1 SETTLEMENT AGREEMENT Regulation 24(1) of the Electricity Industry (Enforcement) Regulations 2010 DATED: BETWEEN: (1) Transpower New Zealand Limited as the grid owner of 96 The Terrace, Wellington (grid owner) (2) MainPower New Zealand Limited asset owner of 172 Fernside Road, Rangiora (MainPower) (3) Transpower New Zealand Limited as the system operator of 96 The Terrace, Wellington (system operator) (Collectively the parties). BACKGROUND: (A) On 23 November 2016, the grid owner reported to the Electricity Authority (Authority) that it had breached clauses 4(1), 4(4)(i) and 4(4)(ii) of Technical Code A of Schedule 8.3 of the Code. At the same time, the grid owner alleged that MainPower had breached clauses 4(1), 4(2), 4(4)(i) and 4(4)(ii) of Technical Code A of Schedule 8.3. (B) Clause 4(1) of Technical Code A of Schedule 8.3 requires each asset owner and grid owner to cooperate with the system operator to ensure that the protection systems for their assets are coordinated so that the main protection system disconnects a faulted asset first, and the other assets are not prematurely disconnected. (C) Clause 4(2) of Technical Code A of Schedule 8.3 requires the system operator and the relevant asset owner to agree a proposed grid interface, including the settings of any associated protection system, before implementing the grid interface. (D) Clauses 4(4)(i) and 4(4)(ii) of Technical Code A of Schedule 8.3 respectively require asset owners to provide protection systems for their gridconnected assets that support the system operator in planning to comply, and complying with, its principal performance obligations, and are designed, commissioned and maintained, and settings are applied, to achieve the following in a reliable manner: a) disconnect any faulted asset in minimum practical time (taking into account selectivity margins and industry best design practice) and minimum disruption to the operation of the grid or other assets 1
2 b) be selective when operating, so that the minimum amount of assets are disconnected. (E) On 24 February 2017, the Authority: appointed an investigator under regulation 12 of the Electricity Industry (Enforcement) Regulations 2010 (Regulations) to investigate the Alleged Breaches by the grid owner appointed an investigator under regulation 12 of the Enforcement Regulations to investigate the Alleged Breaches by MainPower. (F) The investigator gave notice of two separate investigations: one investigation relating to the grid owner's alleged breaches, and the other to MainPower's alleged breaches. (G) MainPower joined the investigation of the grid owner, and the system operator joined both investigations, as interested participants. (H) The parties have agreed to settle the Alleged Breaches of both investigations on the terms contained in this Agreement. IT IS AGREED: 1. Interpretation 1.1 In this Agreement, unless the context requires otherwise: (c) Agreement means this Settlement Agreement; Alleged Breaches means the alleged breaches of the Code arising from the Circumstances and described in clause 2; Approval Date means the date the parties to this Agreement are notified that the Electricity Authority has approved this Agreement under regulation 24(4) of the Regulations; (d) Circumstances means the circumstances set out in clause 3; (e) Code means the Electricity Industry Participation Code 2010; (f) Regulations means the Electricity Industry (Enforcement) Regulations Alleged Breaches 2.1 The grid owner self-reported breaches of clauses 4(1), 4(4)(i) and 4(4)(ii) of Technical Code A of Schedule 8.3. The grid owner also breached clause 4(2) of Technical Code A of Schedule The grid owner alleged that MainPower breached clauses 4(1), 4(2), 4(4)(i) and 4(4)(ii) of Technical Code A of Schedule
3 3. Circumstances of the Breaches 3.1 On 17 November 2015, the grid owner commissioned a new 66 kv feeder at its Southbrook substation providing supply to MainPower. 3.2 At 20:01 on 24 March 2016, the Islington Southbrook 1, Islington Southbrook 2, Ashley Southbrook 1 and Southbrook Waipara 1 circuits tripped, resulting in a loss of supply to the Southbrook and Kaiapoi substations. 3.3 Following an on-site inspection at Southbrook, the grid owner returned the two Islington Southbrook circuits to service at 21:39. The grid owner restored all of the remaining 66 kv circuits between Southbrook, Kaiapoi and Ashley by 22: The grid owner then proceeded to liven the 66 kv feeders supplying MainPower. When the grid owner closed the Southbrook circuit breaker 152 supplying the MainPower 66 kv Burnt Hill feeder, all of the incoming circuits to Southbrook tripped. 3.5 At that point, the grid owner determined that a fault on the MainPower Burnt Hill feeder had probably led to the initial and subsequent tripping. At 23:39, the grid owner returned to service the transmission circuits between Islington, Southbrook, Kaiapoi and Ashley, but left Southbrook circuit breaker 152 in the open position. 3.6 The fault analysis concluded that: a high resistance yellow-phase-to-earth fault on the MainPower 66 kv network caused the circuit trips the directional earth fault final time protection at the grid owner s Islington, Ashley, and Waipara substations cleared the fault indiscriminately. The grid owner s protection setting on the new Southbrook 66 kv feeder circuit breaker 152 supplying MainPower appeared to cause the circuit trips. 3.7 The grid owner had set the earth fault protection time delay for the new feeder to operate in three seconds, in accordance with its protection setting guide. The rest of the earth fault protection on the 66 kv Southbrook bus was set to operate in one second. These settings meant that the 66 kv circuits into Southbrook tripped before feeder circuit breaker 152 could trip. 3.8 MainPower confirmed to the grid owner that its line differential protection elements, which should have operated for this high resistance fault, were disabled because MainPower had not yet commissioned its protection signalling between Southbrook and Burnt Hill. 3.9 MainPower had previously advised commissioning staff on site that the protection signalling would not be available when MainPower commissioned the new feeder on 17 November The grid owner believes this information was not relayed to the grid owner s protection designer or the protection and automation engineers The grid owner has advised that, because MainPower s feeder was commissioned without protection signalling, MainPower considered the grid 3
