoir system in the Comprehensive Plan. It will also add the new powerhouse associated with the Swinging Bridge Dam into the Comprehensive Plan.
4 4 B. FINDINGS Special Protection Waters In 1992, the DRBC adopted SPW requirements, as part of the DRBC Water Quality Regulations (WQR), designed to protect existing high water quality in applicable areas of the Delaware River Basin. One hundred twenty miles of the Delaware River from Hancock, New York downstream to the Delaware Water Gap has been classified by the DRBC as SPW. This stretch includes the sections of the river federally designated as "Wild and Scenic" in the Upper Delaware Scenic and Recreational River and the Delaware Water Gap National Recreation Area -- as well as an eight-mile reach between Milrift and Milford, Pennsylvania which is not federally designated. The SPW regulations apply to this 120-mile stretch of the river and its drainage area. On July 16, 2008, the DRBC approved amendments to its WQR that provide increased protection for waters that the Commission classifies as SPW. The portion of the Delaware River and its tributaries within the boundary of the Lower Delaware River Management Plan Area was approved for SPW designation and clarity on definitions and terms were updated for the entire program. Article A.2.e.1). and 2). of the Commission s WQR states that projects subject to review under Section 3.8 of the Compact that are located in the drainage area of SPW must submit for approval a Non-Point Source Pollution Control Plan (NPSPCP) that controls the new or increased non-point source loads generated within the portion of the docket holder s service area which is also located within the drainage area of SPW. The service area of the docket holder is located within in the drainage area to the SPW. The Swinging Bridge Hydropower Station is upstream from two other reservoirs in the Mongaup System, which are regarded as a major water storage facilities, therefore the non-point source pollution control plan requirement pertaining to projects in the drainage area of SPW is not applicable at this time. Condition C.II.d. continues the requirement that the docket holder maintain minimal flow releases from the Toronto and Cliff Lake dams of 10 cfs and 10 cfs, respectively, and from Swinging Bridge Dam of 100 cfs, or inflow if less, based on consultation with NYSDEC, but not less than 60 cfs. This requirement remains in place to ensure downstream water flows continue to support aquatic life and aid in the Montague flow target. The docket holder shall continue to operate the reservoirs in accordance with the Mongaup River Hydroelectric System Normal Conditions Operating Plan and the Mongaup River Hydroelectric System Drought Conditions Operating Plan dated April 12, 2016 and in consultation with the NYSDEC, as applicable. Any future updates or modifications to the Operating Plans shall be submitted to the Commission and approved by the DRBC Executive Director prior to implementation.
5 5 The project does not conflict with the Comprehensive Plan and is designed to prevent substantial adverse impact on the water resources related environment, while sustaining the current and future water uses and development of the water resources of the Basin. The project is designed to produce a discharge meeting the effluent requirements as set forth in the Commission s Water Quality Regulations (WQR). C. DECISION I. Effective on the approval date for Docket No. D- D CP-3 below: a. The Upper Mongaup Reservoirs and hydro-electric facilities described in Docket No. D CP-2 are removed from the Comprehensive Plan to the extent that they are not included in Docket No. D CP-3; and b. Docket No. D CP-2 is terminated and replaced by Docket No. D CP-3; and c. The project and the appurtenant facilities described in Section A Physical Features of this docket shall be continued in the Comprehensive Plan. II. The project and appurtenant facilities as described in Section A Physical Features of this docket are approved pursuant to Section 3.8 of the Compact, subject to the following conditions: a. Docket approval is subject to all conditions, requirements, and limitations imposed by the FERC and NYSDEC. b. The Upper Mongaup Reservoirs along with their respective dams and powerhouses shall be available at all times for inspection by the DRBC. c. The facilities shall be operated at all times to comply with the requirements of the Commission s WQR and Water Code. d. The docket holder shall maintain minimal flow releases of 10 cfs and 10 cfs at the Toronto and Cliff Lake dams, respectively and 100 cfs, or inflow, if less, based on consultation with NYSDEC, but not less than 60 cfs at Swinging Bridge dam. e. The docket holder shall continue to operate the reservoirs in accordance with the Mongaup River Hydroelectric System Normal Conditions Operating Plan and the Mongaup River Hydroelectric System Drought Conditions Operating Plan dated April 12, 2016 and in consultation with NYSDEC, as applicable. Any future updates or modifications to the Operating Plans shall be submitted to the Commission and approved by the DRBC Executive Director prior to implementation.
