Government of Sierra Leone Bumbuna Hydroelectric Environmental and Social Management Project Updated Resettlement Action Plan August 2010

Size: px
Start display at page:

Download "Government of Sierra Leone Bumbuna Hydroelectric Environmental and Social Management Project Updated Resettlement Action Plan August 2010"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Government of Sierra Leone Bumbuna Hydroelectric Environmental and Social Management Project Updated Resettlement Action Plan August 2010 EXECUTIVE SUMMARY RP992 V1 Sierra Leone is presently moving from being a primarily post-conflict nation to one that is on the path towards longer-term growth. The country s economy contracted tremendously during a decade-long conflict. A visible legacy of unrest was the series of power-lines that were cut, removed, and resold, including damages in the Bumbuna hydropower site. Subsequently, in 2004, the Government of Sierra Leone (GoSL) negotiated an agreement with the World Bank (WB) for completion of the Bumbuna Hydroelectric Project (BHP). First proposed in 1970/71, BHP s operation was interrupted and later refinanced as it entered its final phase. This report summarizes the findings of an update of the Resettlement Action Plan (RAP) completed in 2004/05 by Electrowatt Ekono. This RAP Audit used results of the 2006/7 shoreline survey, which provided the basis for delineating the directly affected villages, or those whose lands and other assets would be inundated after reservoir impoundment. Following guidelines in the World Bank (WB) operational policy on involuntary resettlement (OP/BP4.12) and cultural property (OP4.11), the RAP Audit process included: (a) a re-identification of project affected persons (PAPs); (b) formulation of a new plan for resettling people and compensating them for losses incurred from flooding; and (c) putting in place a process for carrying out income restoration and community development activities. The audit involved jointly organized groundtruthing, site visits, and intensive consultations between the PIU and BCEOM/Techsult staff. The consultations focused on the extent households and villages were affected by BHP s operations, and on this basis, the approaches that would best address their immediate (short term) and longerterm needs. The RAP Audit has two limitations. First, the number and names of villages differed between official maps, records of the Statistical Department, and what the villagers used (such as in local signs and markers). The RAP Audit team had to adjust and ensure consistency between the map labels and local markers since it was vital that locally used names of villages, especially those that were visited, coincided with those in the topographic map. As a result, it was difficult to verify population census information. Second, due to limited time, there was no follow-up of the 2004 socio-economic survey. Instead, a survey in the next dry season will be combined with the needs assessment for the community development plans. The survey will target households who were previously interviewed to establish panel data and benchmark changes in demographic, socio-economic, and other (e.g. perceptions, political aspects) information. The constrained time period for the RAP audit was necessary because further delays would entail another year before the power plant begins operating. Although the resettlement process is

2 usually carried out over a one year period, the audit was completed only in nine months. In order to do this, it required the cooperation of a number of villagers and local government officials. A consultative process was put in place with the assistance of a dedicated group of specialists in the PIU and the commitment of local leaders, including the Paramount Chiefs of Diang, Kasunku, and Kalansongoia, village leaders, and several non-government organizations who actively participated in various aspects of the audit. The following is a summary of PAPs identification comparing the 2005 RAP and 2008 RAP Audit. Table RAP Finding Categories of PAPs Villages Households Population Category A: Villages that are not 22 affected by impoundment (not flooded) Category B: Villages that would ,786 lose a small part of its land (less than 20%) Category C: Villages that would ,250 lose a considerable part of its land (more than 20% up to 40%) Category D: Villages at a critical elevation and would require to move and will lose a considerable part of its land (more than 50%) Category E: Villages that will be completely submerged and will have to be relocated Category F: Villages outside of the reservoir area or downstream of the dam and that lost land to dam construction. 4 n/a n/a Total 59 n/a n/a The 2005 survey results of 59 settlements (100 respondents) showed that most villages in the project area are small in size and population density. Most households rely on slash-and-burn agriculture as their main source of income (e.g. fruit trees and some upland rice, root crops, palm trees, etc). A few households engage in small-scale fishing along Seli River. Table 2: 2008 RAP Audit Findings Categories of Project Affected Villages Villages Name Chiefdom House Holds Population Category A: Villages that are not affected by impoundment 0 0 0

3 Category B: Villages that lose sacred sites 3 Kadala Kasokira, Gbulia Kalasongoia Diang Category C: Villages that only lose access 3 Kunsulima Mabaray Kamawole Diang Category D: Villages that only lose land Category E: Villages that lose land and access Category F: Villages that lose trees and sacred sites Category G: Villages that lose trees and access 1 Kamathor Kalasongoia Banakoro Diang 5 1 Kasasi Kasunku Kamawayway Diang 6 43 Category H: Villages that lose land, trees, and access 6 Kasawulay, Kayiben, Kamaniki, Fulla Town, Kathanda. & Gbambali Dien Kawunkulu Diang Category I: Villages that lose land, trees and sacred sites 12 Kabendugu Kafogo Kamagbamaa, Kagboray, Kakutan, Kamasaypanya, Kamera, Kasasi, Katene, Kathengben, Kawunkulu, Kayakala, Kasunku Kalasongoia ,414 1,383 Category J: Villages that lose land, trees, sacred sites and houses 1 Kasalobah Kasunku 4 74 Category K: Villages that lose land, trees, sacred sites and access 5 Waia, Kalatia, Kamabareh, Masamandugu. Kathoina Diang Kalasongoia Category L: Villages that lose land, trees, sacred sites, access and houses 4 Matombe, Kamasilon, Kamawone. Gboskoroma Diang