4 owner s earth fault protection on the feeder would be time graded with other earth fault protection in the vicinity. However, the grid owner has advised that the grid owner s protection operated indiscriminately because: the discriminative protection element on the MainPower-owned Southbrook feeder protection equipment was unavailable the time grading of the grid owner s earth fault protection relay was unsuitable The grid owner advised that, for a high resistance earth fault such as that which occurred at Southbrook, the normal distance protection elements are not sensitive enough to detect the fault. It is usual to rely on earth fault protection elements to provide backup protection in these circumstances. For transmission protection, the grid owner does not normally specify that timedelayed earth fault protection elements be time graded, as the distributor normally installs communication-assisted line differential unit protection MainPower had incorporated communication-assisted line differential unit protection relays in its design, but at the time of commissioning the new feeder circuit breakers, the communications circuits had not themselves been commissioned. The grid owner advised that MainPower did not make it clear to the grid owner at any stage of the project that MainPower s protection scheme would not have the communication-assisted line differential unit protection scheme operating when the new feeders were commissioned The grid owner's understanding of MainPower's design was that, because MainPower had communication-assisted line protection installed on the new Southbrook feeders, there was no need for the grid owner to incorporate time grading of its earth fault elements into the protection design The grid owner s earth fault time delay settings at Islington, Waipara, Ashley and Southbrook are time graded to discriminate in favour of high-impedance earth faults when protection signalling is not in service. With time-graded protection settings at these sites, the grid owner should have also time graded its protection settings for the two new Southbrook feeders On the morning of 25 March 2016, the grid owner agreed with MainPower to reduce the grid owner s earth fault protection time-delay setting from 3.0 seconds to 0.6 seconds on its feeder circuit breakers (CB152 and CB202) On the evening of 25 March 2016, the grid owner applied new protection settings and returned the two new Southbrook feeders to service. 4. Impact of the Breaches 4.1 The incident caused a loss of supply of 44 MW from Southbrook and Kaiapoi substations. 5. Steps taken to prevent recurrence 5.1 To prevent recurrence, the grid owner will: 4
5 a) investigate and identify whether there are any other feeders that need to be time graded with other earth fault time delay settings in the area b) update its protection design guides to include the requirement to timegrade earth fault time delay settings with other earth fault time delay settings in the relevant area c) ensure that protection design consultants it engages are aware of the time-grading requirement when commissioning new feeders in areas where asset owners have not installed (and do not propose to install) differential line protection with protection signalling d) discuss with protection design consultants the importance of confirming protection requirements at the grid interface with asset owners prior to designing any new protection systems e) discuss with asset owners the obligations that the grid owner and asset owners both have under clause 4 of Technical Code A of Schedule 8.3 regarding their asset protection systems f) discuss with the grid owner s design consultants and with asset owners the need to time-grade protection time delay settings for when differential protection is removed from service for maintenance and testing when the feeder remains in service. The grid owner will take the relevant feeder out of service if earth fault time-delay settings in the relevant area are not, or cannot be, time graded. 5.2 In September 2016, MainPower completed installation of the protection signalling between Southbrook and Burnt Hill. 6. Guiding Principles 6.1 The parties agree the following guiding principles in relation to this Agreement: it is essential participants have a clear understanding of protection coordination compliance requirements to ensure reliable supply of electricity to consumers. commissioning activity introduces risk that requires careful project management to ensure reliable and efficient operation of the electricity industry. 5
6 7. Settlement 7.1 The grid owner agrees to complete the steps to prevent recurrence outlined in clause 5.1 of this Agreement. 7.2 The grid owner and Mainpower agree to the following procedure to ensure cooperation with the system operator and to obtain agreement from the system operator to meet the requirements of clause 4(1) and 4(2) of Technical Code A of Schedule 8.3. The grid owner and asset owners will each separately notify the system operator by , to the generic address compliance@transpower.co.nz, of any new or changes to existing protection systems at the grid interface prior to commissioning of the equipment. The system operator, subject to evaluation, will then provide its agreement in writing to the parties prior to the go live date of the proposed changes. 7.3 The grid owner will arrange for this procedure in clause 7.2 to be publicised on the relevant sections of Transpower s website. 7.4 The grid owner agrees to complete its settlement actions by 30 September Confidentiality 8.1 If the Authority decides under regulation 25(2) of the Regulations not to publicise any part of this Agreement, each party will treat that part of the Agreement as confidential information and will not disclose it other than: (c) (d) (e) to the party s employees or contractors who need to know the confidential information to implement or monitor the implementation of this Agreement; to the party s professional advisers, auditors and bankers; as required by law or for the purposes of judicial proceedings; as required by any securities exchange or regulatory or governmental body to which the party is subject or submits; or as authorised in writing by the other parties. 8.2 A party must not disclose confidential information under clause 8.1 or unless the party obtains a confidentiality undertaking from the person to whom the confidential information is to be disclosed on terms no less onerous than those set out in this clause 8 before disclosing the confidential information. Any confidential information to be disclosed in the circumstances set out in clause 8.1(c) or (d) may only be disclosed after written notice to the other parties (unless the disclosing party is prevented from notifying the other parties by law). 6
