EU Public Procurement Law: Lesson 8 - The procurement procedures. Simon Evers Kalsmose-Hjelmborg

Size: px
Start display at page:

Download "EU Public Procurement Law: Lesson 8 - The procurement procedures. Simon Evers Kalsmose-Hjelmborg"

Transcription

1 EU Public Procurement Law: Lesson 8 - The procurement procedures Simon Evers Kalsmose-Hjelmborg (seh@bechbruun.com)

2 EC public procurement rules - Contracts subject to award procedure - procurement procedure II - Choice of procedure - Open or restricted procedure - Competitive dialogue, negotiated procedure - Requirements of the procedure - Publication, time-limits 2

3 Chapter V of the Directive - The procedures Chapters V - VI contain the following provisions on procedures in Articles 28-43: Article 28: Use of open, restricted and negotiated procedures and of competitive dialogue. Article 29: Competitive dialogue. Article 30: Cases justifying use of the negotiated procedure with prior publication of a contract notice. Article 31: Cases justifying use of the negotiated procedure without publication of a contract notice. 3

4 Chapters V - VI of the Directive - The procedures Chapters V - VI contain the following provisions on procedures in Articles 28-43: Article 32: Framework agreements. Article 33: Dynamic purchasing systems. Article 34: Public works contracts: particular rules on subsidised housing schemes. Article 35: Notices. Article 36: Form and manner of publication of notices. Article 37: Non-mandatory publication. 4

5 Chapters V - VI of the Directive - The procedures Chapters V - VI contain the following provisions on procedures in Articles 28-43: Article 38: Time-limits for receipt of requests to participate and for receipt of tenders. Article 39: Open procedures: Specifications, additional documents and information. Article 40: Invitations to submit a tender, participate in the dialogue or negotiate. Article 41: Informing candidates and tenderers. Article 42: Rules applicable to communication. Article 43: Content of reports. 5

6 Chapter V of the Directive - The procedures Main rule of Article 28: The following procedures may always be applied: Open procedure. Restricted procedure. The other types of procedure are exemption procedures presupposing the existence of specific (express) circumstances: Procedure by means of competitive dialogue. Negotiated procedure: with publication of contract notice. without publication of contract notice. 6

7 Chapter V of the Directive - The procedures Open procedure + negotiations negotiations Contract notice published in OJ Time-limit for tenders Award decision Conclusion of contract Report to the Comm. Art. 38(2) Art. 35(2) Art. 43 Min. 52 days Art. 39 Documents to be sent within 6 days Art. 41 Informing of candidates/ tenderers 7

8 Chapter V of the Directive - The procedures Restricted procedure + negotiations negotiations Award decision Report to the Comm. Contract notice published in OJ Time-limit for requests Time-limit for requests Conclusion of contract Art. 38(3) Art. 38(3) Art. 35(2) Art. 43 Min. 37 days Min. 40 days Art. 40 Invitation to submit tenders - information requirements Art. 41 Informing of candidates/ tenderers 8

9 Chapter V of the Directive - The procedures Framework agreements/contracts the rules Article 32 of the Public Procurement Directive Article 1(5) of the Public Procurement Directive Introductory consideration of article 11 of the Public Procurement Directive Explanatory note Framework Agreements Classic Directive (January 2006) 9

10 Framework agreements Definition A "framework agreement" is an agreement between one or more contracting authorities and one or more economic operators, the purpose of which is to establish the terms governing contracts to be awarded during a given period, in particular with regard to price and, where appropriate, the quantity envisaged. Framework contracts* Establish all the terms Framework agreements* Do not establish all the terms * The terms framework contract and framework agreement stricto sensu are used only for explanatory purposes. Please note that the use of this terminology is not obligatory for implementing the Directive. 10

11 Framework agreements General conditions: The procedures of the directives must be supervised in all phases until the award of the contract (open, restricted or negotiated procedures (restricted procedure)) Note that framework agreement(s) must be awarded to one or minimum 3 entity/entities The party/parties of the framework agreements is/are selected on the basis of the Directive s award criteria The duration of framework agreements and contracts based on framework agreements is limited to 4 years unless exceptional cases exist 11

12 Framework agreements General conditions: The standard terms are not to be amended considerably when awarding the individual contract No other entity or authority can be involved when awarding the contract a closed system Notice regarding award of the contract must be sent to the Commission no later than 48 days after the conclusion of the framework agreement There are no notice obligations regarding award of individual contracts 12

13 Framework agreements stricto sensu General conditions framework agreements stricto sensu (all terms are not established): The Directive does not state which terms are not set out in the agreement and thus not which terms are to be established later It is possible to use an economic operator to supervise the framework agreements (prices) In order to consider future development of the products, it is essential to establish the terms of the technical specifications It is essential to establish the products and the quantities These cannot be substantially amended during the term of the framework agreement It is positively recommended to list the established specifications and terms in a sub clause regarding contract conditions 13

14 Framework agreements Four types: Individual framework contract with one entity Individual framework agreement stricto sensu with one entity Parallel framework contracts with several entities Parallel framework agreements stricto sensu with several entities 14

15 Individual framework contract with one entity Traditional tender procedure completion of offer Entering into the framework agreement Entering into the contract The supplier cannot be consulted in writing concerning completion when entering into the contract Simple placing of orders under the terms of the framework agreement Contractual liability to deliver for the supplier 15

16 Individual framework agreement stricto sensu with one entity Traditional tender procedure + completion of offer Entering into the framework agreement Entering into the contract The supplier can be consulted in writing concerning completion when entering into the contract Entering into the contract is based on the terms of the framework agreement in combination of the terms offered by the supplier and which do not concern the terms of the framework agreement No contractual liability to deliver for the supplier 16

17 Individual framework contract with several entities Traditional tender procedure completion of offer Entering into minimum 3 framework agreements Entering into the contract The supplier cannot be consulted in writing concerning completion when entering into the contract Simple placing of orders under the terms of the framework agreement Contractual liability to deliver for the selected supplier(s) Selection of supplier? Article 2: Non-discrimination, transparency 17

18 Individual framework agreement stricto sensu with several entities Traditional tender procedure New competition Entering into framework agreements Entering into the contract New competition procedure when entering into the contract All relevant entities are contacted in writing A tender deadline is made The offers are made in writing/handled with confidence The contract is awarded on the basis of the award criterion determined in the general conditions of the framework agreement No contractual liability to submission of tender/deliver for the supplier 18

19 Chapter V of the Directive - The procedures Competitive dialogue + negotiations (Art. 29) negotiations Award decision Report to the Comm. Contract notice published in OJ Time-limit for requests Time-limit for tenders Conclusion of contract Art. 38(3) Art. 38(3) Art. 35(2) Min. 37 days Min. 40 days Art. 43 Art. 29 Negotiations Art. 40 Invitation to submit tenders - information requirements Art. 41 Informing of candidates/ tenderers 19

20 Chapter V of the Directive - The procedures Competitive dialogue Art. 29 conditions. "In the case of particularly complex contracts ". "Award criterion [is] the most economically advantageous tender". "Contracting authorities shall publish a contract notice setting out their needs and requirements". "During the dialogue, contracting authorities shall ensure equality of treatment among all tenderers. In particular, they shall not provide information in a discriminatory manner which may give some tenderers an advantage over others". Flexibility with respect to determining the procedure for the dialogue, but requirement of prior publication thereof in the contract notice. After submission of tenders, negotiations are prohibited (6)+(7). 20

21 Chapter V of the Directive - The procedures Negotiated procedure with prior publication of notice + negotiations (Art. 30) negotiations Award decision Report to the Comm. Contract notice published in OJ Time-limit for requests Time-limit for tenders Conclusion of contract Art. 38(3) Art. 38(3) Art. 30 Art. 35(2) Art. 43 Min. 37 days Min. 40 days Negotiations Art. 40 Invitation to submit tenders - information requirements Art. 41 Informing of candidates/ tenderers 21

22 Chapter V of the Directive - The procedures Negotiated procedure with publication of notice - Art. 30 This procedure may be applied in the following cases: In the event of irregular tenders or the submission of tenders which are unacceptable in response to an open or restricted procedure or a competitive dialogue, When the nature of the works, supplies, or services or the risks attaching thereto do not permit prior overall pricing, Where the services to be provided cannot be established with sufficient precision, and Public works contracts which are performed solely for purposes of research, testing or development and not with the aim of ensuring profitability or recovering research and development costs. 22

