1 REGISTERED CONSUMERS GRIEVANCES REDRESSAL FORUM AT KASUMPTI SHIMLA-9 No. CGRF/Comp. No. 1453/1/17/005 Dated:- KBM Food Product, V/s. HPSEBL & Others. Complaint No 1453/1/17/ KBM Food Product, 2. The Executive Director (Pers.), HPSEBL, Vidyut Bhawan, Shimla-4 3. The Dy. Chief Engineer, (Op.) Circle, HPSEBL, Solan, 4. The Addl. Superintending Engineer, Electrical Division, HPSEBL, Baddi, 5. The Assistant Executive Engineer, Electrical Sub-Division, HPSEBL, Baddi, The Certified copy of final order dated passed by the Hon ble Forum in the aforesaid complaint is enclosed herewith for further necessary action at your end please. The compliance be reported/ intimated within one month after the receipt of order in the office. DA:-As above. Secretary, CGRF, HPSEBL Kasumpti Shimla-9.

2 CONSUMERS GRIEVANCES REDRESSAL FORUM AT KASUMPTI SHIMLA-9 No. FRGC/Complaint No. 1453/1/17/005 Dated:- KBM Food Product, V/s. HPSEBL & Others. Complaint No 1453/1/17/005 Dated: The order in the above-cited complaint is announced today on dated Copy of order be sent to all concerned through registered post. The complaint stands disposed off. (Rajiv Gupta) Member (S.L.Sharma) Chairman

3 CONSUMERS GRIEVANCES REDRESSAL FORUM AT KASUMPTI SHIMLA-9 Complaint No.: /1/17/005 Date of Admission: Quorum: - Er. S.L. Sharma, Chairman. Er. Rajiv Gupta, Member In Re: - KBM Food Product, V/s 1 The Executive Director (Pers.), HPSEBL, Vidyut Bhawan, Shimla-4 2. The Dy. Chief Engineer, (Op.) Circle, HPSEBL, Solan, 3. The Addl. Superintending Engineer, Electrical Division, HPSEBL, Baddi, 4. The Assistant Executive Engineer, Electrical Sub-Division, HPSEBL, Baddi, Complaint Regarding:- Defective meter-billing dispute. Final hearing held on dated: Present For: - 1. Sh. Kiran Negi, Advocate. 1. Sh. Nageen Kumar Clerk of Sh. Surender Sharma, Advocate. 2. Sh. Lakshmi Chand, Sr. Assistant. Date of Decision:

4 COMPLAINANT S CONTENTION:- The complainant got power connection from the respondents for 98 kw of load with 60 kva of contract demand. The complainant has been paying the monthly electricity bills raised by the respondents as per periodicity and time limits specified in the Supply Code, The complainant was served as demand notice dated by respondent no.1 for Rs.1,60,638/- on account of defective metering, involving overhauling of the complainant s account w.e.f upto Nov, 16 for a period of three and a half year. The respondent number 1 has stated that the potential was missing. He further alleged that the current was missing in B Phase on the basis of analysis of MRI data. The respondent raised the demand without even providing the consumer the MRI data on the basis of which the conclusion was arrived. In other words, the demand had been raised without conducting such test that could have satisfied the consumer, merely on the basis of theory and the data which is only available with respondents. The complainant is at a loss of understanding. Had a check meter be installed in parallel to the defective meter, the slowness would have been proved beyond doubt. The complainant wrote in reply to the respondent number 1 vide his letter dated that the slowness of the meter/metering equipment is dealt by the para 4.4 (i) of the Supply code, 2009, which provides for the overhauling of consumer accounts only for a period of six months from the date of test or removal of the defective meter. The respondents did not accede to the contention of the complainant and reverted vide his letter dated that the case of defective meter does not fall in the purview of para (i) of the Supply Code, 2009 and hence maintained his stand for overhauling for a period of three and a half years. The respondents are required to check the meters periodically as a routine within every six months. The respondents contention that the meter was slow by 33% since three and a half years is itself a proof that the metering was never tested/ verified during such a long period. Para (i) of the Supply Code and the corresponding instruction number 27.4 of the revised sales manual and instruction No.116 of the Old Sales Manual provide for overhauling in the case of inaccurate meters/metering equipment only for a period of six months. These provisions have been included in the interest of the consumer keeping in view various legalities and thus cannot be ignored while such overhauling is ordered.

5 The defective meter is still in place and has not been replaced by a proper accurate meter. The continuance of the defective meter in use, shall result further loss to the respondents as the date of removal of the defective meter is crucial to determine the period of overhauling. The relevant legal provision are reproduced below:- Para of the Supply code state overhauling of consumer accounts (a) If a meter on testing is found to be beyond the limits of accuracy as specified in the regulations frame by the Authority under Section 55 of the Act, the electricity charges for all categories of consumers will be computed in accordance with the said test results for a period of six months immediately preceding- (b) The date the defective meter is removed for testing in the laboratory of the licensee where such testing is undertaken at the instance of the licensee: or (c) The date of receipt of request from the consumer for testing a meter in the laboratory of the licensee. Instruction 27.4 of Sales Manual 27.4 Overhauling of consumer accounts--- (d) If a meter on testing is found to be beyond the limits of accuracy as specified in the regulations framed by the authority under section 55 of the Act, the electricity charges for all categories of consumers will be computed in accordance with the said test results for a period of six months immediately preceding- (e) the date of test in case the meter has been tested at site to the satisfaction of the consumer: or (f) the date on which the defective meter is removed for testing in the laboratory of the licensee, where such testing is undertaken at the instance of licensee: or (g) the date of receipt of request from the consumer for testing of a meter in the laboratory of the licensee. (h) Instruction No.116 of the old sales manual: INSTRUCTUION NO.116 Difference or dispute over the Accuracy: Where any difference or dispute arises as to whether any meter is or is not correct the matter should be decided, upon the application by either party, by the Electrical inspector under Section 26 (6) of the Indian Electricity Act, 1910, as amended from time to

