2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field

Size: px
Start display at page:

Download "2622-BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field"

Transcription

1 Draft Safeguards Monitoring Report Project No Draft Semi Annual Report December BAN: Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field Prepared by Bangladesh Gas Fields Company Limited for People s Republic of Bangladesh

2 This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

3 BANGLADESH GAS FIELDS COMPANY LIMITED (A Company of Petrobangla ) Birashar, Brahmanbaria Draft Social Safeguard Monitoring Report Natural Gas Access Improvement Project, Part B: Safety and Supply Efficiency Improvement in Titas Gas Field PREPARED BY- Bangladesh Gas Fields Company Limited December 2015

4 Executive Summary BGFCL is the largest gas producer in the country; it has planned to carry out drilling of 4 new wells (well nos ) and installation of 2 nos. process plants with associated facilities in two different locations at Titas gas field with the financial assistance of ADB. Around 15 acres of land (mostly agricultural) has been acquired to implement the project. Accordingly RP has been developed and approved by ADB to compensate the APs. The project is located in two different locations at Titas gas field. One of them (Well # 25 & 26 and one process plant) located at mouza Chhatian, Jangilsar,Malihata & Suhilpur under Sadar upazila and the other (Well # 23 & 24 and one process plant) is located at Sarail mouza, upazila Sarail, both the areas are under Brahmanbaria district. DC, Brahmanbaria had determined the value of losses and as per the RP all valid claims were settled down. The DC office determined the compensation amount based on yearly average of recorded sale value plus 50% additional cash compensation. Resettlement Plan had been carried out as per ADB s Safeguard Policy Statement (2009) and law/policy of Govt. of Peoples Republic of Bangladesh for implementation of the project. Under section 3, notice was served by the DC on cut-off date for non-title holders. An Entitlement Matrix had been prepared on the basis of census and socioeconomic survey conducted in July It identified the categories of impact based on the census and showed the entitlements for each type of loss. The matrix described the units of entitlements for compensating the lost assets and various resettlement benefits. Cash Compensation under Law (CCL) for lost assets (land) had recorded to the owners through the DC as per market value assessed through legal procedure. The resettlement benefit for indirect losses and difference between replacement value and the CCL will be paid by BGFCL directly to the APs. A total of acres land of 66 APs was acquired and as of date a total of BDT 191,078, taka has been disbursed to the APs. The project office endorsed that the CCL value of the acquired land paid to the land owners by the DC office is higher than the market price of land on that time. However this fact requires to be validated by a Property Valuation Advisory Team, which is under process An ADB safeguards mission comprising Mr. Shahidul Alam, Senior Safeguards Officer (Resettlement) and Mr. Ansar A. Siddiquee, staff Consultant visited the project locations in October 15 and organized two FGDs with the APs. The mission found that the Grievance Redress Committees (GRC) has yet not been formed. So, BGFCL agreed that they would establish GRC of the project with representation from the Executing Agency (EA), APs (including vulnerable groups), Local Government Engineering Department (LGED) and private consultant. The affected persons (AP s) of project area have demanded to arrange a permanent drain for irrigation in Sarail Mouza. Also, the APs demanded priority in getting jobs in the

5 project sites. However, the above two grievances had been redressed by the EA and the following resettlement activities are being considered: a. The EA has considered the grievance of affected persons of construction of an irrigation drain adjacent to the boundary wall of project area in Sarail Mouza. The EA has taken local competitive bidding (tender) to find the eligible Tenderer and after finishing the bidding process notification of award (NOA) has been issued to eligible contractor. After successful completion of the irrigation drain the affected and unaffected people nearby the project area will get benefit for cultivation of crops. b. The Affected People of the project area have applied for jobs. The EA have taken step to appoint them where appropriate. In this consideration, two affected persons have appointed as security guards on temporary basis. Also, the EA requested the drilling contractor to appoint the APs on priority basis. As a result, already 11 APs have been appointed in project activities in different categories. Although the project was categorized as A for Involuntary Resettlement (IR) Safeguards, the number of affected family is only 66. So, the project may be recategorized as B considering the level of impact. BGFCL has been carrying out the resettlement activities as per the approved RP. There are still some issues i.e. formation of GRC, PVAT etc. But, the EA is very keen to follow all the guideline and policies per the RP. Thus, they are working on to facilitate the formation of the GRC. Also, they keep close communication with the contractors so that the APs will get suitable job in the project sites. BGFCLE confirmed that regular semiannual monitoring Report will be submitted to ADB on January and July of each year until the resettlement activities are 100 % completed. As being category A for IR safeguards, an independent monitoring consultant will also be engaged by BGFCL, who will submit an independent monitoring report by June 2016.

6 Contents Abbreviation... v Definition of Terms... vi Executive Summary... ii Introduction... viii The Project... viii Monitoring and Evaluation... ix Monitoring Progress... xi Delivery of Entitlements... xi Consultation and Grievances... xxii Communications and Participation... xxiii Budget and Timeframe... xxiv Livelihood and Income Restoration... xxiv Benefit Monitoring... xxv Conclusion... xxv

7 Abbreviation ADB AH APs BGFCL CCL DC EA EPs FGD FHHs GRC GOB HHs IOL IR LA LAP LAO M&E MOL MOPEMR PCC PD PIC PIU PVAT RAC RAP RP R&R RV SES UP RU Asian Development Bank Affected Household Affected Persons Bangladesh Gas Fields Company Ltd Cash Compensation under Law Deputy Commissioner Executing Agency Effected People Focused Group Discussion Female Headed Households Grievance Redress Committee Government of Bangladesh Affected households Inventory of Loss Involuntary resettlement Land Acquisition Land Acquisition Proposal Land Acquisition Officer Monitoring and Evaluation Ministry of lands Ministry of Power, Energy and Mineral Resources Public Consultative Committee Project Director Project Implementation Committee Project Implementation Unit Property Valuation Advisory Team Resettlement Advisory Committee Resettlement Action Plan Resettlement Plan Resettlement & Rehabilitation Replacement Value Socio-economic Survey Union Parishad Resettlement Unit