4 Gboskoroma Total ,033 The RAP Audit results indicate that the Project affected communities comprise 38 villages, 599 households, 5,033 population. The following is an updated summary of the PAPs information. There are 41 households (186 people) in five villages Matombe, Kasalobah, Kamawone and Kamasilon, -- that will be relocated. Households in Matombe, Kasolobah, Kamawone and Kamasilon will be moved to new resettlement sites in Katene, Fadugu, Kunsulima and Kabendugu respectively; Matombe, Kamasilon and Kamahone are the only situations where the entire village will be submerged; between them they will lose access to ha of village lands. In addition to housing, there are 95 farm plots which are farmed by 171 farmers covering a total area of 117 ha that will be partially or fully inundated (104 hectares of these lands will be lost but will need 137 ha in replacement due to the lower productivity of dry land compared with wet land). These farm lands are cultivated under shifting rotation, in swamplands or in uplands, all interspersed with economic trees. There are 4,956 commercial value oil palms and 3,715 other economic trees (e.g. banana, kola, orange, mango, lime, pineapple, sisal, tola, etc) recorded. PAPs will be compensated for the value of economic trees lost. Waia, Gbulia and Kadala villages will not lose much farm land but foot paths and sacred sites will be lost. There will be some villages, especially in Diang Chiefdom where access will be restricted. These villages will be given priority, for example, in the construction of footpaths, such as in Waia (whose footpaths will be extensively flooded) followed by other villages. Surveys of these foot paths have already started under the Stabilized Agriculture Program (SAP). There are 48 sacred sites in 21 villages that will be flooded. The costs of ceremonies for transferring these sites, including some gravesites, will be covered in the RAP. In terms of compliance with cultural property, the 2004 EIA showed no evidence of significant historical and cultural sites within the vicinity of the reservoir area and dam. In 2005, a chance find procedure was completed during the construction phase and the survey team found some areas with sacred sites and graveyards. Subsequently, the RAP Audit uncovered more sacred sites and gravesites, all of which were recorded in the list of assets to be compensated. The project will cover the costs of ceremonies aimed at appeasing or pacifying the spirits most of which will be conducted along the Seli River. Income restoration and livelihood related activities will be carried out under two programs -- the Livelihood Assessment and Income Restoration (LAIR) program and the Stabilized Agriculture Program (SAP). The 2005 RAP report provided some descriptions and cost estimates. Since the report, the PIU finalized contracts with two local NGOs -- Organization for Research and Extension of Intermediate Technology (ORIENT) for the LAIR program and the Business Engineering Science Technology (BEST) for the SAP. Both of these NGOs have started operating in the project area and have managed within the short time period to set up its field offices and hire locally-based staff.

5 LAIR and SAP are implemented in two phases (i) short-term (emergency) phase corresponding to the period immediately before and throughout phased impoundment (precommissioning); and (ii) long-term (post-commissioning) phase corresponding to full-scale implementation of livelihood support and sustainable land and water management. The short-term, emergency period was endorsed by the Environmental and Social Advisory Panel (ESAP) to stress the importance of urgent programs that would assist PAPs in transition and adjustment to new housing and new lands. As noted in the ESAP Report (February 2008, p 19): The impoundment period and the subsequent year will be most stressful for the affected people, who will be opening new cultivation and planting trees while their former agricultural resources and cross-river paths are submerged and replaced by a reservoir, with which the people have no experience, and that has not yet had a flush of high productivity. The ESAP endorsed for a period of two years the following short-term LAIR and SAP programs: (i) food support to PAPs to cover the transition period from resettlement to land clearing prior to cultivation; (ii) foot paths construction in identified villages anticipated to be isolated once the river rises; (iii) sustainable agricultural support, through formation of Farmer Field Schools (FFS), in the form of short-duration seeds, farm implements, and start-up poultry; (iv) agribusiness units, linked with FFS formation, to assist PAPs in setting up small scale livelihoods that will allow them to adjust quickly to changes in river flow and height (e.g., boat building; water safety); and (v) life skills programs, including money management, health (water related illnesses; HIV/AIDs) and sanitation, and vocational education. In addition, youth reintegration, focusing on sports and leadership development, complements the adjustment period by establishing social linkages across the three chiefdoms while also targeting an increasing number of unemployed youth. The long-term phase may also cover, if funding is available, implementation of community driven development (CDD) types of projects under what was originally designed in the RAP 2005 under the Upper Seli Community Development Initiative (USCDI). The activities under this program will be finalized after needs assessment, and after extensive consultations with villagers and local leaders. Some USCDI activities extend LAIR and SAP programs to a larger number of communities, covering both upstream and downstream areas. Implementation of the RAP is the responsibility of the Project Implementing Unit (PIU), which was established by MoEP. The PIU set up a Resettlement Unit (RU) and hired a national resettlement consultant to coordinate RAP activities. A Consultant, Société Française d Ingenerie (BCEOM)/Techsult Company Limited, was given the contract to carry out technical aspects of the RAP Audit related to PAPs identification, computation of compensation and distribution of PAPs, preparation of the resettlement sites, village visits and monitoring, etc. Twelve Resettlement Officers (RO) are hired and assigned to the villages in the project area. A Legal Counsel to PAPs provides legal advice throughout the resettlement and compensation process. At the village level, Village Resettlement Committees (VRC) are set up in most affected villages. Those with less than 5 families are joined to adjacent villages. The terms of reference for the VRC stipulate that representatives of vulnerable groups (especially women and young people) are adequately represented. District Resettlement Committees (DRC) are organized and chaired by the Paramount Chiefs to coordinate inter-village activities. The ROs visited each village at least twice a month during the PAPs identification process. The same frequency of visits is expected throughout the 3-year RAP implementation period. At the national level, the PIU organized a Resettlement Advisory Group (RAG) composed of representatives from various stakeholder groups, including government, NGOs, host communities, and vulnerable populations. The RAG provides oversight and refers to policy decisions to facilitate RAP implementation. Lastly, a Witness NGO, the Coalition of Civil Society and Human Rights Activists (CCSHRA), monitors and records specific activities, such