6 6 f. The docket holder shall submit final construction plans related to the new powerhouse to the Commission s Executive Director prior to the start of construction. g. Nothing herein shall be construed to exempt the docket holder from obtaining all necessary permits and/or approvals from other State, Federal or local government agencies having jurisdiction over this project. h. The docket holder is permitted to provide power to the grid and utilize water storage in each reservoir for recreational use/conservation release as defined in the Area Served Section of this docket. i. The docket holder shall discharge water from the turbines/generators in such a manner as to avoid injury or damage to fish or wildlife and shall avoid any injury to public or private property. j. Within 30 days of completion of construction of the approved project, the docket holder is to submit to the attention of the Project Review Section of DRBC a Construction Completion Statement ( Statement ) signed by the docket holder s responsible agent for the project. The Statement must (a) either confirm that construction has been completed in a manner consistent with any and all DRBC-approved plans or explain how the as-built project deviates from such plans; (b) report the project s final construction cost as such cost is defined by the project review fee schedule in effect at the time application was made; and (c) indicate the date on which the project was (or is to be) placed in operation. In the event that the final project cost exceeds the estimated cost used by the applicant to calculate the DRBC project review fee, the statement must also include (d) the amount of any outstanding balance owed for DRBC review. Such outstanding balance will equal the difference between the fee paid to the Commission and the fee calculated on the basis of the project s final cost, using the formula and definition of project cost set forth in the DRBC s project review fee schedule in effect at the time application was made. k. This approval of the construction related to the new powerhouse as described in paragraph A.4.b. of this docket shall expire three years from date below unless prior thereto the docket holder has commenced operation of the subject project or has provided the Executive Director with written notification that is has expended substantial funds (in relation to the cost of the project) in reliance upon this docket approval. l. The issuance of this docket approval shall not create any private or proprietary rights in the waters of the Basin, and the Commission reserves the right to amend, suspend or rescind the docket for cause, in order to ensure proper control, use and management of the water resources of the Basin. m. The docket holder is responsible for timely submittal to the DRBC of a docket renewal application on the appropriate application form including the appropriate docket application filing fee (see 18 CFR ) at least 6 months in advance of the docket expiration date set forth below. The docket holder will be subject to late filed renewal surcharges in the event of untimely submittal of its renewal application, whether or not DRBC issues a reminder notice in advance of the deadline or the docket holder receives such notice. In the event that a timely and
7 7 complete application for renewal has been submitted and the DRBC is unable, through no fault of the docket holder, to reissue the docket before the expiration date below, the terms and conditions of the current docket will remain fully effective and enforceable against the docket holder pending the grant or denial of the application for docket approval. n. The docket holder shall be subject to applicable DRBC regulatory program fees, in accordance with duly adopted DRBC resolutions and/or regulations. (see 18 CFR ). o. This approval is transferable by request to the DRBC Executive Director provided that the project purpose and area served approved by the Commission in this docket will not be materially altered because of the change in project ownership. The request shall be submitted on the appropriate form and be accompanied by the appropriate fee (see 18 CFR ). p. The docket holder shall request a name change of the entity to which this approval is issued if the name of the entity to which this approval is issued changes its name. The request for name change shall be submitted on the appropriate form and be accompanied by the appropriate fee (see 18 CFR ). q. The Executive Director may modify or suspend this approval or any condition thereof, or require mitigating measures pending additional review, if in the Executive Director's judgment such modification or suspension is required to protect the water resources of the Basin. r. Any person who objects to a docket decision by the Commission may request a hearing in accordance with Article 6 of the Rules of Practice and Procedure. In accordance with Section 15.1(p) of the Delaware River Basin Compact, cases and controversies arising under the Compact are reviewable in the United States district courts. BY THE COMMISSION DATE APPROVED: March 14, 2018 EXPIRATION DATE: March 14, 2028
DOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Discharge to the Drainage Area of Special Protection Waters
DOCKET NO. D-2018-008-1 DELAWARE RIVER BASIN COMMISSION Discharge to the Drainage Area of Special Protection Waters Village Utility, LLC Wastewater Treatment Plant and Groundwater Discharge Sparta Township,
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
DOCKET NO. D-2006-037-5 DELAWARE RIVER BASIN COMMISSION Discharge to a Tributary of Special Protection Waters Hudson Valley Foie Gras, LLC Industrial Wastewater Treatment Plant Ferndale, Sullivan County,
More informationDOCKET NO. D CP-4 DELAWARE RIVER BASIN COMMISSION. Drainage Area to Special Protection Waters
DOCKET NO. D-1990-068 CP-4 DELAWARE RIVER BASIN COMMISSION Drainage Area to Special Protection Waters Kiamesha Artesian Spring Water Company Groundwater and Surface Water Withdrawal Town of Thompson, Sullivan
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
DOCKET NO. D-2017-011-1 DELAWARE RIVER BASIN COMMISSION Discharge to a Tributary of Special Protection Waters Lake Bryn Mawr Camp, Inc. Wastewater Treatment Plant Oregon Township, Wayne County, Pennsylvania
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
This DRAFT Docket has been prepared for the purposes of the scheduled public hearing and may be substantially modified as a result of the public hearing process prior to Commission action. 6/25/2013 2:04
More informationDOCKET NO. D CP-2 DELAWARE RIVER BASIN COMMISSION. Special Protection Waters
DOCKET NO. D-2015-021 CP-2 DELAWARE RIVER BASIN COMMISSION Special Protection Waters Pennsylvania Department of Environmental Protection Bureau of Abandoned Mine Reclamation Jeanesville Mine Fire Groundwater
More informationDOCKET NO. D CP-2 DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
DOCKET NO. D-2004-013 CP-2 DELAWARE RIVER BASIN COMMISSION Discharge to a Tributary of Special Protection Waters Northampton Borough Municipal Authority Water Filtration Plant North Whitehall Township,
More informationDOCKET NO. D CP-4 DELAWARE RIVER BASIN COMMISSION. Special Protection Waters
DOCKET NO. D-1991-042 CP-4 DELAWARE RIVER BASIN COMMISSION Special Protection Waters Borough of Alburtis Groundwater Withdrawal Borough of Alburtis and Lower Macungie Township, Lehigh County, Pennsylvania
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
DOCKET NO. D-1985-025-3 DELAWARE RIVER BASIN COMMISSION Discharge to a Tributary of Special Protection Waters Big Boulder Corporation Wastewater Treatment Plant Kidder Township, Carbon County, Pennsylvania
More informationDOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
DOCKET NO. D-2007-025 CP-3 DELAWARE RIVER BASIN COMMISSION Discharge to a Tributary of Special Protection Waters Upper Makefield Township Wastewater Treatment Plant Upper Makefield Township, Bucks County,
More informationDOCKET NO. D CP-2 DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
DOCKET NO. D-2013-006 CP-2 DELAWARE RIVER BASIN COMMISSION Discharge to a Tributary of Special Protection Waters Lehigh County Lehigh Valley Zoo Wastewater Treatment Plant North Whitehall, Lehigh County,
More informationDOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
DOCKET NO. D-1996-039 CP-3 DELAWARE RIVER BASIN COMMISSION Discharge to a Tributary of Special Protection Waters Northside Heights Mobile Home Estates, Inc. Wastewater Treatment Plant East Penn Township,
More informationDOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-2001-002 CP-3 DELAWARE RIVER BASIN COMMISSION Upper Bern Township Wastewater Treatment Plant Upper Bern Township, Berks County, Pennsylvania PROCEEDINGS This docket is issued in response to
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
DOCKET NO. D-1985-025-4 DELAWARE RIVER BASIN COMMISSION Discharge to a Tributary of Special Protection Waters Blue Ridge Real Estate Company Big Boulder Wastewater Treatment Plant Kidder Township, Carbon
More informationDOCKET NO. D CP-2 DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
DOCKET NO. D-1996-019 CP-2 DELAWARE RIVER BASIN COMMISSION Discharge to a Tributary of Special Protection Waters Borough of Jim Thorpe Wastewater Treatment Plant Borough of Jim Thorpe, Carbon County, Pennsylvania
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-1998-028-3 DELAWARE RIVER BASIN COMMISSION Honeybrook Golf Club Ground and Surface Water Withdrawal Honey Brook Township, Chester County, Pennsylvania PROCEEDINGS This docket is issued in
More informationDOCKET NO. D CP-5 DELAWARE RIVER BASIN COMMISSION. Special Protection Waters
DOCKET NO. D-1981-071 CP-5 DELAWARE RIVER BASIN COMMISSION Special Protection Waters Borough of Jim Thorpe Surface Water and Groundwater Withdrawal Borough of Jim Thorpe, Carbon County, Pennsylvania PROCEEDINGS