23 Chapter V of the Directive - The procedures Negotiated procedure without prior publication of notice + negotiations (Art. 31) negotiations Award decision Report to the Comm. Contract notice published in OJ Time-limit for requests Time-limit for tenders Conclusion of contract Art. 31 Negotiations Art. 43 No procedure requirements - or time-limits. NB! Telaustria!! 23

24 Chapter V of the Directive - The procedures Negotiated procedure without publication - Art. 31 This procedure may be applied for all contracts in the following cases (1): When no tenders or no suitable tenders or no applications have been submitted in response to an open procedure or a restricted procedure provided that the initial conditions of contract are not substantially altered, When for technical or artistic reasons or for reasons connected with the protection of exclusive rights, the contract may be awarded only to a particular economic operator, and When it is strictly necessary when for reasons of extreme urgency brought about by events unforeseeable by the contracting authorities, the time-limit for the open restricted or negotiated procedures cannot be complied with- must not in any event be attributable to the contracting authority. 24

25 Chapter V of the Directive - The procedures Negotiated procedure without publication Art. 31 This procedure may be applied for public supply contracts in the following cases (2): When the products involved are manufactured purely for the purpose of research, experimentation, study or development, For additional deliveries by the original supplier which are intended either as a partial replacement of normal supplies or installations or as the extension of existing supplies or installations, For supplies quoted and purchased on a commodity market, and For the purchase of supplies on particularly advantageous terms from either a supplier which is definitively winding up its business activities or the receivers or liquidators etc. 25

26 Chapter V of the Directive - The procedures Negotiated procedure without publication Art. 31 This procedure may be applied for public service contracts in the following cases (3): "When the contract concerned follows a design contest and must, under the applicable rules, be awarded to the successful candidate or to one of the successful candidates". 26

27 Chapter V of the Directive - The procedures Negotiated procedure without publication Art. 31 This procedure may be applied for public works and service contracts in the following cases (4): Subject to the fulfilment of certain conditions "for additional works or services not included in the project initially considered or in the original contract but which have, through unforeseen circumstances, become necessary for the performance of the works or services described therein". Subject to the fulfilment of certain conditions "for new works or services consisting in the repetition of similar works or services entrusted to the economic operator to whom the same contracting authorities awarded an original contract". 27

28 Chapter V of the Directive - The procedures Dynamic purchasing system In addition to the public procurement procedure, a dynamic list of known and potential suppliers can be established The contracting authority must publish a contract notice making it clear that a dynamic purchasing system is involved the award criterion must be determined The contract documents must include: the nature of the purchase, necessary information on the system, technical information regarding connection, etc. The dynamic purchasing systems must be renewed every four years All tenderers who fulfil the selection criteria and have submitted a indicative tender in compliance with the contract documents must be admitted to the system through the entire period Solely electronic communication means must be made available 28

29 Chapter V of the Directive - The procedures Public procurement Establisment and maintenance of dynamic list Simple procurement regarding specific purchase Invitation to all suppliers on the list Contract 29

30 Chapter V of the Directive - The procedures Specific purchases under the dynamic purchasing system The procedure of entering into specific contracts: 1. A simplified notice must be published in the Official Journal of the European Union with the request to all to give an indicative tender within 15 days (from the forwarding date) 2. All replies will be evaluated and the suppliers will be listed 3. All listed and newly listed suppliers are all requested to make a final tender within a reasonable time limit 4. The contract is awarded under the award criteria set out in the contract notice for the establishment of the dynamic purchasing system 30

31 Chapter V of the Directive - The procedures Electronic auction The directive states that electronic auctions may be used in addition to the tender procedure Conditions: Open, restricted or negotiated procedures The contract specifications can be established with precision The contract notice states that this type of auction is being used Only entities that have made acceptable tenders are invited to participate 31

32 Chapter V of the Directive - The procedures Traditional procurement procedure Electronic auction(s) First tender evaluation Invitations to tenderers who have made acceptable tenders Contract 32

33 Chapter V of the Directive - The procedures Electronic auction The object of the auction (the competition): Price (the lowest price ) Price and/or the new values of other features (the economically advantageous tender ) Several auction phases can be made The auction must be electronic - a mathematical formula to determine automatic rerankings on the basis of the new prices and/or new values The contracting authority must instantaneously communicate to all the tenderers at least sufficient information to enable them to ascertain their relative rankings at any moment The contracting authority may at any time announce the number of the remaining participants but not the identity 33

34 Types of public procurement procedures - combinations Electronic auction Dynamic purchases Framework agreement with competition Open procedure Restricted procedure Certain Negotiated procedures Competitive dialogue procedure 34

35 Chapter V of the Directive - The procedures Prior information notices (Art. 35). (May be) published for estimated value of purchases throughout the following year (12 months). Are not binding, but serves to "prepare" the market for contracts likely to be awarded. The time-limits may be shortened following publication of such notice. Non-mandatory publication (Art. 37). Only allows "contracting authorities" access to the system on a voluntary basis. 35

36 Chapter V of the Directive - The procedures Time-limits (arts 38+39). Time-limits are often shortened where the contract notices are published by electronic means etc. 36

37 Chapter V of the Directive - The procedures - Discontinuance of procedure Kauppatalo C-244/02: Facts The Finnish town of Imatra invited tenders from 20 electricity companies for an electricity supply contract for the period 1 July June The "lowest price" was the award criterion. The tender submitted by Hansel was of the lowest price. Subsequently, Imatra realised that changing the supplier would give rise to additional costs which had not been taken into consideration and decided that the tender submitted by its supplier at that time, Imatran Seudun Sähkö Oy, was overall the most economically advantageous tender. 37

38 Chapter V of the Directive - The procedures - Discontinuance of procedure Kauppatalo C-244/02: Facts In that light, the town of Imatra discontinued the award procedure initiated. The town of Imatra then published a new invitation to tender in which, following a more comprehensive assessment of the overall cost of the contract, the estimated amount of electricity required was now stated to be 25 GWh per year instead of the 16 GWh per year in order to ensure that the best tender was also overall the most economically advantageous. In the new procedure, the best tender was submitted by Lappeenrannan Energia Oy to which the contract was awarded. 38

39 Chapter V of the Directive - The procedures - Discontinuance of procedure Kauppatalo C-244/02: Hansel arguments Hansel lodged an appeal against the decision to discontinue the first procedure arguing: that the City of Imatra did not have any valid reason to reject a tender satisfying the required criteria and to discontinue the procedure for the award of the contract, that the organisation of a new procedure changing the award critierion was unlawful, and that the new procedure amounted to unlawful bargaining tactics. In its view, the City of Imatra had sought by way of the first invitation to tender to obtain information on prices and had, subsequently, commenced a new procedure in order to negotiate the price of the tenders submitted using the information which had become public during the first invitation to tender. 39

40 Chapter V of the Directive - The procedures - Discontinuance of procedure Kauppatalo - C-244/02: Question referred to the ECJ: Is Directive 93/36 to be interpreted "as meaning that a contracting authority which has commenced a procedure for the award of a contract on the basis of the lowest price may discontinue the procedure without awarding a contract when it discovers after examining and comparing the tenders that because of errors committed by itself in its preliminary assessment, the content of the invitation to tender makes it impossible for it to accept the most economically advantageous tender?" (p. 24). 40

41 Chapter V of the Directive - The procedures - Discontinuance of procedure Kauppatalo C-244/02: Answer by the ECJ: " the answer must be that Directive 93/36 is to be interpreted as meaning that a contracting authority which has commenced a procedure for the award of a contract on the basis of the lowest price may discontinue the procedure, without awarding a contract, when it discovers after examining and comparing the tenders that, because of errors committed by itself in its preliminary assessment, the content of the invitation to tender makes it impossible for it to accept the most economically advantageous tender, provided that, when it adopts such a decision, it complies with the fundamental rules of Community law on public procurement such as the principle of equal treatment. (p. 36) 41

42 Chapter V of the Directive - The procedures Commission vs. France C-225/98: Facts Departement Pas-de Calais had commenced a tendering procedure (open procedure) for a public works contract relating to the construction of a school The Commission forwarded a formal notice listing a number of complaints: The time-limit for the receipt of tenders was less than 52 days, Discriminatory description of the lots, Discriminatory minimum standards, Criteria for the award which did not comply with the Directive, Improper award of the contract, and Failure to inform an eliminated tenderer of the reasons for rejection of its tender. 42

43 Chapter V of the Directive - The procedures Commission vs. France C-225/98: Facts Meanwhile, the Nord-Pas-de-Calais Region had published a series of 14 identical contract notices (restricted procedure) relating to the completion of contracts of modernisation and maintenance works over a period of 10 years (known as the "Secondary School Plan"). The notices stated that the tenders would be assessed by taking account of various award criteria, including: The "quality/price ratio of the technical response and the services", The "time-limit for completion of the works of construction and renovation excluding maintenance", and An "additional criterion relating to employment". 43