6 time, and if in his opinion, the meter is not correct, the Electricity Inspector shall estimate the amount of adjustment to the carried out in the consumer s account for a period not exceeding six months preceding the date of test. Provided that before the Board or a consumer applied to Chief Electrical Inspector, he shall give to the other party not less than 7 days notice of his intention to do so. Nature of relief sought from the Forum:- (a) To quash and set aside the arrears demanded vide letter dated , issued by respondent/non-applicant No.2 vide which the complainant/ applicant company has been asked to deposit Rs.1,60,638/- as arrears towards slowness of meter. (b) To direct the respondent to change the meter at the earliest so as not to extend the dispute over the meter for the further period. (c) Cost of the complaint amounting to Rs.50,000/-. (d) Call for the record of the case. (e) Any other or further orders which this Hon ble forum may deem fit and proper, in the facts and circumstances of the case may kindly be passed in favour of the complainant company and against the respondents/ distribution licensees. RESPONDENTS CONTENTION: - The complainant was served a demand notice for recovery of less billed amount to the tune of Rs. 1,60,638/- (Rs. One lac sixty thousand six hundred thirty eight) only as current in B phase is missing w.e.f The consumer is free to ask for MRI data which can be provided depositing applicable fees as per tariff orders. The slowness of 33% is exact as current in one phase is missing. FORUM S OBSERVATIONS AND ORDER :- We have heard the arguments of both the parties and have gone through their claims and counter claims vis-à-vis copies of various details and documents filed with the complaint, reply thereafter. Thus the Forum observes as under:- We have gone through all the documents and listened to the arguments of both parties very carefully. We observe that the respondents served demand notice dated to the complainants demanding Rs. 1,60,638/- on account of defective metering after overhauling the accounts since to 11/2016. The respondents issued demand notice stating that the current in B-Phase was missing since and the energy has been recorded 33% less (Page 8).

7 The respondents have also supplied copy of tamper report (Page 23) which also indicates that the current in B-Phase is missing. The respondents also verified the percentage of less energy being recorded by installing a check meter in parallel. The check meter also indicated that 31.95% less energy is being recorded by the old meter ( to ). The complainant pleaded during arguments that overhauling of accounts should not be for the period to 11/2016 but only for a period of six months. The respondents argued for overhauling for the complete period as 33% more energy has been used by the complainants. We also checked the overhauling details of the demand of Rs. 1,60,638/-, the temper report and the comparison of consumption by the check meter and old meter. We find that the current in B-Phase was actually missing since We are also satisfied with the plea of the respondents that the complainants have used 33% more energy than actually billed. We are also satisfied with the overhauling details of the demand raised. We are, thus, of the opinion that the complainants must pay for the energy consumed by them. We also do not agree with the plea of the complainant to overhaul the accounts for six months instead of whole period because the actual date of 33% less energy being recorded is available in records i.e We, therefore, feel that the plea of the complainant to restrict the overhauling of accounts to six months is not maintainable and should be rejected. We, thus, direct as under:- i ii The demand of Rs. 1,60,638/- raised by the respondents is held right. The respondents are directed to adjust all the money already received against their complaint in the above said demand of Rs. 1,60,638/-. Iii The respondents are directed to recover the balance amount in six equal monthly instalments alongwith the monthly bills of next six months. The case is decided in favour of the respondents. The file be consigned to the record room alongwith original copy of the order. The certified copy of order be kept in safe custody in the folder of orders. Certified copies of this order be supplied to both the parties. Place: - Shimla Dated: (Rajiv Gupta) Member (S.L.Sharma) Chairman

BEFORE THE DISTRICT CONSUMER DISPUTES REDRESSAL FORUM, FEROZEPUR. C.C. No. 137 of 2017

BEFORE THE DISTRICT CONSUMER DISPUTES REDRESSAL FORUM, FEROZEPUR. C.C. No. 137 of 2017 BEFORE THE DISTRICT CONSUMER DISPUTES REDRESSAL FORUM, FEROZEPUR. C.C. No. 137 of 2017 Date of Institution:27.02.2017 Date of Decision: 04.01.2018 Tehal Singh aged 63 years son of Lachhman Singh, resident

More information

Case No.06/2016 Date of Grievance : Date of Order :

Case No.06/2016 Date of Grievance : Date of Order : 1 06/2016 CONSUMER GRIEVANCE REDRESSAL FORUM M.S.E.D.C.L., PUNE ZONE, PUNE Case No.06/2016 Date of Grievance : 15.03.2016 Date of Order : 21.04.2016 In the matter of recovery of arrears in the event of

More information

Case No.25/2016 Date of Grievance : Date of Order :

Case No.25/2016 Date of Grievance : Date of Order : 1 25/2016 CONSUMER GRIEVANCE REDRESSAL FORUM M.S.E.D.C.L., PUNE ZONE, PUNE Case No.25/2016 Date of Grievance : 19.07.2016 Date of Order : 14.09.2016 In the matter of recovery of arrears in the event of

More information

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003) BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai

More information

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION SHIMLA Petition No. 82 of 2012 M/S Himachal Chamber of Commerce and Industry C/O Goel Diesel Service, Bhupper, Poanta Sahib, Distt. Sirmour

More information

Date of Admission : Date of Decision :

Date of Admission : Date of Decision : 1 Case No. 668/2018 BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM AURANGABAD ZONE, AURANGABAD. Case No. CGRF/AZ/AUR/R/668/2018/08 Registration No. 2018020042 Date of Admission : 14.02.2018 Date of Decision

More information

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003) BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai

More information

Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur Case No.

Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur Case No. Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur Case No. CGRF(NUZ)/71/2014 Applicant Non applicant Quorum Present : M/s. Sanvijay Rolling

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION PUNJAB STATE ELECTRICITY REGULATORY COMMISSION NOTIFICATION The 4th October, 2013 No. PSERC/Secy/Regu. 88 Punjab State Electricity Regulatory Commission hereby approves the guidelines for handling of consumer

More information

Case No. DH/CGRF-1595/2017 Date of Institution: Date of Hearing: Date of Order: 25/01/2017

Case No. DH/CGRF-1595/2017 Date of Institution: Date of Hearing: Date of Order: 25/01/2017 FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES DAKSHIN HARYANA BIJLI VITRAN NIGAM D-BLOCK, Ground Floor, Vidyut Sadan, Vidyut Nagar, Hisar-125 005 Telephone No. 01662-223081 (website: www.dhbvn.com) (e-mail

More information

Case No. 16 of 2007 Date: 19/12/2007. In the matter of Shri Sachin P. Sakpal V/S

Case No. 16 of 2007 Date: 19/12/2007. In the matter of Shri Sachin P. Sakpal V/S Before Maharashtra State Electricity Distribution Co. Limited Consumer Grievances Redressal Forum, Pune Zone, 925,Kasabapeth Building, IInd flr. Pune-11 Case No. 16 of 2007 Date: 19/12/2007 In the matter

More information

BEFORE THE KERALA STATE ELECTRICITY REGULATORY COMMISSION. PETITION No. CP 02/17

BEFORE THE KERALA STATE ELECTRICITY REGULATORY COMMISSION. PETITION No. CP 02/17 BEFORE THE KERALA STATE ELECTRICITY REGULATORY COMMISSION PETITION No. CP 02/17 In the matter of : Non implementation of the order dated 29.05.2017 in P/005/2016 of Kerala State Electricity Ombudsman.

