Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities. First Compliance Proceeding

Size: px
Start display at page:

Download "Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities. First Compliance Proceeding"

Transcription

1 Decision D Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities April 27, 2018

2 Alberta Utilities Commission Decision D Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities Proceeding April 27, 2018 Published by Alberta Utilities Commission Eau Claire Tower, 1400, 600 Third Avenue S.W. Calgary, Alberta T2P 0G5 Telephone: Fax: Website:

3 Contents 1 Introduction Commission findings Consumers Coalition of Alberta Allocation of the CCA s costs Order... 6 ii Decision D (April 27, 2018)

4 Alberta Utilities Commission Calgary, Alberta Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities Decision D Proceeding Introduction 1. In this decision, the Alberta Utilities Commission considers an application (the costs claim application) by the Consumers Coalition of Alberta (CCA) for approval and payment of its costs of participation in Proceeding (the original proceeding). The following table sets out the costs claimed and the amounts awarded: Claimant Total Fees Claimed Total Disbursements Claimed Total GST Claimed Total Amount Claimed Total Fees Awarded Total Disbursements Awarded Total GST Awarded Total Amount Awarded CCA Wachowich & Company $89, $5, $4, $100, $67, $5, $ 3, $76, Regulatory Services Inc. $144, $0.00 $7, $152, $108, $0.00 $ 5, $ 114, Total $234, $5, $12, $252, $175, $5, $9, $191, The Commission has awarded the applicant costs in an amount less than the amount claimed for the reasons set out below. 3. The original proceeding was convened by the Commission to consider the notional 2017 revenue requirement and 2018 K-bar amount to be used for rebasing purposes, as a basis for setting the going-in rates in a subsequent compliance proceeding for the performance-based regulation plans for Alberta electric and gas distribution. The original proceeding included information requests (IRs), IR responses, written evidence, an oral hearing, argument and reply argument. The Commission issued Decision D on February 5, On December 8, 2017, the Commission issued a letter stating that interveners eligible to claim costs should have their claims filed within 30 days of November 27, The CCA submitted its costs claim application on January 5, The costs claim application was filed eight days outside the timeframe specified in the Commission s correspondence dated December 8, Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities First Compliance Filing. 2 Decision D : Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities, February 5, In its December 8, 2017 correspondence, the Commission addressed a request from the City of Calgary with respect to the close of record in Proceeding The Commission clarified that for the purposes of Decision D (April 27, 2018) 1

5 6. Costs not received within the specified timeframe may be rejected without further process. The Commission has used its discretion in this case to accept the late filing for the reasons set out below. The Commission assigned Proceeding and Application A001 to the costs claim application. 7. No comments were filed with respect to the costs claim application and the Commission considers the close of record for this proceeding to be February 7, 2018, the deadline for filing comments. 2 Commission findings 8. The Commission s authority to award costs for participation in a utility rates proceeding is found in Section 21 of the Alberta Utilities Commission Act. When considering a claim for costs for a utility rates proceeding, the Commission is also guided by the factors set out in Section 11 of Rule 022: Rules on Costs in Utility Rate Proceedings (Rule 022). Section 11.1 of Rule 022 provides that the Commission may award costs to an eligible participant if the Commission is of the opinion that: (a) the costs are reasonable and directly and necessarily related to the hearing or other proceeding, and (b) the eligible participant acted responsibly in the hearing or other proceeding and contributed to a better understanding of the issues before the Commission. Section 11.2 of Rule 022 enumerates a number of factors the Commission may consider in determining the amount of any cost award, including whether the eligible participant failed to comply with a direction of the Commission, including a direction on the filing of evidence (11.2(e)), submitted evidence and argument on issues that were not relevant (11.2(f)) and engaged in conduct that unnecessarily lengthened the duration of the hearing or other proceeding or resulted in unnecessary costs to the applicant or other participants (11.2(h)). 9. The applicable provisions in Rule 022 are permissive in nature and shall be exercised by the Commission, using its judgment, based on the circumstances before it in each case. Appendix A of Rule 022 prescribes a Scale of Costs applicable to all costs claimed. 2.1 Consumers Coalition of Alberta 10. The following table summarizes the CCA s costs claim: Claimant Hours Preparation Attendance Argument Fees Disbursements GST Total CCA Wachowich & Company $89, $5, $4, $100, Regulatory Services Inc $144, $0.00 $7, $152, Total $234, $5, $12, $252, calculating its performance standards under Bulletin , the record development phase of the proceeding concluded with the filing of reply arguments on November 7, 2017, notwithstanding the subsequent process established to address a request from EPCOR Distribution and Transmission Inc. to file sur-reply. However, the Commission indicated that in light of the additional process steps associated with EPCOR s request, the Commission would extend the date by which an intervener s cost claim must be filed. The Commission directed, pursuant to Section 9(3) of Rule 022, that any claim for costs should be filed within 30 days of November 27, Decision D (April 27, 2018)

6 11. Although the Commission finds that the CCA generally acted responsibly in the original proceeding and contributed in some respects to the Commission s understanding of the relevant issues, the Commission is not prepared to approve the entirety of the CCA s cost claim for the reasons set out below. 12. The Commission is not satisfied that the amount of the costs claimed are reasonable in the circumstances. The total amount of fees claimed (before any disbursements or applicable G.S.T.) is $234, for the participation of 2 individuals on behalf of the CCA (Mr. Wachowich, as the CCA s legal counsel, and Mr. Thygesen, as the CCA s consultant).this includes over 250 hours charged by the CCA s legal counsel and over 500 hours charged by the CCA s consultant. 13. The CCA submitted evidence and argument on issues that were not relevant, and inconsistent with direction from the Commission regarding the scope of evidence. For example, portions of the supplemental evidence filed by the CCA in response to a request from the Commission for evidence on k-bar sought to adduce additional or surrebuttal evidence responding to the rebuttal evidence filed by the ATCO Utilities on the I factor and Q adjustment. This evidence was outside the scope of the supplemental evidence requested by the Commission. Portions of the CCA s supplemental evidence was objected to on this basis and struck by the Commission in its ruling dated September 6, The CCA also devoted a considerable amount of time in evidence, cross-examination and argument on matters related to cost of debt and interest expense, some of which was unclear 5 and was not always clearly relevant to the proceeding. Moreover, certain of the CCA s evidence and positions on these issues appeared to reflect a misunderstanding of the application of the mid-year convention and utilities debt practices. The CCA also developed a further recommended method for calculating EPCOR s cost of debt in argument, which was not put forward in evidence. 6 As a result, portions of the CCA s evidence and argument did not contribute to a better understanding of the matters that were the subject of this application. Further, the CCA s treatment of these issues required other parties to devote resources to responding to these matters and detracted from the proceeding s focus. 15. In addition, and as discussed in the introduction to this decision, the CCA filed its cost claim application outside the timeframe permitted by Rule 022, as extended by the Commission in its correspondence in the original proceeding. 7 The CCA did not acknowledge in its application that it was being filed outside the applicable deadline, nor did it offer any explanation for the delay or request that an extension be permitted. Given that the delay is of a relatively minor nature and that the filing deadline was shortly after the Christmas holidays, the Commission has exercised its discretion to accept the costs claim application. However, the 4 Exhibit X For example, the Commission found that it was not able to distinguish whether the CCA s recommendation to true up to the actual cost of debt was specific to the WACC to be used for calculation of base K-bar or if it applied to the WACC to be used for the notional 2017 revenue requirement as well. Decision D , at para Decision D , at para Exhibit X0426, Correspondence dated December 8, 2017, which provided: the Commission will extend by 20 days the date by which an intervener s cost claim must be filed. Accordingly, pursuant to Section 9.3(a) of Rule 022, any claim for costs should be filed within 30 days of November 27, Decision D (April 27, 2018) 3