6 as compensation payments or signing of agreements. As part of monitoring and evaluation, an internal (quarterly) monitoring process has been set up. The PIU Resettlement Unit meets weekly to update all those involved in the RAP, LAIR and SAP. Each programme submits a quarterly status report that is shared and reviewed by the PIU, with feedback from the RU team. Two types of monitoring will be used internal and external. Internal monitoring covers reports from the Area Managers and Witness NGO on changes in PAP status; their incomes and livelihoods; grievances or problems encountered or reported; and how these were resolved. The baseline survey (socio-economic survey of 2004) will be used to measure changes in PAP status. However it is not clear if the same respondents as PAPs were interviewed. A new baseline will then be established immediately. It will consist of at least three panel surveys over a period of three to four years. The surveys will inform a set of outcome indicators that the RU can use to track changes in incomes and livelihoods. In addition to the surveys, the RU monitoring team will evaluate the impacts on PAPs of the following: (i) status of resettled households, including social, political and economic adjustments to their host communities; (ii) impacts of the land-for-land swap, such as assessments of whether PAPs were satisfied with replacement land and whether PAPs have managed to recover their original productivity levels; (iii) cash compensation, specifically, money management and inter- and intra-household adjustments arising from cash inflows; and (iv) livelihood restoration and development, in particular, access to income generating opportunities, social services, etc. The other type of monitoring is external. The external review will occur at midpoint (approximately one year after the RAP was implemented), which will constitute the First Review of the RAP Audit. An independent consultant or NGO will be contracted to do this review made up of external and reputable scientists who can contribute knowledge from other RAP programmes. It is expected that the evaluations will begin after one year of RAP implementation. With respect to the legal framework for RAP implementation in Sierra Leone, compliance with the WB s social safeguards policies is consistent with Sierra Leone s Public Lands Act Cap 116. However, as noted in the 2005 RAP, this legislation does not apply to provinces. It will either be expanded for nationwide coverage or amended together with the National Power Authority Act No. 6 of 1982 to allow for compulsory acquisition of land in the provinces. Another legal issue concerns compensation for land since customary laws vary from tribe to tribe, and even within the tribe, may vary by locality. Although Sierra Leone has a national agency for resettlement affairs (National Commission for Social Action or NaCSA), its mandate is limited to coordinating and implementing efforts to resettle people displaced by the war. The Total cost of the RAP is US $ 4,450,272; comprising Resettlement US $ 286,370; Compensation US $ 1,399,250: Community Development US $2,764,652. Total Cost of the Resettlement Action Plan Category Item Activity Units Number Rate Cost 1. Resettlement 1.1 Houses Replacement Houses 41 7, , Survey Community sites Km ,370 Sub-total 286,370 2.Compensation 2.1 Allowance Disturbance H.H , Allowance Moving H.H , Allowance Economic Trees Trees 8, , Allowance Sacred Sites Sites ,800

7 2.5 Allowances Opening new land hectares , Community Compensation Sum 1 1,000,00 1,000, Community Administration & 60,000 60,000 Oversight Sub-total 1,399,250 Total ,685, Support to PAPs 3.1 Assistance Finance & Sum Unit 8,000 Business 3.2 Assistance Short-term Sum Unit 7,000 Emergency Livelihood 3.3 Assistance Short-term Sum Unit 80,000 Emergency Agriculture 3.4 Assistance Footpaths Sum Unit 45, Assistance Food Aid Sum Unit 205, Assistance Technical Assistance Sum Unit 2,419,652 Sub-total 2,764,652 Grand Total 4,450,272

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Resettlement Policy Framework for the Smallholder Agriculture Development Project

More information

Gender Equality and Development

Gender Equality and Development Overview Gender Equality and Development Welcome to Topic 3 of the e-module on Gender and Energy. We have already discussed how increased access to electricity improves men s and women s lives. Topic Three

More information

Protecting Liberia s Forest

Protecting Liberia s Forest Protecting Liberia s Forest Conservation for People and Planet 10 December 2015 This paper deploys geospatial analysis to approximate the costs associated with plans to allocate 30% of Liberia s forest

More information

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B. Module 8 - Involuntary Resettlement- Policy Principles & Requirements (World bank OP 4.12 and 4.12 Annex A) Key principles and objectives of an involuntary Resettlement Policy Resettlement planning instruments

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

Tenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold

Tenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold Tenke Fungurume Mining An affiliate of Freeport-McMoRan Copper & Gold Tenke Fungurume Mining (TFM), an affiliate of Freeport-McMoRan Copper & Gold, is the largest private foreign investment in the DRC,

More information

Resettlement and Income Restoration in Thilawa SEZ

Resettlement and Income Restoration in Thilawa SEZ Resettlement and Income Restoration in Thilawa SEZ Lessons from the first & second phases and emerging good practices Thilawa SEZ Management Committee (TSMC) Yangon Region Government (YRG) 20 February

More information

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project BURCU ERGIN SOCIAL SAFEGUARDS SPECIALIST WORLD BANK RSM LAUNCH WORKSHOP IZMIR, 5 JULY 2018 Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project Why is it critical

