ORDER (Hearing on & )

Size: px
Start display at page:

Download "ORDER (Hearing on & )"

Transcription

1 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Smt. Meenakshi Singh, Member Shri I. B. Pandey, Member In the matter of: Petition u/s 86 (1) (c) & (f), 35 & 36 of Electricity Act, 2003 and In the matter of Open Access for conveyance of upto 45MW power being procured from alternate sources at UPPTCL s 132 KV Surajpur Substation for Noida Power Company Ltd. M/s Noida Power Company Ltd., Commercial Complex, H Block, Alpha II Sector, Greater Noida (UP) Petitioner Versus 1. Uttar Pradesh State Load Dispatch Centre, Uttar Pradesh Power Transmission Company Ltd., 14, Ashok Marg, Shakti Bhawan, Lucknow (UP) 2. Uttar Pradesh Power Transmission Company Ltd., 14, Ashok Marg, Shakti Bhawan, Lucknow (UP) Present in the Hearing: 1. Shri Rahul Srivastava, Advocate, Counsel for UPSLDC 2. Shri Sunil Mohan Agarwal, Superintending Engineer, UPSLDC 3. Shri Zahir Ahmad, Executive Engineer, UPSLDC 4. Shri S. P. Gupta, Executive Engineer, UPSLDC 5. Shri M. K. Gupta, Assistant Engineer, SLDC 6. Shri M. G. Ramachandran, Sr. Advocate, NPCL 7. Shri Vishal Gupta, Advocate, NPCL 8. Shri R. C. Agarwala, MD & CEO, NPCL 9. Rajeev Goyal, GM (Projects & Power Trading), NPCL 10. Alok Sharma, Manager - Legal 11. Shri A. K. Arora, Resident Manager, NPCL. Respondents ORDER (Hearing on & ) Whereas the petitioner Noida Power Company Ltd., Commercial Complex, H Block, Alpha II Sector, Greater Noida (UP), has filed petition no. 934 of 2014, in the matter u/s 86 (1) (c) & (f), 35 & 36 of Electricity Act, 2003 and in the matter of Open Access for conveyance of upto 45MW power being procured from alternate sources at UPPTCL s 132 KV Surajpur Substation for Noida Power Company Ltd. Page 1 of 6

2 Submissions of NPCL: Shri Ramchandran Counsel for NPCL submitted that NPCL has entered into Bulk Power Transmission Agreement with UP Power Transmission Corporation Ltd. (UPPTCL) on as can be observed from the rejoinder filed by NPCL. Para 2 of this BPTA signed with UPPTCL is as follows: 2.0 Transmission System The list of transmission system presently owned, operated and maintained by UPPTCL within the territory of State (for license area of LTC) is detailed in Annexure-B. The list also incorporates separately such other systems which are under construction and those which are yet to be commissioned. Additions to the existing transmission system may be made by UPPTCL during the course of the Agreement as may be approved by the Competent Authority, viz Board of Directors or Energy Task Force followed by approval of transmission plan by Central Electricity Authority and the same shall become part of this Agreement. The list of the sub-stations are mentioned in Annexure B of BPTA which is as follows: List of Existing Sub-Stations:- S.N. Name of Sub- Voltage Existing Proposed Remarks Stations Ratio (KV) Capacity Capacity Greator Existing S/S Noida KV S/S 400/220 3x315 2x Greater Noida 220/132 2x KV S/S R.C. Green 220/ / x x KV S/S 132/33 2x40+20 Surajpur List of Sub-Stations Under Construction: S.N. Name of Sub- Voltage Existing Proposed Remarks Stations Ratio (KV) Capacity Capacity Page 2 of 6

3 Greator Existing S/S Noida 1 400/220KV S/S Noida Sector 148 (GIS) 400/ / /33 2x500 1x160 2x100 This BPTA SLDC has provided 68 MW of power upto year 2003 and upto 200 MW power upto year 2009 and its providing 240 MW of power with different point in injection to the periphery of NPCL. Clause of Open Access defines allotment of priority first come first basis. And even in these priority should be given to Distribution Licensee. NPCL was a distribution licensee prior to the Electricity Act, So, it became deemed distribution licensee. NPCL is the only distribution licensee having Long Term Open Access Agreement with UPPTCL in the State. So, highest priority should be given to NPCL and distribution licensee should have priority of Short Term Open Access over the Long Term Open Access consumers. NPCL was ready to pay Long Term Open Access Charges even on Short Term Open Access. Shri Ramchandran further emphasized that NPCL should be treated equivalent to State Discoms and NPCL should be treated at par with other distribution licensees. He further submitted that they have contributed nearly 30 crores for substations development of in Greater Noida area for Long Term Open Access. UPPCL stopped the supply of 45 MW power to NPCL as per the Hon ble High Court order. NPCL had to then make necessary arrangement for supply of power to the consumer on Short Term basis. Shri Ramchandran further submitted that SLDC has said that they will only give Short Term Open Access on day ahead basis and only after fulfilling the requirement of State owned Discoms. This means that the petitioner has to make application daily and application charges are to be paid on daily basis and which in turn are passed on the consumers of NPCL area thereby increasing their tariff. He further requested that the Commission may direct SLDC to grant Long Term Open Access. SLDC submitted that they have not received Long Term Open Access Page 3 of 6