7 Commission does consider that the late filing of the application is further support for a reduction to the costs being claimed. The Commission expects that, in future, the CCA will monitor applicable deadlines more closely, to ensure that its costs claim applications are filed on time. If a costs claim application is filed outside the applicable deadline, the CCA should request an extension in its application and include an explanation as to the cause for the delay and the basis upon which the Commission should grant the extension. The Commission may reject the entirety of any future cost claim application that is filed outside the applicable deadline, particularly if no request for an extension, and explanation for the necessity of the extension, is provided. 16. Having regard to the foregoing and the CCA s contributions to the Commission s understanding of the issues before it, the Commission has determined that it will approve 75 per cent of the legal and consulting costs claimed by the CCA. Wachowich & Company 17. The CCA was represented by Wachowich & Company in the original proceeding. The fees claimed by the CCA for the legal services provided by Mr. James Wachowich relate to reviewing the application, researching, reviewing IRs, reviewing draft evidence, preparing for and attending the oral hearing, and reviewing draft argument and reply argument. 18. While the Commission finds that that the services performed by Wachowich & Company were generally directly and necessarily related to the CCA s participation in the original proceeding, it finds, for the reasons stated above, that the fees claimed for these services are unreasonable and excessive. For the reasons articulated above, the Commission finds that a 25 per cent reduction in fees is reasonable in these circumstances. Accordingly, the Commission approves the CCA s claim for legal fees for Wachowich & Company in the amount of $67,252.50, disbursements for transcripts of $5, and GST of $3, for a total of $76, Regulatory Services Inc. 19. Regulatory Services Inc. was retained by the CCA to perform consulting services in the original proceeding. The fees claimed by the CCA for the consulting services provided by Mr. Jan Thygesen relate to reviewing the application, drafting IRs, reviewing IR responses, drafting IR responses, drafting evidence, drafting rebuttal evidence, drafting cross examination, preparing for and attending the oral hearing, drafting argument and drafting reply argument. 20. While the Commission finds that the services performed by Regulatory Services Inc. were generally directly and necessarily related to the CCA s participation in the original proceeding, it finds for the reasons stated above that the fees claimed for these services are unreasonable and excessive for the reasons articulated above. The Commission considers that a 25 per cent reduction is reasonable in the circumstances. Accordingly, the Commission approves the CCA s claim for consulting fees for Regulatory Services Inc. in the amount of $108, and GST of $5, for a total of $114, Total amount awarded 21. For the reasons provided above, the Commission approves the CCA s claim for recovery of costs in the total amount of $191, This amount is composed of legal fees of $67,252.50, consulting fees of $108,742.50, disbursements of $5, and GST of $9, Decision D (April 27, 2018)

8 2.2 Allocation of the CCA s costs 22. The CCA did not propose a method for allocating its costs and no submissions were provided from the utilities on the proposed allocation of costs approved for the CCA. The CCA was the only intervener eligible to claim costs under Rule 022 in respect of the original proceeding. The CCA s participation addressed matters that were applicable to all of the distribution utilities, each of whom actively participated in the original proceeding. The CCA s participation also addressed certain matters specific to each of the distribution utilities. Accordingly, the Commission has determined that each of the distribution utilities should bear a portion of the costs of the CCA s participation. 23. Consistent with past decisions of the Commission involving multiple utilities, but subject to the modifications discussed below, 25 per cent of the CCA s allowed costs will be allocated on an equal basis to each utility who actively participated in the original proceeding and 75 per cent on a proportional basis, using amounts reported by each such distribution utility for 2016 in their respective filings under Rule 005: Annual Reporting Requirements of Financial and Operational Results (Rule 005). 8 This allocation methodology was approved previously by the Commission in performance-based regulation costs decisions or generic cost of capital costs decisions, such as Decision D and Decision The CCA s costs will be allocated and recovered from the following distribution utilities, who actively participated in the original proceeding: AltaGas Utilities Inc. ATCO Electric Ltd. (distribution) ATCO Gas and Pipelines Ltd. ATCO Gas (distribution) EPCOR Distribution & Transmission Inc. (distribution) ENMAX Power Corporation (distribution) FortisAlberta Inc. 25. The allocation methodology previously utilized by the Commission allocated intervener costs based on approved revenue requirements as reflected in Rule 005 filings. This allocation methodology has been modified for purposes of this decision because the distribution utilities, unlike transmission utilities, do not have an approved revenue requirement under performancebased regulation. Therefore, in determining the allocations for the CCA s approved costs, the Commission has used the 2016 Rule 005 reported revenue amounts rather than revenue requirement. Further, the Commission has adjusted the 2016 Rule 005 reported revenue amounts 8 The 2016 Rule 005 reports for Alberta gas and electric distribution utilities are found on the Commission s website at: under the Finance and Operations. 9 Decision D : Performance-Based Regulation Plans for Alberta Electric and Gas Distribution Utilities,, Proceeding 22082, February 6, Decision : 2011 Generic Cost of Capital, Cost Awards, Applications , , , , , , , , , Proceeding 1486, January 25, Decision D (April 27, 2018) 5

9 to exclude transmission access charges, to ensure consistency among the reported revenue of the distribution utilities. This adjustment was required to recognize that some utilities such as ATCO Electric Ltd. (distribution) include transmission access charges in their Rule 005 reported revenue, while other utilities such as FortisAlberta Inc., exclude these charges. Using revenue amounts from Rule 005, adjusted to account for transmission access charges, will ensure that the calculation of reported revenue amounts for the distribution utilities is done on a comparable and proportionate basis for purposes of allocating intervener costs. 26. The resulting cost allocations are attached in Appendix A to this decision and provide the derivation of the amounts to be paid by each distribution utility. 3 Order 27. It is hereby ordered that: 1) AltaGas Utilities Inc. shall pay intervener costs to the Consumers Coalition of Alberta in the amount of $12, ) AltaGas Utilities Inc. shall record in its Deferred Regulatory Costs (Hearing) Account the approved intervener amounts of $12, ) ATCO Electric Ltd. (distribution) shall pay intervener costs to the Consumers Coalition of Alberta in the amount of $35, ) ATCO Electric Ltd. (distribution) shall record in its Intervener Hearing Costs Account the approved intervener amounts of $35, ) ATCO Gas and Pipelines Ltd. (ATCO Gas) shall pay intervener costs to the Consumers Coalition of Alberta in the amount of $57, ) ATCO Gas and Pipelines Ltd. (ATCO Gas) shall record in its Deferred AUC and Intervener Costs Account the approved intervener amounts of $57, ) ENMAX Power Corporation (distribution) shall pay intervener costs to the Consumers Coalition of Alberta in the amount of $21, ) ENMAX Power Corporation (distribution) shall record in its Hearing Cost Reserve Account approved intervener amounts of $21, ) EPCOR Distribution & Transmission Inc. (distribution) shall pay intervener costs to the Consumers Coalition of Alberta in the amount of $23, ) EPCOR Distribution & Transmission Inc. (distribution) shall record in its Hearing Costs Reserve Account approved intervener amounts of $23, ) FortisAlberta Inc. shall pay intervener costs to the Consumers Coalition of Alberta in the amount of $41, Decision D (April 27, 2018)