More information

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003) BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai

More information

ORDER (passed on 02/07/2015)

ORDER (passed on 02/07/2015) 5(A Govt. of Maharashtra Undertaking) CIN : U40109MH2005SGC153645 PHONE NO. : 25664314/25664316 Consumer Grievance Redressal Forum FAX NO. 26470953 Vidyut Bhavan, Gr. Floor, Email: cgrfbhandupz@mahadiscom.in

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No. 58 of 2017 Date of order: 11.06.2018 Present: Ms. Kusumjit Sidhu, Chairperon Sh. S.S. Sarna, Member

More information

CONSUMER GRIEVANCES REDRESSAL FORUM; NAGPUR (RURAL) COMPLAINT NO. 352/2011

CONSUMER GRIEVANCES REDRESSAL FORUM; NAGPUR (RURAL) COMPLAINT NO. 352/2011 CONSUMER GRIEVANCES REDRESSAL FORUM; NAGPUR (RURAL) COMPLAINT NO. 352/2011 Shri Saibaba Mahila Bachat Gat, C/o Smt. Shraddha Raman Agrawal, Bachpai Chouk, Near Kundan Kuti, Murri Road, Gondiya-441601.,,VS....

More information

1. The Chief Engineer (OP).

1. The Chief Engineer (OP). "SlVI iolllzv foe tht kjtfitofstltandnltton: HIMACHAL '''911&1 'TY BOARD LIMITED No.: HPSEB/CE (Comm.)lElecty.Act.2003 (NottficaHons)l2011-12.\/ Dated: t ~,"3 ~.< ol2.} To..to~Gl-2.\l"'o - -~--~- 1. The

More information

IN THE MATTER OF GRIEVANCE NO. K/DOS/001/482 OF OF MRS.

IN THE MATTER OF GRIEVANCE NO. K/DOS/001/482 OF OF MRS. Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) 421301 Ph 2210707, Fax 2210707, E-mail : cgrfkalyan@mahadiscom.in IN THE MATTER OF GRIEVANCE NO.

More information

Case No. 20 of 2007 Date: 11/01/2008. In the matter of Mr. Sudhir.V.Batra

Case No. 20 of 2007 Date: 11/01/2008. In the matter of Mr. Sudhir.V.Batra Before Maharashtra State Electricity Distribution Co. Limited Consumer Grievances Redressal Forum, Pune Zone, 925,Kasabapeth Building, IInd flr. Pune-11 Case No. 20 of 2007 Date: 11/01/2008 In the matter

More information

CONSUMER GRIEVANCES REDRESSAL FORUM-I OF SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED

CONSUMER GRIEVANCES REDRESSAL FORUM-I OF SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED CONSUMER GRIEVANCES REDRESSAL FORUM-I OF SOUTHERN POWER DISTRIBUTION COMPANY OF TELANGANA LIMITED 01.08.2018 Forum for Redressal of Consumer Grievances TSSPDCL has been established as per Sub-Section (5)

More information

Grievances No.K/DOS/015/874 of and No. K/DOS/016/875 of

Grievances No.K/DOS/015/874 of and No. K/DOS/016/875 of Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) 421301 Ph 2210707, Fax 2210707, E-mail : cgrfkalyan@mahadiscom.in Date of Grievance : 08/10/2013

More information

Case No. CGRF(NZ)/91/2018

Case No. CGRF(NZ)/91/2018 Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redresses Forum Nagpur Zone, Nagpur Case No. CGRF(NZ)/91/2018 Applicant Non applicant : Shri Ramesh Krishnarao Pawar, Usuer Shri

More information

NORTHERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED WARANGAL

NORTHERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED WARANGAL NORTHERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED WARANGAL FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES Forum for Redressal of Consumer Grievances APNPDCL has been established as per Sub - Section (5)

More information

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL. ORDER (Date of Order : 7 th September, 2012)

MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL. ORDER (Date of Order : 7 th September, 2012) MADHYA PRADESH ELECTRICITY REGULATIORY COMMISSION BHOPAL Sub : In the matter of approval of Power Purchase Agreement. ORDER (Date of Order : 7 th September, 2012) Petition No.11 of 2012 1. MP Power Management

More information

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED

SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED SOUTHERN ELECTRICITY SUPPLY COMPANY OF ORISSA LIMITED COMPLAINT HANDLING PROCEDURE OF DISTRIBUTION LICENSEE (APPROVED BY OERC) 1. This "Complaint Handling Procedure relating to Distribution Activity (Complaint

More information

Sri. Alex Soharab. V.F, M/s. Southern Engineering Corporation, V/830-A, Development Area, Edayar, Muppathadom , Aluva.

Sri. Alex Soharab. V.F, M/s. Southern Engineering Corporation, V/830-A, Development Area, Edayar, Muppathadom , Aluva. 1 CONSUMER GRIEVANCE REDRESSAL FORUM CENTRAL REGION (Formed under Section 42(5) of the Electricity Act 2003) 220 kv Substation Compound, HMTColony P.O. Kalamasery, Pin 683 503 Phone No. 0484-2556500 Website

More information

B - On behalf of Applicant 1) Shri.Pavati Rajkumar Nisad - Consumer Representative

B - On behalf of Applicant 1) Shri.Pavati Rajkumar Nisad - Consumer Representative A Govt. of Maharashtra Undertaking) CIN : U40109MH2005SGC153645 PHONE NO. : 25664314/25664316 Consumer Grievance Redressal Forum FAX NO. 26470953 Vidyut Bhavan, Gr. Floor, Email: cgrfbhandupz@mahadiscom.in

More information

Before the Appellate Board National Electric Power Regulatory Authority (NEPRA) Islamic Republic of Pakistan