4 Agreement with UPPCL. The petitioner submitted that they already have Long Term Open Access Agreement with UPPTCL and the same has been submitted to SLDC and if SLDC grants permission then they can make provision of making Long Term Agreement with the PGCIL to supply power on Long Term basis. SLDC submitted that they will schedule the power of NPCL only after fulfilling the requirement of State owned Discoms. The petitioner submitted that SLDC has no such rights and that all the Discoms should be treated at par. The petitioner further submitted that they are the only Discom who has got Long Term Open Access Agreement with UPPTCL whereas no other State owned Discom has such BPTA, therefore the submission of SLDC that priority is given to State owned Discoms is not valid and equal priority should be given to power requirement to all the Discoms. NPCL has no Long Term PPA but NPCL is ready to pay Long Term Transmission Charges so the same priority should be given to NPCL. Electricity Act, 2003 and CERC Regulation, 2009 says Long Term Customer has the first priority and Discoms are the Long Term Customers they should be given equal priority. SLDC submitted that total transmission capability is 6000 MW and the available transmission capability is 5700 MW only, whereas State Discoms have Long Term Agreement for procurement of around 6894 MW from different sources outside the State. The petitioner submitted that: Under the Clause 9 of the UPERC (Terms and Conditions for Open Access) Regulations, 2004 allotment priority for open access for different type of customers has been provided as below: Allotment Priority 1. The priority for allowing open access to customers shall be decided on the following criteria. a. A existing distribution licensee and existing generating company and captive power plant shall have the highest priority in allotment of open access capacity; b. Distribution licensee shall have priority over other customers; Page 4 of 6

5 c. Other Long Term Open Access customers shall have the priority over the short-term open access customers but next to those covered under 9(a)and 9(b);. Hence, NPCL should not be discriminated by SLDC. The Commission enquired from SLDC that if the problems of transmission capability was there and rules do not permit, then how SLDC was granting permission of STOA to NPCL on almost continuous basis. Obviously there was a way out, based on which SLDC was granting permission basis. Director (Commercial), UPPTCL submitted that NPCL should be directed to pay Long Term Charges on the Short Term Open Access, different rates were decided by the Commission for the Short Term and Long Term Charges. NPCL has taken advantage of it and purchased whole of power requirement through Short Term Open Access resulting in loss of revenue to UPPTCL. They should be directed to pay Long Term Charges on the Short Term Transactions right from the date of commencement. Income from Short Term Open Access Transactions is treated as other income which thereby increases in Long Term Transmission Charges which has to be paid by State of Discoms thereby increasing the Retail Tariff. He requested the Commission to make Short Term Open Access and Long Term Open Access charges same and all Discoms should be directed to pay Long Term Charges and they should be treated at par and customer should be treated separately. The petitioner submitted that NPCL s case is not against UPPTCL but against SLDC who has not granted Short Term Open Access as provided in the Act and Regulations. SLDC is providing Open Access on day ahead basis which is an additional burden to NPCL, thereby increasing burden on the consumers in the area of NPCL. As far as the total transmission capacity (TTC) is concerned, it is 5 % for the Short Term Open Access and rest for the Long Term Open Access consumers. It is the duty of UPPTCL to increase the total transmission capability in view of Long Term PPA s of the State Discoms and Short Term Open Access should not be curtailed. He further prayed to the Commission to grant Short Term Open Access on firm basis up to three months for 268 Page 5 of 6

6 MW for drawal at NPCL Distribution periphery for which Bulk Power Transmission Agreement (BPTA) exists between NPCL & UPPTCL. The Commission asked UPPCL whether they have any objections in granting Short Term Open Access to NPCL on firm basis to which UPPCL responded that they have no objection to it. The Commission directs SLDC to grant Short Term Open Access on firm basis up to three months. It is necessary to say according to their requirement for drawal at NPCL Distribution periphery for which they have BPTA with UPPTCL. NPCL is directed to pay Long Term Transmission Charges to UPPTCL on all the power imported by it whether by Interstate or Intrastate transmission. In Case of Shortage of TTC, it should be proportionately divided among the Discoms including NPCL. NPCL is directed to make Long Term PPA for its power requirement within six months. (I. B. Pandey) (Meenakshi Singh) (Desh Deepak Verma) Member Member Chairman Dated: Page 6 of 6

Respondents. Present in the Hearing: Respondents

Respondents. Present in the Hearing: Respondents BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Smt. Meenakshi Singh, Member Shri I. B. Pandey, Member In the matter of: Petition u/s 86 (1) (c) & (f),

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW. Petition No.: 960/2014

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW. Petition No.: 960/2014 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Petition No.: 960/2014 IN THE MATTER OF: Petition under Section 63 of the Electricity Act, 2003 read with Clause 10.4 of the Guidelines

More information

In the matter of: M/s Rauzagaon Chini Mills (A unit of Balrampur Chini Mills Ltd.) Rauzagaon , District Barabanki (U.P.