10 12) FortisAlberta Inc. shall record in its Hearing Cost Reserve Account approved intervener amounts of $41, Dated on April 27, Alberta Utilities Commission (original signed by) Willie Grieve, QC Chair (original signed by) Neil Jamieson Commission Member Decision D (April 27, 2018) 7

11 Alberta Utilities Commission Rebasing for the PBR Plans for Alberta Electric and Gas Distribution Utilities First Compliance Proceeding Appendix A CCA Costs Allocation AltaGas Utilities Inc. (a) ATCO Electric Ltd. (distribution) (b) ATCO Gas and Pipelines Ltd. (c) ENMAX Power Corporation (d) EPCOR Distribution & Transmission Inc. (e) FortisAlberta Inc. (f) Total 2016 Reported Revenue Amounts ($000s) $94, $782, $969, $343, $422, $530, $3,143, Transmission Access Payments/Flow Through Expenses 2016 Rule 005 ($000s) $27, $346, $180, $130, $182, $866, Total Revenue ($000s) $67, $436, $788, $212, $240, $530, $2,276, % of Reported Revenue Amounts 2.96% 19.18% 34.66% 9.35% 10.56% 23.30% % Consumer's Coalition of Alberta 75% Costs Allocation $4, $27, $49, $13, $15, $33, $143, Consumer's Coalition of Alberta 25% Costs Allocation $7, $7, $7, $7, $7, $7, $47, Total Amount Awarded $12, $35, $57, $21, $23, $41, $191, TOTAL PAYABLE $12, $35, $57, $21, $23, $41, $191, *In paragraph 21 of Decision D , the final amount awarded is $191, The final amount in this table shows a cent difference due to rounding

Decision D ATCO Electric Ltd Annual Performance-Based Regulation Rate Adjustment Filing. Costs Award

Decision D ATCO Electric Ltd Annual Performance-Based Regulation Rate Adjustment Filing. Costs Award Decision 22281-D01-2017 2017 Annual Performance-Based Regulation Rate Adjustment Filing February 10, 2017 Decision 22281-D01-2017 2017 Annual Performance-Based Regulation Rate Adjustment Filing Proceeding

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 21717-D01-2016 Distribution 2015-2017 Performance-Based Regulation- Negotiated Settlement Application and Interim X Factor September 26, 2016 Alberta Utilities Commission Decision 21717-D01-2016

More information

Transmission Common Group Application

Transmission Common Group Application Decision 22632-D01-2017 Transmission Common Group Application November 2, 2017 Alberta Utilities Commission Decision 22632-D01-2017 Transmission Common Group Application Proceeding 22632 November 2, 2017

More information

Utility Asset Disposition

Utility Asset Disposition Decision 2014-013 Utility Asset Disposition Costs Award January 17, 2014 The Alberta Utilities Commission Decision 2014-013: Utility Asset Disposition Costs Award Application Nos. 1609440, 1609442, 1609445,

More information

Alberta Electric System Operator. Provost to Edgerton and Nilrem to Vermilion Transmission System Reinforcement Needs Identification Document

Alberta Electric System Operator. Provost to Edgerton and Nilrem to Vermilion Transmission System Reinforcement Needs Identification Document Decision 23137-D01-2018 Provost to Edgerton and Nilrem to Vermilion Transmission System Reinforcement March 8, 2018 Alberta Utilities Commission Decision 23137-D01-2018 Provost to Edgerton and Nilrem to

More information

Chief Mountain Gas Co-op Ltd. and County of Cardston

Chief Mountain Gas Co-op Ltd. and County of Cardston Utility Cost Order 2008-067 Chief Mountain Gas Co-op Ltd. and County of Cardston Cost Awards ALBERTA UTILITIES COMMISSION Utility Cost Order 2008-067: Chief Mountain Gas Co-op Ltd. and Cardston County

More information

AltaLink Management Ltd.

AltaLink Management Ltd. Decision 21818-D01-2016 Southwest Calgary Ring Road Transmission Project November 4, 2016 Alberta Utilities Commission Decision 21818-D01-2016 Southwest Calgary Ring Road Transmission Project Proceeding

More information

Drayton Valley Rural Electrification Association Ltd.

Drayton Valley Rural Electrification Association Ltd. Decision 22208-D01-2016 Varied Code of Conduct Regulation Compliance Plan December 21, 2016 Alberta Utilities Commission Decision 22208-D01-2016 Varied Code of Conduct Regulation Compliance Plan Proceeding

More information

Armena Rural Electrification Association Ltd.

Armena Rural Electrification Association Ltd. Decision 21989-D01-2016 December 14, 2016 Alberta Utilities Commission Decision 21989-D01-2016 Proceeding 21989 Application 21989-A001 December 14, 2016 Published by the: Alberta Utilities Commission Fifth

More information

Devonia Rural Electrification Association Ltd.

Devonia Rural Electrification Association Ltd. Decision 22222-D01-2016 December 21, 2016 Alberta Utilities Commission Decision 22222-D01-2016 Proceeding 22222 Application 22222-A001 December 21, 2016 Published by the: Alberta Utilities Commission Fifth

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 23917-D01-2018 Rejection of Reliability Standard MOD-026-1 November 5, 2018 Alberta Utilities Commission Decision 23917-D01-2018 Rejection of Reliability Standard MOD-026-1 Proceeding 23917 Application

More information

Decision D

Decision D Decision 22190-D01-2016 Power Renewable Energy Corporation, Alberta Electric System Operator and AltaLink Management Ltd. Jenner Wind Power Project and Interconnection Proceeding 21394 Request for review

More information

Central Alberta Rural Electrification Association Limited

Central Alberta Rural Electrification Association Limited Decision 2012-181 Central Alberta Rural Electrification Association Limited Application for a Declaration under the Hydro and Electric Energy Act July 4, 2012 The Alberta Utilities Commission Decision

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 23798-D01-2018 ENMAX No. 36 Substation Transformer Capacity Upgrade August 21, 2018 Alberta Utilities Commission Decision 23798-D01-2018 ENMAX No. 36 Substation Transformer Capacity Upgrade Proceeding

More information

Brooks Heat and Power Ltd.