8 Definition of Terms Affected persons (APs) mean all the people affected by the project through land acquisition, relocation, or loss of incomes and includes any person, household (sometimes referred to as project affected family), firms, or public or private institutions. APs therefore include; i) persons affected directly by the safety corridor, right-of-way, tower or pole foundations or construction work area; (ii) persons whose agricultural land or other productive assets such as trees or crops are affected; (iii) persons whose businesses are affected and who might experience loss of income due to the project impact; (iv) persons who lose work/employment as a result of project impact; and (v) people who lose access to community resources/property as a result of the project. Compensation means payment in cash or kind for an asset to be acquired or affected by a project at replacement cost at current market value. Cut-off-date means the date after which people will NOT be considered. eligible for compensation i.e. they are not included in the list of APs as defined by the census. Normally, the cut-off date is the date of the detailed measurement survey. Detailed measurement survey means the detailed inventory of losses that is completed after design and marking of project boundaries on the ground. Entitlement means the range of measures comprising cash or kind compensation, relocation cost, income rehabilitation assistance, transfer assistance, income substitution, and relocation which are due to /business restoration which are due to APs, depending on the type and degree nature of their losses, to restore their social and economic base. Land acquisition Non-titled means the process whereby a person is compelled by a public agency to alienate all or part of the land s/he owns or possesses, to the ownership and possession of that agency, for public purposes, in return for fair compensation. means those who have no recognizable rights or claims to the land that they are occupying and includes people using private or state land without permission, permit or grant i.e. those people without legal title to land and/or

9 structures occupied or used by them. ADB s policy explicitly states that such people cannot be denied compensation. Poor Replacement cost Sharecropper Vulnerable means those falling below the official national poverty line. means the method of valuing assets to replace the loss at current market value, or its nearest equivalent, and is the amount of cash or kind needed to replace an asset in its existing condition, without deduction of transaction costs or for any material salvaged. means the same as tenant cultivator or tenant farmer, and is a person who cultivates land they do not own for an agreed proportion of the crop or harvest. means any people who might suffer disproportionately or face the risk of being marginalized from the effects of resettlement and includes; (i) female-headed households with dependents; (ii) disabled household heads; (iii) poor households (within the meaning given previously); (iv) landless; (v) elderly households with no means of support; (vi) households without security of tenure; (vii) ethnic minorities; and (viii) marginal farmers (with landholdings of five acres or less)

10 Introduction 1. Bangladesh Gas Fields Company Limited (BGFCL) is a company of Bangladesh Oil, Gas & Mineral Corporation (Petrobangla). The Company is the largest gas producer in the country. With a view to increase the production of gas, BGFCL has planned to carry out drilling of 4 new wells (well nos ) and installation of 2 nos. process plants with associated facilities in two different locations at Titas gas field with the financial assistance of ADB. A total of acres of land (mostly agricultural) has been acquired to implement the project. A resettlement plan (RP) had been prepared and submitted to ADB that has already been approved by ADB. 2. Major works planned under the scope of the project are (i) Drilling of 4(four) appraisal cum-development wells (Titas #23, 24, 25, & 26) and (ii) Installation of two nos. process plants at Titas Gas Field under Sadar Upazila & Sarail Upazila, Brahmanbaria. The Project 3. Bangladesh Gas Fields Company Limited (BGFCL) has planned to carry out drilling of 4 new wells (well nos ) and installation of 2 nos. process plants with associated facilities in two different locations at Titas gas field under financial assistance of ADB. One of them (well # 25 & 26 and one process plant) located at mouzachhatian, Jangilsar,Malihata&Suhilpur under Sadarupazila and other (well # 23 & 24 and one process plant) is located at mouzasarailupazilasarail both are under district Brahmanbaria. 4. Project Areas Map 1: Brahmanbaria District Map Showing Project Location

11 Benefits and Impacts 5. All the four wells will produce total 120 MMSCFD natural gas and each well of the 4 wells (Well no 23-26) will produce 30 MMSCFDwhich will facilitate a total flow of additional natural gas supply to the national grid. Gas from the wells will be used for producing mainly electricity which in turn will drive industries contributing to national GDP. Implementation of the project will develop socio-economic environment of the area including poverty alleviation by creation opportunities through industrial development. Besides, many unskilled local people can be employed temporarily during project implementation period. This will lead to the enhancement of skill of the personnel engaged in physical execution of the project which in turn would help execution of similar projects in future. 6. Since there are no structure in the propose location of the project hence, implementation of project physical works will not cause adverse involuntary resettlement impacts entailing acquisition of land, other assets and displacement. The census survey undertaken brought forth that the proposed project requires acquisition of about 15 acres of land the all of which comprises of agricultural land and no homestead and commercial assets. A total of 66 households constituting of 322 persons would be affected as a result of the project. Monitoring and Evaluation 7. The internal monitoring is being carried out by the project office in order to oversee the performance of the resettlement plan implementation. Following are the indicators based on which the overall monitoring is being carried out: Table 1: Monitoring Indicators Monitoring Aspects Delivery of Entitlements Potential/Relevant Indicators Entitlements disbursed as per the entitlement matrix. Disbursements against timelines. Identification of the displaced persons. Timely disbursements of the agreed transport costs, relocation costs, income substitution support, and any resettlement allowances, according to schedule. Provision of replacement land plots. Quality of new plots and issue of land titles. Restoration of social infrastructure and services. Progress on income and livelihood restoration activities being implemented as set out in the income restoration plan, for example, utilizing replacement land, commencement of production, the number of the displaced persons trained in employment with jobs, microcredit disbursed, number of income-generating activities assisted. Affected businesses receiving entitlements, including transfer and payments for net losses resulting from lost business. Consultation & Grievances Consultations organized as scheduled including meetings, groups, and community activities. Knowledge of entitlements by the displaced

12 Monitoring Aspects Potential/Relevant Indicators persons. Use of the grievance redress mechanism by the displaced persons. Information on the resolution of the grievances. Information on the implementation of the social preparation phase. Implementation of special measures for Indigenous Peoples. Communications & Participation Number of general meetings (for both men and women). Percentage of women out of total participants. Number of meetings exclusively with women. Number of meetings exclusively with vulnerable groups. Number of meetings at new sites. Number of meetings between hosts and the displaced persons. Level of participation in meetings (of women, men, and vulnerable groups). Level of information communicated adequate or inadequate. Information disclosure. Translation of information disclosure in the local languages. Budget & Timeframe Land acquisition and resettlement staff appointed and mobilized on schedule for the field and office work. Capacity building and training activities completed on schedule. Achieving resettlement implementation activities against the agreed implementation plan. Funds allocation for resettlement to resettlement agencies on time. Receipt of scheduled funds by resettlement offices. Funds disbursement according to the resettlement plan. Social preparation phase as per schedule. Land acquisition and occupation in time for implementation. Livelihood & Income Restoration Number of displaced persons under the rehabilitation programs (women, men, and vulnerable groups). Number of displaced persons who received vocational training (women, men, and vulnerable groups). Types of training and number of participants in each. Number and percentage of displaced persons covered under livelihood programs (women, men, and vulnerable groups). Number of displaced persons who have restored their income and livelihood patterns (women, men, and vulnerable groups). Number of new employment activities. Extent of participation in rehabilitation programs. Extent of participation in vocational training programs. Degree of satisfaction with support received for livelihood programs. Percentage of successful enterprises breaking even (women, men, and vulnerable groups). Percentage of displaced persons who improved their income (women, men, and vulnerable groups) Percentage of displaced persons who improved their standard of living (women, men, and vulnerable groups) Number of displaced persons with replacement agriculture land (women, men, and vulnerable groups) Quantity of land owned/contracted by displaced persons (women, men and vulnerable groups) Number of households with agricultural equipment. Number of households with livestock Benefit Monitoring Noticeable changes in patterns of occupation, production, and resource use compared to the pre-project situation. Noticeable changes in income and expenditure patterns compared to the pre-