More information

Indonesia: Enhanced Water Security Investment Project

Indonesia: Enhanced Water Security Investment Project Initial Poverty and Social Analysis March 2018 Indonesia: Enhanced Water Security Investment Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy

More information

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FINAL REPORT Resettlement and Rehabilitation (R&R) Entitlement Framework RP297 Under

More information

Resettlement and Impact Assessment points of intersection

Resettlement and Impact Assessment points of intersection Resettlement and Impact Assessment points of intersection IAIA Webinar December 15 th, 2016 Liz Wall Shared Resources Contents The basic principles of resettlement Intersections with impact assessment:

More information

RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1

RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1 RESETTLEMENT ACTION PLAN SHALA NEIGHBOURHOOD HADE PROJECT KOSOVO MONITORING REPORT 1 Prepared for: CLRP-AF Project Monitoring Unit, Ministry of Environment and Spatial Planning Prepared by: replan Inc.

More information

Resettlement Action Plan

Resettlement Action Plan Resettlement Action Plan Ref. No. 9A000329.01 2013-06-24 WEST AFRICAN POWER POOL (WAPP) Benin Mount Coffee HPP ESIA and RAP Environmental and Social Impact Assessment and Resettlement Action Plan for the

More information

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the RESETTLEMENT FRAMEWORK Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the Secondary Education Modernization Project II in Sri Lanka Ministry of Education

More information

Ethiopia : the Gilgel Gibe Resettlement Project

Ethiopia : the Gilgel Gibe Resettlement Project No. 141 August 1999 Findings occasionally reports on development initiatives not assisted by the World Bank. This article is one such effort. The views expressed here do not necessarily reflect the views

More information

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION Table of Content Volume 4 Chapter 1: Project Description 1 PROJECT DESCRIPTION...1 1.1 THE NT2 PROJECT...1 1.2 THE NEED FOR RESETTLEMENT AND DEVELOPMENT...1 1.3 THE

More information

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING Road Development Agency 1 5 6 2 3 4 RESETTLEMENT POLICY FRAMEWORK FINAL REPORT Consultancy Services for the Design and Preparation of Bidding Documents for a Countrywide Roll-out of the Output and Performance

More information

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007 Involuntary Resettlement - Overview Transport Forum Washington, D.C. March 30, 2007 OP 4.12 - Triggers Trigger: acquisition of land which displaces people physically and / or economically. Policy applies

More information

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT A. Introduction and Subprojects Components 1. Tranche 2 of the

More information

Activist Guide to Sinohydro s International Corporation Limited s Environmental and Social Policy Commitments

Activist Guide to Sinohydro s International Corporation Limited s Environmental and Social Policy Commitments Activist Guide to Sinohydro s International Corporation Limited s Environmental and Social Policy Commitments Sinohydro, a Chinese government-owned enterprise, is the world s largest dam builder. By its

More information

Performance Standard 5 Land Acquisition and Involuntary Resettlement

Performance Standard 5 Land Acquisition and Involuntary Resettlement Introduction Performance Standard 5 1. Involuntary resettlement refers both to physical displacement (relocation or loss of shelter) and to economic displacement (loss of assets or access to assets that

More information

Government of the Republic of Malawi MINISTRY OF FINANCE. Malawi Social Action Fund MASAF 4- Strengthening Safety Net Systems in Malawi

Government of the Republic of Malawi MINISTRY OF FINANCE. Malawi Social Action Fund MASAF 4- Strengthening Safety Net Systems in Malawi Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Government of the Republic of Malawi MINISTRY OF FINANCE Malawi Social Action Fund MASAF

More information

Guidance Note 5 Land Acquisition and Involuntary Resettlement

Guidance Note 5 Land Acquisition and Involuntary Resettlement This Guidance Note 5 corresponds to Performance Standard 5. Please also refer to the Performance Standards 1-4 and 6-8 as well as the corresponding Guidance Notes for additional information. Bibliographical

More information

Livelihood Restoration in Practice: Key Challenges and Opportunities

Livelihood Restoration in Practice: Key Challenges and Opportunities Livelihood Restoration in Practice: Key Challenges and Opportunities BRITISH MUSEUM, LONDON, NOVEMBER 9, 2016 Shaza Zeinelabdin, Senior Social Dev t Specialist Larissa Luy, Principal E&S Specialist IFC

More information

Supplemental. Resettlement Work Plan (RWP) for. Expanded Area of Area 2-1 of. Thilawa Special Economic Zone (SEZ)

Supplemental. Resettlement Work Plan (RWP) for. Expanded Area of Area 2-1 of. Thilawa Special Economic Zone (SEZ) Supplemental Resettlement Work Plan (RWP) for Expanded Area of Area 2-1 of Thilawa Special Economic Zone (SEZ) February 2018 Yangon Region Government Table of Content List of Abbreviations Acronyms CHAPTER

More information

EBRD Performance Requirement 5

EBRD Performance Requirement 5 EBRD Performance Requirement 5 Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or loss of

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005 Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project

More information

SCOPING REPORT FOR THE BUMBUNA II HYDROPOWER PROJECT PHASE II RESETTLEMENT ACTION PLAN, SIERRA LEONE

SCOPING REPORT FOR THE BUMBUNA II HYDROPOWER PROJECT PHASE II RESETTLEMENT ACTION PLAN, SIERRA LEONE SCOPING REPORT FOR THE BUMBUNA II HYDROPOWER PROJECT PHASE II RESETTLEMENT ACTION PLAN, SIERRA LEONE Prepared For Joule Africa Report Prepared by SRK Consulting (UK) Limited UK6923 and changed the report