44 Chapter V of the Directive - The procedures Commission vs. France C-225/98: Facts Then, the Commission brought the matter before the ECJ based on eight complaints relating to: 1. The prior information procedure, 2. The additional criterion relating to employment, 3. The number of candidates selected, 4. The method known as "award by reference to the French Code of Public Procurement", 5. The mode of designating the lots, 6. The minimum standards for participation, 7. The procedure of information on contract awards, and 8. The failure to forward the written reports. 44

45 Chapter V of the Directive - The procedures Commission vs. France C-225/98: ECJ re 1 prior information notice. " the purpose of the rules on advertising laid down in Directive 93/37, including publication of the prior information notice, is to inform all potential tenderers at the Community level in good time about the main points of a contract in order that they may submit their tender within the time-limits" (p. 35). " the time-limits for the receipt of tenders may not be less than 52 days from the date of dispatch of the contract notice in respect of open procedures and 40 days from the date of dispatch of the written invitation in respect of restricted procedures, but that they may be reduced, respectively, to 36 and 26 days only where the contracting authorities have published the prior information notice"(p. 32). 45

46 Chapter V of the Directive - The procedures Commission vs. France C-225/98: ECJ re 1 prior information notice " a prior information notice is compulsory only where the contracting authorities exercise their option to reduce the time-limits for the receipt of tenders" (p. 38). " [as] it is clear that the contracting authorities in question did not reduce the time-limits for the receipt of tenders in relation to the disputed contracts, it must be concluded that those contracting authorities were not in breach of their obligations under [the] Directives, as regards the prior information procedure" (p. 44). 46

47 Chapter V of the Directive - The procedures Commission vs. France C-225/98: ECJ re 2 additional criterion relating to employment. Commission: " in expressly setting forth as an award criterion in a number of contract notices a condition relating to employment linked to a local project to combat unemployment, the French authorities have infringed Article 30 of Directive 93/37" (p. 46). France: " the award criterion does not constitute a primary criterion, such as those referred to in Article 29 of Directive 71/305, the purpose of which is to make it possible to determine which is the most advantageous tender, but a secondary criterion which is not decisive" (p. 47). 47

48 Chapter V of the Directive - The procedures Commission vs. France C-225/98: ECJ re 2 additional criterion relating to employment. "[Art. 30] does not preclude all possibility for the contracting authorities to use as a criterion a condition linked to the campaign against unemployment provided that that condition is consistent with all the fundamental principles of Community law, in particular the principle of non-discrimination" (p. 50). Seeing that the Commission "does not claim that the criterion linked to the campaign against unemployment is inconsistent with the fundamental principles of Community law, in particular the principle of non-discrimination, or that it was not advertised in the contract notice the Commission's complaint relating to the additional award criterion linked to the campaign against unemployment must be rejected" (p ). 48

49 Chapter V of the Directive - The procedures Commission vs. France C-225/98: ECJ re 3 the number of candidates selected. In the contract notices, it was stated that "the maximum number of candidates which may be invited to submit a tender is 5" (p. 62). This wording "implies that it is the maximum number of candidates invited to tender for the contracts in question which was fixed at five. It follows that, on the basis of the disputed contract notices, a number of candidates below five was regarded as acceptable" (p. 62). " the French Republic has failed to fulfil its obligations under [the Directive]" (p. 63). 49

50 Chapter V of the Directive - The procedures Commission vs. France C-225/98: ECJ re 4 award by reference to "the French Code on Public Procurement". Commission: " to indicate the award criteria, to the method known as "award by reference to the French Code des Marchés Publics" which it claims is contrary to [the Directive]. By referring generally to various provisions of the French Code des Marchés Publics, the abovementioned contract notices do not satisfy the requirement as to advertising as stated in Beentjes" (p. 64). " where the authorities awarding the contract do not take the lowest price as the sole criterion for awarding the contract but have regard to various criteria with a view to awarding the contract to the most economically advantageous tender, they are required to state these criteria in the contract notice or the contract documents. Consequently, a general reference to a provision of national legislation cannot satisfy the publicity requirement" (p. 73). 50

51 Chapter V of the Directive - The procedures Commission vs. France C-225/98: ECJ re 5 the mode of designating the lots. Commission: "Many of the contract notices examined refer under the heading "Works. Designation of lots and qualifications to the classifications" of French professional organisations in particular the OPQCB and Qualibat - Qualifélec" (p. 76). ""Qualibat chauffage 5312" corresponds to a design office of approved technical expertise in environmental engineering with at least four years' practical experience and at Level 6 in the 'Convention Collective ETAM des Bâtiment et Travaux Publics". ECJ: " the technical specifications selected are so specific and abstruse that, as a rule, only French candidates are able immediately to discern their relevance" (p. 81). [The specifications] directly discriminate and thus constitute a restriction for the freedom to provide services in accordance with the Treaty. (p. 83) 51

52 Chapter V of the Directive - The procedures Commission vs. France C-225/98: ECJ re 6 minimum standards for participation. "[under] the minimum standards for participation specified under heading 10 in a certain number of contract notices [it] states unambiguously "for the designer: proof of registration with the Ordre des Architectes". Consequently, the Département du Nord has failed to fulfil its obligations under Article 59 of the Treaty by imposing restrictions on Community architects' freedom to provide services" (p. 85). " the French Republic has failed in its obligations under Article 59 of the Treaty and Article 26 of [the Directive]" (p. 90). 52

53 Chapter V of the Directive - The procedures Commission vs. France C-225/98: ECJ re 7+8 procedure of information on contract awards + the failure to communicate the written reports. Commission: " the Nord-Pas-de-Calais Region failed to fulfil the obligation to publish information on contract awards as provided for in Article 12(5) of Directive 71/305 and 11(5) of Directive 93/37" (p. 91). ECJ: " the French Republic has failed in its obligations under [the Directive]" (p. 94). 53

54 Chapter V of the Directive - The procedures - exemptions Commission vs. Italy C-385/02: Fact: Magistrato del Po de Parma entered into the following collateral contracts using negotiated procedure without prior publication of notice: Completion of the construction of an overflow basin for flood waters of the Parma watercourse in the Marano area (Parma commune) Development and completion of an overflow basin for flood waters of Enza Retention of flood waters of the Terdoppios watercourse south-west of Cerano The price of this work was app. ITL 37, 21 and 19.5 billion The original contracts regarding this work were concluded in 1982 (Enza) and 1988 (Parma and Terdoppio) 54

55 Chapter V of the Directive - The procedures - exemptions Commission vs. Italy C-385/02: Arguments Italy claimed that the contracts could be made according to one of the following exemptions: 1. When, for technical or artistic reasons, or for reasons connected with the protection of exclusive rights, the contract may be awarded only to a particular economic operator (article 31(1)(b)) 2. Insofar as is strictly necessary when, for reasons of extreme urgency brought about by events unforeseeable by the contracting authorities in question, the time limit for the open, restricted or negotiated procedures with publication of a contract notice as referred to in Article 30 cannot be complied with. The circumstances invoked to justify extreme urgency must not in any event be attributable to the contracting authority (article 31(1)(c)) 55

56 Chapter V of the Directive - The procedures - exemptions Commission vs. Italy C-385/02: Arguments Italy claimed that the contracts could be made according to one of the following exemptions: 3. For new works or services consisting in the repetition of similar works or services entrusted to the economic operator to whom the same contracting authorities awarded an original contract, provided that such works or services are in conformity with a basic project for which the original contract was awarded according to the open or restricted procedure. As soon as the first project is put up for tender, the possible use of this procedure shall be disclosed and the total estimated cost of subsequent works or services shall be taken into consideration by the contracting authorities when they apply the provisions of Article 7. This procedure may be used only during the three years following the conclusion of the original contract. (article 31(4)(b)) 56

57 Chapter V of the Directive - The procedures - exemptions Commission vs. Italy C-385/02: ECJ: Re 1: Italy did not prove that technical reasons made an award of an additional contract necessary for the existing contractor Re 2: The planned division of the stages of the project did not make it strictly necessary to use the procurement procedure as this division of the procedure was actually planned Re 3: This exemption did not apply as the three years condition, which is calculated from the conclusion date of the contract, was not fulfilled Italy violated the directive by not providing the projects according to the main rules 57