13 Monitoring Aspects Potential/Relevant Indicators project situation. Changes in cost of living compared to the preproject situation. Changes in key social and cultural parameters relating to living standards. Changes occurred for vulnerable groups. Benefiting from the project by the displaced persons. Ref. ADB Involuntary Resettlement Safeguards: A Planning and Implementation Good Practice Sourcebook Monitoring Progress Delivery of Entitlements 8. An Entitlement Matrix has been prepared on the basis of census and socioeconomic survey conducted in July It identified the categories of impact based on the census and portrayed the entitlements for each type of loss. The matrix below describes the units of entitlements for compensating the lost assets and various resettlement benefits based on which the basic of social safeguard monitoring stands. Cash Compensation under Law (CCL) for lost assets (land) accorded to the owners through the DC as per market value assessed through legal procedure. The resettlement benefit for indirect losses and difference between replacement value and the CCL was paid by BGFCL directly to the APs. Table 2: Compensation and Entitlements Type of loss Entitled Persons(s) Entitlements 1. Loss of agricultural land Legal owner(s) of land as determined by the DC, and or determined by the court Value of land at current market price of the equivalent replacement land. The DC office determines the compensation amount based on yearly average of recorded sale value plus 50% additional cash compensation. Refund of registration cost incurred for replacement land purchase at the replacement value. Any difference between the awarded value and the replacement value at the cut-offdate (on the date of issuance of notice under section 3 of Acquisition Act, 1982) will be paid to APs as a cash grant. APs will be provided with all possible assistance to identify and purchase replacement land. APs severely affected by loss of agricultural land (i.e., losing more than 20% of total land holding) will receive a cash grant of Tk.5000/- per family or Tk per decimal of concerned land,

14 2. Lose of access by tenants/sharecroppers to agricultural land for crops production. 3. Loss of wages income. 4. Loss of standing crops Farmers leasing in or share cropping the land that is defined to be acquired for the project at the time of the socio-economic survey. Persons engaged in wage labor in agriculture or nonagriculture sectors in the affected areas whose means of livelihood have been affected. Compensation for one year s crop value to crop owner whichever is lower. Suitable candidates will also be provided with free training on income employment. No compensation for land. One time cash grant of Tk.5000/- per family or Tk. 2000/-per decimal of concerned land, whichever is lower. Suitable candidates will also be provided free training on income generating activities and a subsistence allowance during the training period. If necessary, access to credit facilities to start selfemployment will be provided. One-time cash grant of Tk. 5000/-and Wage employment with contractors and / or training in income generating activities. If necessary, access to credit facilities will be provided to start self-employment activities. A subsistence allowance will be provided during the training period. Advance notice to harvest crops. Cash compensation equivalent to the market value of one year s income from the crops. One-time cash grant of Tk.10000/- per family 5. Vulnerable groups Members of vulnerable groups such as the landless, very poor, femaleheaded Provision of a land purchase grant for households landless households. or households of the elderly, physically impaired or disabled 6. Unforeseen impact Concerned impacts Determined as per policy on unique Findings at detailed design stage 9. A total of 15 acres of land worth around Tk million of 66 household were affected through land loss and income from sharecrops loss throughout the implementation process. Adequate efforts have been made by BGFCL in order to minimize the impacts and disruption of livelihood. BGFCL initiated maximum possible extent and adequate measure to reduce the adverse impact and which has been incorporated in the planning design of the project to mitigate the unavoidable adverse impacts. An entitlement matrix for different categories of people affected by the project has been prepared. People moving in the project area after the cut-off date were not entitled to any assistance. After issuance of notice under section 3 by the DC and census cut-off date for non-titleholders or a similar designated date declared by BGFCL, joint verification of the acquired properties were carried-out by the requiring and acquiring bodied. All APs had been brought under entitlements to compensation and resettlement assistance based on severity (significance) of impacts. All the APs were paid by the DC Office which can be found through proper paper work as shown below sequentially:

15

16

17

18

19

20

21

22

23

24 10. An ADB Mission comprising Mr. Shahidul Alam, Sr. Safeguards Officer, ADB- BRM, and Mr. Ansar Ahammed Siddiquee, Social Safeguard Monitoring Specialist, visited the project areas on 12 October There the team met with the APs through conducting FGD session. They didn t find any objection on the entitlement other than the price of the land which were set by the PVAT. But, finally the APs also agreed with the team that they were considering the current value of land during the discussion period. The team was satisfied with the overall delivery process of entitlements to the APs. As of reporting date a total of BDT 191,078, had been disbursed among the APs (66 persons of acres of land) in the project areas. Most of the lands acquired by the project are agricultural land and thus doesn t involve any relocation cost for anyone of the APs. Consultation and Grievances 11. ADB team didn t find the Grievance Redress Committees (GRC) during their visit on 12 October BGFCL was well informed about the importance and need of forming the committee urgently. Also, based on the discussion and being suggested by the team of ADB, BGFCL already placed complain boxes on grievances as shown in the picture below: Figure 1: Notice box placed in the door-step of the project area to receive grievance notice by APs 12. BGFCL is working now on to forming the GRC so that it can handle disputes relating to ownership rights under the court of law, to review grievances involving all resettlement benefits, relocation, and other assistance forwarded by the Resettlement Unit (RU) or APs. BGFCL is committed to redress within 2-4 weeks

25 from the date of lodging the complaints when it will be able to form the committee. The local Union Parishad Chairman is also working very closely with them to assist in forming the committee. However, this will be worthwhile to mention here that there were no major grievances brought forward by the APs during the discussion with the team from ADB in October 15 visit. 13. It was well noticed by the APs that they are in need of a permanent irrigation drainage for them and BGFCL already agreed to build a 1400 feet long irrigation drain for them. The construction work for the drainage for irrigation is underway. Communications and Participation 14. Based on the RP and Socio-economic survey, it was revealed that the landholdings and ownership pattern of the APs are as follows: Table: Distribution of land ownership of the Affected Persons Mouza Agricultural land Holding in percentage Virtually landless (%) Merginal ( Small ( ( Acre) Acre) Acre) Medium( Acre) Chhatian Malihata Jangilsar Suhilpur Sarail Table: Owner, Tenant, Labor Holdings and others Household Mouza Owner Holdings Others No. % No. % Chhatian Malihata Jangilsar Suhilpur Sarail Table: Occupation of head of households Occupation Head of Households No of persons Percent Business Construction Worker 1 2 Farmer Foreign Labor 1 2 House wife 3 6 Labor 1 2 Service 7 14 Student 3 6 Unemployment 4 8 Thikader 1 2 Large (5.5+ Acre