In the matter of: M/s Rauzagaon Chini Mills (A unit of Balrampur Chini Mills Ltd.) Rauzagaon , District Barabanki (U.P. BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Petition No. 1007 /2015 Quorum Shri Desh Deepak Verma, Chairman Smt. Meenakshi Singh, Member Shri I. B. Pandey, Member In the matter of: Petition

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member In the matter of: Fixation of transmission tariff for 7.2 KM 400 KV dedicated

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member In the matter of: Petitioner Respondents UPNEDA, Vibhuti Khand, Gomti Nagar,

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member In the matter of: Petitioner Respondents UPNEDA, Vibhuti Khand, Gomti Nagar,

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Smt. Meenakshi Singh, Member Shri I. B. Pandey, Member In the matter of: Sub: Petition No. 777 of 2011

More information

2. Chief Engineer (PPA) UP Power Corporation Limited 14 th Floor, Shakti Bhawan Ext. 14 Ashok Marg, Lucknow.Respondent

2. Chief Engineer (PPA) UP Power Corporation Limited 14 th Floor, Shakti Bhawan Ext. 14 Ashok Marg, Lucknow.Respondent PRESENT: Petition No. 967 & 968 of 2014 and 1016 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 14.07.2015 1. Hon ble Sri Desh Deepak Verma, Chairman 2. Hon

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Quorum 1. Hon ble Shri Desh DeepakVerma, Chairman 2. Hon ble Shri InduBhushan Pandey, Member 3. Hon ble Shri S. K. Agarwal, Member In

More information

Petition No 973 of 2014 and 1036,1037,1038,1039 &1040 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

Petition No 973 of 2014 and 1036,1037,1038,1039 &1040 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No 973 of 2014 and 1036,1037,1038,1039 &1040 of 2015 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order: 07.01.16 Present: Hon ble Shri Desh Deepak Verma, Chairman

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. Investigate and to take appropriate action against M/s Torrent and further to cancel the

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. Investigate and to take appropriate action against M/s Torrent and further to cancel the BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum ShriDesh Deepak Verma, Chairman Smt. Meenakshi Singh, Member Shri I. B. Pandey, Member In the matter of Investigate and to take appropriate

More information

THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW

THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Petition No 851 & 861 of 2012 Before THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION, LUCKNOW Date of Order: 20.03.2013 IN THE MATTER OF: Deemed Energy claim of RPSCL Petition No 851 of 2012 BETWEEN

More information

Petition No.881 of 2013, 952 of 2014, 1043 of 2015, 1092& 1093 of 2016 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

Petition No.881 of 2013, 952 of 2014, 1043 of 2015, 1092& 1093 of 2016 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.881 of 2013, 92 of 2014, 1043 of 201, 1092& 1093 of 2016 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW PRESENT: 1. Hon ble Sri. Desh Deepak Verma, Chairman 2. Hon ble Sri.

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Present Shri Rajesh Awasthi, Chairman Petition No. 690/2010 IN THE MATTER OF : Review of the Commission s order dated 02-07-10 passed

More information

Draft Supplementary Power Purchase Agreement

Draft Supplementary Power Purchase Agreement Draft Supplementary Power Purchase Agreement Between Paschimanchal Vidyut Vitran Nigam Ltd. ( Procurer 1 ) and Poorvanchal Vidyut Vitran Nigam Ltd. ( Procurer 2 ) and Madhyanchal Vidyut Vitran Nigam Ltd.

More information

BIHAR ELECTRICITY REGULATORY COMMISSION

BIHAR ELECTRICITY REGULATORY COMMISSION BIHAR ELECTRICITY REGULATORY COMMISSION Vidyut Bhawan-II, J.L. Nehru Marg, Patna 800 021. Case No. 39/2016 IN THE MATTER OF:- PETITION UNDER SECTION 142 OF THE ELECTRICITY ACT, 2003 FOR NON COMPLIANCE

More information

Petition No 768 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order :

Petition No 768 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Date of Order : Petition No 768 of 2011 BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Date of Order : 04.11.2011 IN THE MATTER OF: Approval of determined transfer price of fuel and revised Request

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member Petitioner Western U.P. Power Transmission Co. Ltd., S-3, 2 nd Indirapuram,

More information

Sangeeta Verma Secretary. No. Secy/ UPERC/Supply Code/ Lucknow: Dated Sir,

Sangeeta Verma Secretary. No. Secy/ UPERC/Supply Code/ Lucknow: Dated Sir, Uttar Pradesh Electricity Regulatory Commission Kisan Mandi Bhawan, II Floor, Gomti Nagar, Lucknow-226010 Phone 2720821 Fax 2720423 E-mail secretary@uperc.org Sangeeta Verma Secretary No. Secy/ UPERC/Supply

More information

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL. ORDER (Date of Order : 7 th September, 2012)

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL. ORDER (Date of Order : 7 th September, 2012) MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL Sub : In the matter of approval of Power Purchase Agreement. ORDER (Date of Order : 7 th September, 2012) Petition No.11 of 2012 1. MP Power Management

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2016 INDEX Part A: PRELIMINARY 3 1. Short Title, Applicability and Commencement 3 2. Definitions 3 3. Eligibility to

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.564/08 IN THE MATTER OF: Seeking determination of tariff of 200 MW enhanced capacity of Anpara C TPS and direction for M/s