7 9. Agreement Subject to Approval 9.1 Subject to clause 9.2, this Agreement will come into effect on the Approval Date. 9.2 Clause 8 is binding on the parties as from the date of this Agreement. Pending the Authority s approval of this Agreement under regulation 24(4) of the Regulations, clause 8 will apply as if the Authority has decided under regulation 25(2) of the Regulations not to publicise any part of this Agreement or the existence of this Agreement. 10. Settled Breaches 10.1 This Agreement is in full and final settlement of all claims, actions and demands against any party (under the Regulations, the Code or otherwise) in relation to: the Alleged Breaches; and any other breaches of the Regulations or Code involved in or arising from the Circumstances that the claiming party ought reasonably to have known about at the date of this Agreement, (the Alleged Breaches and such other breaches together the Settled Breaches) Subject to regulation 26 of the Regulations, this Agreement is also binding on the Authority and all participants who are not a party to this Agreement to the effect that: the Authority may not on its own initiative instigate a further breach investigation, or take any enforcement action in respect of, the Settled Breaches; and a participant who is not a party to this Agreement may, in accordance with regulation 26 of the Regulations, make a further notification under regulation 7 or 8 of the Regulations in relation to a Settled Breach, and the Authority may then take all or any of the steps provided for in the Regulations despite this Agreement. 11. General 11.1 Each party will execute all documents and do, or refrain from doing, all other reasonable things necessary or desirable to give full effect to the provisions of this Agreement, including to secure the Authority s approval of this Agreement under regulation 24(4) of the Regulations This Agreement is the whole and only agreement between the parties relating to the settlement of claims, actions and demands arising from the Circumstances. Each party acknowledges that it has not been induced to enter into this Agreement by any representation made by or on behalf of the other party that is not repeated in this Agreement. 7
8 11.3 This Agreement may be signed in any number of counterparts. SIGNED: For Transpower New Zealand Limited as the grid owner Name: Position: SIGNED: For MainPowerNew Zealand Limited Name: Position: SIGNED: For Transpower New Zealand Limited as the system operator Name: Position: 8
NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012
NIGERIAN ELECTRICITY REGULATORY COMMISSION REGULATIONS FOR EMBEDDED GENERATION 2012 1 P a g e REGULATION NO: 0112 NIGERIAN ELECTRICITY REGULATORY COMMISSION In exercise of its powers to make Regulations
More informationSCHEDULE 2 - EXHIBIT 2 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE
SCHEDULE 2 - EXHIBIT 2 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE BILATERAL EMBEDDED GENERATION AGREEMENT [USE OF SYSTEM FOR AN EMBEDDED
More informationCharter. Energy & Water Ombudsman (NSW) Limited. March 2012 and subsequent amendments
Charter Energy & Water Ombudsman (NSW) Limited March 2012 and subsequent amendments 1 Contents 1. DEFINITIONS AND INTERPRETATION 3 2. RESPONSIBILITIES OF EWON 4 3. DELEGATION POWERS 4 4. ENQUIRIES AND
More informationService Agreement No. under PG&E FERC Electric Tariff Volume No. 5
Interconnection Agreement Between Pacific Gas and Electric Company and Northern California Power Agency and City of Alameda, City of Biggs, City of Gridley, City of Healdsburg, City of Lodi, City of Lompoc,
More informationElectricity Supply Act 1995 No 94
New South Wales Electricity Supply Act 1995 No 94 Contents Part 1 Preliminary 1 Name of Act 2 Commencement 3 Objects 4 Definitions 5 Act binds Crown Page 2 2 2 2 2 Part 2 Network operations and wholesale
More informationNORTHERN IRELAND ELECTRICITY plc. and THE CONNECTED PARTY NAMED IN PART C OF THIS AGREEMENT HIGH VOLTAGE CONNECTION AGREEMENT
NORTHERN IRELAND ELECTRICITY plc and THE CONNECTED PARTY NAMED IN PART C OF THIS AGREEMENT HIGH VOLTAGE CONNECTION AGREEMENT CMS Cameron McKenna Mitre House 160 Aldersgate Street London EC1A 4DD T +44(0)20
More informationTHE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO)
THE ORISSA DISTRIBUTION AND RETAIL SUPPLY LICENCE, 1999 (WESCO) (NO. 4/99) (Issued under OERC Order Dt. 31.03.99 in Case No. 25/98) Western Electricity Supply Company of Orissa Limited Registered office:
More informationPOWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only)
JD(Tariff) Page 1 9/20/2006 POWER PURCHASE AGREEMENT FOR WIND ELECTRIC GENERATORS (For sale to Distribution Licensee only) THIS AGREEMENT made this day of,200 at between M/s.being a Company registered
More informationORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004
ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004 2 THE ORISSA GAZETTE EXTRA ORDINARY PUBLISHED BY AUTHORITY NO.711, CUTTACK, FRIDAY, MAY 28, 2004 / JAISTHA
More informationISBN Project no / Public version
ISBN 978-1-869456-22-1 Project no. 14.11/15108 Public version Companion Paper to amendments to the pilot asset health grid output measures and asset health pilot reporting requirements in the Transpower
More informationSUBSIDIARY LEGISLATION DATA PROTECTION (PROCESSING OF PERSONAL DATA IN THE POLICE SECTOR) REGULATIONS
DATA PROTECTION (PROCESSING OF PERSONAL DATA IN THE POLICE SECTOR) [S.L.440.05 1 SUBSIDIARY LEGISLATION 440.05 DATA PROTECTION (PROCESSING OF PERSONAL DATA IN THE POLICE SECTOR) REGULATIONS 30th September,
More informationNORTHERN IRELAND ELECTRICITY SAFETY RULES GUIDANCE DOCUMENT INSTRUCTION FOR OPERATIONS OR WORK ON THE PREMISES
ONCE PRINTED THIS IS AN UNCONTROLLED DOCUMENT NORTHERN IRELAND ELECTRICITY SAFETY RULES GUIDANCE DOCUMENT INSTRUCTION FOR OPERATIONS OR WORK ON THE PREMISES OF CUSTOMERS RECEIVING HIGH VOLTAGE SUPPLY SRG
More information130 FERC 61,151 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER INITIATING REVIEW OF NOTICE OF PENALTY. (Issued February 26, 2010)
130 FERC 61,151 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, and John R. Norris. North American Electric
More informationElectricity Supply (Safety and Network Management) Regulation 2014
New South Wales Electricity Supply (Safety and Network Management) Regulation 2014 under the Electricity Supply Act 1995 Her Excellency the Governor, with the advice of the Executive Council, has made
More informationPhotovoltaic Inverter Network Connection Agreement
Photovoltaic Inverter Network Connection Agreement Power and Water Corporation (PWC) ABN: 15 947 352 360 / / (Day/Month/Year) Customer: Customer s ABN: (Commercial Customers Only) Note to customers 1.