More information

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014)

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Submitted to : Egyptian Natural Gas Holding Company Prepared by: EcoConServ Environmental

More information

SOCIAL DEVELOPMENT PLAN

SOCIAL DEVELOPMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Nam Theun 2 Hydroelectric Project SOCIAL DEVELOPMENT PLAN IPP100 v6 - ADDENDA AND SUPPLEMENTARY

More information

Resettlement Work Plan (RWP) for. Development of Phase 1 Area. Thilawa Special Economic Zone (SEZ)

Resettlement Work Plan (RWP) for. Development of Phase 1 Area. Thilawa Special Economic Zone (SEZ) Yangon Region Government Resettlement Work Plan (RWP) for Development of Phase 1 Area Thilawa Special Economic Zone (SEZ) November 2013 Table of Content Abbreviations CHAPTER 1 INTRODUCTION......1 1.1

More information

isimangaliso Resettlement Policy Framework and Process Framework April 2009

isimangaliso Resettlement Policy Framework and Process Framework April 2009 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized isimangaliso Resettlement Policy Framework and Process Framework April 2009 Resettlement

More information

DRAFT RESETTLEMENT POLICY FRAMEWORK. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

DRAFT RESETTLEMENT POLICY FRAMEWORK. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Finance P 0 Box 30049 DRAFT RESETTLEMENT POLICY FRAMEWORK... -3ey* b4 -I

More information

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems Technical Assistance Consultant s Report Project Number: 44140 Date: April 2013 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Strengthening Involuntary Resettlement Safeguard

More information

MINISTRY OF COMMERCE, TRADE AND INDUSTRY

MINISTRY OF COMMERCE, TRADE AND INDUSTRY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Zambia SFG2542 MINISTRY OF COMMERCE, TRADE AND INDUSTRY Project ID: No. P156492

More information

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives Page 1 of 9 Involuntary Resettlement 1. Bank 1 experience indicates that involuntary resettlement under development projects, if unmitigated, often gives rise to severe economic, social, and environmental

More information

Subproject: Hai Lang Province: Quang Tri

Subproject: Hai Lang Province: Quang Tri Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RP299 vol. 4 Ministry of Agriculture and Rural Development The World Bank Natural Disaster

More information

THE HILL TRIBES OF NORTHERN THAILAND: DEVELOPMENT IN CONFLICT WITH HUMAN RIGHTS - REPORT OF A VISIT IN SEPTEMBER 1996

THE HILL TRIBES OF NORTHERN THAILAND: DEVELOPMENT IN CONFLICT WITH HUMAN RIGHTS - REPORT OF A VISIT IN SEPTEMBER 1996 THE HILL TRIBES OF NORTHERN THAILAND: DEVELOPMENT IN CONFLICT WITH HUMAN RIGHTS - REPORT OF A VISIT IN SEPTEMBER 1996 Contents Summary A background Perceptions, prejudice and policy Cards and identity

More information

Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities

Key Issues: Climate Zone: As: Tropical humid. Subjects: - Restoration of livelihood and Rebuilding of Resettled Communities IEA Hydropower Implementing Agreement Annex VIII Hydropower Good Practices: Environmental Mitigation Measures and Benefits Case Study 07-01: Resettlement - Chiew Larn Multipurpose Project, Thailand Key

More information

Resettlement Policy Framework

Resettlement Policy Framework Urban Transport Improvement Project of Tianjin by Using the World Bank Loan Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

ROGUN HPP ESIA. Livelihood Restoration Plan for Stage 1. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

ROGUN HPP ESIA. Livelihood Restoration Plan for Stage 1. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized for Stage 1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Barki Tojik January 30 th 2015 LIVELIHOOD RESTORATION PLAN FOR STAGE 1 Table

More information

EG-Giza North Power Project (P116194)

EG-Giza North Power Project (P116194) Public Disclosure Authorized The Egyptian Natural Gas Company SFG1796 Public Disclosure Authorized Public Disclosure Authorized EG-Giza North Power Project (P116194) Utilization of Project Savings for

More information

MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT

MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Government of the People s Republic of Bangladesh Ministry of Road Transport and Bridges Roads and Highways Department Land Acquisition and Resettlement Action Plan Submitted by: November 2018 BETS Consulting

More information

Integrating Environmental and Social Impact Assessment into Resettlement Management: Example from NN2 Hydropower Project in Laos

Integrating Environmental and Social Impact Assessment into Resettlement Management: Example from NN2 Hydropower Project in Laos International Journal of Engineering Research And Management (IJERM) ISSN: 2349-2058, Volume-04, Issue-07, July 2017 Integrating Environmental and Social Impact Assessment into Resettlement Management:

More information

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014 Work plan of Independent Agency and Implementation of IFC Performance Standards Green Goal Ltd., 17 February 2014 Content IFC performance standards Legal grounds of Cambodia Resettlement planning process

More information

RESETTLEMENT ACTION PLAN

RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized PEOPLE S COMMITTEE OF PHU YEN PROVINCE PHU YEN PROJECT MANAGEMENT UNIT OF CONSTRUCTION INVESTMENT WORKS FOR AGRICULTURE AND RURAL DEVELOPMENT ----------------o0oo---------------

More information

Large Hydropower Projects in Ethnic Areas in Myanmar: Placing Community Participation and Gender Central to Decision-Making

Large Hydropower Projects in Ethnic Areas in Myanmar: Placing Community Participation and Gender Central to Decision-Making Large Hydropower Projects in Ethnic Areas in Myanmar: Placing Community Participation and Gender Central to Decision-Making Author name: Hnin Wut Yee Organization: Myanmar Centre for Responsible Business