Brooks Heat and Power Ltd. Decision 23028-D01-2017 14.9-Megawatt Power Plant Time Extension October 24, 2017 Alberta Utilities Commission Decision 23028-D01-2017 14.9-Megawatt Power Plant Time Extension Proceeding 23028 Application

More information

Tomahawk Rural Electrification Association Limited

Tomahawk Rural Electrification Association Limited Decision 21657-D01-2016 Varied Code of Conduct Regulation Compliance Plan December 22, 2016 Alberta Utilities Commission Decision 21657-D01-2016 Varied Code of Conduct Regulation Compliance Plan Proceeding

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 2011-501 Alberta Electric System Operator Approval of Alberta reliability standard BAL-002-AB-1 December 20, 2011 The Alberta Utilities Commission Decision 2011-501: Alberta Electric System Operator

More information

Decision D FortisAlberta Inc. Application for Orders Confirming Boundaries of FortisAlberta Inc. Exclusive Municipal Franchise Areas

Decision D FortisAlberta Inc. Application for Orders Confirming Boundaries of FortisAlberta Inc. Exclusive Municipal Franchise Areas Decision 22164-D01-2018 Application for Orders Confirming Boundaries of Exclusive Municipal Franchise Areas July 16, 2018 Alberta Utilities Commission Decision 22164-D01-2018 Application for Orders Confirming

More information

Dalziel Enterprises Ltd.

Dalziel Enterprises Ltd. Decision 22796-D01-2018 Payment in Lieu of Notice Charge Complaint with FortisAlberta Inc. February 9, 2018 Alberta Utilities Commission Decision 22796-D01-2018 Proceeding 22796 February 9, 2018 Published

More information

Salt Box Coulee Water Supply Company Ltd. Customer Complaints - Infrastructure Repair Expense

Salt Box Coulee Water Supply Company Ltd. Customer Complaints - Infrastructure Repair Expense Decision 23401-D01-2018 Customer Complaints - Infrastructure Repair Expense October 22, 2018 Alberta Utilities Commission Decision 23401-D01-2018 Customer Complaints Infrastructure Repair Expense Proceeding

More information

Cochrane Lakes Gas Co-op Ltd.

Cochrane Lakes Gas Co-op Ltd. Decision 2009-213 Interim Order Compelling Gas Service November 10, 2009 ALBERTA UTILITIES COMMISSION Decision 2009-213: Interim Order Compelling Gas Service Application No. 1605607 November 10, 2009 Published

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 20509-D01-2015 Approval of Alberta reliability standard BAL-002-WECC-AB1-2 June 26, 2015 Alberta Utilities Commission Decision 20509-D01-2015 Approval of Alberta reliability standard BAL-002-WECC-AB1-2

More information

Costs Order Value Creation Inc. Application to Amend OSCA and EPEA Approvals W4M. Costs Awards

Costs Order Value Creation Inc. Application to Amend OSCA and EPEA Approvals W4M. Costs Awards Costs Order 2018-02 Value Creation Inc. Application to Amend OSCA and EPEA Approvals 10-056-21W4M Costs Awards July 31, 2018 Alberta Energy Regulator Costs Order 2018-02: Value Creation Inc., Application

More information

June 7, 2018 FILED ELECTRONICALLY.

June 7, 2018 FILED ELECTRONICALLY. Capital Power Corporation 1200 10423 101 Street NW Edmonton, AB T5H 0E9 www.capitalpower.com June 7, 2018 FILED ELECTRONICALLY capacitymarket@auc.ab.ca Alberta Utilities Commission Eau Claire Tower 1400,

More information

August 11, To: Parties currently registered on Proceeding 21030

August 11, To: Parties currently registered on Proceeding 21030 August 11, 2016 To: Parties currently registered on Proceeding 21030 Fort McMurray West 500-kV Transmission Project Proceeding 21030 Applications 21030-A001 to 21030-A015 Ruling on standing and participation

More information

Savanna Villas Condominium Association

Savanna Villas Condominium Association Decision 21765-D01-2016 Meter Consolidation Dispute with AltaGas Utilities Inc. November 8, 2016 Alberta Utilities Commission Decision 21765-D01-2016 Meter Consolidation Dispute with AltaGas Utilities

More information

AUC Rule 017: June 14, proposed changes

AUC Rule 017: June 14, proposed changes AUC Rule 017: June 14, proposed changes Stakeholder comments: Alberta Electric System Operator (AESO), AltaLink Management Ltd. (AltaLink), ATCO Electricity Generation (ATCO), Capital Power Corporation

More information

PHOENIX NATURAL GAS LTD. DISTRIBUTION NETWORK CODE MODIFICATION RULES

PHOENIX NATURAL GAS LTD. DISTRIBUTION NETWORK CODE MODIFICATION RULES PHOENIX NATURAL GAS LTD. DISTRIBUTION NETWORK CODE MODIFICATION RULES 20 th October 2005 Phoenix Natural Gas Ltd 2012 - all rights reserved. Material published in this document is the copyright of Phoenix

More information

Review and Variance Request by Lavesta Area Group on Utility Cost Order December 19, 2008

Review and Variance Request by Lavesta Area Group on Utility Cost Order December 19, 2008 Decision 2008-136 Request for Review and Variance of Decision 2005-031: Alberta Electric System Operator, Needs Identification Document Application, Edmonton Calgary 500 kv Electric Transmission Facilities

More information

Riverview Substation Project

Riverview Substation Project Decision 23128-D01-2018 Alberta Electric System Operator Needs Identification Document Application EPCOR Distribution & Transmission Inc. Facility Applications AltaLink Management Ltd. Interconnection

More information

INFORMATION BULLETIN

INFORMATION BULLETIN INFORMATION BULLETIN #25 REVIEW OF ARBITRATIONS - TRANSITIONAL I. INTRODUCTION Most collective agreements provide for grievance arbitration as the method for resolving disputes over the meaning or application

More information

Ruling on standing of the Asini Wachi Nehiyawak (Mountain Cree) / Bobtail Descendants Traditional Band

Ruling on standing of the Asini Wachi Nehiyawak (Mountain Cree) / Bobtail Descendants Traditional Band July 12, 2017 To: Parties currently registered on Proceeding 22634 ATCO Gas and Pipelines Ltd. (South) Southwest Calgary Connector Pipeline Project Proceeding 22634 Application 22634-A001 Ruling on standing

More information

THE ALBERTA GAZETTE, PART II, JULY 14, Alberta Regulation 102/2001. Oil and Gas Conservation Act OIL AND GAS CONSERVATION AMENDMENT REGULATION

THE ALBERTA GAZETTE, PART II, JULY 14, Alberta Regulation 102/2001. Oil and Gas Conservation Act OIL AND GAS CONSERVATION AMENDMENT REGULATION Alberta Regulation 102/2001 Oil and Gas Conservation Act OIL AND GAS CONSERVATION AMENDMENT REGULATION Filed: June 19, 2001 Made by the Alberta Energy and Utilities Board on June 15, 2001 pursuant to section