26 Total Table3 : Land ownership characteristics of Female headed households Number of households Total land ownership (dec) Land lost (dec) Percentage It is found that only a minor percentage of the APs are female. But still the participation of females in all the meetings were ensured by the implementers. Due to a very poor number of female APs no exclusive meetings were conducted with them rather they were consulted individually on different occasions throughout the implementation process. Also, during the visit of the ADB team in October 15, the participation of the female APs were ensured and the team was informed by the female AP that they were being informed on various occasions of the implementation process. In case of the issue of vulnerable group, it was pretty common in the area that there were no such communities among the APs who may fall into the group of vulnerable; still the implementing agency is working with the weak APs on the issue of let them get priority in case of taking workers in the project areas. Budget and Timeframe 16. Based on the approved RP, a budget provision was made to cover all land acquisition, compensation, and rehabilitation costs for the project. The budget provision was made in the project Proforma in the amount of Tk million. In estimating land acquisition cost, last one year s average sale rates of different types of land in the project jurisdiction were collected from the concerned sub-registry offices. These rates were sale value plus 50% as per GoB policy of involuntary resettlement (compulsory nature of acquisition). However, based on the budgetary provision BGFCL completed the resettlement of land acquisition on time. However, it is obvious that there were some late in disbursing the money to the APs from the DC Office due to some administrative issues. Also, the team of ADB found out the same issue from the APs during conducting the FGD in October 15. Livelihood and Income Restoration 17. Resettlement census survey covered all the households of the project areas and found out that a total of 66 households will lost lands of which almost all are agricultural lands. Loss of income from crops lost by farmers leasing in or share cropping lands was thus compensated with one-time cash grants of Tk per family or Tk per decimal of affected land, whichever is lower. Suitable candidates were supposed to be provided with free training on income generating activities and a subsistence allowance during the training period. But, less or no efforts were made on this as among the APs almost no one showed any interest on such initiative. It was also suggested in the RP that if necessary, access to credit

27 facilities to start self-employment would have been provided; but still no such progress was made for the APs. 18. Person engaged in wage labor in agriculture or non-agricultural sectors whose means of livelihood were affected by acquisition of the land or property are dependent on were supposed to be entitled to a onetime cash grant of Tk and priority for wage employment with contractors and/ or training in income generating activities. However, it is evident that BGFCL is putting utmost effort to arrange onsite job for the APs or members of APs families in the project areas. BGFCL is committed to give priority to the APs in getting job in the project sites. Benefit Monitoring 19. BGFCL is not in a situation to monitor noticeable changes in pattern of occupations, income or expenditures of the APs. It is always good to engage partner NGOs which are capable in such activities. However, this should be noted here that during the visit of ADB team in October 15, it was remarkably noticed in the FGD session that none of the APs bought land in somewhere else with the money they got as compensation for land acquisition. The money rather they spent out for any other purposes. However, the APs still expect that BGFCL will play a vital role to ensure job for them in the project areas. Conclusion 20. This is to emphasize that resettlement Plan should be implemented as per resettlement frame work and compensation policy so that the project affected persons must not be worse off than their pre-project living standard and socioeconomic status due to the project because of shifting to other places or loosing land or being relocated. It has been observed that an internal resettlement monitoring specialist would have been worthy to capture all the glitches during the RP implementation. Also, involving an NGO to ensure livelihood restoration would have been beneficial for the APs. The experience in getting late in disbursing money to the APs from the DC Office was crucial and this dependency was contributing in timely implementation of the RP.

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity. Prime Minister s Office Date: 7 July, 2005 Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Prime Minister s Office No 192/PM Date: 7 July, 2005 DECREE on the Compensation and Resettlement of the Development Project

More information

Bangladesh: Urban Public and Environmental Health Sector Development Program

Bangladesh: Urban Public and Environmental Health Sector Development Program Resettlement Planning Document Draft Resettlement Framework Document Stage: Draft for Consultation Project Number: 39305 May 2009 Bangladesh: Urban Public and Environmental Health Sector Development Program

More information

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the

RESETTLEMENT FRAMEWORK. Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors. on the RESETTLEMENT FRAMEWORK Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the Secondary Education Modernization Project II in Sri Lanka Ministry of Education

More information

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT

SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT SUMMARY RESETTLEMENT PLAN OF WATER SUPPLY AND SOLID WASTE MANAGEMENT TRANCHE-2 SUB PROJECT OF GANGTOK UNDER ADB ASSISTED NERCCDIP PROJECT A. Introduction and Subprojects Components 1. Tranche 2 of the

More information

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework

RP297. Resettlement and Rehabilitation (R&R) Entitlement Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FINAL REPORT Resettlement and Rehabilitation (R&R) Entitlement Framework RP297 Under

More information

BAN: Railway Sector Investment Program

BAN: Railway Sector Investment Program Resettlement Planning Document Resettlement Framework Document Stage: Final Project Number: 32234 June 2006 BAN: Railway Sector Investment Program Prepared by Bangladesh Railway, Dhaka, Bangladesh The

More information

BAN: Secondary Education Sector Investment Program

BAN: Secondary Education Sector Investment Program Secondary Education Sector Investment Program (RRP BAN 44213) Resettlement Framework September 2013 BAN: Secondary Education Sector Investment Program Prepared by Directorate of Secondary and Higher Education

More information

Resettlement Plan: Solar-LED Streetlights. BAN: Power System Efficiency Improvement Project

Resettlement Plan: Solar-LED Streetlights. BAN: Power System Efficiency Improvement Project Resettlement Plan: Solar-LED Streetlights Document Stage: Draft Project Number: 37113 April 2011 BAN: Power System Efficiency Improvement Project Prepared by: Bangladesh Power Development Board (BPDB),

More information

EBRD Performance Requirement 5

EBRD Performance Requirement 5 EBRD Performance Requirement 5 Land Acquisition, Involuntary Resettlement and Economic Displacement Introduction 1. Involuntary resettlement refers both to physical displacement (relocation or loss of

More information

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014

Work plan of Independent Agency and Implementation of IFC Performance Standards. Green Goal Ltd., 17 February 2014 Work plan of Independent Agency and Implementation of IFC Performance Standards Green Goal Ltd., 17 February 2014 Content IFC performance standards Legal grounds of Cambodia Resettlement planning process

More information

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement

SECOND DRAFT FOR CONSULTATION JULY Environmental and Social Standard 5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement This document should be read in conjunction with the proposed World Bank Policy to understand the proposed responsibilities of the World Bank (in the Policy) and the Borrowing Country (in the Standards).