58 Chapter V of the Directive - The procedures - exemptions Commission vs. Germany C-20+28/01: Facts: The municipality Bockhorn in Niedersachsen had on the basis of a negotiated procedure without prior notification in the Official Journal concluded a contract with the company EWE regarding collection of its waste water for a 30-year period. The city of Braunschweig in Niedersachsen had - on the basis of a negotiated procedure without prior notification in the Official Journal concluded a contract with the company BKB regarding residual waste disposal by thermal processing for a 30-year period. 58

59 Chapter V of the Directive - The procedures - exemptions Commission vs. Germany C-20+28/01: Arguments: Commission: In the Bockhorn-Case (C-20/01), the Commission argues that the Directive applied to the contract concerned which should have been the subject of an invitation to tender in accordance with the provisions of the directive. In the Braunschweig-Case (C-28/01), the Commission submits that the contract in question also falls within the scope of the Directive. In its submission, the criteria allowing a negotiated procedure to be used without publication of a prior contract notice were not met. Neither the location of the undertaking selected, on account of its proximity to the place where the services were to be provided, nor the fact that award of the contract was urgent, provides a basis for the application of that provision in this instance. 59

60 Chapter V of the Directive - The procedures - exemptions Commission vs. Germany C-20+28/01: Arguments: Germany (Bockhorn) no material arguments. Germany (Braunschweig): The Directive applies, but Braunschweig relied on the derogation in Article 11(3) thereof which released them from their obligation to publish a contract notice and allowed them to award the contract by a negotiated procedure. " the conditions on which Article 11(3)(b) of Directive 92/50 applied were met since for technical reasons thermal treatment of waste could be entrusted only to BKB. It had been an essential criterion of the award of the contract that the incineration facilities were close to the City of Braunschweig in order to avoid transport over longer distances". 60

61 Chapter V of the Directive - The procedures - exemptions Commission vs. Germany C-20+28/01: Arguments: Germany (Braunschweig): " only BKB was in a position to satisfy the quite lawfully selected criterion that the waste disposal facility should be close to the relevant region. The criterion was not automatically discriminatory since it was not impossible that undertakings established in other Member States would be able to meet the requirement". "In general, a contracting authority is entitled to take account of environmental criteria in its considerations relating to the award of a public contract when it determines which type of service it is proposing to acquire". 61

62 Chapter V of the Directive - The procedures - exemptions Commission vs. Germany C-20+28/01: Arguments: Germany (Braunschweig): The exemption in article 31(1)(b) when, for technical or artistic reasons, or for reasons connected with the protection of exclusive rights, the contract may be awarded only to a particular economic operator was used as BKB was the only operator having a thermal system in the region 62

63 Chapter V of the Directive - The procedures - exemptions Commission vs. Germany C-20+28/01: ECJ: Therefore, it is not impossible that a technical reason relating to the protection of the environment may be taken into account in an assessment of whether the contract at issue may be awarded to a given supplier. However, the procedure used where there is a technical reason of that kind must comply with the fundamental principles of Community law [ ]. The risk of a breach of the principle of non-discrimination is particularly high where a contracting authority decides not to put a particular contract out to tender. 63

64 Chapter V of the Directive - The procedures - exemptions In this instance, the Court notes: First, that in the absence of any evidence to that effect the choice of thermal waste treatment cannot be regarded as a technical reason substantiating the claim that the contract could be awarded to only one particular supplier. Second, the German Government's submission that the proximity of the waste disposal facility is a necessary consequence of the City of Braunschweig's decision that residual waste should be treated thermally is not borne out by any evidence and cannot therefore be regarded as a technical reason of that kind. More specifically, the German Government has not shown that the transport of waste over a greater distance would necessarily constitute a danger to the environment or to public health. Third, the fact that a particular supplier is close to the local authority's area can likewise not amount, on its own, to a technical reason for the purpose of Article 11(3)(b) of Directive 92/50". It follows that Germany has violated its obligations under the Directive. 64

JUDGMENT OF THE COURT (Fifth Chamber) 10 April 2003 *

JUDGMENT OF THE COURT (Fifth Chamber) 10 April 2003 * JUDGMENT OF 10. 4. 2003 JOINED CASES C-20/01 AND C-28/01 JUDGMENT OF THE COURT (Fifth Chamber) 10 April 2003 * In Joined Cases C-20/01 and C-28/01, Commission of the European Communities, represented by

More information

ORDER OF THE COURT (Second Chamber) 16 October 2003 *

ORDER OF THE COURT (Second Chamber) 16 October 2003 * ORDER OF THE COURT (Second Chamber) 16 October 2003 * In Case C-244/02, REFERENCE to the Court under Article 234 EC by the Korkein hallinto-oikeus (Finland) for a preliminary ruling in the proceedings

More information

The new European Directive on public procurement law

The new European Directive on public procurement law Silberg, Sebastian The new European Directive on public procurement law The European Legal Forum (E) 5-2004, 304-308 2004 IPR Verlag GmbH München The European Legal Forum - Internet Portal Literature Doc.

More information

Types and procedures of public procurement

Types and procedures of public procurement Types and procedures of public procurement Goran Kitić, advisor Ministry of Finance, Public Assets Directorate Phases of the procedure prior information notice, where appropriate; decision to initiate

More information

JUDGMENT OF THE COURT (Second Chamber) 18 July 2007 * ACTION under Article 228 EC for failure to fulfil obligations, brought on 7 December 2004,

JUDGMENT OF THE COURT (Second Chamber) 18 July 2007 * ACTION under Article 228 EC for failure to fulfil obligations, brought on 7 December 2004, JUDGMENT OF THE COURT (Second Chamber) 18 July 2007 * In Case C-503/04, ACTION under Article 228 EC for failure to fulfil obligations, brought on 7 December 2004, Commission of the European Communities,

More information

General guidance on EFSA procurements

General guidance on EFSA procurements General guidance on EFSA procurements For potential tenderers when considering the submission of a tender in response to a procurement procedure of the European Food Safety Authority Updated February 206

More information

Law No. 02/L-44 ON THE PROCEDURE FOR THE AWARD OF CONCESSIONS

Law No. 02/L-44 ON THE PROCEDURE FOR THE AWARD OF CONCESSIONS UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo PROVISIONAL INSTITUTIONS OF SELF GOVERNMENT Law

More information

GOVERNMENT PROCUREMENT ARTICLE 47. Objective. ARTICLE 48 Scope and coverage. (ii) an international agreement relating to the stationing of troops; and

GOVERNMENT PROCUREMENT ARTICLE 47. Objective. ARTICLE 48 Scope and coverage. (ii) an international agreement relating to the stationing of troops; and EFTA GOVERNMENT PROCUREMENT ARTICLE 47 Objective In accordance with the provisions of this Chapter, the Parties shall ensure the effective and reciprocal opening of their government procurement markets.

More information

(ii) sufficient transparency, fair competition and adequate ex-ante publicity must be ensured;

(ii) sufficient transparency, fair competition and adequate ex-ante publicity must be ensured; DRAFT Annex Award of procurement contracts by beneficiaries established in the Russian Federation other than public entities as defined in point (k) of Article 2 of the Agreement and other legal entities

More information

N O T I F I C A T I O N

N O T I F I C A T I O N Islamabad, June 9, 2004 N O T I F I C A T I O N S.R.O. 432(I)/2004.- In exercise of the powers conferred by section 26 of the Public Procurement Regulatory Authority Ordinance, 2002 (XXII of 2002), the

More information

EU Public Sector Directive: Advertising, Qualification, Award criteria, Frameworks, Horizontal Policies- Seminar 5

EU Public Sector Directive: Advertising, Qualification, Award criteria, Frameworks, Horizontal Policies- Seminar 5 Qualification, Award criteria, - Seminar 5 Dr Aris Georgopoulos Assist. Professor in European and Public Law- Advocate University of Nottingham Global Governance Fellow, Robert Schuman Centre of Advanced

More information

Regulations for Application of the Public Procurement Act

Regulations for Application of the Public Procurement Act Regulations for Application of the Public Procurement Act Adopted by Council of Ministers Decree No. 150/21.06.2006. Promulgated, State Gazette No. 53/30.06.2006, effective 1.07.2006, amended, SG No. 84/19.10.2007,

More information

1. PROCUREMENT AND CONTRACTS

1. PROCUREMENT AND CONTRACTS 1. PROCUREMENT AND CONTRACTS Electronic Tendering 1.1 In line with current best practice all tendering will be carried out electronically unless agreed by Head of Procurement. Pre Contract Requirements

More information

Directive 2001/24/EC of the European Parliament and of the Council of 4 April 2001 on the reorganisation and winding up of credit institutions