More informationFRAMEWORK AGREEMENT RELATING TO NETWORK ACCESS AND ADOPTION OF ELECTRICITY CONNECTIONS AND DISTRIBUTION EQUIPMENT BETWEEN
FRAMEWORK AGREEMENT RELATING TO NETWORK ACCESS AND ADOPTION OF ELECTRICITY CONNECTIONS AND DISTRIBUTION EQUIPMENT BETWEEN WESTERN POWER DISTRIBUTION (SOUTH WEST) PLC, WESTERN POWER DISTRIBUTION (SOUTH
More informationTelekom Austria Group Standard Data Processing Agreement
Telekom Austria Group Standard Data Processing Agreement This Agreement is entered into by and between: I. [TAG Company NAME], a company duly established and existing under the laws of [COUNTRY] with its
More informationAGREEMENT FOR LIMITED INTERCONNECTION OF SOUTHERN CALIFORNIA EDISON COMPANY-220 KV SWITCHYARD TO THE ELDORADO SYSTEM FOR AN INTERIM PERIOD AMONG
Attachment 4 Title Page Southern California Edison Company Tariff Title: Rate Schedules Tariff Record Title: Rate Schedule FERC No. 492 FERC FPA Electric Tariff AGREEMENT FOR LIMITED INTERCONNECTION OF
More informationCalifornia Independent System Operator Corporation Fifth Replacement Tariff. Appendix B.8 Utility Distribution Company Operating Agreement (UDCOA)
Utility Distribution Company Operating Agreement (UDCOA) THIS OPERATING AGREEMENT is dated this day of, and is entered into, by and between: (1) [Full legal name of UDC] having its registered and principal
More informationElectricity (Safety, Quality and Continuity) Regulation
Electricity (Safety, Quality and Continuity) Regulation I fldgi ( ^I& fpoh - YS%,xld m%cd;dka;s%l iudcjd ckrcfha w;s úfyi.eiü m;%h - 2016'07'13 1A Y% S,xld m%cd;dka;% sl iudcjd ckrcfha.eiü m;%h w;s úfyi
More informationRENEWABLE ENERGY INTERCONNECTION AGREEMENT
RENEWABLE ENERGY INTERCONNECTION AGREEMENT This Renewable Energy Interconnection Agreement is made this day of, 20 BETWEEN THE BARBADOS LIGHT & POWER COMPANY LIMITED, a company incorporated under the Companies
More informationGas Compliance Reporting Manual. Energy Coordination Act 1994
Gas Compliance Reporting Manual Energy Coordination Act 1994 January 2017 This document is available at the Economic Regulation ERA s website at www.erawa.com.au. For further information, contact: Economic
More informationGeneral Rules on the Processing of Personal Data SCHEDULE 1 DATA TRANSFER AGREEMENT (Data Controller to Data Controller transfers)...
DATA PROTECTION REGULATIONS 2015 DATA PROTECTION REGULATIONS 2015 General Rules on the Processing of Personal Data... 1 Rights of Data Subjects... 6 Notifications to the Registrar... 7 The Registrar...