More information

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives

THE WORLD BANK OPERATIONAL MANUAL OP 4.12 December Involuntary Resettlement. Policy Objectives Page 1 of 9 Involuntary Resettlement 1. Bank 1 experience indicates that involuntary resettlement under development projects, if unmitigated, often gives rise to severe economic, social, and environmental

More information

Guidance Note 5 Land Acquisition and Involuntary Resettlement

Guidance Note 5 Land Acquisition and Involuntary Resettlement This Guidance Note 5 corresponds to Performance Standard 5. Please also refer to the Performance Standards 1-4 and 6-8 as well as the corresponding Guidance Notes for additional information. Bibliographical

More information

Annex 2: Does the Xayaburi resettlement comply with Lao law?

Annex 2: Does the Xayaburi resettlement comply with Lao law? Annex 2: Does the Xayaburi resettlement comply with Lao law? The Xayaburi project s resettlement scheme has not complied with Lao laws and policies on involuntary resettlement and compensation. As the

More information

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project

Indigenous Peoples Development Planning Document. VIE: Calamity Damage Rehabilitation Project Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Final Project Number: 40282 September 2006 VIE: Calamity Damage Rehabilitation Project The summary

More information

Land Acquisition and Resettlement Action Plan. Matarbari 2x600 MW Coal Fired Power Plant Project

Land Acquisition and Resettlement Action Plan. Matarbari 2x600 MW Coal Fired Power Plant Project Draft Peoples Republic of Bangladesh Ministry of Power, Energy and Mineral Resources Land Acquisition and Resettlement Action Plan Matarbari 2x600 MW Coal Fired Power Plant Project (for Power Plant, Port

More information

IND: Railway Sector Investment Program

IND: Railway Sector Investment Program Resettlement Framework Document Stage: Final March 2011 IND: Railway Sector Investment Program Prepared by Ministry of Railways for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 16 March 2011)

More information

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea

The Resettlement Policy Framework for the Smallholder Agriculture Development Project. Papua New Guinea Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Resettlement Policy Framework for the Smallholder Agriculture Development Project

More information

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B.

A. Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. B. Module 8 - Involuntary Resettlement- Policy Principles & Requirements (World bank OP 4.12 and 4.12 Annex A) Key principles and objectives of an involuntary Resettlement Policy Resettlement planning instruments

More information

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT

FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT DRAFT COMPARATIVE ANALYSIS OF NEPAL s LEGAL FRAMEWORK FOR LAND ACQUISTION AND INVOLUNTARY RESETTLEMENT AND THE ASIAN DEVELOPMENT BANK SAFEGUARD FOR INVOLUNTARY RESETTLMENT Note: The following is based

More information

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS

SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS SUMMARY EQUIVALENCE ASSESSMENT BY POLICY PRINCIPLE AND KEY ELEMENTS ENVIRONMENTAL SAFEGUARDS Objectives To ensure the environmental soundness and sustainability of projects and to support the integration

More information

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007

Involuntary Resettlement - Overview. Transport Forum Washington, D.C. March 30, 2007 Involuntary Resettlement - Overview Transport Forum Washington, D.C. March 30, 2007 OP 4.12 - Triggers Trigger: acquisition of land which displaces people physically and / or economically. Policy applies

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: VIE 34055 TECHNICAL ASSISTANCE TO THE SOCIALIST REPUBLIC OF VIET NAM FOR ENHANCING THE RESETTLEMENT LEGAL FRAMEWORK AND INSTITUTIONAL CAPACITY September 2001 CURRENCY EQUIVALENTS

More information

Performance Standard 5 Land Acquisition and Involuntary Resettlement

Performance Standard 5 Land Acquisition and Involuntary Resettlement Introduction Performance Standard 5 1. Involuntary resettlement refers both to physical displacement (relocation or loss of shelter) and to economic displacement (loss of assets or access to assets that

More information

BAN: Railway Sector Investment Program

BAN: Railway Sector Investment Program Resettlement Due Diligence Report February 2016 BAN: Railway Sector Investment Program Sub Project 1: Tongi-Bhairab Bazar Double Line Project (TBDLP) Sub Project 2: Rehabilitation of Yards and Extension

More information

Revised Resettlement Plan Tibar-Gleno Road

Revised Resettlement Plan Tibar-Gleno Road REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING PROJECT February 2012 Democratic Republic of Timor-Leste REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Tajikistan Ministry of Transport Central Asia Road Links Project Republic

More information

India: Madhya Pradesh Urban Services Improvement Project (MPUSIP)

India: Madhya Pradesh Urban Services Improvement Project (MPUSIP) Resettlement Planning Document Resettlement Framework Document Stage: Draft for Consultation Project Number: 42486 June 2016 India: Madhya Pradesh Urban Services Improvement Project (MPUSIP) The resettlement

More information

Draft Resettlement Policy Framework

Draft Resettlement Policy Framework Republic of Tajikistan Ministry of Transport Central Asia Road Links Project Republic of Tajikistan Draft Resettlement Policy Framework Date: July 5, 2014 Draft Resettlement Policy Framework for Central

More information

SRI: Local Government Enhancement Project

SRI: Local Government Enhancement Project Draft Resettlement Framework July 2011 SRI: Local Government Enhancement Project Prepared by the Ministry of Local Government and Provincial Councils for the Asian Development Bank. CURRENCY EQUIVALENTS

More information

BAN: South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2

BAN: South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2 Resettlement Due Diligence Report May 2017 BAN: South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2 Prepared by the Roads and Highways Department, Government of the

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Quang Binh Province Prepared by the Ministry of

More information

Resettlement Plan Dili-Tibar-Liquica Road

Resettlement Plan Dili-Tibar-Liquica Road REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK UPGRADING SECTOR PROJECT November 2011 REPUBLICA DEMOCRATICA DE TIMOR LESTE MINISTERIO DAS INFRA-ESTRUTURAS ROAD NETWORK

More information

Indigenous Peoples Development Planning Document. IND: Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program

Indigenous Peoples Development Planning Document. IND: Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program Indigenous Peoples Development Planning Document Indigenous Peoples Development Framework Document Stage: Draft for Consultation Project Number: 38412 June 2009 IND: Assam Integrated Flood and Riverbank

More information

India: Jammu & Kashmir Urban Sector Development Project

India: Jammu & Kashmir Urban Sector Development Project Resettlement Planning Document Full Resettlement Plan- Improvements to B.C Road from Shakuntala Crossing to Children s Hospital Including pedestrian subway Document Stage: Final Project Number: 41116 October