Directive 2001/24/EC of the European Parliament and of the Council of 4 April 2001 on the reorganisation and winding up of credit institutions Directive 2001/24/EC of the European Parliament and of the Council of 4 April 2001 on the reorganisation and winding up of credit institutions THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN UNION,

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 1989L0665 EN 09.01.2008 002.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COUNCIL DIRECTIVE of 21 December 1989 on the

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 18.6.2014 COM(2014) 358 final 2014/0180 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL amending Regulation (EU, EURATOM) No 966/2012 on the

More information

PART IV GOVERNMENT PROCUREMENT CHAPTER 15 GOVERNMENT PROCUREMENT

PART IV GOVERNMENT PROCUREMENT CHAPTER 15 GOVERNMENT PROCUREMENT PART IV GOVERNMENT PROCUREMENT CHAPTER 15 GOVERNMENT PROCUREMENT Article 15.1: Definitions For purposes of this Chapter: entity means an entity of a Party covered in Annex 15.1; government procurement

More information

ANNEX IV Procurement by grant Beneficiaries in the context of European Union external actions 1

ANNEX IV Procurement by grant Beneficiaries in the context of European Union external actions 1 ANNEX IV Procurement by grant Beneficiaries in the context of European Union external actions 1 1. GENERAL PRINCIPLES If the implementation of an Action requires procurement by the Beneficiary(ies), the

More information

CONTRACT REGULATIONS OF THE EUROCONTROL ORGANISATION

CONTRACT REGULATIONS OF THE EUROCONTROL ORGANISATION EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL CONTRACT REGULATIONS OF THE EUROCONTROL ORGANISATION Text approved by Measure No. 10/170 of the Permanent Commission, dated 1 December

More information

ECB - T105 roofing for the new ECB premises (D-Frankfurt-on-Main) 2009/S Contract notice

ECB - T105 roofing for the new ECB premises (D-Frankfurt-on-Main) 2009/S Contract notice 1/7 ECB - T105 roofing for the new ECB premises (D-Frankfurt-on-Main) 2009/S 48-068764 Contract notice Section I: Contracting authority I.1) Name, addresses and contact point(s):, attention: Mr Horst Roman-Müller,

More information

LAW ON CONCESSIONS GENERAL PROVISIONS. Subject matter of the Law Article 1

LAW ON CONCESSIONS GENERAL PROVISIONS. Subject matter of the Law Article 1 LAW ON CONCESSIONS I GENERAL PROVISIONS Subject matter of the Law Article 1 This Law shall govern requirements, method, and procedure for awarding concessions, the subject matter of concessions, period

More information

THE NEW LEGISLATIVE PACKAGE ON PUBLIC PROCUREMENT, CONCESSIONS FOR WORKS AND CONCESSIONS FOR SERVICES

THE NEW LEGISLATIVE PACKAGE ON PUBLIC PROCUREMENT, CONCESSIONS FOR WORKS AND CONCESSIONS FOR SERVICES THE NEW LEGISLATIVE PACKAGE ON PUBLIC PROCUREMENT, CONCESSIONS FOR WORKS AND CONCESSIONS FOR SERVICES 26 May 2016 The adoption by the European Union of Directive 2014/23/EU of the European Parliament and

More information

134/2016 Coll. ACT BOOK ONE GENERAL PROVISIONS

134/2016 Coll. ACT BOOK ONE GENERAL PROVISIONS 134/2016 Coll. ACT of 19 April 2016 on Public Procurement the Parliament has adopted the following Act of the Czech Republic: BOOK ONE GENERAL PROVISIONS TITLE I BASIC PROVISIONS Section 1 Scope of regulation

More information

General guidance on EFSA procurements

General guidance on EFSA procurements General guidance on EFSA procurements Important information for potential tenderers when considering the submission of a tender in response to a procurement procedure of the European Food Safety Authority

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 1992L0013 EN 09.01.2008 004.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COUNCIL DIRECTIVE 92/13/EEC of 25 February 1992

More information

ANNEX IV Procurement by grant Beneficiaries in the context of European Community external actions

ANNEX IV Procurement by grant Beneficiaries in the context of European Community external actions ANNEX IV Procurement by grant Beneficiaries in the context of European Community external actions 1. GENERAL PRINCIPLES If the implementation of an Action requires procurement by the Beneficiary, the contract

More information

REPUBLIC OF LITHUANIA LAW ON PUBLIC PROCUREMENT CHAPTER I GENERAL PROVISIONS

REPUBLIC OF LITHUANIA LAW ON PUBLIC PROCUREMENT CHAPTER I GENERAL PROVISIONS REPUBLIC OF LITHUANIA LAW ON PUBLIC PROCUREMENT Official translation 6 September 1997, No. I-1491 Vilnius (As last amended by 18 October 2007, No. X-1298) CHAPTER I GENERAL PROVISIONS Article 1. Scope

More information

Summary table of draft transposition of directive 2007/66/EC into Member States law

Summary table of draft transposition of directive 2007/66/EC into Member States law Summary table of draft transposition of directive 2007/66/EC into Member States law 1-General features of review system (art.1) 1-1 Scope of the review system All contracts covered by Directives 2004/18/EC

More information

European Investment Fund. EIF Procurement Guide

European Investment Fund. EIF Procurement Guide Board of Directors Meeting 14/06/2017 Document approved European Investment Fund EIF Procurement Guide Policy for the procurement of services, supplies and works by the EIF Page 1 of 18 Contents 1. GENERAL...

More information

CONTRACT AWARDING REGULATIONS FOR SHIPMENTS, SERVICES AND CONSTRUCTION WORKS

CONTRACT AWARDING REGULATIONS FOR SHIPMENTS, SERVICES AND CONSTRUCTION WORKS Attachment no. 3 to Decree no. 10/14 Bochnia, 10.03.2014 r. CONTRACT AWARDING REGULATIONS FOR SHIPMENTS, SERVICES AND CONSTRUCTION WORKS by Stalprodukt S.A. located in Bochnia, Poland required for the

More information

Public procurement: infringement procedures against Germany, Spain, Greece, Italy, Portugal and France

Public procurement: infringement procedures against Germany, Spain, Greece, Italy, Portugal and France IP/05/949 Brussels, 15 July 2005 Public procurement: infringement procedures against Germany, Spain, Greece, Italy, Portugal and France The European Commission has taken action in ten cases against six

More information

Standard terms and conditions

Standard terms and conditions müller quadax gmbh Teslastraße 6 74670 Forchtenberg Germany Tel. +49 7947 828-20 Fax +49 7947 828-14 Email info@quadax.de Website www.quadax.de Section 1 General / scope of application (1) These standard

More information

Scope and Application of Article 346 of the Treaty on the Functioning of the EU

Scope and Application of Article 346 of the Treaty on the Functioning of the EU Scope and Application of Article 346 of the Treaty on the Functioning of the EU Dr Baudouin Heuninckx, MCIPS Ph.D., D.Sc., LL.M., M.Sc., M.A. Defence and Strategic Procurement Unit Public Procurement Research

More information

PUBLIC PROCUREMENT RULES, 2004

PUBLIC PROCUREMENT RULES, 2004 PUBLIC PROCUREMENT RULES, 2004 1 Part-II STATUTORY NOTIFICATION (S.R.O.) GOVERNMENT OF PAKISTAN FINANCE DIVISION (Admn. And Coord. Wing) NOTIFICATION Islamabad, the 8 th June, 2004 S.R.O. 432 (I)/2004.--

More information

Aim is to simplify and update EU public procurement rules

Aim is to simplify and update EU public procurement rules New EU Directives Richard Heath, Associate New EU Directives One of a package of 3 Directives Directive 2014/23/EU of the European Parliament and of the Council of 26 February 2014 on the award of concession

More information

Public Procurement Law

Public Procurement Law Public Procurement Law Entered into force since 1.10.2004, Published, SG No. 28/06.04.2004, Amended, SG No. 53/22.06.2004, Amended, SG No. 31/8.04.2005, Amended, SG No. 34/19.04.2005, Amended SG No. 105/29.12.2005,

More information

General Part of the Economic Activities Code Act 1

General Part of the Economic Activities Code Act 1 Issuer: Riigikogu Type: act In force from: 06.07.2017 In force until: 02.01.2018 Translation published: 10.07.2017 General Part of the Economic Activities Code Act 1 Amended by the following acts Passed

More information

REGULATION (EC) No 764/2008 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 9 July 2008