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized The World Bank SFG3873 REV Public Disclosure Authorized Hezhou Urban Water Infrastructure and Environment Improvement Project Public Disclosure Authorized Resettlement Policy

More information

RESETTLEMENT ACTION PLAN (RAP) FOR THE PROPOSED RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT

RESETTLEMENT ACTION PLAN (RAP) FOR THE PROPOSED RUSUMO FALLS HYDROELECTRIC PROJECT DAM & POWERPLANT COMPONENT PROJECT DEVELOPER: SPECIAL PURPOSE VEHICLE COMPANY (RUSUMO POWER COMPANY LIMITED) P.O. BOX 6759 KIGALI, RWANDA RESETTLEMENT ACTION PLAN (RAP) FOR THE PROPOSED RUSUMO FALLS HYDROELECTRIC PROJECT VOLUME

More information

Bangladesh: Urban Public and Environmental Health Sector Development Program

Bangladesh: Urban Public and Environmental Health Sector Development Program Resettlement Planning Document Draft Resettlement Framework Document Stage: Draft for Consultation Project Number: 39305 May 2009 Bangladesh: Urban Public and Environmental Health Sector Development Program

More information

FEDERAL REPUBLIC OF ETHIOPIAN MINISTRY OF MINES

FEDERAL REPUBLIC OF ETHIOPIAN MINISTRY OF MINES Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FEDERAL REPUBLIC OF ETHIOPIAN MINISTRY OF MINES Volume II: Resettlement Policy Framework

More information

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS ENVIRONMENTAL SAFEGUARDS Objectives To ensure the environmental soundness and sustainability of projects and to support the integration

More information

VIET NAM: MEDIUM CITES DEVELOPMENT PROJECT (MCDP) PHU LY CITY SUBPROJECT HA NAM PROVINCE. (Final Draft)

VIET NAM: MEDIUM CITES DEVELOPMENT PROJECT (MCDP) PHU LY CITY SUBPROJECT HA NAM PROVINCE. (Final Draft) Public Disclosure Authorized VIET NAM: MEDIUM CITES DEVELOPMENT PROJECT (MCDP) PHU LY CITY SUBPROJECT HA NAM PROVINCE COMPENSATION, ASSISTANCE AND RESETTLEMENT POLICY FRAMEWORK (Final Draft) Table of Contents

More information

Ethnic Minorities Development Framework. PRC: Guiyang Integrated Water Resources Management Sector Project

Ethnic Minorities Development Framework. PRC: Guiyang Integrated Water Resources Management Sector Project Ethnic Minorities Development Framework Ethnic Minorities Development Framework Document Stage: Draft Project Number: P38594 September 2006 PRC: Guiyang Integrated Water Resources Management Sector Project

More information

Responses provided by the Social Management Office of Nam Ngiep 1 Power Company for the Asian Development Bank

Responses provided by the Social Management Office of Nam Ngiep 1 Power Company for the Asian Development Bank Independent Advisory Panel Report Project Number: 41924 August 2014 Stage: Final Nam Ngiep 1 Hydropower Project (Lao People s Democratic Republic) Report Number 3 (Social) of the Independent Advisory Panel

More information

SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP)

SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP) Language: English Original: English AFRICAN DEVELOPMENT BANK GROUP SUMMARY OF THE ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP) FOR THE ORGANIC SUGAR PROJECT OF PURE DIETS MOZAMBIQUE S.A. IN MOZAMBIQUE 0CTOBER

More information

> ~~RP1 FILE COPY. Resettlement Policy Framework SIERRA LEONE NATIONAL COMMISSION FOR SOCIAL ACTION. Prepared By

> ~~RP1 FILE COPY. Resettlement Policy Framework SIERRA LEONE NATIONAL COMMISSION FOR SOCIAL ACTION. Prepared By Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SIERRA LEONE NATIONAL COMMISSION FOR SOCIAL ACTION > ~~RP1 27 Resettlement Policy Framework

More information

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents

RPF of Additional Financing for Fujian Highway Sector Investment Project Contents Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized RPF of Additional Financing for Fujian Highway Sector Investment Project Contents RP1032

More information

FILE COPY. RP222 February Water Supply and Sanitation Project. Resettlement Policy Framework. Final. The World Bank

FILE COPY. RP222 February Water Supply and Sanitation Project. Resettlement Policy Framework. Final. The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Federal Democratic Republic of Ethiopia Ministry of Water Resources Prepared for: Prepared

More information

Government Led Resettlement : Experiences in Zambia Challenges and Lessons Learned

Government Led Resettlement : Experiences in Zambia Challenges and Lessons Learned Government Led Resettlement : Experiences in Zambia Challenges and Lessons Learned Presentation to Resettlement & Livelihoods Symposium held from 20-24 October 2014 in Kruger National Park, South Africa.