More informationDOCKET NO. D CP-4 DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-1994-080 CP-4 DELAWARE RIVER BASIN COMMISSION Lyons Borough Municipal Authority Wastewater Treatment Plant Borough of Lyons, Berks County, Pennsylvania PROCEEDINGS This docket is issued in
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-1988-043-6 DELAWARE RIVER BASIN COMMISSION Giorgio Foods, Inc. Industrial Wastewater Treatment Plant Modification Maidencreek Township, Berks County, Pennsylvania PROCEEDINGS This docket is
More informationDOCKET NO. D CP-2 DELAWARE RIVER BASIN COMMISSION. Discharge to a Tributary of Special Protection Waters
DOCKET NO. D-1996-039 CP-2 DELAWARE RIVER BASIN COMMISSION Discharge to a Tributary of Special Protection Waters Northside Heights Mobile Home Estates Wastewater Treatment Plant East Penn Township, Carbon
More informationDOCKET NO. D CP-2 DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-2012-001 CP-2 DELAWARE RIVER BASIN COMMISSION Lower Bucks County Joint Municipal Authority Water Filtration Plant Tullytown Borough, Bucks County, Pennsylvania PROCEEDINGS This docket is issued
More informationDOCKET NO. D CP-2 DELAWARE RIVER BASIN COMMISSION. Drainage to Special Protection Waters
DOCKET NO. D-2006-043 CP-2 DELAWARE RIVER BASIN COMMISSION Drainage to Special Protection Waters Pocono Manor Investors PT1, LP Pocono Manor Groundwater Withdrawal Pocono Township, Monroe County, Pennsylvania
More informationDOCKET NO. D CP-1 DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-2012-008 CP-1 DELAWARE RIVER BASIN COMMISSION Philadelphia International Airport Airport Expansion and Wetland Encroachment Project City of Philadelphia, Pennsylvania Tinicum Township, Delaware
More informationDOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Southeastern Pennsylvania Ground Water Protected Area
DOCKET NO. D-1997-003 CP-3 DELAWARE RIVER BASIN COMMISSION Southeastern Pennsylvania Ground Water Protected Area Aqua Pennsylvania, Inc. Bubbling Springs Groundwater Withdrawal Whitemarsh Township, Montgomery
More informationDOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-1994-080 CP-3 DELAWARE RIVER BASIN COMMISSION Lyons Borough Municipal Authority Wastewater Treatment Plant Borough of Lyons, Berks County, Pennsylvania PROCEEDINGS This docket is issued in
More informationDOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-1993-068 CP-3 DELAWARE RIVER BASIN COMMISSION Lower Bucks County Joint Municipal Authority Wastewater Treatment Plant Bristol Township, Bucks County, Pennsylvania PROCEEDINGS This docket is
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-1988-043-5 DELAWARE RIVER BASIN COMMISSION Giorgio Foods, Inc. Industrial Wastewater Treatment Plant Modification Maidencreek Township, Berks County, Pennsylvania PROCEEDINGS This docket is
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-1992-024-3 DELAWARE RIVER BASIN COMMISSION Bart Golf Club, Inc. Hickory Valley Golf Club Surface Water Withdrawal New Hanover Township, Montgomery County, Pennsylvania PROCEEDINGS This docket
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-2006-022-2 DELAWARE RIVER BASIN COMMISSION Teva Pharmaceuticals Groundwater Withdrawal City of Philadelphia, Philadelphia County, Pennsylvania PROCEEDINGS This docket is issued in response
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-2007-003-3 DELAWARE RIVER BASIN COMMISSION To-Jo Mushrooms, Inc. Industrial Wastewater Treatment Plant New Garden Township, Chester County, Pennsylvania PROCEEDINGS This docket is issued in
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION. SPI Pharma, Inc. Groundwater Withdrawal Lewes, Sussex County, Delaware PROCEEDINGS
DOCKET NO. D-1978-085-2 DELAWARE RIVER BASIN COMMISSION SPI Pharma, Inc. Groundwater Withdrawal Lewes, Sussex County, Delaware PROCEEDINGS This docket is issued in response to an Application submitted
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-2012-025-1 DELAWARE RIVER BASIN COMMISSION Cambridge Lee Industries, LLC Surface Water Withdrawal Ontelaunee Township, Berks County, Pennsylvania PROCEEDINGS This docket is issued in response
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Southeastern Pennsylvania Ground Water Protected Area
DOCKET NO. D-1998-014-3 DELAWARE RIVER BASIN COMMISSION Southeastern Pennsylvania Ground Water Protected Area Merck Sharp & Dohme Corporation Groundwater Withdrawal Upper Gwynedd Township, Montgomery County,
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Special Protection Waters PROCEEDINGS A. DESCRIPTION
DOCKET NO. D-2001-040-2 DELAWARE RIVER BASIN COMMISSION Special Protection Waters CBH2OLP Surface Water Withdrawal Pocono Township, Monroe County, Pennsylvania PROCEEDINGS This docket is issued in response
More informationUNITED STATES OF AMERICA 134 FERC 62,197 FEDERAL ENERGY REGULATORY COMMISSION. Clean River Power 15, LLC Project No