REGULATION (EC) No 764/2008 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 9 July 2008 13.8.2008 EN Official Journal of the European Union L 218/21 REGULATION (EC) No 764/2008 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 9 July 2008 laying down procedures relating to the application

More information

...'. OPINION OF MR ADVOCATE GENERAL LENZ delivered on 13 January 1987* Mr President, Members of the Court, down in other procedures cannot be kept;

...'. OPINION OF MR ADVOCATE GENERAL LENZ delivered on 13 January 1987* Mr President, Members of the Court, down in other procedures cannot be kept; COMMISSION v ITALY OPINION OF MR ADVOCATE GENERAL LENZ delivered on 13 January 1987* Mr President, Members of the Court, down in other procedures cannot be kept; A 1. In the case to be considered today

More information

STATUTE OF THE COURT OF JUSTICE OF THE EUROPEAN UNION

STATUTE OF THE COURT OF JUSTICE OF THE EUROPEAN UNION CONSOLIDATED VERSION OF THE STATUTE OF THE COURT OF JUSTICE OF THE EUROPEAN UNION This text contains the consolidated version of Protocol (No 3) on the Statute of the Court of Justice of the European Union,

More information

AGS Assedic Pas-de-Calais v François Dumon and Froment, liquidator and representative of Établissements Pierre Gilson

AGS Assedic Pas-de-Calais v François Dumon and Froment, liquidator and representative of Établissements Pierre Gilson Opinion of Advocate General Cosmas delivered on 21 November 1996 AGS Assedic Pas-de-Calais v François Dumon and Froment, liquidator and representative of Établissements Pierre Gilson Reference for a preliminary

More information

The Act on Processing of Personal Data

The Act on Processing of Personal Data The Act on Processing of Personal Data Act No. 429 of 31 May 2000 as amended by section 7 of Act No. 280 of 25 April 2001, section 6 of Act No. 552 of 24 June 2005 and section 2 of Act No. 519 of 6 June

More information

Official Journal L 018, 21/01/1997 P

Official Journal L 018, 21/01/1997 P Directive 96/71/EC of the European Parliament and of the Council of 16 December 1996 concerning the posting of workers in the framework of the provision of services Official Journal L 018, 21/01/1997 P.

More information

Cheshire Academies Trust Standard Terms & Conditions

Cheshire Academies Trust Standard Terms & Conditions Cheshire Academies Trust Standard Terms & Conditions 1. DEFINITIONS AND RELEVANT LAW The Trust means Cheshire Academies Trust (CAT) or one of its Academies (Boughton Heath Academy, Kelsall Primary School,

More information

PUBLIC PROCUREMENT ACT (ZJN-1)

PUBLIC PROCUREMENT ACT (ZJN-1) Page 1 of 71 NATIONAL ASSEMBLY 1893. Public Procurement Act (ZJN-1) Pursuant to Article 107 (1), second indent, and Article 91(1) of the Constitution of the Republic of Slovenia I hereby issue THE ORDER

More information

Procurement by Non-Governmental Organisations in the context of Sidafinanced projects/programmes, version of 2013

Procurement by Non-Governmental Organisations in the context of Sidafinanced projects/programmes, version of 2013 Page 1 of 7 Annex V Procurement by Non-Governmental Organisations in the context of Sidafinanced projects/programmes, version of 2013 1. General principles If the implementation of a Project/programme

More information

Quality Assurance Agreement

Quality Assurance Agreement Quality Assurance Agreement between the company CGR B-E GmbH, Emil-Beerli-Straße 20, 40822 Mettmann hereinafter referred to as "Purchaser" and the company ; registered office: hereinafter referred to as

More information

32000R1346 OJ L 160, , p (ES, DA, DE, EL, EN, FR, 1. Council regulation (EC) No 1346/2000 of 29 May 2000 on insolvency proceedings

32000R1346 OJ L 160, , p (ES, DA, DE, EL, EN, FR, 1. Council regulation (EC) No 1346/2000 of 29 May 2000 on insolvency proceedings 32000R1346 OJ L 160, 30.6.2000, p. 1-18 (ES, DA, DE, EL, EN, FR, 1 Council regulation (EC) No 1346/2000 of 29 May 2000 on insolvency proceedings THE COUNCIL OF THE EUROPEAN UNION, Council regulation (EC)

More information

Opinion of the Committee of the Regions on Public procurement package (2012/C 391/09)

Opinion of the Committee of the Regions on Public procurement package (2012/C 391/09) 18.12.2012 Official Journal of the European Union C 391/49 Opinion of the Committee of the Regions on Public procurement package (2012/C 391/09) THE COMMITTEE OF THE REGIONS takes the view that the regulatory

More information

REPLY TO THE CASES AND QUESTIONNAIRE FOR THE ESCL CONFERENCE Copenhagen, August 28 th, 2009

REPLY TO THE CASES AND QUESTIONNAIRE FOR THE ESCL CONFERENCE Copenhagen, August 28 th, 2009 HELLENIC SOCIETY FOR CONSTRUCTION AND TECHNOLOGY LAW Valaoritou St. 9 10671 Athens Greece Τel. +30 210 3611390 Fax: +30 210 3635194 Email: info@emediteka.gr REPLY TO THE CASES AND QUESTIONNAIRE FOR THE

More information

STATUTE OF THE COURT OF JUSTICE OF THE EUROPEAN UNION (CONSOLIDATED VERSION)

STATUTE OF THE COURT OF JUSTICE OF THE EUROPEAN UNION (CONSOLIDATED VERSION) STATUTE OF THE COURT OF JUSTICE OF THE EUROPEAN UNION (CONSOLIDATED VERSION) This text contains the consolidated version of Protocol (No 3) on the Statute of the Court of Justice of the European Union,

More information

Ministry of Trade and Industry, Finland Nuclear Energy Act

Ministry of Trade and Industry, Finland Nuclear Energy Act Ministry of Trade and Industry, Finland Nuclear Energy Act 990/1987; amendments up to 342/2008 included CHAPTER 1 Objectives and Scope of Application Section 1 - Objectives To keep the use of nuclear energy

More information

FOA netting opinion issued in relation to the FOA Netting Agreements, FOA Clearing Module and ISDA/FOA Clearing Addendum

FOA netting opinion issued in relation to the FOA Netting Agreements, FOA Clearing Module and ISDA/FOA Clearing Addendum NETTING ANALYSER LIBRARY The Futures & Options Association 2nd Floor 36-38 Botolph Lane London EC3R 8DE 4 December 2013 Dear Sirs, FOA netting opinion issued in relation to the FOA Netting Agreements,

More information

JUDGMENT OF THE COURT (Grand Chamber) 14 March 2006 * ACTION under Article 228 EC for failure to fulfil obligations, brought on 14 April 2004,

JUDGMENT OF THE COURT (Grand Chamber) 14 March 2006 * ACTION under Article 228 EC for failure to fulfil obligations, brought on 14 April 2004, COMMISSION v FRANCE JUDGMENT OF THE COURT (Grand Chamber) 14 March 2006 * In Case C-177/04, ACTION under Article 228 EC for failure to fulfil obligations, brought on 14 April 2004, Commission of the European

More information

B REGULATION No 17 First Regulation implementing Articles 85 and 86 of the Treaty. (OJ P 13, , p. 204)

B REGULATION No 17 First Regulation implementing Articles 85 and 86 of the Treaty. (OJ P 13, , p. 204) 1962R0017 EN 18.06.1999 002.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B REGULATION No 17 First Regulation implementing

More information

Official Journal of the European Union L 251/3

Official Journal of the European Union L 251/3 24.9.2009 Official Journal of the European Union L 251/3 COMMISSION REGULATION (EC) No 874/2009 of 17 September 2009 establishing implementing rules for the application of Council Regulation (EC) No 2100/94

More information

GENERAL PURCHASING TERMS AND CONDITIONS. Strama-MPS Maschinenbau GmbH & Co. KG

GENERAL PURCHASING TERMS AND CONDITIONS. Strama-MPS Maschinenbau GmbH & Co. KG GENERAL PURCHASING TERMS AND CONDITIONS Strama-MPS Maschinenbau GmbH & Co. KG I. General Provisions 1.1. These Terms and Conditions of Purchase shall exclusively apply to orders of Strama-MPS Maschinenbau

More information

ENVIRONMENTAL IMPACT ASSESSMENT OF PROJECTS RULINGS OF THE COURT OF JUSTICE

ENVIRONMENTAL IMPACT ASSESSMENT OF PROJECTS RULINGS OF THE COURT OF JUSTICE ENVIRONMENTAL IMPACT ASSESSMENT OF PROJECTS RULINGS OF THE COURT OF JUSTICE Europe Direct is a service to help you find answers to your questions about the European Union Freephone number (*): 00 800 6

More information

TITLE VII LIABILITY FOR INFRINGEMENT OF PROVISIONS OF THIS ACT TITLE VIII AMENDMENTS TO THE PROVISIONS IN FORCE TITLE IX INTERIM AND FINAL PROVISIONS

TITLE VII LIABILITY FOR INFRINGEMENT OF PROVISIONS OF THIS ACT TITLE VIII AMENDMENTS TO THE PROVISIONS IN FORCE TITLE IX INTERIM AND FINAL PROVISIONS Note: The English translation of the Act below has been provided by the Public Procurement Office for information purposes only. Only the official Polish text of the Act should be considered authentic.