More information

LAW SOCIETY OF ALBERTA IN THE MATTER OF THE LEGAL PROFESSION ACT; AND

LAW SOCIETY OF ALBERTA IN THE MATTER OF THE LEGAL PROFESSION ACT; AND LAW SOCIETY OF ALBERTA IN THE MATTER OF THE LEGAL PROFESSION ACT; AND IN THE MATTER OF A HEARING REGARDING THE CONDUCT OF GEORGE ROSZLER A MEMBER OF THE LAW SOCIETY OF ALBERTA Single Bencher Hearing Committee:

More information

GENERAL RULES ABOUT COSTS

GENERAL RULES ABOUT COSTS GENERAL RULES ABOUT COSTS PART 44 PART 44 Contents of this Part Rule 44.1 Rule 44.2 Rule 44.3 Rule 44.3A Rule 44.3B Rule 44.3C Rule 44.4 Rule 44.5 Rule 44.6 Rule 44.7 Rule 44.8 Rule 44.9 Rule 44.10 Rule

More information

Economic Regulation Authority's Revised Access Arrangement Decision for the Mid-West and South-West Gas Distribution System

Economic Regulation Authority's Revised Access Arrangement Decision for the Mid-West and South-West Gas Distribution System Economic Regulation Authority's Revised Access Arrangement Decision for the Mid-West and South-West Gas Distribution System 10 September 2015 Economic Regulation Authority's revised access arrangement

More information

REVOKED AS OF APRIL 11, 2016

REVOKED AS OF APRIL 11, 2016 MSA Hearing Procedures Table of Contents PART 1 INTERPRETATION 1 Definitions 2 Application of Procedures PART 2 GENERAL MATTERS 3 Directions 4 Setting of time limits and extending or abridging time 5 Variation

More information

COURT OF QUEEN'S BENCH OF ALBERTA POSEIDON CONCEPTS CORP., POSEIDON CONCEPTS LTD., POSEIDON CONCEPTS LIMITED PARTNERSHIP, AND POSEIDON CONCEPTS INC.

COURT OF QUEEN'S BENCH OF ALBERTA POSEIDON CONCEPTS CORP., POSEIDON CONCEPTS LTD., POSEIDON CONCEPTS LIMITED PARTNERSHIP, AND POSEIDON CONCEPTS INC. SCHEDULE C COURT FILE NUMBERS 1301-04364 COURT JUDICIAL CENTRE COURT OF QUEEN'S BENCH OF ALBERTA CALGARY IN THE MATTER OF THE COMPANIES CREDITORS ARRANGEMENT ACT, R.S.C. 1985, c. C-36, AS AMENDED AND IN

More information

Declaration Pursuant to Section 106 of the Oil and Gas Conservation Act

Declaration Pursuant to Section 106 of the Oil and Gas Conservation Act Decision 2005-040 Declaration Pursuant to Section 106 of the Oil and Gas Conservation Act May 3, 2005 ALBERTA ENERGY AND UTILITIES BOARD Decision 2005-040: May 3, 2005 Published by Alberta Energy and Utilities

More information

THE ELECTRICITY ARBITRATION ASSOCIATION

THE ELECTRICITY ARBITRATION ASSOCIATION The Rules of this Association were amended with effect from the 1 st January, 1993 in the manner herein set out. This is to allow for the reference to the Association, in accordance with its Rules, of

More information

04 NCAC ARBITRATION POLICIES

04 NCAC ARBITRATION POLICIES 8 9 10 11 1 1 1 1 1 1 18 19 0 1 8 9 0 1 0 NCAC 08.01 ARBITRATION POLICIES The Authority shall arbitrate any interconnection disputes between a TMC and other telecommunications carriers as described in

More information

DEPARTMENT OF REGULATORY AGENCIES DIVISION OF REAL ESTATE CONSERVATION EASEMENTS 4 CCR 725-4

DEPARTMENT OF REGULATORY AGENCIES DIVISION OF REAL ESTATE CONSERVATION EASEMENTS 4 CCR 725-4 DEPARTMENT OF REGULATORY AGENCIES DIVISION OF REAL ESTATE CONSERVATION EASEMENTS 4 CCR 725-4 NOTICE OF PROPOSED PERMANENT RULEMAKING HEARING May 3, 2018 RULE CHAPTER 6. EXCEPTIONS AND REVIEW OF INITIAL

More information

GENERAL RULES ABOUT COSTS

GENERAL RULES ABOUT COSTS PRACTICE DIRECTION PART 44 DIRECTIONS RELATING TO PART 44 GENERAL RULES ABOUT COSTS SECTION 7 SOLICITOR S DUTY TO NOTIFY CLIENT: RULE 44.2 7.1 For the purposes of rule 44.2 client includes a party for

More information

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF SERVICEMASTER GLOBAL HOLDINGS, INC.

CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF SERVICEMASTER GLOBAL HOLDINGS, INC. CHARTER OF THE COMPENSATION COMMITTEE OF THE BOARD OF DIRECTORS OF SERVICEMASTER GLOBAL HOLDINGS, INC. Adopted by the Board of Directors on July 24, 2007; and as last amended July 25, 2017. Pursuant to

More information

RULES OF THE AUSTRALIAN SEED FEDERATION DISPUTE RESOLUTION SCHEME

RULES OF THE AUSTRALIAN SEED FEDERATION DISPUTE RESOLUTION SCHEME RULES OF THE AUSTRALIAN SEED FEDERATION DISPUTE RESOLUTION SCHEME FOR THE DOMESTIC TRADE IN SEED FOR SOWING PURPOSES AND FOR THE MANAGEMENT OF INTELLECTUAL PROPERTY The Australian Seed Federation Dispute

More information

Arbitration Rules. Administered. Effective July 1, 2013 CPR PROCEDURES & CLAUSES. International Institute for Conflict Prevention & Resolution

Arbitration Rules. Administered. Effective July 1, 2013 CPR PROCEDURES & CLAUSES. International Institute for Conflict Prevention & Resolution International Institute for Conflict Prevention & Resolution CPR PROCEDURES & CLAUSES Administered Arbitration Rules Effective July 1, 2013 30 East 33rd Street 6th Floor New York, NY 10016 tel +1.212.949.6490

More information

ADR INSTITUTE OF CANADA, INC. ADRIC ARBITRATION RULES I. MODEL DISPUTE RESOLUTION CLAUSE

ADR INSTITUTE OF CANADA, INC. ADRIC ARBITRATION RULES I. MODEL DISPUTE RESOLUTION CLAUSE ADR INSTITUTE OF CANADA, INC. ADRIC ARBITRATION RULES I. MODEL DISPUTE RESOLUTION CLAUSE Parties who agree to arbitrate under the Rules may use the following clause in their agreement: ADRIC Arbitration

More information

COURT OF QUEEN S BENCH OF ALBERTA FAMILY LAW PRACTICE NOTE 2 FAMILY LAW CHAMBERS EFFECTIVE MARCH 1, 2011

COURT OF QUEEN S BENCH OF ALBERTA FAMILY LAW PRACTICE NOTE 2 FAMILY LAW CHAMBERS EFFECTIVE MARCH 1, 2011 COURT OF QUEEN S BENCH OF ALBERTA FAMILY LAW PRACTICE NOTE 2 FAMILY LAW CHAMBERS EFFECTIVE MARCH 1, 2011 A. General 1. This Practice Note applies to interim applications brought under the Divorce Act,

More information

CHARTER OF THE NOMINATING AND CORPORATE GOVERNANCE COMMITTEE OF THE BOARD OF DIRECTORS OF FRONTDOOR, INC.