UNITED STATES OF AMERICA 134 FERC 62,197 FEDERAL ENERGY REGULATORY COMMISSION Clean River Power 15, LLC Project No. 13874-000 ORDER ISSUING PRELIMINARY PERMIT AND GRANTING PRIORITY TO FILE LICENSE APPLICATION
More informationDOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Discharge to the Drainage Area of Special Protection Waters
DOCKET NO. D-1986-011 CP-3 DELAWARE RIVER BASIN COMMISSION Discharge to the Drainage Area of Special Protection Waters Brodhead Creek Regional Authority Wastewater Treatment Plant Service Area Expansion
More informationDOCKET NO. D CP-4 DELAWARE RIVER BASIN COMMISSION. Drainage Area to Special Protection Waters
DOCKET NO. D-1991-001 CP-4 DELAWARE RIVER BASIN COMMISSION Drainage Area to Special Protection Waters Brodhead Creek Regional Authority Groundwater and Surface Water Withdrawal Stroud Township, Monroe
More informationDOCKET NO. D CP-3 DELAWARE RIVER BASIN COMMISSION. Southeastern Pennsylvania Ground Water Protected Area
DOCKET NO. D-1990-006 CP-3 DELAWARE RIVER BASIN COMMISSION Southeastern Pennsylvania Ground Water Protected Area North Wales Water Authority Groundwater Withdrawal and Surface Water Withdrawal North Wales
More informationDOCKET NO. D DELAWARE RIVER BASIN COMMISSION. Special Protection Waters
DOCKET NO. D-2009-13-1 DELAWARE RIVER BASIN COMMISSION Special Protection Waters Stone Energy Corporation Surface Water Withdrawal for Natural Gas Exploration and Development Projects West Branch Lackawaxen
More informationFERC INTRODUCTION
Attachment 6 Agreement between Warmsprings Irrigation District and the Oregon Fish and Wildlife Commission Concerning Funding of a Fish Entrainment Mitigation Program in Lieu of Fish Screens for the Warmsprings
More informationNOTICE ANNOUNCING RE-ISSUANCE OF A REGIONAL GENERAL PERMIT
Public Notice US Army Corps of Engineers Louisville District Public Notice No. Date: Expiration Date: RGP No. 003 9 Jul 08 9 Jul 13 Please address all comments and inquiries to: U.S. Army Corps of Engineers,
More informationL. Regulation of surface water transfers. (a) Certificate Required. No person, without first obtaining a certificate from the Commission,
143-215.22L. Regulation of surface water transfers. (a) Certificate Required. No person, without first obtaining a certificate from the Commission, may: (1) Initiate a transfer of 2,000,000 gallons of
More information129 FERC 62,208 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. KW Sackheim Development Project No
129 FERC 62,208 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION KW Sackheim Development Project No. 13224-000 ORDER ISSUING PRELIMINARY PERMIT AND GRANTING PRIORITY TO FILE LICENSE APPLICATION
More informationNavajo Nation Surface Water Quality Standards Certification Regulations
Navajo Nation Surface Water Quality Standards Certification Regulations [Approved by the Resources Committee of the Navajo Nation Council, RCJY-29-04, on July 30, 2004] Navajo Nation Environmental Protection
More informationArkansas River Compact Kansas-Colorado 1949 ARKANSAS RIVER COMPACT
Arkansas River Compact Kansas-Colorado 1949 K.S.A. 82a-520. Arkansas river compact. The legislature hereby ratifies the compact, designated as the "Arkansas river compact," between the states of Colorado
More informationSETTLEMENT AGREEMENT CONCERNING THE RELICENSING OF THE PELTON ROUND BUTTE HYDROELECTRIC PROJECT FERC PROJECT NO AMONG
SETTLEMENT AGREEMENT CONCERNING THE RELICENSING OF THE PELTON ROUND BUTTE HYDROELECTRIC PROJECT FERC PROJECT NO. 2030 AMONG PORTLAND GENERAL ELECTRIC COMPANY CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION
More informationOne Hundred Fourteenth Congress of the United States of America
S. 612 One Hundred Fourteenth Congress of the United States of America AT THE SECOND SESSION Begun and held at the City of Washington on Monday, the fourth day of January, two thousand and sixteen An Act
More informationSUPREME COURT OF THE UNITED STATES
OCTOBER TERM, 2001 1 Decree SUPREME COURT OF THE UNITED STATES No. 108, Orig. STATE OF NEBRASKA, PLAINTIFF v. STATES OF WYOMING AND COLORADO ON PETITION FOR ORDER ENFORCING DECREE AND FOR INJUNCTIVE RELIEF
More informationPublic Notice. Notice No. CELRP-OP 15-LOP1 Expiration Date: March 11, 2020
Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Issued Date:
More informationCHAPTER 23: DETENTION BASIN STANDARDS Introduction and Goals Administration Standards Standard Attachments 23.
CHAPTER 23: DETENTION BASIN STANDARDS 23.00 Introduction and Goals 23.01 Administration 23.02 Standards 23.03 Standard Attachments 23.1 23.00 INTRODUCTION AND GOALS A. The purpose of this chapter is to
More informationU.S ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT REGIONAL AND PROGRAMMATIC GENERAL PERMIT SWG
U.S ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT REGIONAL AND PROGRAMMATIC GENERAL PERMIT SWG-2007-00720 Permittee: General Public Issuing Office: U.S. Army Corps of Engineers. Galveston District Project