More information

ORDER (Date of hearing 24 th November, 2012) (Date of order 10 th December, 2012)

ORDER (Date of hearing 24 th November, 2012) (Date of order 10 th December, 2012) ORDER (Date of hearing 24 th November, 2012) (Date of order 10 th December, 2012) M/s Birla Corporation Ltd. - Petitioner Unit Satna Cement Works, PO Birla Vikas, Satna 485005 (MP). V/s MP Poorv Kshetra

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition no. 646/10 IN THE MATTER OF: AND IN THE MATTER OF Adoption of tariff obtained through competitive bidding process for 2x660 Sangam

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL Subject: Dated: 7 th February, 2013 M/s Essar Power M. P. Limited DAILY ORDER (Date of Motion Hearing : 5 th February, 2013) Petition No.03/2013

More information

Case No.139 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member

Case No.139 of Smt. Chandra Iyengar, Chairperson Shri Azeez M. Khan, Member Shri Deepak Lad, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI (Case No.23/ ) QUORUM Shri Mukhtiar Singh, Chairperson Shri P. C. Verma, Member.

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI (Case No.23/ ) QUORUM Shri Mukhtiar Singh, Chairperson Shri P. C. Verma, Member. JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI (Case No.23/2007-08) IN THE MATTER OF QUORUM Shri Mukhtiar Singh, Chairperson Shri P. C. Verma, Member. An application for setting aside the letter

More information

Case No. 64 of Shri. V. P. Raja, Chairman Shri. Vijay L. Sonavane, Member ORDER

Case No. 64 of Shri. V. P. Raja, Chairman Shri. Vijay L. Sonavane, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@mercindia.org.in

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014 104 MAHARASHTRA ELECTRICITY REGULATORY COMMISSION NOTIFICATION (TRANSMISSION OPEN ACCESS) REGULATIONS, 2014 ELECTRICITY ACT, 2003. No./MERC/Tech/Open Access Transmission/Regulations/2014/561. In exercise

More information

Draft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016

Draft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016 Draft JSERC (Terms and Conditions for Intra State Open Access) Regulations, 2016 JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION In exercise of powers conferred by Section 181 read with relevant provisions

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION

KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION KERALA STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. 1824/CT/KSERC/2012 Dated, Thiruvananthapuram 10 th September, 2013 Kerala State Electricity Regulatory Commission (Connectivity and Intrastate

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Notice dated U/s130 of Electricity Act2003.

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Notice dated U/s130 of Electricity Act2003. UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW In the matter of : Notice dated 12.5.2007 U/s130 of Electricity Act2003. AND In the matter of : 1. Managing Director, U.P.Power Corporation Limited,

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION No.L-7/105(121)/2007-CERC Dated the 25 th January, 2008 In exercise of powers conferred by Section 178 of the Electricity Act, 2003 and

More information

Case No. 22 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER

Case No. 22 of Shri V.P. Raja, Chairman Shri Vijay L. Sonavane, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.com

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 211/MP/2012

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 211/MP/2012 CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 211/MP/2012 Coram: Dr. Pramod Deo, Chairperson Shri S. Jayaraman, Member Shri V.S. Verma, Member Shri M. Deena Dayalan, Member Date of Hearing:

More information

Case No. 295 of Coram. Anand B. Kulkarni, Chairperson Mukesh Khullar, Member. Adani Power Maharashtra Limited (APML)

Case No. 295 of Coram. Anand B. Kulkarni, Chairperson Mukesh Khullar, Member. Adani Power Maharashtra Limited (APML) Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Order on. Petition No. 58/2013

Order on. Petition No. 58/2013 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 IN THE MATTER OF: Order on ARR & Retail Supply Tariff for Special Economic Zone (SEZ)

More information

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL ORDER

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL ORDER MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL ORDER (Date of Order : 7 th September, 2012) Petition Nos.7, 8, 9, 10 & 12 of 2012 1. MP Power Management Co. Ltd., Jabalpur 2. MP Paschim Kshetra

More information

ORDER (Date of Hearing : 23 rd November, 2010) (Date of Order : 24 th November, 2010)

ORDER (Date of Hearing : 23 rd November, 2010) (Date of Order : 24 th November, 2010) MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION, BHOPAL Sub : In the matter of petition for approval of cost sharing scheme by prospective EHT ORDER (Date of Hearing : 23 rd November, 2010) (Date of Order

More information

Order on. Petition No. 38/2013

Order on. Petition No. 38/2013 MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION 4 th and 5 th Floor, Metro Plaza, Bittan Market, Bhopal - 462 016 IN THE MATTER OF: Order on ARR & Retail Supply Tariff for Special Economic Zone (SEZ)

More information

GUIDELINES/PROCEDURE FOR IMPLEMENTATION OF SHORT TERM OPEN ACCESS (STOA)

GUIDELINES/PROCEDURE FOR IMPLEMENTATION OF SHORT TERM OPEN ACCESS (STOA) Annexure-A GUIDELINES/PROCEDURE FOR IMPLEMENTATION OF SHORT TERM OPEN ACCESS (STOA) 1. Eligibility Requirements: (1) The Short Term Open Access shall be permissible to a consumer having a contract demand

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 119/MP/2013. Date of Hearing: Date of Order :

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Petition No. 119/MP/2013. Date of Hearing: Date of Order : CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 119/MP/2013 Coram: Shri V.S. Verma, Member Shri M. Deena Dayalan, Member In the matter of Date of Hearing: 17.09.2013 Date of Order : 03.12.2013

More information

Distribution List (WRLDC Letter No. WRLDC/MO/RPS/PG-EPMPL/2018) 1. Executive Director, POWER GRID WRTS-1 2. Executive Director, POWER GRID WRTS-2 3.