More information

Resettlement in Action

Resettlement in Action Resettlement in Action An Eyewitness Report from the Middle Route of China s South-North Water Transfer Project Executive Summary Prepared for International Rivers August 25, 2010 This report studies the

More information

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems Technical Assistance Consultant s Report Project Number: 44140 Date: April 2014 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Supporting and Strengthening National-Level Capacity

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 34055 TECHNICAL ASSISTANCE TO THE SOCIALIST REPUBLIC OF VIET NAM FOR ENHANCING THE RESETTLEMENT LEGAL FRAMEWORK AND INSTITUTIONAL CAPACITY September 2001 CURRENCY EQUIVALENTS

More information

ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP)

ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP) AFRICAN DEVELOPMENT BANK GROUP COUNTRY: ZAMBIA PROJECT: SKILLS DEVELOPMENT AND ENTREPRENEURSHIP PROJECT ABBREVIATED RESETTLEMENT ACTION PLAN (ARAP) FOR 27 HOUSEHOLDS (145 PEOPLE) TO BE DISPLACED FROM PROJECT

More information

This section outlines Chinese law governing domestic dam building, Chinese policies. Policies Guiding Chinese Dam Building

This section outlines Chinese law governing domestic dam building, Chinese policies. Policies Guiding Chinese Dam Building Policies Guiding Chinese Dam Building This section outlines Chinese law governing domestic dam building, Chinese policies on overseas dams, and international guidelines that can be applied to Chinese overseas

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Soc Trang Province Prepared by the Ministry of

More information

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction.

Article 2These Regulations apply to the residents-resettlement for the Three Gorges Project construction. Regulations on Residents-Resettlement for the Yangtze River Three Gorges Project Construction (Adopted at the 35th Executive Meeting of the State Council on February 15, 2001, promulgated by Decree No.

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of

More information

2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field

2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field Draft Safeguards Monitoring Report Project No. 38164-013 Draft Semi Annual Report December 2015 2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas

More information

THE WORLD BANK OPERATIONAL MANUAL. Indigenous Peoples

THE WORLD BANK OPERATIONAL MANUAL. Indigenous Peoples THE WORLD BANK OPERATIONAL MANUAL Indigenous Peoples (Draft OP 4.10, March 09, 2000) INTRODUCTION. 1. The Bank's policy 1 towards indigenous peoples contributes to its wider objectives of poverty reduction

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Tajikistan Ministry of Transport Central Asia Road Links Project Republic

More information

IAIA Special Symposium Resettlement and Livelihoods October Ted Pollett

IAIA Special Symposium Resettlement and Livelihoods October Ted Pollett IAIA Special Symposium Resettlement and Livelihoods 21 22 October 2014 Ted Pollett WHAT PLETHORA OF STANDARDS, GUIDELINES AND FRAMEWORKS? GOVERNMENT POLICIES, LEGISLATION AND REGULATIONS (NATIONAL, REGIONAL,

More information

Mekong Youth Assembly and International Rivers submission to John Knox, United Nations Special Rapporteur on Human Rights and the Environment

Mekong Youth Assembly and International Rivers submission to John Knox, United Nations Special Rapporteur on Human Rights and the Environment Mekong Youth Assembly Mekong Youth Assembly and International Rivers submission to John Knox, United Nations Special Rapporteur on Human Rights and the Environment The Mekong Youth Assembly and International

More information

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF)

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) World Bank-financed Project World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Thua Thien Hue Province Prepared by the Ministry

More information

LIVELIHOOD RESTORATION IN URBANISING ENVIRONMENTS ANGELA REEMAN, REEMAN CONSULTING PTY LTD

LIVELIHOOD RESTORATION IN URBANISING ENVIRONMENTS ANGELA REEMAN, REEMAN CONSULTING PTY LTD IAIA Special Symposium, Resettlement & Livelihoods Manila, Philippines, 20-22 February 2017 LIVELIHOOD RESTORATION IN URBANISING ENVIRONMENTS ANGELA REEMAN, PTY LTD ASIA AND URBANIZATION Source: Asian

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education

More information

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II Social Safeguards Monitoring Report Full Report November 2018 CAM: Rural Roads Improvement Project II Prepared by the Ministry of Rural Development for the Kingdom of Cambodia and the Asian Development

More information

RESETTLEMENT POLICY FRAMEWORK (RPF) ZAMBIA RENEWABLE ENERGY FINANCING FRAMEWORK

RESETTLEMENT POLICY FRAMEWORK (RPF) ZAMBIA RENEWABLE ENERGY FINANCING FRAMEWORK RESETTLEMENT POLICY FRAMEWORK (RPF) ZAMBIA RENEWABLE ENERGY FINANCING FRAMEWORK i TABLE OF CONTENTS LIST OF ACRONYMS AND ABBREVIATIONS... iv DEFINITIONS... v 1.0 INTRODUCTION... 1 1.1 Background... 1 1.2

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

ABBREVIATED RESETTLEMENT ACTION PLAN

ABBREVIATED RESETTLEMENT ACTION PLAN Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT ==================== Public Disclosure Authorized Mekong Delta Integrated Climate Resilience and

More information

STAKEHOLDER ENGAGEMENT IN PLANNING AND IMPLEMENTATION OF RESETTLEMENT AND LIVELIHOOD RESTORATION

STAKEHOLDER ENGAGEMENT IN PLANNING AND IMPLEMENTATION OF RESETTLEMENT AND LIVELIHOOD RESTORATION STAKEHOLDER ENGAGEMENT IN PLANNING AND IMPLEMENTATION OF RESETTLEMENT AND LIVELIHOOD RESTORATION Lead writer: Afandi Anwar Muhammad Foundation Co-writer: Aldi Muhammad Alizar IAP2 Indonesia For: IAIA event

More information

REPORT 2014/052 INTERNAL AUDIT DIVISION

REPORT 2014/052 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2014/052 Audit of the operations of the Regional Office in South Africa for the Office of the United Nations High Commissioner for Refugees Overall results relating to the

More information

IND: Railway Sector Investment Program

IND: Railway Sector Investment Program Resettlement Framework Document Stage: Final March 2011 IND: Railway Sector Investment Program Prepared by Ministry of Railways for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 16 March 2011)