More informationCHIPPEWA CREE TRIBE OF THE ROCKY BOY S RESERVATION INDIAN RESERVED WATER RIGHTS SETTLEMENT AND WATER SUPPLY ENHANCEMENT ACT OF 1999
CHIPPEWA CREE TRIBE OF THE ROCKY BOY S RESERVATION INDIAN RESERVED WATER RIGHTS SETTLEMENT AND WATER SUPPLY ENHANCEMENT ACT OF 1999 VerDate 04-JAN-2000 18:14 Jan 07, 2000 Jkt 079139 PO 00163 Frm 00001
More informationAPALACHICOLA-CHATTAHOOCHEE-FLINT RIVER BASIN COMPACT
APALACHICOLA-CHATTAHOOCHEE-FLINT RIVER BASIN COMPACT The states of Alabama, Florida and Georgia and the United States of America hereby agree to the following Compact which shall become effective upon
More informationMARYLAND DEPARTMENT OF THE ENVIRONMENT GENERAL PERMIT FOR CONSTRUCTION ACTIVITY General NPDES Permit Number MDR10 State Discharge Permit Number 03 GP
MARYLAND DEPARTMENT OF THE ENVIRONMENT GENERAL PERMIT FOR CONSTRUCTION ACTIVITY General NPDES Permit Number MDR10 State Discharge Permit Number 03 GP EFFECTIVE DATE: MARCH 1, 2003 EXPIRATION DATE: FEBRUARY
More informationThe General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:
DAM SAFETY AND ENCROACHMENTS ACT Act of Nov. 26, 1978, P.L. 1375, No. 325 AN ACT Cl. 32 Providing for the regulation and safety of dams and reservoirs, water obstructions and encroachments; consolidating
More informationThe Board of Supervisors of the County of Riverside Ordains as Follows:
ORDINANCE NO. 555 (AS AMENDED THROUGH 555.19) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO. 555 IMPLEMENTING THE SURFACE MINING AND RECLAMATION ACT OF 1975 The Board of Supervisors of
More informationATLANTA REGIONAL COMMISSION METROPOLITAN RIVER PROTECTION ACT RULES AND REGULATIONS
ATLANTA REGIONAL COMMISSION METROPOLITAN RIVER PROTECTION ACT RULES AND REGULATIONS Adopted 5/28/03 These Rules and Regulations are adopted by the Atlanta Regional Commission pursuant to the Metropolitan
More informationCUSHMAN PROJECT FERC Project No Settlement Agreement for the Cushman Project
CUSHMAN PROJECT FERC Project No. 460 Settlement Agreement for the Cushman Project January 12, 2009 Cushman Project FERC Project No. 460 Settlement Agreement for the Cushman Project Table of Contents Page
More informationCITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE. Adopted: June 1, 2000 by Ordinance #
CITY OF MEDFORD RIPARIAN CORRIDOR ORDINANCE Adopted: June 1, 2000 by Ordinance # 1999-215 This new language is located in Article V - Site Development Standards, and replaces the Bear Creek (B-C) Overlay
More informationWater Resources Protection Ordinance
Water Resources Protection Ordinance The mission of the district is to provide Silicon Valley safe, clean water for a healthy life, environment, and economy. This ordinance protects water resources managed
More informationGENERAL ASSEMBLY OF NORTH CAROLINA SESSION
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 0 S SENATE BILL 1 Agriculture/Environment/Natural Resources Committee Substitute Adopted /0/ House Committee Substitute Favorable /1/ Fourth Edition Engrossed
More informationCHAPTER 21 JUNEAU COUNTY ANIMAL WASTE MANAGEMENT ORDINANCE
CHAPTER 21 JUNEAU COUNTY ANIMAL WASTE MANAGEMENT ORDINANCE 21.01 Authority This ordinance is adopted under authority by Section 59.02, 59.03 and 92.16, Wis. Stats. 21.02 Title This ordinance shall be known
More informationINTERLOCAL COOPERATION AGREEMENT. Between the Texas Colorado River Floodplain Coalition and, Texas
INTERLOCAL COOPERATION AGREEMENT Between the Texas Colorado River Floodplain Coalition and, Texas THIS INTERLOCAL COOPERATION AGREEMENT (Agreement) is made effective and entered into on, 20, by and between
More informationNational Wildlife Federation, v. Consumers Power Company,
1 National Wildlife Federation, v. Consumers Power Company, UNITED STATES DISTRICT COURT FOR THE WESTERN DISTRICT OF MICHIGAN 657 F. Supp. 989 March 31, 1987, Decided SUBSEQUENT HISTORY: Reversed and Remanded,
More informationTHE DAM SAFETY BILL, 2010
Bill No. 108 of 2010 THE DAM SAFETY BILL, 2010 ARRANGEMENT OF CLAUSES CHAPTER I PRELIMINARY TO BE INTRODUCED IN LOK SABHA CLAUSES 1. Short title, extent and commencement. 2. Application of Act. 3. Definitions.
More informationLAKE OF THE OZARKS PERMIT No. Activity: DOCK Sq. Ft.: Slips: Organization: Lake Mile: Township: Name: County: Range: Legal Desc.
LAKE OF THE OZARKS PERMIT No. Activity: DOCK Sq. Ft.: Slips: Permittee Date Issued: Section: Organization: Lake Mile: Township: Name: County: Range: Address: Subdivision: Legal Desc. Add'l Owners: Fire
More informationMODEL STREAM BUFFER PROTECTION ORDINANCE
MODEL STREAM BUFFER PROTECTION ORDINANCE Description: This model ordinance provides a framework for local governments to develop buffer zones for streams, as well as the requirements that minimize land
More informationDEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING
DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF OIL, GAS, AND MINERALS FERROUS MINERAL MINING (By authority conferred on the environmental quality by section 63103 of 1994 PA 451, MCL 324.63103) PART 1.