Distribution List (WRLDC Letter No. WRLDC/MO/RPS/PG-EPMPL/2018) 1. Executive Director, POWER GRID WRTS-1 2. Executive Director, POWER GRID WRTS-2 3. Distribution List (WRLDC Letter No. WRLDC/MO/RPS/PG-EPMPL/2018) 1. Executive Director, POWER GRID WRTS-1 2. Executive Director, POWER GRID WRTS-2 3. Chief Operating Officer, CTU-Planning, POWERGRID, Gurgaon

More information

Uttar Pradesh Electricity Regulatory Commission

Uttar Pradesh Electricity Regulatory Commission Uttar Pradesh Electricity Regulatory Commission Kisan Mandi Bhawan, II Floor, Gomti Nagar, Lucknow-226010 Phone 2720426 Fax 2720423 E-mail secretary@uperc.org Commission s Order Dt. 22 nd July, 2014 Electricity

More information

No. HPSEBL/CE(SO&P)/IS-60A(Vol-IV)/ Dated:

No. HPSEBL/CE(SO&P)/IS-60A(Vol-IV)/ Dated: Tender Document No.: 4 HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED (A State Government Undertaking) Office of the Chief Engineer (SO&P), Vidyut Bhawan, Shimla-171004 (HP) Tel./Fax No. 0177-2653119,

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2015 INDEX Part A: PRELIMINARY 4 1. Short Title, extent and commencement 4 2. Definitions 4 3. Eligibility to seek

More information

ASSAM ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2018 NOTIFICATION

ASSAM ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2018 NOTIFICATION ASSAM ELECTRICITY REGULATORY COMMISSION (DEVIATION SETTLEMENT MECHANISM AND RELATED MATTERS) REGULATIONS, 2018 November 2018 NOTIFICATION No. AERC 694/2018 - In exercise of the powers conferred under sub-section

More information

IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL NO OF 2018 VERSUS WITH CIVIL APPEAL NO OF 2018 JUDGMENT

IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL NO OF 2018 VERSUS WITH CIVIL APPEAL NO OF 2018 JUDGMENT REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL NO. 5865 OF 2018 UTTAR HARYANA BIJLI VITRAN NIGAM LTD. [UHBVNL] & ANR. APPELLANTS VERSUS ADANI POWER LTD. & ORS. RESPONDENTS

More information

(A Govt. of Maharashtra Undertaking) - CIN: U40109MH2005SGC153645

(A Govt. of Maharashtra Undertaking) - CIN: U40109MH2005SGC153645 (A Govt. of Maharashtra Undertaking) - CIN: U40109MH2005SGC153645 PROCEDURE FOR DISTRIBUTION OPEN ACCESS INDEX Sr. No. Chapters Page No. 01 Preamble 02 02 Types of Open Access 02 03 Eligibility to Seek

More information

CHAPTER I: PRELIMINARY

CHAPTER I: PRELIMINARY ASSAM ELECTRICITY REGULATORY COMMISSION NOTIFICATION 7 th February, 2018 DRAFT AERC (TERMS AND CONDITIONS FOR OPEN ACCESS) REGULATIONS, 2018 No. AERC 616/2017-- In exercise of powers conferred by Section

More information

Case No. 166 of The Tata Power Co. Ltd. (Generation) [TPC-G] Brihanmumbai Electric Supply & Transport Undertaking (BEST)...

Case No. 166 of The Tata Power Co. Ltd. (Generation) [TPC-G] Brihanmumbai Electric Supply & Transport Undertaking (BEST)... Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Case No. 61 of In the matter of. Petition of Wardha Power Company Ltd. for Review of Order dated 17 January, 2014 in Case No.

Case No. 61 of In the matter of. Petition of Wardha Power Company Ltd. for Review of Order dated 17 January, 2014 in Case No. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai

BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai BEFORE THE MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai-400 005 Case Nos. 16 and 17 of 2000 IN THE MATTER OF (I) PETITION OF PRAYAS,

More information

Case No. 17 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member. Reliance Infrastructure Ltd., Santacruz (E).

Case No. 17 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member. Reliance Infrastructure Ltd., Santacruz (E). Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

No. HPSEBL/CE(SO&P)/IS-60A(Vol-II)/ As per list attached.