Before the Appellate Board National Electric Power Regulatory Authority (NEPRA) Islamic Republic of Pakistan Before the Appellate Board National Electric Power Regulatory Authority (NEPRA) Islamic Republic of Pakistan No. NEPRA/AB/Appeal-170/POI-2016/89/..le/ NEPRA Office, Atta Turk Avenue (East), G5/1, Islamabad

More information

Case No. 2 of Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member

Case No. 2 of Shri V. P. Raja, Chairman Shri Vijay L. Sonavane, Member Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003) BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai

More information

AGREEMENT FOR SUPPLY OF HT ENERGY

AGREEMENT FOR SUPPLY OF HT ENERGY AGREEMENT FOR SUPPLY OF HT ENERGY This agreement made on the.. day of.., 200 between the Development Commissioner, Cochin Special Economic Zone, Kakkanad for and on behalf of Cochin Special Economic Zone

More information

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003) BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai

More information

Bar & Bench (

Bar & Bench ( CONSUMER DISPUTES REDRESSAL FORUM -II UDYOG SADAN C C 22 23 QUTUB INSTITUTIONNAL AREA BEHIND QUTUB HOTEL NEW DELHI 110016 Complaint Case No. CC/230/2011 ( Date of Filing : 15 Jul 2011 ) 1. KHUSHAL KOLWAR

More information

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Notice dated U/s130 of Electricity Act2003.

UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW. Notice dated U/s130 of Electricity Act2003. UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION LUCKNOW In the matter of : Notice dated 12.5.2007 U/s130 of Electricity Act2003. AND In the matter of : 1. Managing Director, U.P.Power Corporation Limited,

More information

AGREEMENT FOR SUPPLY OF LT ENERGY

AGREEMENT FOR SUPPLY OF LT ENERGY AGREEMENT FOR SUPPLY OF LT ENERGY This agreement made on the.. day of.., 200 between the Development Commissioner, Cochin Special Economic Zone, Kakkanad for and on behalf of Cochin Special Economic Zone

More information

IN THE GAUHATI HIGH COURT (THE HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH)

IN THE GAUHATI HIGH COURT (THE HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH) IN THE GAUHATI HIGH COURT (THE HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH) WP(C) No. 2882/2005 M/s. Ladi Steel Industries Pvt. Limited, a private limited company duly incorporated under

More information

CONSUMER GRIEVANCE REDRESSAL FORUM M.S.E.D.C.L., PUNE ZONE, PUNE. Case No.07/2016 Date of Grievance : Date of Order :

CONSUMER GRIEVANCE REDRESSAL FORUM M.S.E.D.C.L., PUNE ZONE, PUNE. Case No.07/2016 Date of Grievance : Date of Order : 1 07/2016 CONSUMER GRIEVANCE REDRESSAL FORUM M.S.E.D.C.L., PUNE ZONE, PUNE Case No.07/2016 Date of Grievance : 15.03.2016 Date of Order : 13.05.2016 In the matter of removal of meter and disconnection

More information

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003)

BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. (Constituted under section 42(5) of Electricity Act 2003) BEFORE THE CONSUMER GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba, Mumbai

More information

The Orissa Electricity (Duty) Act, 1961.

The Orissa Electricity (Duty) Act, 1961. The Orissa Electricity (Duty) Act, 1961. An Act to levy a duty on the consumption of electrical energy on the State of Orissa. Be it enacted by the legislature of the State of Orissa in the Twelfth year

More information

~~. HPSEBL./ CE (Comm.)/S-4/Vol-Ill/ ,\.\ h 1- 'CO \Y Dated: a 5/D ~ /2P If::,

~~. HPSEBL./ CE (Comm.)/S-4/Vol-Ill/ ,\.\ h 1- 'CO \Y Dated: a 5/D ~ /2P If::, HIMACHAL PRADESH STATE ELECTRICITY BOARD UMUED (A State Government Undertaking) Registered Office: Vidyut Bhawan, HPSEBL, Shimla-171004 (H.P.) CIN: U40109HP2009SGC031255 Phone No.: 0177-2656624 (Office),

More information

Maharashtra Electricity Regulatory Commission, Mumbai.

Maharashtra Electricity Regulatory Commission, Mumbai. Maharashtra Electricity Regulatory Commission, Mumbai. Maharashtra Electricity Regulatory Commission (Consumer Grievance Redressal Forum & Ombudsman) Regulations, 2003 ELECTRICITY ACT, 2003 No.MERC / LEGAL

More information

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : SUIT FOR PARTITION. Judgment pronounced on: I.A. No.4998/2012 in CS(OS) No.

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : SUIT FOR PARTITION. Judgment pronounced on: I.A. No.4998/2012 in CS(OS) No. IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : SUIT FOR PARTITION Judgment pronounced on: 10.04.2012 I.A. No.4998/2012 in CS(OS) No.136/2009 SUGANDHA SETHI...Plaintiff Through: Ms. N.Shoba with Mr.

More information

BEFORE THE CONSUMER GRIEVANCES REDRESSAL FORUM O R D E R

BEFORE THE CONSUMER GRIEVANCES REDRESSAL FORUM O R D E R BEFORE THE CONSUMER GRIEVANCES REDRESSAL FORUM M. S. ELECTRICITY DISTRIBUTION CO.LTD. (NAGPUR ZONE RURAL) NAGPUR. Application/Case No. CGRF/NZ/Rural/ 29 of 2006 Applicant : M/S. Shyam Rice Industries,

More information

Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur. Case No.

Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur. Case No. Maharashtra State Electricity Distribution Co. Ltd. s Consumer Grievance Redressal Forum Nagpur Urban Zone, Nagpur Case No. CGRF(NUZ)/52/2012 Applicant : M/s. MPM Pvt.Ltd, M-22, MIDC, Hingna Road, Nagpur

More information

CONSUMER GRIEVANCES REDRESSAL FORUM; MSEDCL NAGPUR (RURAL) ZONE NAGPUR COMPLAINT NO.7 /2015

CONSUMER GRIEVANCES REDRESSAL FORUM; MSEDCL NAGPUR (RURAL) ZONE NAGPUR COMPLAINT NO.7 /2015 CONSUMER GRIEVANCES REDRESSAL FORUM; MSEDCL NAGPUR (RURAL) ZONE NAGPUR COMPLAINT NO.7 /2015 Shri Nilesh M. Kolhe At.Aajanti Po.Tq.Hinganghat District - Wardha.,,VS.. Complainant 1. Executive Engineer,

More information

(Li. Before the Appellate Board National Electric Power Regulatory Authority (NEPRA) Islamic Republic of Pakistan

(Li. Before the Appellate Board National Electric Power Regulatory Authority (NEPRA) Islamic Republic of Pakistan Before the Appellate Board National Electric Power Regulatory Authority (NEPRA) Islamic Republic of Pakistan NEPRA Office Ana Turk Avenue (East), G5/ 1, Islamabad TeL No.+92 051 2015200 Fax No. +92 051

More information

No. HPSEBL/CE(SO&P)/IS-60A(Vol-IV)/ Dated:

No. HPSEBL/CE(SO&P)/IS-60A(Vol-IV)/ Dated: Tender Document No.: 4 HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED (A State Government Undertaking) Office of the Chief Engineer (SO&P), Vidyut Bhawan, Shimla-171004 (HP) Tel./Fax No. 0177-2653119,

More information

No:- CGRF/AZ/AUR/U/ 446 / 2013 /30 Date :-

No:- CGRF/AZ/AUR/U/ 446 / 2013 /30 Date :- CONSUMER GRIEVANCE REDRESSAL FORUM MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LTD. Old Power House Premises, Dr. Ambedkar Road, Phone: 0240-2336172 No:- CGRF/AZ/AUR/U/ 446 / 2013 /30 Date :- To,

More information

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : ELECTRICITY MATTER. Date of Decision : January 16, 2007 W.P.(C) 344/2007

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : ELECTRICITY MATTER. Date of Decision : January 16, 2007 W.P.(C) 344/2007 IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : ELECTRICITY MATTER Date of Decision : January 16, 2007 W.P.(C) 344/2007 YOGESH JAIN... Petitioner Through Mr. Laliet Kumar, Advocate. versus BSES YAMUNA

More information

CONSUMER GRIEVANCES REDRESSAL FORUM; NAGPUR (RURAL) COMPLAINT NO. 365/2012

CONSUMER GRIEVANCES REDRESSAL FORUM; NAGPUR (RURAL) COMPLAINT NO. 365/2012 CONSUMER GRIEVANCES REDRESSAL FORUM; NAGPUR (RURAL) COMPLAINT NO. 365/2012 Smt. Shardaben D. Patel, C/o Vinayak Agarbatti Works, Near Railway Station, Rail Toly, Gondia.,,VS.... Complainant 1. Executive

More information

'8. Sue ~ /44 tie. HIMACHAL PRADESH SUTE ELECTRICITY BOARD LIMITED -, (A State Govt. Undertaking)

'8. Sue ~ /44 tie. HIMACHAL PRADESH SUTE ELECTRICITY BOARD LIMITED -, (A State Govt. Undertaking) L -. ~~~~-----~,~----"'- --.----,---~--,~--- '" SeLl &~,...,I."~--..."'. '"'_ "",,~~w,~~miii..w""""".~"-"-,*-#"rr,. 1' '8. Sue ~ /44 tie HIMACHAL PRADESH SUTE ELECTRICITY BOARD LIMITED -, (A State Govt.

More information

PATNA HIGH COURT MIDDLE INCOME GROUP LEGAL AID SOCIETY FAQ ON PATNA HIGH COURT MIDDLE INCOME GROUP LEGAL AID SCHEME

PATNA HIGH COURT MIDDLE INCOME GROUP LEGAL AID SOCIETY FAQ ON PATNA HIGH COURT MIDDLE INCOME GROUP LEGAL AID SCHEME PATNA HIGH COURT MIDDLE INCOME GROUP LEGAL AID SOCIETY FAQ ON PATNA HIGH COURT MIDDLE INCOME GROUP LEGAL AID SCHEME 1 What is Middle Income Group Scheme? This scheme provides legal services to the middle

More information

NOTICE. MPERC (Establishment of Forum and Electricity Ombudsman for redressal of grievances of the consumers) Regulations, 2004

NOTICE. MPERC (Establishment of Forum and Electricity Ombudsman for redressal of grievances of the consumers) Regulations, 2004 NOTICE Bhopal, Dated 12th April,2004 No.1003/MPERC/2004.In exercise of the powers under sub-sections (5) (6) and (7) of section 42 read with clauses {r} and {s} of sub-section (2) of section 181 of the

More information

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA.

BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. In the matter of:- BEFORE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. M/s Tangnu Romai Power Generation (P) Ltd. House No. 835, Excel Society, Sector-48 Chandigarh-160047 through Sh.

More information

The Himachal Pradesh Electricity Supply Code, 2009 CHAPTER - 1 GENERAL

The Himachal Pradesh Electricity Supply Code, 2009 CHAPTER - 1 GENERAL HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION NOTIFICATION No. HPERC/390-09 Shimla 2, 26 th May, 2009 In exercise of powers conferred by Section 50 and clause (x) of sub-section (2) of Section 181of

More information

CONSUMER GRIEVANCE REDRESSAl FORUM,

CONSUMER GRIEVANCE REDRESSAl FORUM, CONSUMER GRIEVANCE REDRESSAl FORUM, AMRAVATI ZONE, AMRAVATI. 11 Vidyut Bhavan" Shivaji Nagar, Amravati, PIN :- 444603 Tel No 0721.2551158 Dt. 15/12/2016 Complaint No.15/2016 In the matter of grievance

More information

THE TAMIL NADU ELECTRICITY REGULATORY COMMISSION

THE TAMIL NADU ELECTRICITY REGULATORY COMMISSION THE TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under Section 82(1) of the Electricity Act, 2003) (Central Act 36 of 2003) PRESENT : Thiru S. Kabilan Thiru B. Jeyaraman - Chairman - Member

More information

$~ * IN THE HIGH COURT OF DELHI AT NEW DELHI REHABILITATION MINISTRY EMPLOYEES CO-OPERATIVE. versus

$~ * IN THE HIGH COURT OF DELHI AT NEW DELHI REHABILITATION MINISTRY EMPLOYEES CO-OPERATIVE. versus $~ * IN THE HIGH COURT OF DELHI AT NEW DELHI + W.P.(C) 8444/2011 Date of Decision: 29 th September, 2015 REHABILITATION MINISTRY EMPLOYEES CO-OPERATIVE HOUSE BUILDING SOCIETY... Petitioner Through Mr.