More information.nz Connection Agreement
Title: Date 23 February 2018 Issued: Version 4.1 between: Internet New Zealand Incorporated, trading as InternetNZ and: [full & formal name of Registrar's legal entity] dated: 1. Definitions In this Agreement:
More informationTRANSMISSION SYSTEM OPERATOR LICENCE GRANTED TO. Gaslink Independent System Operator Limited. Consultation Paper
TRANSMISSION SYSTEM OPERATOR LICENCE GRANTED TO Gaslink Independent System Operator Limited Consultation Paper CER/08/078 [ ] 2008 TABLE OF CONTENTS PART I: PART II: Condition 1: Condition 2: Condition
More informationTelecommunications Carriers Forum. Co-siting Code
Telecommunications Carriers Forum Co-siting Code December 2007 2007 The Telecommunications Carriers' Forum Inc. All rights reserved. Copyright in the material contained in this document belongs to the
More informationVIA HAND DELIVERY. P.S.C. Case No E-C. October 26,2009
A unit ofamerican Electric Power Appalachian Power 707 Virginia Street East, Suite 1100 P 0 Box 1986 Charleston, WV 25327.19% APCOcustorner.com October 26,2009 VIA HAND DELIVERY Sandra Squire Executive
More informationELECTRICITY GENERATION LICENCE GRANTED TO INSERT NAME HERE INSERT GEN REF NUMBER HERE
ELECTRICITY GENERATION LICENCE GRANTED TO INSERT NAME HERE INSERT GEN REF NUMBER HERE September 2017 Contents PART I Terms of the Licence... 13 PART II Conditions of the Licence... 24 Section C Conditions
More informationDATA PROCESSING AGREEMENT. between [Customer] (the "Controller") and LINK Mobility (the "Processor")
DATA PROCESSING AGREEMENT between [Customer] (the "Controller") and LINK Mobility (the "Processor") Controller Contact Information Name: Title: Address: Phone: Email: Processor Contact Information Name:
More informationAnyComms Plus. End User Licence Agreement. Agreement for the provision of data exchange software licence for end users
AnyComms Plus End User Licence Agreement Agreement for the provision of data exchange software licence for end users i March 2018 V4 Terms & Conditions Definitions and Interpretation Commencement Date
More informationElectricity (Consumer Safety) Regulation 2006
New South Wales Electricity (Consumer Safety) Regulation 2006 under the Electricity (Consumer Safety) Act 2004 Her Excellency the Governor, with the advice of the Executive Council, has made the following
More informationSOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED
SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED COMPLAINT HANDLING PROCEDURE OF DISTRIBUTION LICENSEE (APPROVED BY OERC) 1. This "Complaint Handling Procedure relating to Distribution Activity (Complaint
More informationAGREEMENT FOR SUPPLY OF HT ENERGY
AGREEMENT FOR SUPPLY OF HT ENERGY This agreement made on the.. day of.., 200 between the Development Commissioner, Cochin Special Economic Zone, Kakkanad for and on behalf of Cochin Special Economic Zone
More informationElectricity Act, 1998 Loi de 1998 sur l électricité
Electricity Act, 1998 Loi de 1998 sur l électricité ONTARIO REGULATION 22/04 ELECTRICAL DISTRIBUTION SAFETY Consolidation Period: From October 1, 2017 to the e-laws currency date. Last amendment: O. Reg.
More informationElectricity Generation Licence. EG-20xx-0xxx. Name of Licensee
Electricity Generation Licence EG-20xx-0xxx Name of Licensee Valid Until Month day year Peter Fraser Vice President, Industry Operations & Performance Ontario Energy Board Date of Issuance: Month day year
More informationSCHEDULE 2 - EXHIBIT 5 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE BELLA
SCHEDULE 2 - EXHIBIT 5 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and [ ] (2) THE CONNECTION AND USE OF SYSTEM CODE BELLA [EMBEDDED EXEMPTABLE LARGE POWER STATION WHICH IS SMRS REGISTERED]
More informationTERMS OF REFERENCE INSURANCE & FINANCIAL SERVICES OMBUDSMAN SCHEME INCORPORATED
TERMS OF REFERENCE INSURANCE & FINANCIAL SERVICES OMBUDSMAN SCHEME INCORPORATED 1 JULY 2015 Contents 1. Definitions and Interpretation... 3 2. Delegation Powers... 5 3. Principal Powers and Duties of the
More informationMODEL POWER PURCHASE AGREEMENT BETWEEN JAMMU AND KASHMIR POWER DEVELOPMENT DEPARTMENT AND. M/s (IPP)
MODEL POWER PURCHASE AGREEMENT BETWEEN JAMMU AND KASHMIR POWER DEVELOPMENT DEPARTMENT AND M/s ----------------------------- (IPP) J&K STATE HYDROELECTRIC PROJECTS DEVELOPMENT POLICY 2011 21 POWER PURCHASE
More informationGENERATOR INTERCONNECTION & OPERATING AGREEMENT FOR CATEGORY 3-5 PROJECTS WITH AGGREGATE GENERATOR OUTPUT. OF GREATER THAN 150 kw
GENERATOR INTERCONNECTION & OPERATING AGREEMENT FOR CATEGORY 3-5 PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF GREATER THAN 150 kw GENERATOR INTERCONNECTION & OPERATING AGREEMENT BETWEEN UPPER PENINSULA
More informationCONSULTANCY SERVICES AGREEMENT
DATED 2010 [INSERT NAME OF CUSTOMER] (Customer) CAVALLINO HOLDINGS PTY LIMITED ACN 136 816 656 ATF THE DAYTONA DISCRETIONARY TRUST T/A INSIGHT ACUMEN (Consultant) CONSULTANCY SERVICES AGREEMENT Suite 5,
More informationAnnex 1: Standard Contractual Clauses (processors)
Annex 1: Standard Contractual Clauses (processors) For the purposes of Article 26(2) of Directive 95/46/EC for the transfer of personal data to processors established in third countries which do not ensure
More informationAGREEMENT FOR SUPPLY OF LT ENERGY
AGREEMENT FOR SUPPLY OF LT ENERGY This agreement made on the.. day of.., 200 between the Development Commissioner, Cochin Special Economic Zone, Kakkanad for and on behalf of Cochin Special Economic Zone
More informationEnergy Networks Association
The Voice of the Networks Energy Networks Association Competition in Connections Code of Practice July 2015 Competition in Connections Code of Practice Produced in accordance with standard condition 52
More informationSEVENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004
Bhopal, dated: 12 th July, 2006 No.1740&MPERC&2006. In exercise of powers conferred by Section 181 (1) of the Electricity Act, 2003 (No. 36 of 2003) and also in compliance of the notification dated 08
More informationOman Electricity Transmission Company S.A.O.C
SULTANATE OF OMAN ELECTRICITY TRANSMISSION AND DISPATCH LICENCE GRANTED TO Oman Electricity Transmission Company S.A.O.C Effective: 1 May 2005 Modified: 1 January 2016 CONTENTS PART I THE LICENCE... 4
More informationSTUDENT DISCIPLINARY PROCEDURE: NON-ACADEMIC MISCONDUCT
STUDENT DISCIPLINARY PROCEDURE: NON-ACADEMIC MISCONDUCT 1. INTRODUCTION Purpose 1.1 In order to operate effectively, all organisations need to set standards of conduct to which their members are expected
More informationSCHEDULE 1 DATA TRANSFER AGREEMENT (Data Controller to Data Controller transfers)... 16
DATA PROTECTION REGULATIONS 2015 DATA PROTECTION REGULATIONS 2015 Part 1 General Rules on the Processing of Personal Data... 1 Part 2 Rights of Data Subjects... 7 Part 3 Notifications to the Registrar...