More informationYou are here: Water Laws & Regulations Policy & Guidance Wetlands Clean Water Act, Section 402: National Pollutant Discharge Elimination System
1 of 7 12/16/2014 3:27 PM Water: Wetlands You are here: Water Laws & Regulations Policy & Guidance Wetlands Clean Water Act, Section 402: National Pollutant Discharge Elimination System (a) Permits for
More informationTHIS INDEPENDENT ENGINEER'S AGREEMENT (this Independent Engineer's Agreement) is made on [ ]
THIS INDEPENDENT ENGINEER'S AGREEMENT (this Independent Engineer's Agreement) is made on [ ] AMONG (1) REGIONAL TRANSPORTATION DISTRICT (RTD); (2) DENVER TRANSIT PARTNERS, LLC, a limited liability company
More informationSandra Y. Snyder Regulatory Attorney for Environment & Personnel Safety
Interstate Natural Gas Association of America Submitted via www.regulations.gov May 15, 2017 U.S. Environmental Protection Agency Office of Regulatory Policy and Management Office of Policy 1200 Pennsylvania
More informationSAN JUAN RIVER BASIN IN NEW MEXICO NAVAJO NATION WATER RIGHTS SETTLEMENT AGREEMENT
SAN JUAN RIVER BASIN IN NEW MEXICO NAVAJO NATION WATER RIGHTS SETTLEMENT AGREEMENT This Agreement is entered into as of the dates executed below, by and among the State of New Mexico, the Navajo Nation
More informationOFF-LICENSE SETTLEMENT AGREEMENT BETWEEN PUBLIC UTILITY DISTRICT NO. 1 OF PEND OREILLE COUNTY, WASHINGTON, AND THE KALISPEL TRIBE OF INDIANS
OFF-LICENSE SETTLEMENT AGREEMENT BETWEEN PUBLIC UTILITY DISTRICT NO. 1 OF PEND OREILLE COUNTY, WASHINGTON, AND THE KALISPEL TRIBE OF INDIANS This Off-License Settlement Agreement ( OLSA ) is entered into
More informationSTATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT TO DISCHARGE STORMWATER UNDER THE
STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance
More informationTitle 19 Environmental Protection Chapter 5 Land Clearing
Title 19 Environmental Protection Chapter 5 Land Clearing Sec. 19-05.010 Title 19-05.020 Purpose and Scope 19-05.030 Jurisdiction 19-05.040 Authority 19-05.050 Findings 19-05.060 Definitions 19-05.070
More informationSOUTHBOROUGH WETLANDS BY-LAW First Draft 1/2/92, (last revised 2/22/95) Approved at Annual Town Meeting of April 10, 1995 (Article #48)
SOUTHBOROUGH WETLANDS BY-LAW First Draft 1/2/92, (last revised 2/22/95) Approved at Annual Town Meeting of April 10, 1995 (Article #48) CHAPTER 170-1. PURPOSE The purpose of this chapter is to protect
More informationMWCC Environmental Conference. Osage Renewable Energy Center. Warren A. Witt Director of Hydro Operations July 16, 2018
MWCC Environmental Conference Osage Renewable Energy Center Warren A. Witt Director of Hydro Operations July 16, 2018 TOPICS Ø Ameren Hydroelectric Operations Ø Osage/Bagnell Dam Construction Ø FERC License
More informationMARYLAND DEPARTMENT OF THE ENVIRONMENT GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY
MARYLAND DEPARTMENT OF THE ENVIRONMENT GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY General NPDES Permit Number MDR10 State Discharge Permit Number 09GP EFFECTIVE DATE: January 1,
More informationUNITED STATES OF AMERICA 118 FERC 62,141 FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA 118 FERC 62,141 FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Snohomish County, Project No. 12698-000 Washington ORDER ISSUING PRELIMINARY PERMIT (Issued
More informationG.S Page 1
143-215.1. Control of sources of water pollution; permits required. (a) Activities for Which Permits Required. Except as provided in subsection (a6) of this section, no person shall do any of the following
More informationUNITED STATES OF AMERICA 118 FERC 62,144 FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA 118 FERC 62,144 FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Snohomish County, Project No. 12689-000 Washington ORDER ISSUING PRELIMINARY PERMIT (Issued
More informationWater Law Senior College Jonathan Carlson
Water Law Senior College Jonathan Carlson The problem Future water shortages Supply side challenges: climate variability Demand side challenges: changes in use and demand State laws and administrative
More informationWILDERNESS ACT. Public Law (16 U.S. C ) 88 th Congress, Second Session September 3, 1964
WILDERNESS ACT Public Law 88-577 (16 U.S. C. 1131-1136) 88 th Congress, Second Session September 3, 1964 AN ACT To establish a National Wilderness Preservation System for the permanent good of the whole
More informationIdaho Water Law: Water Rights Primer & Definitions. A. What is a Water Right?