More information

General Terms and Conditions of Business. Article 1 Conclusion of the Agreement. Article 2 Delivery. Article 3 Delivery Deadline and Acceptance

General Terms and Conditions of Business. Article 1 Conclusion of the Agreement. Article 2 Delivery. Article 3 Delivery Deadline and Acceptance Article 1 Conclusion of the Agreement 1. Unless otherwise expressly agreed, the "General Delivery Terms and Conditions" alone shall apply to all agreements, deliveries and other services included in the

More information

1.1. These "General Terms and Conditions for Deliveries and Services" are hereinafter called "TERMS".

1.1. These General Terms and Conditions for Deliveries and Services are hereinafter called TERMS. General Terms and Conditions for Deliveries and Services of AUMUND Fördertechnik GmbH Issued January 2015 I. Basic conditions 1. Definitions 1.1. These "General Terms and Conditions for Deliveries and

More information

PROTOCOL (No 3) ON THE STATUTE OF THE COURT OF JUSTICE OF THE EUROPEAN UNION

PROTOCOL (No 3) ON THE STATUTE OF THE COURT OF JUSTICE OF THE EUROPEAN UNION C 83/210 Official Journal of the European Union 30.3.2010 PROTOCOL (No 3) ON THE STATUTE OF THE COURT OF JUSTICE OF THE EUROPEAN UNION THE HIGH CONTRACTING PARTIES, DESIRING to lay down the Statute of

More information

ORDINANCE ON THE AWARD OF SPECIAL PUBLIC CONTRACTS. (Heading amended, SG 7/2007, in force from ) In force from 1 October 2004

ORDINANCE ON THE AWARD OF SPECIAL PUBLIC CONTRACTS. (Heading amended, SG 7/2007, in force from ) In force from 1 October 2004 ORDINANCE ON THE AWARD OF SPECIAL PUBLIC CONTRACTS (Heading amended, SG 7/2007, in force from 23.01.2007) In force from 1 October 2004 Adopted by Council of Ministers Decree No 233 of 3 September 2004

More information

Antitrust: Commission introduces settlement procedure for cartels frequently asked questions (see also IP/08/1056)

Antitrust: Commission introduces settlement procedure for cartels frequently asked questions (see also IP/08/1056) MEMO/08/458 Brussels, 30 th June 2008 Antitrust: Commission introduces settlement procedure for cartels frequently asked questions (see also IP/08/1056) Why does the Commission introduce a settlement procedure?

More information

Patent Law of the Republic of Kazakhstan

Patent Law of the Republic of Kazakhstan Patent Law of the Republic of Kazakhstan With an adoption of the Law On Amendments and Additions for some legislative acts concerning an intellectual property of the Republic of Kazakhstan March 2, 2007,

More information

REGULATION (EC) No 593/2008 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 17 June on the law applicable to contractual obligations (Rome I)

REGULATION (EC) No 593/2008 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 17 June on the law applicable to contractual obligations (Rome I) REGULATION (EC) No 593/2008 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 June 2008 on the law applicable to contractual obligations (Rome I) THE EUROPEAN PARLIAMENT AND THE COUNCIL OF THE EUROPEAN

More information

General Terms and Conditions. General Terms and Conditions WILAmed GmbH, Kammerstein, Germany. 4. Delivery, Passing of the Risk

General Terms and Conditions. General Terms and Conditions WILAmed GmbH, Kammerstein, Germany. 4. Delivery, Passing of the Risk WILAmed GmbH, Kammerstein, Germany 1. Scope of Application 1.1. Unless explicitly agreed otherwise in writing, any deliveries and services by WILAmed GmbH ("WILAmed ) shall only be made in accordance with

More information

JUDGMENT OF THE COURT 10 March 1987 *

JUDGMENT OF THE COURT 10 March 1987 * COMMISSION v ITALY JUDGMENT OF THE COURT 10 March 1987 * In Case 199/85 Commission of the European Communities, represented by Guido Berardis, a member of its Legal Department, acting as Agent, with an

More information

INTERNAL INSTRUCTIONS GOVERNING CONTRACTS WITH LANTIK S.A. THAT ARE NOT SUBJECT TO STANDARDISED REGULATIONS C O N T E N T S:

INTERNAL INSTRUCTIONS GOVERNING CONTRACTS WITH LANTIK S.A. THAT ARE NOT SUBJECT TO STANDARDISED REGULATIONS C O N T E N T S: INTERNAL INSTRUCTIONS GOVERNING CONTRACTS WITH LANTIK S.A. THAT ARE NOT SUBJECT TO STANDARDISED REGULATIONS C O N T E N T S: 1. Aim 2. Interpretation of the Instructions 3. Types of Contract 3.1 Building

More information

CONSOLIDATED TEXT OF ACT no. 137/2006 Coll. on Public Contracts

CONSOLIDATED TEXT OF ACT no. 137/2006 Coll. on Public Contracts CONSOLIDATED TEXT OF ACT no. 137/2006 Coll. on Public Contracts as Amended by Act no. 110/2007 Coll., Act no. 296/2007 Coll., Act no. 76/2008 Coll., Act no. 124/2008 Coll., Act no. 110/2009 Coll., Act

More information

ECB-PUBLIC. Recommendation for a

ECB-PUBLIC. Recommendation for a EN ECB-PUBLIC Frankfurt, 16 April 2014 Recommendation for a Council Regulation amending Regulation (EC) No 2532/98 concerning the powers of the European Central Bank to impose sanctions (ECB/2014/19) (presented

More information

1. Introduction Purpose and scope of the guidelines

1. Introduction Purpose and scope of the guidelines EN ANNEX Guidelines for determining financial corrections to be made to expenditure financed by the Union under shared management, for non-compliance with the rules on public procurement 1 Table of Contents

More information

TERMS AND CONDITIONS OF PURCHASE

TERMS AND CONDITIONS OF PURCHASE TERMS AND CONDITIONS OF PURCHASE The following general terms and conditions shall govern all purchase contracts and other contracts for deliveries and services, which are concluded by one of the German

More information

OPINION OF ADVOCATE GENERAL SAUGMANDSGAARD ØE delivered on 22 February 2018 (1) Case C 44/17

OPINION OF ADVOCATE GENERAL SAUGMANDSGAARD ØE delivered on 22 February 2018 (1) Case C 44/17 Provisional text OPINION OF ADVOCATE GENERAL SAUGMANDSGAARD ØE delivered on 22 February 2018 (1) Case C 44/17 The Scotch Whisky Association, The Registered Office v Michael Klotz (Request for a preliminary

More information

EUROPEAN UNION. Brussels, 31 March 2008 (OR. en) 2005/0261 (COD) PE-CONS 3691/07 JUSTCIV 334 CODEC 1401

EUROPEAN UNION. Brussels, 31 March 2008 (OR. en) 2005/0261 (COD) PE-CONS 3691/07 JUSTCIV 334 CODEC 1401 EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Brussels, 31 March 2008 (OR. en) 2005/0261 (COD) PE-CONS 3691/07 JUSTCIV 334 CODEC 1401 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject: Regulation of the

More information

Community Directives relating to the coordination of procedures for the award of public contracts:

Community Directives relating to the coordination of procedures for the award of public contracts: Final version of 29/11/2007 COCOF 07/0037/03-EN EUROPEAN C0MMISSION GUIDELINES FOR DETERMINING FINANCIAL CORRECTIONS TO BE MADE TO EXPENDITURE CO- FINANCED BY THE STRUCTURAL FUNDS OR THE COHESION FUND

More information

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, 16.5.2013 COM(2013) 288 final 2013/0150 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL amending Regulation (EU) No 528/2012 concerning the making

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2004L0038 EN 30.04.2004 000.003 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 DIRECTIVE 2004/38/EC OF THE EUROPEAN PARLIAMENT