CHARTER OF THE NOMINATING AND CORPORATE GOVERNANCE COMMITTEE OF THE BOARD OF DIRECTORS OF FRONTDOOR, INC. CHARTER OF THE NOMINATING AND CORPORATE GOVERNANCE COMMITTEE OF THE BOARD OF DIRECTORS OF FRONTDOOR, INC. Approved by the Board of Directors August 24, 2018; Effect as of September 10, 2018. The Board

More information

File No. 185-A February 2003 T0: ALL INTERESTED PARTIES

File No. 185-A February 2003 T0: ALL INTERESTED PARTIES File No. 185-A000-19 7 February 2003 T0: ALL INTERESTED PARTIES Update of the Electricity Memorandum of Guidance to Interested Parties Concerning Full Implementation of the September 1988 Canadian Electricity

More information

NOTICE OF PUBLIC RULEMAKING HEARING BEFORE THE COLORADO WATER QUALITY CONTROL COMMISSION

NOTICE OF PUBLIC RULEMAKING HEARING BEFORE THE COLORADO WATER QUALITY CONTROL COMMISSION John W. Hickenlooper, Governor Christopher E. Urbina, MD, MPH Executive Director and Chief Medical Officer WATER QUALITY CONTROL COMMISSION http://www.cdphe.state.co.us/op/wqcc/index.html 4300 Cherry Creek

More information

Constitution of the International Bar Association

Constitution of the International Bar Association Constitution of the International Bar Association Contents Article Page 1 Name and Objects......1 2 Definitions... 2 3 Membership... 4 4 The Council... 9 5 Management Board... 15 6 Constituents... 17 7

More information

State of Wyoming Office of Administrative Hearings

State of Wyoming Office of Administrative Hearings State of Wyoming Office of Administrative Hearings MATTHEW H. MEAD 2020 CAREY AVENUE, FIFTH FLOOR GOVERNOR CHEYENNE, WYOMING 82002-0270 (307) 777-6660 DEBORAH BAUMER FAX (307) 777-5269 DIRECTOR Summary

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION California Independent System Operator Corporation In Re Transmission Control Agreement Docket No. EL08-52-000 SOUTHERN CALIFORNIA

More information

Case 2:10-md CJB-SS Document Filed 07/26/13 Page 1 of 2 IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF LOUISIANA

Case 2:10-md CJB-SS Document Filed 07/26/13 Page 1 of 2 IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF LOUISIANA Case 2:10-md-02179-CJB-SS Document 10877 Filed 07/26/13 Page 1 of 2 IN THE UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF LOUISIANA In re: Oil Spill by the Oil Rig Deepwater * MDL No. 2179 Horizon

More information

Procedural Order (PO) No.1

Procedural Order (PO) No.1 NAFTA Chapter 11/UNCITRAL Cattle Cases Consolidated Canadian Claims v United States of America October 20, 2006 Procedural Order (PO) No.1 This PO puts on record the results of the discussion and agreement

More information

RULES OF PRACTICE OF THE NATURAL RESOURCES CONSERVATION BOARD REGULATION

RULES OF PRACTICE OF THE NATURAL RESOURCES CONSERVATION BOARD REGULATION Province of Alberta NATURAL RESOURCES CONSERVATION BOARD ACT RULES OF PRACTICE OF THE NATURAL RESOURCES CONSERVATION BOARD REGULATION Alberta Regulation 77/2005 With amendments up to and including Alberta

More information

Mid-West and South-West Gas Distribution Systems Access Arrangement

Mid-West and South-West Gas Distribution Systems Access Arrangement 10 September 2015 Mid-West and South-West Gas Distribution Systems Access Arrangement 2015-2019 The Economic Regulation Authority today published an amended Final Decision on ATCO Gas Australia s Pty Ltd

More information

BCTC ILM RECONSIDER DUTY TO CONSULT EXHIBIT

BCTC ILM RECONSIDER DUTY TO CONSULT EXHIBIT C3-25 BRITISH COLUMBIA UTILITIES COMMISSION IN THE MATTER OF THE UTILITIES COMMISSION ACT, R.S.B.C 1996, CHAPTER 473 Regarding the Application by British Columbia Transmission Corporation ( BCTC ) for

More information

CPR PROCEDURES & CLAUSES. Non-Administered. Arbitration Rules. Effective March 1, tel fax

CPR PROCEDURES & CLAUSES. Non-Administered. Arbitration Rules. Effective March 1, tel fax CPR PROCEDURES & CLAUSES Non-Administered Arbitration Rules Effective March 1, 2018 tel +1.212.949.6490 fax +1.212.949.8859 www.cpradr.org CPR International Institute for Conflict Prevention & Resolution

More information

PUBLIC UTILITIES COMMISSION

PUBLIC UTILITIES COMMISSION STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS PUBLIC UTILITIES COMMISSION IN RE: TOTAL ELEMENT LONG RUN INCREMENTAL COST INTERIM RATES FOR BELL ATLANTIC - RHODE ISLAND DOCKET NO. 2681 Order WHEREAS,

More information

THE LAW SOCIETY OF ALBERTA HEARING COMMITTEE REPORT

THE LAW SOCIETY OF ALBERTA HEARING COMMITTEE REPORT THE LAW SOCIETY OF ALBERTA HEARING COMMITTEE REPORT IN THE MATTER OF THE Legal Profession Act, and in the matter of a Hearing regarding the conduct of TARANJEET AUJLA a Member of The Law Society of Alberta

More information

Procedures and Process for Development of ISO Rules and Filing of ISO Rules with the Alberta Utilities Commission

Procedures and Process for Development of ISO Rules and Filing of ISO Rules with the Alberta Utilities Commission Rule 017 Procedures and Process for Development of ISO Rules and Filing of ISO Rules with the Alberta Utilities Commission This rule was approved by the Alberta Utilities Commission on

More information

RULES OF PRACTICE AND PROCEDURE

RULES OF PRACTICE AND PROCEDURE Financial Services Tribunal Tribunal des services financiers RULES OF PRACTICE AND PROCEDURE FOR PROCEEDINGS BEFORE THE FINANCIAL SERVICES TRIBUNAL Ce document est également disponible en français TABLE

More information

Notice and Protest Procedures for Protests Related to a University s Contract Procurement Process.