No. HPSEBL/CE(SO&P)/IS-60A(Vol-II)/ As per list attached. HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED (A State Government Undertaking) Office of the Chief Engineer (SO&P), Vidyut Bhawan, Shimla-171004. (HP) Tel./Fax No. 0177-2657901, Email: ceso@hpseb.in,

More information

THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.1258/2017, 1259/2017, 1260/2017, 1261/2017 & 1262/2017

THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.1258/2017, 1259/2017, 1260/2017, 1261/2017 & 1262/2017 THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW Petition No.1258/2017, 1259/2017, 1260/2017, 1261/2017 & 1262/2017 PRESENT: Hon ble Sri Suresh Kumar Agarwal, Chairman IN THE MATTER OF : Petition

More information

TAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement)

TAMIL NADU GOVERNMENT GAZETTE. Part VI --- Section 2 (Supplement) TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 30A CHENNAI, WEDNESDAY, AUGUST 3, 2005 Aadi 18, Parthiba, Thiruvalluvar Aandu - 2036 Part VI --- Section 2 (Supplement) NOTIFICATIONS BY HEADS OF

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Coram: Dr. Pramod Deo, Chairperson Shri S. Jayaraman, Member Shri V.S. Verma, Member Shri M. Deena Dayalan, Member Date of Hearing: 20.11.2012 Date of

More information

Case No. 167 of Coram. Smt. Chandra Iyengar, Chairperson Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member

Case No. 167 of Coram. Smt. Chandra Iyengar, Chairperson Shri. Azeez M. Khan, Member Shri. Deepak Lad, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Sub: In the matter of representation in compliance to the directions of Hon ble High Court, Jabalpur in Writ Petition no.

Sub: In the matter of representation in compliance to the directions of Hon ble High Court, Jabalpur in Writ Petition no. ORDER (Date of hearing: 12 th March, 2015) (Date of order: 30 th March, 2015) Shri Ashok Kumar Sable, - Petitioner S/o Shri Anand Rao Sable, R/o near Gas Godown, Mordongri Road, Sarni, District Betul (M.P.)

More information

Case No. 94 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member

Case No. 94 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

DETAILED PROCEDURE FOR GRANT OF CONNECTIVITY & OPEN ACCESS IN INTRA-STATE TRANSMISSION SYSTEM

DETAILED PROCEDURE FOR GRANT OF CONNECTIVITY & OPEN ACCESS IN INTRA-STATE TRANSMISSION SYSTEM DETAILED PROCEDURE FOR GRANT OF CONNECTIVITY & OPEN ACCESS IN INTRA-STATE TRANSMISSION SYSTEM 1. Introduction: 1.1 The Kerala State Electricity Regulatory Commission notified KSERC (Connectivity and Intra-state

More information

Case No. 02 of Shri V. P. Raja, Chairman Shri S. B. Kulkarni, Member Shri V. L. Sonavane, Member

Case No. 02 of Shri V. P. Raja, Chairman Shri S. B. Kulkarni, Member Shri V. L. Sonavane, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No. 1, 13th Floor, Cuffe Parade, Mumbai - 400005 Email: mercindia@mercindia.org.in Website: www.mercindia.org.in Case

More information

Request for Proposal Document. For Selection of Developer for Setting up of

Request for Proposal Document. For Selection of Developer for Setting up of Request for Proposal Document For Selection of Developer for Setting up of 8 MW Solar PV Power Plant on the land of Procurer at Village Jaun Samana, Greater Noida For Procurement on Long Term Basis by

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL Sub: In the matter of petition under Section 86(1)(f) of the Electricity Act, 2003 for Management Co. Ltd. in relation to termination of the Power

More information

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA In the matter of:- In the matter of:- Review Petition No.118/07 Review Petition under regulation 63 of the Himachal Pradesh Electricity

More information

765 kv S/C Mainpuri-Hapur & Mainpuri-Greater Noida Line with 765 kv/400 kv AIS at Hapur & Greater Noida and Associated Schemes/Work

765 kv S/C Mainpuri-Hapur & Mainpuri-Greater Noida Line with 765 kv/400 kv AIS at Hapur & Greater Noida and Associated Schemes/Work TRANSMISSION SERVICE AGREEMENT FOR PROCUREMENT OF TRANSMISSION SERVICES FOR TRANSMISSION OF ELECTRICITY THROUGH TARIFF BASED COMPETITIVE BIDDING FOR 765 kv S/C Mainpuri-Hapur & Mainpuri-Greater Noida Line

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC)

GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) FEES, FINES AND CHARGES REGULATIONS Notification No. 6 of 2005 In exercise of the powers conferred under Section 181 of the Electricity Act, 2003 (Act 36

More information

STANDARD REQUEST FOR PROPOSAL FOR PROCUREMENT OF POWER FOR MEDIUM TERM. Under Case 1 Bidding Procedure THROUGH

STANDARD REQUEST FOR PROPOSAL FOR PROCUREMENT OF POWER FOR MEDIUM TERM. Under Case 1 Bidding Procedure THROUGH STANDARD REQUEST FOR PROPOSAL FOR PROCUREMENT OF POWER FOR MEDIUM TERM Under Case 1 Bidding Procedure THROUGH TARIFF BASED COMPETITIVE BIDDING PROCESS (As per Bidding Guidelines, issued by the Government

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Notification

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI. Notification CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Notification Dated the 17 th Feburary 2016 No. L-1/(3)/2009-CERC: In exercise of the powers conferred under section 178 of the Electricity Act, 2003