More information

Indigenous Peoples Development Planning Document. IND: Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program

Indigenous Peoples Development Planning Document. IND: Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Draft for Consultation Project Number: 38412 June 2009 IND: Assam Integrated Flood and Riverbank

More information

Resettlement Action Plan Update for the Rehabilitation and Upgrading of Bukoba Airport

Resettlement Action Plan Update for the Rehabilitation and Upgrading of Bukoba Airport Public Disclosure Authorized UNITED REPUBLIC OF TANZANIA SFG2612 Public Disclosure Authorized MINISTRY OF WORKS, TRANSPORT AND COMMUNICATION TANZANIA AIRPORTS AUTHORITY Public Disclosure Authorized Resettlement

More information

Lubuk Jering and PT. RAPP Resolve their Land Conflict

Lubuk Jering and PT. RAPP Resolve their Land Conflict Tour 1 Lubuk Jering Lubuk Jering and PT. RAPP Resolve their Land Conflict Lubuk Jering is community in Siak district, 125 kilometers to the north of Pekanbaru. A conflict over land developed between Lubuk

More information

Draft Resettlement Policy Framework

Draft Resettlement Policy Framework Republic of Tajikistan Ministry of Transport Central Asia Road Links Project Republic of Tajikistan Draft Resettlement Policy Framework Date: July 5, 2014 Draft Resettlement Policy Framework for Central

More information

HAUT-COMMISSARIAT AUX DROITS DE L HOMME OFFICE OF THE HIGH COMMISSIONER FOR HUMAN RIGHTS PALAIS DES NATIONS 1211 GENEVA 10, SWITZERLAND

HAUT-COMMISSARIAT AUX DROITS DE L HOMME OFFICE OF THE HIGH COMMISSIONER FOR HUMAN RIGHTS PALAIS DES NATIONS 1211 GENEVA 10, SWITZERLAND HAUT-COMMISSARIAT AUX DROITS DE L HOMME OFFICE OF THE HIGH COMMISSIONER FOR HUMAN RIGHTS PALAIS DES NATIONS 1211 GENEVA 10, SWITZERLAND Mandates of the Special Rapporteur on adequate housing as a component

More information

Indira Sagar Dam. Rs crore but expected to be nearly Rs. 5,000 crore Loss

Indira Sagar Dam. Rs crore but expected to be nearly Rs. 5,000 crore Loss Indira Sagar Dam Site On Narmada River, about 10 km. from Punasa village, in Khandwa district of western Madhya Pradesh, India Schedule Project initiated in 1984, started in 1992, scheduled to finish in

More information

DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT

DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT DANANG DEPARTMENT OF TRANSPORT DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT MANAGEMENT UNIT DANANG SUSTAINABLE CITY DEVELOPMENT PROJECT (Loan No. 5233-VN) SFG1981 V2 RESETTLEMENT PLAN Public Disclosure

More information

SUMMARY POVERTY REDUCTION AND SOCIAL STRATEGY

SUMMARY POVERTY REDUCTION AND SOCIAL STRATEGY Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project (RRP CAM46293) SUMMARY POVERTY REDUCTION AND SOCIAL STRATEGY Country: Cambodia Project Title: Greater Mekong Subregion Tourism

More information

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement This document should be read in conjunction with the proposed World Bank Policy to understand the proposed responsibilities of the World Bank (in the Policy) and the Borrowing Country (in the Standards).

More information

THE CHALLENGES AND LEGAL IMPLICATIONS OF SECURING THE OCCUPATION OF LAND REQUIRED FOR PROJECTS IN WEST AFRICA

THE CHALLENGES AND LEGAL IMPLICATIONS OF SECURING THE OCCUPATION OF LAND REQUIRED FOR PROJECTS IN WEST AFRICA THE CHALLENGES AND LEGAL IMPLICATIONS OF SECURING THE OCCUPATION OF LAND REQUIRED FOR PROJECTS IN WEST AFRICA 28 OCTOBER 2014 Nicolas Heurzeau, Of Counsel, +33 1 53 57 78 55, nicolas.heurzeau@hsf.com OUTLINE

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4547 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4547 Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report.: AB4547 Project Name Kenya Slum Upgrading Program Region AFRICA Sector General water, sanitation and flood protection (40%); general transportation

More information

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Final Project Number: 40282 September 2006 VIE: Calamity Damage Rehabilitation Project The summary

More information

STATUTE THE CAMBODIAN CHILDREN S ADVOCACY FOUNDATION

STATUTE THE CAMBODIAN CHILDREN S ADVOCACY FOUNDATION STATUTE OF THE CAMBODIAN CHILDREN S ADVOCACY FOUNDATION 2006 CHAPTER I INTRODUCTION AND BACKGROUND Article 1: Introduction Ever since the Paris Peace accords were signed in 1991 and ex-khmer Rough soldiers

More information

REPORT 2016/100 INTERNAL AUDIT DIVISION. Audit of the operations in Niger for the Office of the United Nations High Commissioner for Refugees

REPORT 2016/100 INTERNAL AUDIT DIVISION. Audit of the operations in Niger for the Office of the United Nations High Commissioner for Refugees INTERNAL AUDIT DIVISION REPORT 2016/100 Audit of the operations in Niger for the Office of the United Nations High Commissioner for Refugees Overall results relating to the effective management of the

More information

RESETTLEMENT ACTION PLAN (RAP)

RESETTLEMENT ACTION PLAN (RAP) TERMS OF REFERENCE SFG1801 RESETTLEMENT ACTION PLAN (RAP) FOR SAVING OF GIZA NORTH PROJECTS Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information