Notice and Protest Procedures for Protests Related to a University s Contract Procurement Process. 18.002 Notice and Protest Procedures for Protests Related to a University s Contract Procurement Process. (1) Purpose. The procedures set forth in this Regulation shall apply to protests that arise from

More information

ATCO Gas and Pipelines Ltd. Fifth Floor, St. Edmonton, Alta. T5J 2V6. Senior Engineer Regulatory

ATCO Gas and Pipelines Ltd. Fifth Floor, St. Edmonton, Alta. T5J 2V6. Senior Engineer Regulatory July 26, 2016 Disposition 21842-D01-2016 ATCO Gas and Pipelines Ltd. Fifth Floor, 10035 106 St. Edmonton, Alta. T5J 2V6 Attention: Mr. Doug Stone Senior Engineer Regulatory ATCO Gas and Pipelines Ltd.

More information

National Patent Board Non-Binding Arbitration Rules TABLE OF CONTENTS

National Patent Board Non-Binding Arbitration Rules TABLE OF CONTENTS National Patent Board Non-Binding Arbitration Rules Rules Amended and Effective June 1, 2014 TABLE OF CONTENTS Important Notice...3 Introduction...3 Standard Clause...3 Submission Agreement...3 Administrative

More information

FedEx Corporation (Exact name of registrant as specified in its charter)

FedEx Corporation (Exact name of registrant as specified in its charter) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 8-K CURRENT REPORT Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 Date of Report (Date of Earliest Event

More information

JAMS International Arbitration Rules & Procedures

JAMS International Arbitration Rules & Procedures JAMS International Arbitration Rules & Procedures Effective September 1, 2016 JAMS INTERNATIONAL ARBITRATION RULES JAMS International and JAMS provide arbitration and mediation services from Resolution

More information

Decision to Issue a Declaration Naming James W. Glover Pursuant to Section 106 of the Oil and Gas Conservation Act

Decision to Issue a Declaration Naming James W. Glover Pursuant to Section 106 of the Oil and Gas Conservation Act Decision 2006-103 Decision to Issue a Declaration Naming Pursuant to Section 106 of the Oil and Gas Conservation Act October 24, 2006 ALBERTA ENERGY AND UTILITIES BOARD Decision 2006-103: Declaration Naming

More information

TERMS OF REFERENCE. Issued Date: 3 January 2011

TERMS OF REFERENCE. Issued Date: 3 January 2011 TERMS OF REFERENCE Issued Date: 3 January 2011 Last Revised Date: 21 March 2017 List of Revisions Revision No. Revision Date Effective Date Revision 1 23 November 2015 1 December 2015 Revision 2 21 March

More information

Procedural Order No. 3

Procedural Order No. 3 IN THE MATTER OF AN ARBITRATION BEFORE A TRIBUNAL CONSTITUTED IN ACCORDANCE WITH THE UNITED STATES-DOMINICAN REPUBLIC- CENTRAL AMERICA FREE TRADE AGREEMENT, SIGNED AUGUST 5, 2004 ( CAFTA-DR ) - and - THE

More information

2010 No. 791 COPYRIGHT

2010 No. 791 COPYRIGHT STATUTORY INSTRUMENTS 2010 No. 791 COPYRIGHT The Copyright Tribunal Rules 2010 Made - - - - 15th March 2010 Laid before Parliament 16th March 2010 Coming into force - - 6th April 2010 The Lord Chancellor

More information

The Small Claims Act, 2016

The Small Claims Act, 2016 1 SMALL CLAIMS, 2016 c S-50.12 The Small Claims Act, 2016 being Chapter S-50.12 of The Statutes of Saskatchewan, 2016 (effective January 1, 2018). *NOTE: Pursuant to subsection 33(1) of The Interpretation

More information

Table of Contents. Injury Manual Insurer s Decisions and Appeals. Division Summary Information

Table of Contents. Injury Manual Insurer s Decisions and Appeals. Division Summary Information Table of Contents Division 11 11.0 Insurer s Decisions and Appeals 11.1 Summary Information 11.1.1 Division 11 Legislation Section 188 - Insurer s decisions final Section 189 - Insurer to give written

More information

STREET SW EDMONTON, AB T6X 1E9 Phone: Fax: SURFACE RIGHTS BOARD RULES

STREET SW EDMONTON, AB T6X 1E9 Phone: Fax: SURFACE RIGHTS BOARD RULES 1229-91 STREET SW EDMONTON, AB T6X 1E9 Phone: 780-427-2444 Fax: 780-427-5798 SURFACE RIGHTS BOARD RULES RULES OF THE SURFACE RIGHTS BOARD TABLE OF CONTENTS Rule # PART 1: PURPOSE, APPLICATION OF RULES,

More information

2009 No (L. 20) TRIBUNALS AND INQUIRIES

2009 No (L. 20) TRIBUNALS AND INQUIRIES S T A T U T O R Y I N S T R U M E N T S 2009 No. 1976 (L. 20) TRIBUNALS AND INQUIRIES The Tribunal Procedure (First-tier Tribunal) (General Regulatory Chamber) Rules 2009 Made - - - - 16th July 2009 Laid

More information

APPENDIX F PUBLIC PRIVATE PARTNERSHIP PROCUREMENT PROCEDURES

APPENDIX F PUBLIC PRIVATE PARTNERSHIP PROCUREMENT PROCEDURES APPENDIX F PUBLIC PRIVATE PARTNERSHIP PROCUREMENT PROCEDURES PURPOSE The purpose of these Procurement Procedures ("Procedures") is to establish procedures for the procurement of services for public private

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Offer Caps in Markets Operated by ) Regional Transmission ) Docket No. RM16-5-000 Organizations and Independent ) System Operators

More information

TO THE CREDITORS OF ALBERTA LTD., carrying on business as SPAREPARTS

TO THE CREDITORS OF ALBERTA LTD., carrying on business as SPAREPARTS KPMG Inc. 205 5th Avenue SW Suite 3100 Calgary AB T2P 4B9 Tel 403-691-8000 Fax 403-691-8008 www.kpmg.ca October 5, 2017 TO THE CREDITORS OF 1031084 ALBERTA LTD., carrying on business as SPAREPARTS Please

More information

PART 11: RECOVERABLE COSTS OF LITIGATION, ASSESSMENT OF COSTS AND SANCTIONS

PART 11: RECOVERABLE COSTS OF LITIGATION, ASSESSMENT OF COSTS AND SANCTIONS PART 11: RECOVERABLE COSTS OF LITIGATION, ASSESSMENT OF COSTS AND SANCTIONS What this Part is about: This Part deals with: how the Court may make an order or direction with respect to costs in a proceeding;

More information

Case 3:11-cv JRS Document Filed 07/10/14 Page 1 of 12 PageID# 3720

Case 3:11-cv JRS Document Filed 07/10/14 Page 1 of 12 PageID# 3720 Case 3:11-cv-00754-JRS Document 126-1 Filed 07/10/14 Page 1 of 12 PageID# 3720 IN THE UNITED STATES DISTRICT COURT IN THE EASTERN DISTRICT OF VIRGINIA Richmond Division EXHIBIT A GREGORY THOMAS BERRY,

More information

RULES FOR THE CONDUCT OF PROCEEDINGS IN THE LABOUR COURT. as promulgated by. Government Notice 1665 of 14 October 1996.