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No.149/MP/2013 Coram: Shri V. S. Verma, Member Shri M. Deena Dayalan, Member In the matter of Date of Hearing: 13.08.2013 Date of Order: 21.11.2013

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram. November 27, Tamil Nadu Electricity Board

KERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram. November 27, Tamil Nadu Electricity Board KERALA STATE ELECTRICITY REGULATORY COMMISSION Thiruvananthapuram Present : Shri.M.K.G.Pillai, Chairman Shri.C.Balakrishnan, Member November 27, 2004 Tamil Nadu Electricity Board Petitioner Petition No.DP18

More information

Bhopal dated 6th August, 2004

Bhopal dated 6th August, 2004 Bhopal dated 6th August, 2004 No.2118/MPERC/2004. In exercise of the powers conferred by section 181 (2) (ze, zg) read with section 62(2) and 64 (1) of the Electricity Act, 2003 enacted by the parliament,

More information

Case No. 68 of Coram. Shri. I. M. Bohari, Member Shri. Mukesh Khullar, Member. M/s RattanIndia Nasik Power Ltd.

Case No. 68 of Coram. Shri. I. M. Bohari, Member Shri. Mukesh Khullar, Member. M/s RattanIndia Nasik Power Ltd. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

BEFORE THE H.P. ELECTRICITY REGULATORY COMMISSION AT SHIMLA

BEFORE THE H.P. ELECTRICITY REGULATORY COMMISSION AT SHIMLA BEFORE THE H.P. ELECTRICITY REGULATORY COMMISSION AT SHIMLA Petition No. 151/2004 In the matter of:- Filing of petition by Uttaranchal Jal Vidyut Nigam Ltd. for determining the generation tariff for inter-state

More information

POWER PURCHASE AGREEMENT

POWER PURCHASE AGREEMENT POWER PURCHASE AGREEMENT for Procurement of MW Solar Power from Solar Power Project at Village:, Dist:. State: on Long Term Basis Between [ ] [Seller] And [ ] [Procurer] 2014 1 TABLE OF CONTENTS DEFINITIONS...

More information

Case No. 7 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member

Case No. 7 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

3. M. P. Poorv Kshetra Vidyut Vitaran Co. Ltd. - Respondents Shakti Bhawan, Rampur, Jabalpur

3. M. P. Poorv Kshetra Vidyut Vitaran Co. Ltd. - Respondents Shakti Bhawan, Rampur, Jabalpur Order (Date of Motion Hearing: 30 th May 2017) (Date of Order: 02 nd June 2017) BLA Power Pvt. Ltd. 84, Marker Chambers Nariman Point, Mumbai-400 021 - Petitioner Vs. 1. Energy Department, Government of

More information

NEW DELHI. Shri M. Deena. to the National Load Despatch e Energy Certificates to

NEW DELHI. Shri M. Deena. to the National Load Despatch e Energy Certificates to CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 22/MP/2013 Coram: Shri V.S.Verma, Member Shri M. Deena Dayalan, Member Date Hearing: 2.7.2013 Date Order : 15.7.2013 In the matter Petition

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH. Smt.Romila Dubey, Chairperson Shri Gurinder Jit Singh, Member

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH. Smt.Romila Dubey, Chairperson Shri Gurinder Jit Singh, Member PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No.70 of 2014 Date of Order: 22.04.2015 Present: Smt.Romila Dubey, Chairperson Shri Gurinder Jit Singh,

More information

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR **** **** ****

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR **** **** **** ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT-VIII, BHUBANESWAR-751012 **** **** **** Present: Shri B.K.Das, Chairperson Shri S.K.Jena, Member Shri K.C.Badu, Member Case No.77 of

More information

Suo-Motu Petition No. 2/2018

Suo-Motu Petition No. 2/2018 Page 1 of 6 BEFORE THE ARUNACHAL PRADESH STATE ELECTRICITY REGULATORY COMMISSION ITANAGAR Suo-Motu Petition No. 2/2018 In the Matter of Compliance of Renewable Purchase Obligation targets as specified

More information

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA.

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. In the matter of:- BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. M/s Tangnu Romai Power Generation (P) Ltd. House No. 835, Excel Society, Sector-48 Chandigarh-160047 through Sh.

More information

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. The H.P. State Electricity Board, Vidyut Bhawan, Shimla-4

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. The H.P. State Electricity Board, Vidyut Bhawan, Shimla-4 BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA In the matter of:- The H.P. State Electricity Board, Vidyut Bhawan, Shimla-4 V/s M/S Padmavati Steels Ltd; Vill Johron, Trilokpur Road,

More information

GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR

GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Draft Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) (First Amendment) Regulations, 2016 Notification No.. of 2016 In exercise

More information

Bhopal, Dated: 23rd July, 2004

Bhopal, Dated: 23rd July, 2004 Bhopal, Dated: 23rd July, 2004 No.1998/MPERC/2004.In exercise of powers under Section 16 of the Electricity Act 2003, MPERC specifies the Conditions of Transmission License applicable to the Transmission

More information

Terms and conditions for supply of 50 MW and part thereof on Short Term basis from December 2007 to May 2008