More informationLESOTHO ELECTRICITY AND WATER AUTHORITY
LESOTHO ELECTRICITY AND WATER AUTHORITY RENEWABLE ELECTRICITY GENERATION LICENCE TEMPLATE August EFFECTIVE DATE 01 MAY 2016 LESOTHO ELECTRICITY AND WATER AUTHORITY pursuant to the provision of the Lesotho
More informationAppendix 1 Data Processing Agreement
Appendix 1 Data Processing Agreement Except as modified below, the terms of the Agreement shall remain in full force and effect. The Agreement and this DPA are connected and cannot be terminated separately.
More informationAnnex I To Loughborough University Estates Services Health and Safety Policy
Annex I Annex I To Loughborough University Estates Services Health and Safety Policy High Voltage Electricity System Safety Rules And Associated Safety Guidance 1. Introduction a. These Safety Rules are
More informationEDB Information Disclosure Requirements Information Templates for Schedules 11a 13
EDB Information Disclosure Requirements Information Templates for Schedules 11a 13 Disclosure Date 31 March 2019 Start Date (first day) 1 April 2019 Templates for Schedules 11a 13 (Asset Management Plan)
More informationET Hydro One Networks Inc.
Filed: September 12, 2006 EB-2005-0501 Exhibit A Tab 5 Schedule 1 Electricity Transmission Licence ET-2003-0035 Hydro One Networks Inc. Valid Until December 2, 2023 Mark C. Garner Secretary Ontario Energy
More informationElectricity Generation Licence EG The Regional Municipality of Durham and Regional Municipality of York (Durham York Energy Centre)
Electricity Generation Licence EG-2013-0380 The Regional Municipality of Durham and Regional Municipality of York Valid Until January 22, 2034 Original signed by Viive Sawler Manager, Licence Applications,
More informationSUPPLIER DATA PROCESSING AGREEMENT
SUPPLIER DATA PROCESSING AGREEMENT This Data Protection Agreement ("Agreement"), dated ("Agreement Effective Date") forms part of the ("Principal Agreement") between: [Company name] (hereinafter referred
More informationEffective Date: 1 January Dated 1 January 2009 CONSTITUTION FOR THE ELECTRICITY AND GAS COMPLAINTS COMMISSIONER SCHEME
Dated 1 January 2009 CONSTITUTION FOR THE ELECTRICITY AND GAS COMPLAINTS COMMISSIONER SCHEME CONTENTS 1. INTERPRETATION 1 Definitions 1 References to statutes, etc 11 Exclusions from the definition of
More informationSECTION #6 - REFERENCE #2. Standard Toronto Hydro Connection Agreements Terms of Conditions
SECTION #6 - REFERENCE #2 Standard Toronto Hydro Connection Agreements Terms of Conditions : o Toronto Hydro-Electric System Limited Connection Agreement Schedule B1: o Micro-Embedded Generation Facility
More informationParticipant Agreement
Participant Agreement [insert name of Participant] Nord Pool AS PARTICIPANT AGREEMENT This Participant Agreement (the Participant Agreement ) is made the day of [ ] 20[ ] by and between: 1. [Insert name
More informationDisciplinary and Dismissal Procedure
Disciplinary and Dismissal Procedure [Company Name] Drafted by Solicitors Contents Clause 1. Policy statement... 1 2. Who is covered by the procedure?... 1 3. What is covered by the procedure?... 1 4.
More informationSubstantial Security Holder Disclosure. Discussion Document
Substantial Security Holder Disclosure Discussion Document November 2002 Table of Contents SUMMARY OF QUESTIONS FOR SUBMISSION...3 BACKGROUND INFORMATION...5 Process...5 Official Information and Privacy
More informationREGULATORY SYSTEMS (BUILDING AND HOUSING) AMENDMENT BILL
REGULATORY SYSTEMS (BUILDING AND HOUSING) AMENDMENT BILL Departmental Report to Local Government and Environment Committee 9 February 2017 The Chair Local Government and Environment Committee 1. This is
More informationRevision 11 of Issue 4 of the Grid Code has been approved by the Authority for implementation on 16 th March 2012.