RULES FOR THE CONDUCT OF PROCEEDINGS IN THE LABOUR COURT. as promulgated by. Government Notice 1665 of 14 October 1996. RULES FOR THE CONDUCT OF PROCEEDINGS IN THE LABOUR COURT as promulgated by Government Notice 1665 of 14 October 1996 as amended by Government Notice R961 in Government Gazette 18142 of 11 July 1997 [with

More information

LCB File No. T ADOPTED TEMPORARY REGULATION OF THE PUBLIC UTILITIES COMMISSION OF NEVADA

LCB File No. T ADOPTED TEMPORARY REGULATION OF THE PUBLIC UTILITIES COMMISSION OF NEVADA Chapter 704 of NAC LCB File No. T024-05 ADOPTED TEMPORARY REGULATION OF THE PUBLIC UTILITIES COMMISSION OF NEVADA Filed with the Secretary of State on June 2, 2005 PUCN DOCKET NO. 04-6022 (PHASE II GAS

More information

160 FERC 61,058 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

160 FERC 61,058 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 160 FERC 61,058 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Neil Chatterjee, Chairman; Cheryl A. LaFleur, and Robert F. Powelson. California Independent System Operator

More information

Pembina Pipeline Corporation

Pembina Pipeline Corporation Costs Order 2016-003 Pembina Pipeline Corporation Applications for Two Pipelines Fox Creek to Namao Pipeline Expansion Project Costs Award Alexander First Nation October 5, 2016 Alberta Energy Regulator

More information

Law Society of Alberta Trust Safety Approvals Guideline

Law Society of Alberta Trust Safety Approvals Guideline Format updated April 2016 Table of Contents...1 I. The Nature of this Guideline...1 II. Statutory Role and Mandate...1 III. Setting up as a Sole Proprietor or a Firm...2 IV. Designation of a Responsible

More information

LOWIN. and W PORTSMOUTH & CO. JUDGMENT (As Approved)

LOWIN. and W PORTSMOUTH & CO. JUDGMENT (As Approved) [2016] EWHC 2301 (QB) IN THE HIGH COURT OF JUSTICE QUEEN'S BENCH DIVISION Case No: QB/2016/0049 The Royal Courts of Justice Strand London WC2A 2LL Monday, 20 June 2016 BEFORE: MRS JUSTICE ELISABETH LAING

More information

Rules for the Conduct of an administered Arbitration

Rules for the Conduct of an administered Arbitration Rules for the Conduct of an administered Arbitration EXPLANATORY STATEMENT 1.1 These Rules govern disputes which are international in character, and are referred by the parties to AFSA INTERNATIONAL for

More information

INTERVENOR REQUEST FORM

INTERVENOR REQUEST FORM Intergovernmental Affairs The Public Utilities Board 400 330 Portage APPENDIX I INTERVENOR REQUEST FORM PAGE 1 OF 2 1. Application Re Hearing: MPI 2016 General Rate Application 2. Name of Requesting Party:

More information

Date: January 14, 2011 Re: Final Offer Behaviour Enforcement Guidelines and stakeholder comments on the draft

Date: January 14, 2011 Re: Final Offer Behaviour Enforcement Guidelines and stakeholder comments on the draft NOTICE TO MARKET PARTICIPANTS AND STAKEHOLDERS Date: January 14, 2011 Re: Final Offer Behaviour Enforcement Guidelines and stakeholder comments on the draft Effective today the MSA is releasing its finalized

More information

Design and Construct Contract - Standard User Funding Agreement

Design and Construct Contract - Standard User Funding Agreement QCA Draft 8 September 2014 Aurizon Network Pty Ltd [insert Trustee] Design and Construct Contract - Standard User Funding Agreement (amended form of AS 4902-2000) Ref: QRPA15047 9101397 11391098/5 L\313599357.2

More information

Amendments to information disclosure determinations for electricity distribution and gas pipeline services 2015

Amendments to information disclosure determinations for electricity distribution and gas pipeline services 2015 ISBN 978-1-869454-42-5 Project no. 14.09:15.01/14700:14699 Public version Amendments to information disclosure determinations for electricity distribution and gas pipeline services 2015 Final reasons paper

More information

PARTICIPATING INTEREST AGREEMENT

PARTICIPATING INTEREST AGREEMENT EX-10 3 ex104.htm EXHIBIT 10.4 PARTICIPATING INTEREST AGREEMENT EXHIBIT 10.4 This Agreement is made on March 27, 2003. BETWEEN: WHEREAS: PARTICIPATING INTEREST AGREEMENT GEOGLOBAL RESOURCES (INDIA) INC.,

More information

ADR CODE OF PROCEDURE

ADR CODE OF PROCEDURE Last Revised 12/1/2006 ADR CODE OF PROCEDURE Rules & Procedures for Arbitration RULE 1: SCOPE OF RULES A. The arbitration Rules and Procedures ( Rules ) govern binding arbitration of disputes or claims

More information

RULES OF PROCEDURE FOR THE ADMINISTRATIVE LAW COURT

RULES OF PROCEDURE FOR THE ADMINISTRATIVE LAW COURT RULES OF PROCEDURE FOR THE ADMINISTRATIVE LAW COURT Effective April 29, 2010 TABLE OF CONTENTS I. GENERAL PROVISIONS... 1 1. Authority and Applicability.... 1 2. Definitions.... 1 A. Administrative Law

More information

CBI KEYSTONE INVESTMENT CLASS ACTION PLEASE READ THIS NOTICE CAREFULLY AS IT MAY AFFECT YOUR LEGAL RIGHTS

CBI KEYSTONE INVESTMENT CLASS ACTION PLEASE READ THIS NOTICE CAREFULLY AS IT MAY AFFECT YOUR LEGAL RIGHTS CBI KEYSTONE INVESTMENT CLASS ACTION NOTICE OF SETTLEMENT APPROVAL PLEASE READ THIS NOTICE CAREFULLY AS IT MAY AFFECT YOUR LEGAL RIGHTS TO CLASS MEMBERS: If you are a Canadian resident, and you purchased

More information

19 October The new AMIT Regime

19 October The new AMIT Regime 19 October 2017 Common Fund No. 14 (EQT Diversified Fixed Income Fund) (ARSN 601 989 815) ( Fund ) Adoption of the Attribution Managed Investment Trust ( AMIT ) regime for the Fund Notice of proposed modifications

More information

CLASS PROCEEDINGS ACT

CLASS PROCEEDINGS ACT Province of Alberta Statutes of Alberta, Current as of December 17, 2014 Office Consolidation Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park Plaza 10611-98 Avenue Edmonton,

More information

STATE OF ALASKA THE REGULATORY COMMISSION OF ALASKA

STATE OF ALASKA THE REGULATORY COMMISSION OF ALASKA 1 2 STATE OF ALASKA THE REGULATORY COMMISSION OF ALASKA 3 4 5 6 7 8 9 10 11 Before Commissioners: In the Matter of the Consideration of the Impact of Rules of the Federal Communications Commission on the

More information