More information

ORDER Dated: 11 th August, 2004

ORDER Dated: 11 th August, 2004 Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION 13 th floor, Centre No.1, World Trade Centre, Cuffe Parade, Mumbai 400 005. Tel. 22163964 / 22163965, Fax No. 22163976 E-mail mercindia@mercindia.com

More information

IN THE HIGH COURT OF DELHI: NEW DELHI SUBJECT : CODE OF CIVIL PROCEDURE Judgment pronounced on: I.A. No.13124/2011 in CS (OS) No.

IN THE HIGH COURT OF DELHI: NEW DELHI SUBJECT : CODE OF CIVIL PROCEDURE Judgment pronounced on: I.A. No.13124/2011 in CS (OS) No. IN THE HIGH COURT OF DELHI: NEW DELHI SUBJECT : CODE OF CIVIL PROCEDURE Judgment pronounced on: 07.03.2012 I.A. No.13124/2011 in CS (OS) No.1674/2011 SURENDRA KUMAR GUPTA Through Mr. J.S. Mann, Adv....

More information

IN THE HIGH COURT OF KARNATAKA AT BANGALORE BEFORE THE HON BLE MR. JUSTICE ARAVIND KUMAR REGULAR FIRST APPEAL NO.224 OF 2010

IN THE HIGH COURT OF KARNATAKA AT BANGALORE BEFORE THE HON BLE MR. JUSTICE ARAVIND KUMAR REGULAR FIRST APPEAL NO.224 OF 2010 1 IN THE HIGH COURT OF KARNATAKA AT BANGALORE DATED THIS THE 25 th DAY OF MARCH, 2013 BEFORE THE HON BLE MR. JUSTICE ARAVIND KUMAR REGULAR FIRST APPEAL NO.224 OF 2010 BETWEEN: SRI GANESH SHENOY, AGED ABOUT

More information

BEFRE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA.

BEFRE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. BEFRE THE HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA. In the matter of- M/s Ambuja Cements Limited, Darlaghat, Tehsil Arki, District Solan (H.P) through Sh.Chanchal Kumar its President-cum-Authorised

More information

Shri P J Patel, Gandhinagar Independent Member Harsha S Chauhan, Vadodara Technical Member Smt M M Marathe, MGVCL

Shri P J Patel, Gandhinagar Independent Member Harsha S Chauhan, Vadodara Technical Member Smt M M Marathe, MGVCL BEFORE THE CONSUMER GRIEVANCES REDRESSAL FORUM MADHYA GUJARAT VIJ CO LIMITED CORPORATE OFFICE, 5 TH FLOOR SP VIDYUT BHAVAN, RACECOURSE, VADODARA 390 007 Subject Complainant Respondent Date of hearing Consumer

More information

Case No. 111 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member. Maharashtra State Electricity Distribution Co.

Case No. 111 of Shri. V.P. Raja, Chairman Shri. Vijay L. Sonavane, Member. Maharashtra State Electricity Distribution Co. Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13 th Floor, Cuffe Parade, Mumbai 400005. Tel. 022 22163964/65/69 Fax 22163976 Email: mercindia@mercindia.org.in

More information

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI (Case No.23/ ) QUORUM Shri Mukhtiar Singh, Chairperson Shri P. C. Verma, Member.

JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI (Case No.23/ ) QUORUM Shri Mukhtiar Singh, Chairperson Shri P. C. Verma, Member. JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION RANCHI (Case No.23/2007-08) IN THE MATTER OF QUORUM Shri Mukhtiar Singh, Chairperson Shri P. C. Verma, Member. An application for setting aside the letter

More information

HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED MANUAL OF PRACTICES FOR HANDLING CONSUMERS COMPLAINTS NOTIFICATON

HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED MANUAL OF PRACTICES FOR HANDLING CONSUMERS COMPLAINTS NOTIFICATON HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED MANUAL OF PRACTICES FOR HANDLING CONSUMERS COMPLAINTS NOTIFICATON No HPSEBL/CE-(Comm.)/SERC-34/2013- Dated: - In pursuance to Regulation 7 & 8 of the HPERC

More information

Before the Forum for Redressal of Consumer Grievances, DHBVN.

Before the Forum for Redressal of Consumer Grievances, DHBVN. FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES DAKSHIN HARYANA BIJLI VITRAN NIGAM D-BLOCK, Ground Floor, Vidyut Sadan, Vidyut Nagar, Hisar-125 005 Telephone No. 01662-223081 (website: www.dhbvn.com) (e-mail

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan National Electric Power Regulatory Authority Islamic Republic of Pakistan Registrar NEPRA Tower, Attaturk Avenue (East), G-511, Islamabad. Ph: +92-51-9206500, Fax: +92-51-2600026 Web: www.nepra.org.pk,

More information

Sub: In the matter of representation in compliance to the directions of Hon ble High Court, Jabalpur in Writ Petition no.

Sub: In the matter of representation in compliance to the directions of Hon ble High Court, Jabalpur in Writ Petition no. ORDER (Date of hearing: 12 th March, 2015) (Date of order: 30 th March, 2015) Shri Ashok Kumar Sable, - Petitioner S/o Shri Anand Rao Sable, R/o near Gas Godown, Mordongri Road, Sarni, District Betul (M.P.)

More information

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : ELECTRICITY ACT, 2003 Date of decision: 19th April, 2011 W.P.(C) 8647/2007

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : ELECTRICITY ACT, 2003 Date of decision: 19th April, 2011 W.P.(C) 8647/2007 IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : ELECTRICITY ACT, 2003 Date of decision: 19th April, 2011 W.P.(C) 8647/2007 JINGLE BELL AMUSEMENT PARK P. LTD. Through: Mr. V.K. Goel, Advocate... Petitioner

More information

FAQ on Jharkhand High Court Middle Income Group Legal Aid Scheme

FAQ on Jharkhand High Court Middle Income Group Legal Aid Scheme For Private Circulation : Awareness Purpose Only JHARKHAND HIGH COURT MIDDLE INCOME GROUP LEGAL AID SOCIETY FAQ on Jharkhand High Court Middle Income Group Legal Aid Scheme Published & Printed by : Jharkhand

More information

Memo No. Ch- 43/GM/Comml./ R-16/139/04 Dated:

Memo No. Ch- 43/GM/Comml./ R-16/139/04 Dated: DAKSHIN HARYANA BIJLI VITRAN NIGAM Sales Circular No. D-43/2007 From GM/Commercial, DHBVN, Hisar. To All CGMs/GMs/DGMs/AGMs (OP), FM- I/C Sub offices in DHBVNL. Memo No. Ch- 43/GM/Comml./ R-16/139/04 Dated:

More information

ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004

ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004 ORISSA ELECTRICITY REGULATORY COMMISSION (LICENSEES' STANDARDS OF PERFORMANCE) REGULATIONS, 2004 2 THE ORISSA GAZETTE EXTRA ORDINARY PUBLISHED BY AUTHORITY NO.711, CUTTACK, FRIDAY, MAY 28, 2004 / JAISTHA

More information

BEFORE THE FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES IN SOUTHERN POWER DISTRIBUTION COMPANY OF A.P LIMITED TIRUPATI

BEFORE THE FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES IN SOUTHERN POWER DISTRIBUTION COMPANY OF A.P LIMITED TIRUPATI BEFORE THE FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES IN SOUTHERN POWER DISTRIBUTION COMPANY OF A.P LIMITED TIRUPATI On this the ----------- day of July 2014 In C.G.No: 201/2013-14/ Kadapa Circle Present

More information

NEPRA Office Building, G-511, Attaturk Avenue (East), Islamabad "

NEPRA Office Building, G-511, Attaturk Avenue (East), Islamabad 0" 1 National Electric Power Regulatory Authority Islamic Republic of Pakistan wat **-414' NEPRA Office Building, G-511, Attaturk Avenue (East), Islamabad "-- - 06 Phone: 051-9206500, Fax: 051-2600026

More information

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH. Smt.Romila Dubey, Chairperson Shri Gurinder Jit Singh, Member

PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO , SECTOR 34-A, CHANDIGARH. Smt.Romila Dubey, Chairperson Shri Gurinder Jit Singh, Member PUNJAB STATE ELECTRICITY REGULATORY COMMISSION SCO NO. 220-221, SECTOR 34-A, CHANDIGARH Petition No.70 of 2014 Date of Order: 22.04.2015 Present: Smt.Romila Dubey, Chairperson Shri Gurinder Jit Singh,

More information

Through : Mr.P.V.Kapur, Sr.Advocate with Mr.V.K.Nagrath, Mr.Abhay Varma & Mr.Sidhant Kapur, Advocates.

Through : Mr.P.V.Kapur, Sr.Advocate with Mr.V.K.Nagrath, Mr.Abhay Varma & Mr.Sidhant Kapur, Advocates. IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : SUIT FOR RECOVERY RESERVED ON : 27th NOVEMBER, 2014 DECIDED ON : 11th DECEMBER, 2014 CS (OS) 1980/2011 & CC No.21/2012 SHIV SHAKTI MADAN... Plaintiff Through

More information

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION Before the MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th Floor, Cuffe Parade, Mumbai 400 005 Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail: mercindia@merc.gov.in

More information

SEVENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004

SEVENTH AMENDMENT TO MADHYA PRADESH ELECTRICITY SUPPLY CODE, 2004 Bhopal, dated: 12 th July, 2006 No.1740&MPERC&2006. In exercise of powers conferred by Section 181 (1) of the Electricity Act, 2003 (No. 36 of 2003) and also in compliance of the notification dated 08

More information

M/s. Heer Enterprises - Applicant

M/s. Heer Enterprises - Applicant (A Govt. of Maharashtra Undertaking) CIN : U40109MH2005SGC153645 PHONE NO. : 25664314/25664316 Consumer Grievance Redressal Forum FAX NO. 26470953 Vidyut Bhavan, Gr. Floor, Email: cgrfbhandupz@mahadiscom.in

More information

IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL NO OF 2019 MANTRI CASTLES PVT. LTD & ANR. WITH

IN THE SUPREME COURT OF INDIA CIVIL APPELLATE JURISDICTION CIVIL APPEAL NO OF 2019 MANTRI CASTLES PVT. LTD & ANR. WITH 1 IN THE SUPREME COURT OF INDIA REPORTABLE CIVIL APPELLATE JURISDICTION CIVIL APPEAL NO. 1232 OF 2019 R V PRASANNAKUMAAR & ORS. Appellant(s) VERSUS MANTRI CASTLES PVT. LTD & ANR. Respondent(s) WITH CIVIL

More information

Case No. DH/CGRF- 2138/2018 Date of Institution: Date of Hearing: Date of Order:

Case No. DH/CGRF- 2138/2018 Date of Institution: Date of Hearing: Date of Order: FORUM FOR REDRESSAL OF CONSUMER GRIEVANCES DAKSHIN HARYANA BIJLI VITRAN NIGAM D-BLOCK, Ground Floor, Vidyut Sadan, Vidyut Nagar, Hisar-125 005 Telephone No. 01662-223081 (website: www.dhbvn.com) (e-mail

More information

National Electric Power Regulatory Authority Islamic Republic of Pakistan

National Electric Power Regulatory Authority Islamic Republic of Pakistan a MSc National Electric Power Regulatory Authority Islamic Republic of Pakistan '' 0. s-. -. ss Registrar NEPRA Tower, Attaturk Avenue (East), G-5/1, Islamabad Ph: +92-51-9206500, Fax: +92-51-2600026 Web:

More information

IN THE HIGH COURT OF DELHI AT NEW DELHI. AA No.396/2007. Date of decision: December 3, Vs.