More information

Sri Lanka: DRY ZONE URBAN WATER AND SANITATION PROJECT - for Mannar Subprojects

Sri Lanka: DRY ZONE URBAN WATER AND SANITATION PROJECT - for Mannar Subprojects Resettlement Implementation Plan Project Number: 37381-013 September 2012 Sri Lanka: DRY ZONE URBAN WATER AND SANITATION PROJECT - for Mannar Subprojects Prepared by SMEC Consultants for Dry Zone Urban

More information

BAN: Railway Sector Investment Program

BAN: Railway Sector Investment Program Resettlement Plan August 2011 BAN: Railway Sector Investment Program Tongi-Bhairab Bazar Double Line Subproject (Updated) Prepared by Bangladesh Railway, Ministry of Communications, Government of Bangladesh

More information

Semi-annual Social Safeguards Monitoring Report (January to June 2012)

Semi-annual Social Safeguards Monitoring Report (January to June 2012) Semi-annual Social Safeguards Monitoring Report (January to June 2012) Armenia: Sustainable Urban Development Investment Program Tranche 1 Project Number: 42417 Loan Number: L2752 Prepared: July 2013 Prepared

More information

SRI: Local Government Enhancement Project

SRI: Local Government Enhancement Project Appendix 13 Resettlement Framework Dec 2011 SRI: Local Government Enhancement Project CURRENCY EQUIVALENTS (as of 27 June 2011) Currency Unit = Sri Lankan Rupee/s (SLR/Rs) Rs1.00 = $0.0091 $1.0 = Rs 109.8700

More information

Land Acquisition and Resettlement Framework. BAN: Coastal Climate Resilient Infrastructure Project

Land Acquisition and Resettlement Framework. BAN: Coastal Climate Resilient Infrastructure Project Coastal Climate Resilient Infrastructure Project (RRP BAN 45084) Land Acquisition and Resettlement Framework Project Number: 45084 July 2012 BAN: Coastal Climate Resilient Infrastructure Project Prepared

More information

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING

ASCO CONSULTING ENGINEERS PROJECT MANAGERS URBAN AND REGIONAL PLANNERS TRAINING Road Development Agency 1 5 6 2 3 4 RESETTLEMENT POLICY FRAMEWORK FINAL REPORT Consultancy Services for the Design and Preparation of Bidding Documents for a Countrywide Roll-out of the Output and Performance

More information

MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT

MATARBARI PORT ACCESS ROAD DEVELOPMENT PROJECT Government of the People s Republic of Bangladesh Ministry of Road Transport and Bridges Roads and Highways Department Land Acquisition and Resettlement Action Plan Submitted by: November 2018 BETS Consulting

More information

Resettlement Policy Framework

Resettlement Policy Framework Public Disclosure Authorized The World Bank SFG3873 REV Public Disclosure Authorized Hezhou Urban Water Infrastructure and Environment Improvement Project Public Disclosure Authorized Resettlement Policy

More information

RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE

RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE RESETTLEMENT FRAMEWORK HA TINH, QUANG NAM, QUANG NGAI, QUANG TRI, THANH HOA, THUA THIEN HUE Supplementary Appendix to the Report and Recommendation of the President to the Board of Directors on the CENTRAL

More information

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION

VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION VOLUME 4 CHAPTER 1 PROJECT DESCRIPTION Table of Content Volume 4 Chapter 1: Project Description 1 PROJECT DESCRIPTION...1 1.1 THE NT2 PROJECT...1 1.2 THE NEED FOR RESETTLEMENT AND DEVELOPMENT...1 1.3 THE

More information

VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT

VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT Resettlement Framework February 2012 VIET NAM: GREATER MEKONG SUBREGION FLOOD AND DROUGHT RISK MANAGEMENT AND MITIGATION PROJECT Prepared by the Ministry of Agriculture and Rural Development (MARD), Socialist

More information

BAN: SASEC Chittagong Cox s Bazar Railway Project, Phase 1-Tranche 1

BAN: SASEC Chittagong Cox s Bazar Railway Project, Phase 1-Tranche 1 Social Monitoring Report Semiannual Report September 2017 BAN: SASEC Chittagong Cox s Bazar Railway Project, Phase 1-Tranche 1 Prepared by Bangladesh Railway for the Government of Bangladesh and the Asian

More information

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems Technical Assistance Consultant s Report Project Number: 44140 Date: April 2013 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Strengthening Involuntary Resettlement Safeguard

More information

AFG: MFF Water Resources Development Investment Program- Tranche 1, Nangarhar Valley Development Authority Grant No: 0167 AFG

AFG: MFF Water Resources Development Investment Program- Tranche 1, Nangarhar Valley Development Authority Grant No: 0167 AFG Social Monitoring Report Semiannual Report February 2015 AFG: MFF Water Resources Development Investment Program- Tranche 1, Nangarhar Valley Development Authority 42091 Grant No: 0167 AFG Project Implementation

More information

Ministry of Energy and Mining. Development Bank of Jamaica. Energy Security and Efficiency Enhancement Project

Ministry of Energy and Mining. Development Bank of Jamaica. Energy Security and Efficiency Enhancement Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Ministry of Energy and Mining Development Bank of Jamaica FINAL (JANUARY 21, 2011) Energy

More information

Resettlement Policy Framework

Resettlement Policy Framework Urban Transport Improvement Project of Tianjin by Using the World Bank Loan Resettlement Policy Framework Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Nghe An Province Prepared by the Ministry of Education

More information

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia)

The Republic of Sakha (Yakutia) of the. Russian Federation. Innovative Development of Preschool Education in the Republic of Sakha (Yakutia) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Republic of Sakha (Yakutia) of the Russian Federation Innovative Development of Preschool

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Ha Tinh Province Prepared by the Ministry of Education

More information

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang)

VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Resettlement Plan August 2011 VIE: Comprehensive Socioeconomic Urban Development Project Viet Tri, Hung Yen, and Dong Dang (Dong Dang) Prepared by the Lang Son Provincial People s Committee for the Asian

More information

Bangladesh Economic Zone Authority

Bangladesh Economic Zone Authority Resettlement Action Plan (RAP) for Japanese Economic Zone Bangladesh Economic Zone Authority Draft Report March, 2018 EQMS Consulting Limited Suit# C1, House# 76, Road# 05, Block# F, Banani, Dhaka-1213,

More information

IND: Mumbai Metro Rail Systems Project

IND: Mumbai Metro Rail Systems Project Social Due Diligence Report October 2018 IND: Mumbai Metro Rail Systems Project Prepared by Mumbai Metropolitan Region Development Authority, Government of India for the Asian Development Bank. ABBREVIATION