Idaho Water Law: Water Rights Primer & Definitions DISCLAIMER: This information was created by and is attributable to IDWR. It is provided through the Law Office of Arthur B. for your adjudication circumstances
More informationTHE AMERICAN LAW INSTITUTE Continuing Legal Education Environmental Law 2017
1 THE AMERICAN LAW INSTITUTE Continuing Legal Education Environmental Law 2017 Cosponsored by the Environmental Law Institute February 9-10, 2017 Washington, D.C. Executive Orders on the Keystone and Dakota
More informationCOURT USE ONLY. Decree: Order. DATE FILED: September 13, :12 PM CASE NUMBER: 2012CW191
DISTRICT COURT, GARFIELD (GLENWOOD SPRINGS) COUNTY, COLORADO Court Address: 109 8th Street, Ste. 104, Glenwood Springs, CO, 81601 In the Interest of: INYANGA RANCH LLC DATE FILED: September 13, 2015 3:12
More informationBOROUGH OF CALIFORNIA WASHINGTON COUNTY, PENNSYLVANIA ORDINANCE NO. 524
BOROUGH OF CALIFORNIA WASHINGTON COUNTY, PENNSYLVANIA ORDINANCE NO. 524 AN ORDINANCE OF THE BOROUGH OF CALIFORNIA, WASHINGTON COUNTY, PENNSYLVANIA AMENDING ORDINANCE NO. 426 PERTAINING TO FLOODPLAIN MANAGEMENT
More informationLEGISLATIVE COUNSELʹS DIGEST
Assembly Bill No. 1142 CHAPTER 7 An act to amend Sections 2715.5, 2733, 2770, 2772, 2773.1, 2774, 2774.1, 2774.2, and 2774.4 of, to add Sections 2736, 2772.1, and 2773.4 to, and to add and repeal Section
More informationRUSK COUNTY ANIMAL WASTE MANAGEMENT ORDINANCE
RUSK COUNTY ANIMAL WASTE MANAGEMENT ORDINANCE Adopted by the RUSK COUNTY BOARD OF SUPERVISORS August 19, 1986 RUSK COUNTY ANIMAL WASTE MANAGEMENT ORDINANCE STATE OF WISCONSIN COUNTY OF RUSK I, MELANIE
More informationUNITED STATES OF AMERICA 118 FERC 62,159 FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA 118 FERC 62,159 FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Snohomish County, Project No. 12687-000 Washington Washington Tidal Energy Company Project
More informationPublic Notice ISSUED:
US Army Corps of Engineers St Paul District Public Notice ISSUED: 31 July, 200ti SECTION: 404-Clean \Vater Act REFER TO: LOP-05-MN (2005-825-RJA) ISSUANCE OF LETTER OF PERMISSION PROCEDURES, LOP-05-MN,
More informationTreaty relating to cooperative development of the water resources of the Columbia River Basin (with Annexes)
Treaty relating to cooperative development of the water resources of the Columbia River Basin (with Annexes) Done 17 January 1961 The Governments of the United States of America and Canada Recognizing
More informationAppomattox River Water Authority
Appomattox River Water Authority 21300 Chesdin Rd. - S. Chesterfield, VA 23803 - Phone (804) 590-1145 - Fax (804) 590-9285 APPOMATTOX RIVER WATER AUTHORITY - RESOLUTION - AMENDED AND RESTATED POLICY PERTAINING
More information6.1 Planned Unit Development District
6.1 A. Intent The Planned Unit Development (PUD) District is designed to: encourage creativity and innovation in the design of developments; provide for more efficient use of land including the reduction
More informationPublic Water Supply and Sewerage Act
Issuer: Riigikogu Type: act In force from: 01.01.2015 In force until: 30.06.2017 Translation published: 05.02.2015 Amended by the following acts Passed 10.02.1999 RT I 1999, 25, 363 Entry into force 22.03.1999
More informationThe Water Security Agency Regulations
WATER SECURITY AGENCY W-8.1 REG 1 1 The Water Security Agency Regulations being Chapter W-8.1 Reg 1 (effective August 21, 2015) as amended by Saskatchewan Regulations 33/2016. NOTE: This consolidation
More informationMURRAY-DARLING BASIN AGREEMENT
MURRAY-DARLING BASIN AGREEMENT June 1992 (with additions to October 2000) ARRANGEMENT OF CLAUSES Clause Page PART I INTERPRETATION 1 Purpose 8 2 Definitions 8 3 Interpretation 12 PART II APPROVAL AND ENFORCEMENT
More informationVague and Ambiguous. The terms market and marketing are not defined.as such, the
(c) (d) Not Directed to All Settling Parties. This discovery request was directed to all three Settling Parties (the United States, the Navajo Nation, and the State of New Mexico) requesting information
More informationORD-3258 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA:
ORD-3258 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 AN ORDINANCE TO AMEND SECTIONS 30-57, 30-58, 30-60, 30-60.1, 30-71, 30-73, 30-74 AND 30-77 AND ADD SECTIONS 30-62
More informationFlorida Department of Environmental Protection
Florida Department of Environmental Protection Southwest District Office Chari ic Crist Ciovcrm lr lei! ""llklllll' Ii (1(1\l'Ph1r 13051 North Telecom Parkway '\Ii\h:'~! \\ ", -. Temple T~rrace. Florida
More information