National Grid House Warwick Technology Park Gallows Hill, Warwick CV34 6DA All Recipients of the Serviced Grid Code Lucy Hudson Code Coordinator Electricity Codes lucy.hudson@uk.ngrid.com Direct tel +44
More informationDisclaimer. N: v1
Disclaimer This is not a legally-binding document and is not for execution. It is intended purely to provide an overview of the kind of terms that might be included in any eventual final document and to
More informationPARLIAMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
PARLIAMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA SRI LANKA ELECTRICITY ACT, No. 20 OF 2009 [Certified on 8th April, 2009] Printed on the Order of Government Published as a Supplement to Part
More informationPTO-AC Guidelines for Handling CEII Materials and CEII Requests
PTO-AC Guidelines for Handling CEII Materials and CEII Requests Effective Date: June 25, 2009 Table of Contents 1. Introduction...2 2. Acronyms and Definitions of Terms...2 2.1. CEII Defined...2 2.2. Acronyms
More informationThe Conditions of distribution license for distribution licensee (including deemed licensee), 2004
Bhopal, Dated: 23rd July, 2004 No.1999/MPERC/2004.In exercise of powers under Section 16 of the Electricity Act 2003 (36 of 2003), MPERC specifies Condition of Licence applicable to the distribution licensee
More informationDISTRIBUTION AND SUPPLY LICENCE
SULTANATE OF OMAN DISTRIBUTION AND SUPPLY LICENCE GRANTED TO Majan Electricity Company S.A.O.C Effective: 1 May 2005 Modified: 1 January 2016 CONTENTS Page PART I THE LICENCE... 4 1. Grant of the Licence...
More informationTXU ELECTRICITY LTD ABN STANDARD TERMS AND CONDITIONS ELECTRICITY DISTRIBUTION CONTRACT
Electricity Industry Act 2000 PUBLICATION OF TERMS AND CONDITIONS UNDER SECTION 40A TXU ELECTRICITY LTD ABN 91 064 651 118 STANDARD TERMS AND CONDITIONS ELECTRICITY DISTRIBUTION CONTRACT INTRODUCTION These
More informationTELECOMMUNICATIONS ORDINANCE (Chapter 106) WIRELESS INTERNET OF THINGS LICENCE. [Company Name]... [Address]
Form 034(1) Licence No. TELECOMMUNICATIONS ORDINANCE (Chapter 106) WIRELESS INTERNET OF THINGS LICENCE DATE OF ISSUE: [ ] [Company Name]... of [Address].. (the licensee ) is licensed, subject to the following
More informationDocument name. Date adopted/approved March 25, 2014 Custodian (entity responsible for maintenance and upkeep)
Document name Category Remedial Action Scheme Reliability Subcommittee Charter ( ) Regional Reliability Standard ( ) Regional Criteria ( ) Policy ( ) Guideline ( ) Report or other (x) Charter Document
More informationNET METERING CONNECTION AGREEMENT
NET METERING CONNECTION AGREEMENT This Agreement is made and entered into at Mumbai on this day of 20 between,(i)... (name of consumer), having its premises at... and Consumer No. (hereinafter referred
More informationElectricity Generation Licence EG LunarLight LP
Electricity Generation Licence EG-2014-0212 LunarLight LP Valid Until July 23, 2034 Original Signed By Viive Sawler Manager, Licensing & Performance Reporting Ontario Energy Board Date of Issuance: July
More informationSCHEDULE 2B NATIONAL TERMS OF CONNECTION
SCHEDULE 2B NATIONAL TERMS OF CONNECTION Version 8.0 effective from 01 October 2016 SECTION 1 (A) Introduction: The electricity that is supplied to, or exported from, the premises is conveyed using the
More informationKINGDOM OF SAUDI ARABIA. Capital Market Authority. Draft Rules for Qualified Foreign Financial Institutions Investment in Listed Shares
KINGDOM OF SAUDI ARABIA Capital Market Authority Draft Rules for Qualified Foreign Financial Institutions Investment in Listed Shares English Translation of the Official Arabic Text Issued by the Board
More informationData Processing Agreement. <<Health Service Provider>> The National Message Broker Service known as Healthlink
Between And The National Message Broker Service known as Healthlink THIS AGREEMENT is dated and made between: (1) , which has its principle administrative
More informationTrial Period Terms and Conditions Product Supply Agreement
Trial Period Terms and Conditions Product Supply Agreement Recital The Company has agreed to provide the NESDEP instrument and Test Kits to the Customer and the Customer has agreed to trial the Instrument
More informationTitle Page Southern California Edison Company Tariff Title: Rate Schedules Tariff Record Title: Rate Schedule FERC No. 495 FERC FPA Electric Tariff AGREEMENT FOR ADDITIONAL SOUTHERN CALIFORNIA EDISON COMPANY
More informationKERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION
KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. 1824/CT/KSERC/2012 Dated, Thiruvananthapuram 10 th September, 2013 Kerala State Electricity Regulatory Commission (Connectivity and Intrastate
More informationTERMS AND CONDITIONS WHICH APPLY TO THE SALE OF ALL CEMENT AND SUPPLY OF RELATED SERVICES BY HOPE CEMENT LIMITED
TERMS AND CONDITIONS WHICH APPLY TO THE SALE OF ALL CEMENT AND SUPPLY OF RELATED SERVICES BY HOPE CEMENT LIMITED 1. BASIS OF THE CONTRACT 1.1 All Materials sold by the Company shall be subject to these
More informationISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD. Copyright 2009 All rights reserved.
ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD Copyright 2009 All rights reserved. ISOLATED OPERATIONS LO/TO WORK STANDARD ISOLATED OPERATIONS LOCK OUT/TAG OUT (LO/TO) WORK STANDARD Copyright
More informationDATA PROCESSING AGREEMENT
DATA PROCESSING AGREEMENT PARTIES This agreement between has been concluded on.. by and between HotSpot System Ltd. a company registered in Hungary under company number 01-09883187 whose registered office
More informationRFx Process Terms and Conditions (Conditions of Tendering)
RFx Process Terms and Conditions (Conditions of Tendering) 1 Interpretation These RFx Process Terms and Conditions are the process terms and conditions apply to school property related RFx (including Contract
More informationMarch 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426
California Independent System Operator Corporation March 15, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California
More informationSP MANWEB PLC - GENERAL BILATERAL TERMS AND CONDITIONS FOR ADOPTION OF CONTESTABLE WORKS PART 1 - GENERAL TERMS AND CONDITIONS
1. DEFINITIONS PART 1 - GENERAL TERMS AND CONDITIONS 1.1 The following words and expressions shall (except to the extent that the context otherwise requires) have the meanings hereby assigned to them:-
More informationTemplate Commission pursuant to Section 11 BDSG
Template Commission pursuant to Section 11 BDSG Agreement between... - (the Principal ) - and... - (the Agent ) - 1. Subject-matter and duration of the commission Subject-matter of the commission: The
More informationSupply shall generally be given at the following voltages on the basis of contracted load:
Classification of Supply- Supply shall generally be given at the following voltages on the basis of contracted load: Consumers availing supply at lower voltage than above classification will be required
More information2009 Bill 50. Second Session, 27th Legislature, 58 Elizabeth II THE LEGISLATIVE ASSEMBLY OF ALBERTA BILL 50 ELECTRIC STATUTES AMENDMENT ACT, 2009
2009 Bill 50 Second Session, 27th Legislature, 58 Elizabeth II THE LEGISLATIVE ASSEMBLY OF ALBERTA BILL 50 ELECTRIC STATUTES AMENDMENT ACT, 2009 THE MINISTER OF ENERGY First Reading.......................................................
More informationElectricity Retail Licence. NewRet Pty Ltd
Electricity Retail Licence NewRet Pty Ltd ERL23, Version 1, 24 March 2015 Electricity Industry Act 2004 (WA) Retail Licence Licensee Name: NewRet Pty Ltd ABN: 27 603 402 400 Licensee Address: GPO Box 909
More informationMEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF SACRAMENTO AND THE COUNTY OF SACRAMENTO
MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF SACRAMENTO AND THE COUNTY OF SACRAMENTO THIS MEMORANDUM OF UNDERSTANDING ("MOU") is made and entered into this day of, 2013, by and between the City of Sacramento
More informationConsultation Paper. JSERC (Distribution Standards of Performance) Regulations, 2015 Consultation Paper
Consultation Paper JSERC (Distribution Standards of Performance) Regulations, 2015 Consultation Paper JSERC SOP Regulations Consultation Paper Table of Contents Preamble 2 Objective 2 Legislative mandate
More informationTelecom Equipment Hosting and Marketing Activities Agreement for the poa! Wireless Internet Connectivity Service
23 rd October 2017 Telecom Equipment Hosting and Marketing Activities Agreement for the poa! Wireless Internet Connectivity Service poa! Internet (the "Service") is a wireless internet connectivity service
More informationThe Companies Act Community Interest Company Limited by Guarantee. Articles of Association. Pasture-Fed Livestock Association C.I.C.
The Companies Act 2006 Community Interest Company Limited by Guarantee Articles of Association of Pasture-Fed Livestock Association C.I.C. Revised version of 4 October 2011 1 The Companies Act 2006 Community
More informationData Protection Act 1998
Data Protection Act 1998 1998 CHAPTER 29 ARRANGEMENT OF SECTIONS Part I Preliminary 1. Basic interpretative provisions. 2. Sensitive personal data. 3. The special purposes. 4. The data protection principles.
More informationWEST BENGAL ELECTRICITY REGULATORY COMMISSION NOTIFICATION. NO. 46/WBERC Kolkata, the 31st May, 2010.
WEST BENGAL ELECTRICITY REGULATORY COMMISSION NOTIFICATION NO. 46/WBERC Kolkata, the 31st May, 2010. In exercise of the powers conferred by sub-section (1) and clauses (za) and (zb) of subsection (2) of
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE
EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE Directorate C: Fundamental rights and Union citizenship Unit C.3: Data protection Commission Decision C(2004)5721 SET II Standard contractual clauses for
More informationDecember 18, Filing of PSP Agreement with Placer County Water Agency
California Independent System Operator Corporation December 18, 2017 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California
More information(Non-legislative acts) DECISIONS
14.8.2012 Official Journal of the European Union L 217/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 23 July 2012 amending Decisions 2002/731/EC, 2002/732/EC, 2002/733/EC, 2002/735/EC and
More informationElectricity (Hazards from Trees) Regulations 2003
Reprint as at (SR 2003/375) Dame Sian Elias, Administrator of the Government Order in Council At Wellington this 15th day of December 2003 Present: Her Excellency the Administrator of the Government in
More informationAgreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection)
Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection) This Agreement for Net Metering and Interconnection Services ( Agreement ) is made and entered into this (date)
More informationTAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement)
TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 34A CHENNAI, WEDNESDAY, SEPTEMBER 1, 2004 Aavani 16, Tarana, Thiruvalluvar Aandu - 2035 Part VI --- Section 2 (Supplement) NOTIFICATIONS BY HEADS
More informationThis NET METERING CLASS 1 INTERCONNECTION AGREEMENT made as of the day of, 20, effective as of the day of, 20 ( Effective Date ).
This NET METERING CLASS 1 INTERCONNECTION AGREEMENT made as of the day of, 20, effective as of the day of, 20 ( Effective Date. BETWEEN: (the Customer -and- NOVA SCOTIA POWER INCORPORATED, a body corporate
More information