IN THE HIGH COURT OF DELHI AT NEW DELHI. AA No.396/2007. Date of decision: December 3, Vs. IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : Arbitration and Conciliation Act, 1996 AA No.396/2007 Date of decision: December 3, 2007 AKG Associates Through: Mr.Rajiv Kumar, Advocate....Petitioner

More information

* IN THE HIGH COURT OF DELHI AT NEW DELHI. + RFA No.522/2017 and C.M. No.19306/2017(stay) % 7th August, versus

* IN THE HIGH COURT OF DELHI AT NEW DELHI. + RFA No.522/2017 and C.M. No.19306/2017(stay) % 7th August, versus * IN THE HIGH COURT OF DELHI AT NEW DELHI + RFA No.522/2017 and C.M. No.19306/2017(stay) % 7th August, 2018 MANOJ ARORA... Appellant Through: Mr. M. Sufian Siddiqui, Advocate with Mr. Rakesh Bhugra, Advocate

More information

BEFORE THE COMPLAINANT GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. Representation No. N-G(S) dtd. 25/06/2012 V/S

BEFORE THE COMPLAINANT GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING. Representation No. N-G(S) dtd. 25/06/2012 V/S BEFORE THE COMPLAINANT GRIEVANCE REDRESSAL FORUM B.E.S. & T. UNDERTAKING (Constituted under section 42(5) of Electricity Act 2003) Ground Floor, Multistoried Annex Building, BEST s Colaba Depot Colaba,

More information

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL Subject: Dated: 7 th February, 2013 M/s Essar Power M. P. Limited DAILY ORDER (Date of Motion Hearing : 5 th February, 2013) Petition No.03/2013

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Smt. Meenakshi Singh, Member Shri I. B. Pandey, Member In the matter of: Sub: Petition No. 777 of 2011

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum Shri Desh Deepak Verma, Chairman Shri I. B. Pandey, Member In the matter of: Fixation of transmission tariff for 7.2 KM 400 KV dedicated

More information

order imposes the following restrictions on the petitioner:-

order imposes the following restrictions on the petitioner:- THE HIGH COURT OF DELHI AT NEW DELHI % Judgment delivered on: 22.01.2010 + WP(C) 14152/2009 & CM 16314/2009 VINAY WIRES AND POLY PRODUCTS PVT LTD THROUGH ITS AUTHORISED SIGNATORY H P KANODIA... Petitioner

More information

The Chairman, Himachal Pradesh Micro & Small Enterprises Facilitation Council-cum-Director of Industries, H.P.

The Chairman, Himachal Pradesh Micro & Small Enterprises Facilitation Council-cum-Director of Industries, H.P. Format for filing reference under Section 18 of Micro, Small & Medium Enterprises Development Act-2006 & Rule 4 (6) of Himachal Pradesh Micro & Small Enterprises Facilitation Council Rules-2007. To The

More information

Bhopal dated 6th August, 2004

Bhopal dated 6th August, 2004 Bhopal dated 6th August, 2004 No.2118/MPERC/2004. In exercise of the powers conferred by section 181 (2) (ze, zg) read with section 62(2) and 64 (1) of the Electricity Act, 2003 enacted by the parliament,

More information

Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) Ph: & Ext: - 122

Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree, Jahangir Meherwanji Road, Kalyan (West) Ph: & Ext: - 122 Consumer Grievance Redressal Forum, Kalyan Zone Behind Tejashree", Jahangir Meherwanji Road, Kalyan (West) 421301 Ph: 2210707 & 2328283 Ext: - 122 IN THE MATTER OF GRIEVANCE NO. K/E/255/281 OF 2009-2010

More information

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : SUIT FOR INJUNCTION Date of Judgment: RSA No.55/2009 & CM No.

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : SUIT FOR INJUNCTION Date of Judgment: RSA No.55/2009 & CM No. IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : SUIT FOR INJUNCTION Date of Judgment: 06.04.2011 RSA No.55/2009 & CM No.6268/2009 NEW DELHI MUNICIPAL COUNCIL Through: Mr.Arjun Pant, Advocate...Appellant

More information

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. Investigate and to take appropriate action against M/s Torrent and further to cancel the

BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION. Investigate and to take appropriate action against M/s Torrent and further to cancel the BEFORE THE UTTAR PRADESH ELECTRICITY REGULATORY COMMISSION Quorum ShriDesh Deepak Verma, Chairman Smt. Meenakshi Singh, Member Shri I. B. Pandey, Member In the matter of Investigate and to take appropriate

More information

II (2013) CPJ 10A (NC) (CN) NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION, NEW DELHI Hon ble Mr. Justice V.B. Gupta, Presiding Member PARMOD KUMAR

II (2013) CPJ 10A (NC) (CN) NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION, NEW DELHI Hon ble Mr. Justice V.B. Gupta, Presiding Member PARMOD KUMAR II (2013) CPJ 10A (NC) (CN) NATIONAL CONSUMER DISPUTES REDRESSAL COMMISSION, NEW DELHI Hon ble Mr. Justice V.B. Gupta, Presiding Member PARMOD KUMAR MALIK Petitioner versus HARYANA URBAN DEVELOPMENT AUTHORITY

More information

*IN THE HIGH COURT OF DELHI AT NEW DELHI. % Date of decision:1 st December, 2009 M/S ANSAL PROPERTIES & INFRASTRUCTURE. Versus

*IN THE HIGH COURT OF DELHI AT NEW DELHI. % Date of decision:1 st December, 2009 M/S ANSAL PROPERTIES & INFRASTRUCTURE. Versus *IN THE HIGH COURT OF DELHI AT NEW DELHI + CM(M) No.807/2008. % Date of decision:1 st December, 2009 M/S ANSAL PROPERTIES & INFRASTRUCTURE LTD & ANR. Petitioner Through: Mr Prem Kumar and Mr Sharad C.

More information

IN THE GAUHATI HIGH COURT (THE HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH) WP (C) No of 2015

IN THE GAUHATI HIGH COURT (THE HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH) WP (C) No of 2015 IN THE GAUHATI HIGH COURT (THE HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH) WP (C) No. 2842 of 2015 Md. Sahid Ali, S/o. Late Akbar Ali, R/o. Village- nmerapani Fareshtablak, P.S.- Merapani,

More information

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : CODE OF CIVIL PROCEDURE, 1908 RFA No.31/2011 DATE OF DECISION : 22nd February, 2011

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : CODE OF CIVIL PROCEDURE, 1908 RFA No.31/2011 DATE OF DECISION : 22nd February, 2011 IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : CODE OF CIVIL PROCEDURE, 1908 RFA No.31/2011 DATE OF DECISION : 22nd February, 2011 SHREE LAKSHMI VENKATESH CARGO MOVERS AND CONSULTANTS... Appellant Through:

More information

Jammu and Kashmir State Electricity Regulatory Commission

Jammu and Kashmir State Electricity Regulatory Commission DRAFT INVITING OBJECTIONS, SUGGESTIONS AND COMMENTS Part-III Laws, Regulations and Rules passed there under Jammu and Kashmir State Electricity Regulatory Commission NOTIFICATION No. /JKSERC/ 2010 Jammu