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Thua Thien Hue Province Prepared by the Ministry

More information

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014)

RESETTLEMENT POLICY FRAMEWORK. NATURAL GAS CONNECTION PROJECT IN 11 GOVERNORATES IN EGYPT (March 2014) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Submitted to : Egyptian Natural Gas Holding Company Prepared by: EcoConServ Environmental

More information

PAK: Southern Punjab Basic Urban Services Project in the Islamic Republic of Pakistan

PAK: Southern Punjab Basic Urban Services Project in the Islamic Republic of Pakistan Resettlement Planning Document Resettlement Action Plan Waste Water Treatment Plant at Mouza Akbar Pur (Suraj Miani), Multan City Document Stage: Final Project Number: December 2007 PAK: Southern Punjab

More information

Involuntary Resettlement Safeguards. A Planning and Implementation Good Practice Sourcebook Draft Working Document

Involuntary Resettlement Safeguards. A Planning and Implementation Good Practice Sourcebook Draft Working Document Involuntary Resettlement Safeguards A Planning and Implementation Good Practice Sourcebook Draft Working Document November 2012 This working document was prepared by staff of Asian Development Bank. It

More information

MON: Urban Development Sector Project Bulgan Subproject

MON: Urban Development Sector Project Bulgan Subproject Resettlement Completion Report Annual Report 24 December 2012 MON: Urban Development Sector Project Bulgan Subproject Prepared by Purevsuren Dorjnamjil, Resettlement Specialist, Project Management Unit

More information

India: Infrastructure Development Investment Program for Tourism

India: Infrastructure Development Investment Program for Tourism Infrastructure Development Investment Program for Tourism (RRP IND 40648) Resettlement Framework (Updated) Project Number: P40648 Approved: July 2010 Revised: October 2010 India: Infrastructure Development

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Soc Trang Province Prepared by the Ministry of

More information

Resettlement Plan. IND: Bihar State Highways II Project. March Siwan-Siswan Subproject (SH-89)

Resettlement Plan. IND: Bihar State Highways II Project. March Siwan-Siswan Subproject (SH-89) Resettlement Plan March 2012 IND: Bihar State Highways II Project Siwan-Siswan Subproject (SH-89) Prepared by Bihar State Road Development Corporation, Government of Bihar for the Asian Development Bank.

More information

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF)

World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) World Bank-financed Project World Bank-financed Gansu Revitalization and Innovation Project Resettlement Policy Framework (RPF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Land Acquisition and Resettlement Action Plan (Draft) Chittagong Coal Fired Power Plant Development Project

Land Acquisition and Resettlement Action Plan (Draft) Chittagong Coal Fired Power Plant Development Project People s Republic of Bangladesh Ministry of Power, Energy and Mineral Resources Land Acquisition and Resettlement Action Plan (Draft) Chittagong Coal Fired Power Plant Development Project (For Access Road)

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Binh Thuan Province Prepared by the Ministry of

More information

MLD - Kulhudhuffushi Harbor Expansion Project

MLD - Kulhudhuffushi Harbor Expansion Project Kulhudhuffushi Harbor Expansion Project (RRP MLD 36111-013) Due Diligence Report on Involuntary Resettlement and Indigenous Peoples March 2016 MLD - Kulhudhuffushi Harbor Expansion Project Prepared by

More information

Internal Monitoring Report. PAK: Loan 2299: Lower Bari Doab Canal Improvement Project

Internal Monitoring Report. PAK: Loan 2299: Lower Bari Doab Canal Improvement Project Internal Monitoring Report 37231-023 March 2016 PAK: Loan 2299: Lower Bari Doab Canal Improvement Project This social monitoring report is a document of the borrower. The views expressed herein do not

More information

Cambodia: Agriculture Sector Development Program

Cambodia: Agriculture Sector Development Program Resettlement Planning Document Resettlement Plan (Boeung Ket) Document Stage: Final Project Number: 34380 May 2009 Cambodia: Agriculture Sector Development Program Prepared by National Divestment Committee

More information

Resettlement Plan. October Prepared by the Government of Jammu and Kashmir, Economic Reconstruction Agency for the Asian Development Bank.

Resettlement Plan. October Prepared by the Government of Jammu and Kashmir, Economic Reconstruction Agency for the Asian Development Bank. Resettlement Plan October 2013 IND: Jammu and Kashmir Urban Sector Development Investment Program (JKUSDIP) - Construction of Mechanized Automated Multi Level Parking Facility at Super Bazaar, Jammu (Tranche

More information

THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA

THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA THE WORLD BANK INSPECTION PANEL S EARLY SOLUTIONS PILOT APPROACH: THE CASE OF BADIA EAST, NIGERIA In July 2014 the World Bank Inspection Panel, the Bank s complaints mechanism for people who believe that

More information

Flagship Capital Corporation

Flagship Capital Corporation Resettlement Planning Document Resettlement Framework Project Number: 39906 June 2005 REG: Proposed Equity Investment Flagship Capital Corporation Prepared by Flagship Capital Corporation (Singapore) Ltd.

More information

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project

Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project BURCU ERGIN SOCIAL SAFEGUARDS SPECIALIST WORLD BANK RSM LAUNCH WORKSHOP IZMIR, 5 JULY 2018 Managing Social Risks and Impacts in Geothermal Projects Turkey Geothermal Development Project Why is it critical

More information

India: Infrastructure Development Investment Program for Tourism

India: Infrastructure Development Investment Program for Tourism Infrastructure Development Investment Program for Tourism (RRP IND 40648) Resettlement Framework Document Stage: Draft for Consultation Project Number: P40648 July 2010 India: Infrastructure Development

More information

MINISTRY OF COMMERCE, TRADE AND INDUSTRY

MINISTRY OF COMMERCE, TRADE AND INDUSTRY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Zambia SFG2542 MINISTRY OF COMMERCE, TRADE AND INDUSTRY Project ID: No. P156492

More information

Resettlement Framework

Resettlement Framework i Resettlement Framework Resettlement Framework Document Stage: Draft for Consultation September 2007 Cambodia: Tonle Sap Lowland Stabilization Sector Project The Resettlement Framework is a document of

More information

Resettlement Plan. October Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank.