More information

Official Journal of the European Union L 84/1 REGULATIONS

Official Journal of the European Union L 84/1 REGULATIONS 31.3.2009 Official Journal of the European Union L 84/1 I (Acts adopted under the EC Treaty/Euratom Treaty whose publication is obligatory) REGULATIONS COUNCIL REGULATION (EC) No 260/2009 of 26 February

More information

GENERAL CONDITIONS OF ITINERA SPA SUPPLIERS REGISTER

GENERAL CONDITIONS OF ITINERA SPA SUPPLIERS REGISTER GENERAL CONDITIONS OF ITINERA SPA SUPPLIERS REGISTER 1 1. PREMISES 1.1. Itinera S.p.A. ( Itinera ), with head office in Tortona (AL), via Balustra 15, owner of the online Platform EProcurement of Itinera,

More information

REQUEST FOR PROPOSAL: No. RFP/SWEST/2017/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF. [Documentary movie production]

REQUEST FOR PROPOSAL: No. RFP/SWEST/2017/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF. [Documentary movie production] DATE: [25/01/2017] REQUEST FOR PROPOSAL: No. RFP/SWEST/2017/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF [Documentary movie production] CLOSING DATE AND TIME: 07/03/2017 23:59 hrs

More information

P7_TA-PROV(2014)0125 Biocidal products ***I

P7_TA-PROV(2014)0125 Biocidal products ***I P7_TA-PROV(2014)0125 Biocidal products ***I European Parliament legislative resolution of 25 February 2014 on the proposal for a regulation of the European Parliament and of the Council amending Regulation

More information

Consolidated version of the Rules of Procedure of the Court of Justice of 25 September Table of Contents

Consolidated version of the Rules of Procedure of the Court of Justice of 25 September Table of Contents Consolidated version of the Rules of Procedure of the Court of Justice of 25 September 2012 Table of Contents Page INTRODUCTORY PROVISIONS... 10 Article 1 Definitions... 10 Article 2 Purport of these Rules...

More information

General Terms of Contract

General Terms of Contract APPENDIX III General Terms of Contract GENERAL CONDITIONS OF CONTRACT 1. GENERAL PROVISIONS 1. 1 Definitions Unless the context otherwise requires, the following terms whenever used in this Contract have

More information

Standard Conditions of Sale and Terms of Delivery of

Standard Conditions of Sale and Terms of Delivery of Standard Conditions of Sale and Terms of Delivery of I. General 1. These Standard Conditions of Sale and Terms of Delivery (hereinafter referred to as Terms of Delivery ) apply exclusively to our goods

More information

Having regard to the Treaty on European Union, and in particular Article 28 and Article 31(1) thereof,

Having regard to the Treaty on European Union, and in particular Article 28 and Article 31(1) thereof, 27.6.2014 L 188/73 COUNCIL DECISION 2014/401/CFSP of 26 June 2014 on the European Union Satellite Centre and repealing Joint Action 2001/555/CFSP on the establishment of a European Union Satellite Centre

More information

TENDER DOCUMENTS PROCUREMENT OF GOODS PRICE QUOTATIONS. Public Procurement Board. Accra, Ghana

TENDER DOCUMENTS PROCUREMENT OF GOODS PRICE QUOTATIONS. Public Procurement Board. Accra, Ghana TENDER DOCUMENTS PROCUREMENT OF GOODS PRICE QUOTATIONS Public Procurement Board Accra, Ghana October 2003 i Table Contents Table Contents... i Introduction and Instructions... 1 Section I. Invitation for

More information

NEW EU DIRECTIVES CONCERNING PUBLIC PROCUREMENT TRANSPOSED INTO ROMANIAN LAW STARTING MAY JANUARY BUCHAREST

NEW EU DIRECTIVES CONCERNING PUBLIC PROCUREMENT TRANSPOSED INTO ROMANIAN LAW STARTING MAY JANUARY BUCHAREST NEW EU DIRECTIVES CONCERNING PUBLIC PROCUREMENT TRANSPOSED INTO ROMANIAN LAW STARTING MAY 2016 26 JANUARY 2017 - BUCHAREST Modifications without new procurement procedures Overview I. Introduction II.

More information

SCHOTT Purchasing Terms and Conditions

SCHOTT Purchasing Terms and Conditions SCHOTT Purchasing Terms and Conditions 8/2009/INT The following terms and conditions govern purchase agreements and other contracts relating to goods and services made, or agreed to by the company SCHOTT

More information

ORDER OF THE COURT 23 October 2013

ORDER OF THE COURT 23 October 2013 ORDER OF THE COURT 23 October 2013 (Refusal to commence proceedings for alleged failure of an EEA State to fulfil its obligations in the field of procurement Actionable measures Admissibility) In Case

More information

GENERAL CONDITIONS OF THE CONTRACT (Applicable to purchase orders)

GENERAL CONDITIONS OF THE CONTRACT (Applicable to purchase orders) GENERAL CONDITIONS OF THE CONTRACT (Applicable to purchase orders) ARTICLE 1 PERFORMANCE OF THE CONTRACT 1.1. The Contractor shall perform the Contract to the highest professional standards. The Contractor

More information

EUROPEAN MODEL COMPANY ACT (EMCA) CHAPTER 3 REGISTRATION AND THE ROLE OF THE REGISTRAR

EUROPEAN MODEL COMPANY ACT (EMCA) CHAPTER 3 REGISTRATION AND THE ROLE OF THE REGISTRAR EUROPEAN MODEL COMPANY ACT (EMCA) CHAPTER 3 REGISTRATION AND THE ROLE OF THE REGISTRAR Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section 8 Section 9 Section 10 Section 11 Section

More information

GENERAL CONDITIONS OF THE CONTRACT

GENERAL CONDITIONS OF THE CONTRACT GENERAL CONDITIONS OF THE CONTRACT Version of January 2013 The contract consists of a purchase order and these general conditions. In the event of conflicting interpretations, the purchase order shall

More information

JUDGMENT OF CASE 172/82

JUDGMENT OF CASE 172/82 JUDGMENT OF 10. 3. 1983 CASE 172/82 1. The fact that Articles 169 and 170 of the Treaty enable the Gommission and the Member States to bring before the Court a State which has failed to fulfil one of its

More information

Official Journal of the European Union. (Acts whose publication is obligatory)

Official Journal of the European Union. (Acts whose publication is obligatory) 25.2.2003 L 50/1 I (Acts whose publication is obligatory) COUNCIL REGULATION (EC) No 343/2003 of 18 February 2003 establishing the criteria and mechanisms for determining the Member State responsible for

More information

The Procurement Guidelines of. Japan s Grant Aid. (Type I C)

The Procurement Guidelines of. Japan s Grant Aid. (Type I C) The Procurement Guidelines of Japan s Grant Aid (Type I C) Japan International Cooperation Agency (JICA) Table of Contents PART I Basic Principles... 4 I- I Introduction... 4 I-II Parties Concerned...

More information

Translation in English is for informative purposes only. Legally binding is text in Latvian.

Translation in English is for informative purposes only. Legally binding is text in Latvian. APPROVED with the Minutes No. VeA 2013/10/ERAF-01 of the sitting of the Procurement commission of the Ventspils University College of 16 th of April, 2013 NEGOTIATED PROCEDURE REGULATIONS Development of

More information

GENERAL TERMS AND CONDITIONS OF SALE AND DELIVERY OF AOA APPARATEBAU GAUTING GMBH

GENERAL TERMS AND CONDITIONS OF SALE AND DELIVERY OF AOA APPARATEBAU GAUTING GMBH GENERAL TERMS AND CONDITIONS OF SALE AND DELIVERY OF AOA APPARATEBAU GAUTING GMBH I. Application of the Terms and Conditions of Sale and Delivery 1. This Contract and all subsequent agreements are exclusively

More information

European Aviation Safety Agency

European Aviation Safety Agency European Aviation Safety Agency DECISION OF THE MANAGEMENT BOARD AMENDING AND REPLACING DECISION 7-03 CONCERNING THE PROCEDURE TO BE APPLIED BY THE AGENCY FOR THE ISSUING OF OPINIONS, CERTIFICATION SPECIFICATIONS

More information

OPINION OF ADVOCATE GENERAL LÉGER delivered on 11 November

OPINION OF ADVOCATE GENERAL LÉGER delivered on 11 November OPINION OF MR LÉGER JOINED CASES C-21/03 AND C-34/03 OPINION OF ADVOCATE GENERAL LÉGER delivered on 11 November 2004 1 1. Does the fact that a person has been involved in the preparatory work for a public

More information