Terms and conditions for supply of 50 MW and part thereof on Short Term basis from December 2007 to May 2008 Terms and conditions for supply of 50 MW and part thereof on Short Term basis from December 2007 to May 2008 1. Quantum The quantum of power requirement from December 2007 to May 2008 is minimum of 50

More information

Request for Proposal (RfP) For. Procurement of 215 MW Power. From. Grid Connect Solar PV Power Projects. Through

Request for Proposal (RfP) For. Procurement of 215 MW Power. From. Grid Connect Solar PV Power Projects. Through Request for Proposal (RfP) For Procurement of 215 MW Power From Grid Connect Solar PV Power Projects Through Tariff Based Competitive Bidding Process RfPNo: 01/UPNEDS/GRID Connect/RfP/2015 Dated:31.01.2015

More information

CASE No. 337 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member ORDER

CASE No. 337 of Coram. Anand B. Kulkarni, Chairperson I.M. Bohari, Member Mukesh Khullar, Member ORDER Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

Case No. 224 of Coram. Shri. I.M. Bohari, Member Shri. Mukesh Khullar, Member. M/s. Vidarbha Industries Power Ltd (VIPL-G)

Case No. 224 of Coram. Shri. I.M. Bohari, Member Shri. Mukesh Khullar, Member. M/s. Vidarbha Industries Power Ltd (VIPL-G) Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400005 Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@merc.gov.in Website:

More information

PUBLIC WORKS NOTIFICATIONS TELANGANA STATE ELECTRICITY REGULATORY COMMISSION: HYDERABAD

PUBLIC WORKS NOTIFICATIONS TELANGANA STATE ELECTRICITY REGULATORY COMMISSION: HYDERABAD PUBLIC WORKS NOTIFICATIONS TELANGANA STATE ELECTRICITY REGULATORY COMMISSION: HYDERABAD No. TSERC / 3 / 2018 Dated: 30.05.2018. Regulation No. 3 of 2018 Telangana State Electricity Regulatory Commission

More information

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003) BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai

More information

UTTARAKHAND POWER CORPORATION LTD. BID DOCUMENT FOR PURCHASE OF POWER COMMERCIAL AND GENERAL CONDITIONS

UTTARAKHAND POWER CORPORATION LTD. BID DOCUMENT FOR PURCHASE OF POWER COMMERCIAL AND GENERAL CONDITIONS UTTARAKHAND POWER CORPORATION LTD. COMMERCIAL AND GENERAL CONDITIONS SPECIFICATION NO. UPCL/CGM-04/10-11 (POWER PURCHASE) Dated 26.07.10 Bid Document Available on the UPCL s web-site (www.upcl.org) Chief

More information

Index. 1. Introduction: Scope of the Guidelines Preparation for inviting bids Tariff Structure 6. 5.

Index. 1. Introduction: Scope of the Guidelines Preparation for inviting bids Tariff Structure 6. 5. Index 1. Introduction: 1 2. Scope of the Guidelines 2 3. Preparation for inviting bids 4 4. Tariff Structure 6 5. Bidding Process 8 6. Bid submission and evaluation 10 7. Contract award and conclusion

More information

THE RIGHT TO INFORMATION ACT Compliance of section 4

THE RIGHT TO INFORMATION ACT Compliance of section 4 THE RIGHT TO INFORMATION ACT Compliance of section 4 Sub sections of section 4 of the Act Remarks 4(1) Every public authority shall - a) maintain all its records duly catalogued and indexed in a manner

More information

IN THE HIGH COURT OF JUDICATURE FOR RAJASTHAN AT JAIPUR BENCH JAIPUR

IN THE HIGH COURT OF JUDICATURE FOR RAJASTHAN AT JAIPUR BENCH JAIPUR 1 IN THE HIGH COURT OF JUDICATURE FOR RAJASTHAN AT JAIPUR BENCH JAIPUR 1. D.B. Civil Writ Petition No.2772/2012 Ambuja Cements Ltd. V/s Raj.Electricity Regulatory Commission 2. D.B. Civil Writ Petition

More information

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI IN THE MATTER OF Case No. 04 of 2010 MUKHTIAR SINGH, Chairperson An application for review of Tariff Order for FY 2009-10 of Tata Steel Limited

More information

Managing Director, Kanpur Electricity Supply Company Ltd. (KESCO) 14/71, Civil Lines, Kanpur Petitioner. ORDER (Hearing on

Managing Director, Kanpur Electricity Supply Company Ltd. (KESCO) 14/71, Civil Lines, Kanpur Petitioner. ORDER (Hearing on BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member Shri S. K. Agarwal, Member In the matter of: In the matter of alteration/modification

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No. 58 of 2017 Date of order: 11.06.2018 Present: Ms. Kusumjit Sidhu, Chairperon Sh. S.S. Sarna, Member

More information

Before the Madhya Pradesh Electricity Regulatory Commission, Bhopal

Before the Madhya Pradesh Electricity Regulatory Commission, Bhopal Table of Contents 1 Comparison of Claimed and Allowed Annual Revenue Requirement for FY 2010-11 5 2. Power Purchase Cost and Intra State Transmission Charges... 5 3. Operation & Maintenance (O&M) Cost...

More information