Resettlement Plan. October Prepared by the Government of Jammu & Kashmir, Economic Reconstruction Agency for the Asian Development Bank. Resettlement Plan October 2013 IND: Jammu & Kashmir Urban Sector Development Investment Programme (JKUSDIP) Construction of Storm Water Drains in the Adjoining Areas of NH Bypass (Rawalpora Chowk Chanapora

More information

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION

VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION Public Disclosure Authorized VIETNAM ELECTRICITY NATIONAL POWER TRANSMISSION CORPORATION ------------------------------------------------------------------ SFG1163 V11 Public Disclosure Authorized Public

More information

Timor-Leste: Baucau to Viqueque Highway Project

Timor-Leste: Baucau to Viqueque Highway Project Resettlement Plan Project Number: 51115 June 2017 Timor-Leste: Baucau to Viqueque Highway Project Prepared by the Government of Timor-Leste for the Asian Development Bank. Table of Contents CHAPTER 1

More information

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems

Technical Assistance Consultant s Report. TA 7566-REG: Strengthening and Use of Country Safeguard Systems Technical Assistance Consultant s Report Project Number: 44140 Date: April 2014 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Supporting and Strengthening National-Level Capacity

More information

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP

TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TRANSPORT NOTES TRANSPORT ECONOMICS, POLICY AND POVERTY THEMATIC GROUP THE WORLD BANK,

More information

Land Acquisition and Resettlement Due Diligence Report

Land Acquisition and Resettlement Due Diligence Report Land Acquisition and Resettlement Due Diligence Report Document stage: Draft for consultation Project Number: 48434 Loan and/or Grant Number(s): {LXXXX; GXXXX; TAXXXX} March 2016 India: Visakhapatnam-Chennai

More information

India: Preparing the Energy Efficiency Enhancement Project in the Assam Power Sector

India: Preparing the Energy Efficiency Enhancement Project in the Assam Power Sector Resettlement Planning Document Short Resettlement Plan for Tranche-2 Components Document Stage: Draft for Consultation Project Number: TA 7096-IND April 2010 India: Preparing the Energy Efficiency Enhancement

More information

Resettlement and Income Restoration in Thilawa SEZ

Resettlement and Income Restoration in Thilawa SEZ Resettlement and Income Restoration in Thilawa SEZ Lessons from the first & second phases and emerging good practices Thilawa SEZ Management Committee (TSMC) Yangon Region Government (YRG) 20 February

More information

Resettlement Framework. BHU: Urban Infrastructure Project. October Prepared by the Royal Government of Bhutan for the Asian Development Bank.

Resettlement Framework. BHU: Urban Infrastructure Project. October Prepared by the Royal Government of Bhutan for the Asian Development Bank. Resettlement Framework October 2011 BHU: Urban Infrastructure Project Prepared by the Royal Government of Bhutan for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 5 October 2011) Currency unit

More information

Involuntary Resettlement Assessment and Measures. BAN: Padma Multipurpose Bridge Project

Involuntary Resettlement Assessment and Measures. BAN: Padma Multipurpose Bridge Project Involuntary Resettlement Assessment and Measures Resettlement Action Plan: Resettlement Site Development Document Stage: Final Project Number: 35049 November 2009 BAN: Padma Multipurpose Bridge Project

More information

Resettlement Policy Framework

Resettlement Policy Framework SFG3184 Public Disclosure Authorized GOVERNMENT OF TAMIL NADU PUBLIC WORKS DEPARTMENT WATER RESOURCES ORGANISATION Environmental & Social Assessment and Preparation of Environmental & Social Management

More information

VAN: Port Vila Urban Development Project

VAN: Port Vila Urban Development Project Resettlement Plan November 2015 VAN: Port Vila Urban Development Project Prepared by Ministry of Infrastructure and Public Utilities (MIPU), Government of Vanuatu Bank for the Asian Development Bank. This

More information

Cambodia: Agriculture Sector Development Program

Cambodia: Agriculture Sector Development Program Resettlement Planning Document Resettlement Plan (Chamkar Andong) Document Stage: Final Project Number: 34380 May 2009 Cambodia: Agriculture Sector Development Program Prepared by National Divestment Committee

More information

Guidance Note 5 Land Acquisition and Involuntary Resettlement

Guidance Note 5 Land Acquisition and Involuntary Resettlement This Guidance Note 5 corresponds to Performance Standard 5. Please also refer to the Performance Standards 1-4 and 6-8 as well as their corresponding Guidance Notes for additional information. Bibliographical

More information

Involuntary Resettlement Due Diligence Report

Involuntary Resettlement Due Diligence Report Involuntary Resettlement Due Diligence Report # Report May 2016 VIE: Second Lower Secondary Education for the Most Disadvantaged Areas Project (LSEMDAP2) Bac Lieu Province Prepared by the Ministry of Education

More information

MLD: Greater Malé Environmental Improvement and Waste Management Project

MLD: Greater Malé Environmental Improvement and Waste Management Project Resettlement Framework Document Stage: Draft for Consultation Project Number: 51077-002 March 2018 MLD: Greater Malé Environmental Improvement and Waste Management Project Prepared by Ministry of Environment

More information

Resettlement Work Plan (RWP) for. Development of Phase 1 Area. Thilawa Special Economic Zone (SEZ)

Resettlement Work Plan (RWP) for. Development of Phase 1 Area. Thilawa Special Economic Zone (SEZ) Yangon Region Government Resettlement Work Plan (RWP) for Development of Phase 1 Area Thilawa Special Economic Zone (SEZ) November 2013 Table of Content Abbreviations CHAPTER 1 INTRODUCTION......1 1.1

More information

SRI: Additional Financing for National Highway Sector Project

SRI: Additional Financing for National Highway Sector Project Resettlement Plan May 2011 Document Stage: Draft SRI: Additional Financing for National Highway Sector Project Hikkaduwa Baddegama Section of Hikkaduwa Baddegama Nilhena Road (B153) Prepared by Road Development

More information

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II

Social Safeguards Monitoring Report. CAM: Rural Roads Improvement Project II Social Safeguards Monitoring Report Full Report November 2018 CAM: Rural Roads Improvement Project II Prepared by the Ministry of Rural Development for the Kingdom of Cambodia and the Asian Development

More information

Nepal: Rural Reconstruction and Rehabilitation Sector Development Project

Nepal: Rural Reconstruction and Rehabilitation Sector Development Project Resettlement Planning Document Resettlement Plan Grant Number: 0093 December 2010 Nepal: Rural Reconstruction and Rehabilitation Sector Development Project Kushma-Durlung-Salija Road Sub-Project, Kusma-Parbat

More information

ABBREVIATED RESETTLEMENT ACTION PLAN

ABBREVIATED RESETTLEMENT ACTION PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project: Irrigated Agriculture Improvement (IAIP) Subproject 1, Hoa Binh province SOCIALIST

More information

SYMBION POWER LAKE KIVU LTD.

SYMBION POWER LAKE KIVU LTD. SYMBION POWER LAKE KIVU LTD. DRAFT Abbreviated Relocation Action Plan and Livelihoods Restoration Plan Final October 2018 [11.4.3.3] [10669-20181009-ESIA Abbreviated RAP_final_signed.pdf] [Page 1 of 52]

More information